Architecture 2014 ((Total No. of organizations in which student has been placed during the year = till )

Similar documents
M.L.V. TEXTILE & ENGG. COLLEGE, BHILWARA (RAJ.) PLACEMENT

PLACEMENT BROCHURE to Don t dream about success; work for it.

CENTRE FOR INDUSTRIAL LIAISON AND PLACEMENT

OFFICERS' TRAINING PROGRAMME

EASWARI ENGINEERING COLLEGE, RAMAPURAM, CHENNAI 89. Department of Placement Summary of Placement Details for Batch UG

Dr.N.G.P.Institute of Technology, Coimbatore - 48 Training & Placement Cell CAYm Placement Detail Batch

JCOs/OR & Equivalent Training :

Campus Placement Summary Total Offers Received: 410

List of Companies Visited for Campus Recruitment for the year

TRP Engineering college, Trichy Placed Students

Walchand Institute of Technology, Solapur Placement

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

12. Bank of Baroda Nodal Officer. :Sonu A. Arekar

MasterCard Airport Lounge Access Program: Participating Lounges

DAVP OP WING. Flex extra Ambedkar Nagar to Siri. 300 sq. ft. to 700 sq. ft. -Do- Delhi NCR 177 sq. ft. or meters.

Analysis by The Right Solution

SESSION JANUARY JUNE

IMPORTANT RESEARCH INSTITUTES IN INDIA

BESTECH GROUP. BESTECH has an envious portfolio to its credit, with a formidable in-house construction arm engaged across the four verticals.

List of Past Presidents:

List of our reference clients across India for Soldering Stations

Presentation on City Gas Distribution (CGD) Pipeline Network Projects in Smart Cities


Information for Investors

Realty Decoded - Q4 FY 18 April 2018

JCOs/OR & EQUIVALENTS TRAINING

NACHIMUTHU POLYTECHNIC COLLEGE: POLLACHI - 3 DEPARTMENT OF COMPUTER ENGINEERING

Project Sangam PASSAGE - ESS. Training / User Manual. IBM India Pvt. Ltd. GBS- Domestic Page 1 of 16

Central Power Research Institute Civil Engineering Division. Monthly Vigilance Report for the month of JULY 2014

S b Sky Brother Designer, Developer & Interior Decorators Sher singh complex, Sector-49,Noida Phone , ,

A detailed list of some major projects handled by us is given below

TRADE MISSION TO INDIA Business Program Daily overview (*Program in development. All events and times are subject to change)

Nov2011-June2012 PRAGATI ENGINEERING COLLEGE SURAMPALEM COMPUTER SCIENCE & ENGINEERING VOL # 4 FROM H.O.D S DESK CYBER WAVES -NEWS LETTER

Royal Orchid Hotels Ltd Q1FY18 Results Presentation. Expect more from Royal Orchid Hotels

(NSI-40) CALL FOR PAPERS NATIONAL SYMPOSIUM ON INSTRUMENTATION FOCAL THEME: PROCESS INSTRUMENTATION AND AUTOMATION. October 30th - 31st, 2015

PROGRAMS & schedule 2018

Network Size and Growth

MasterCard Lounge Access Program: List of Lounges for Burgundy, Wealth, Priority,Business Platinum and Titanium Rewards Cardholders

Top 20 IT Hubs of India

Business Opportunity

Corporate Presentation

Placements of 2017 batch students (Placements in progress)

Royal Orchid Hotels Ltd Q4FY17 & FY17 Results Presentation. Expect more from Royal Orchid Hotels

Providing cost effective and intelligent solutions...

RKGIT Batch Name of Company AEI Civil CSE ECE EEE IT ME MBA MCA B.Pharma A&A Healthcare 5 Acadecraft 1 1 ACCENTURE 1 Ace Hardware Pvt.

oil and gas digital technology summit INDIA

Date: February 02, 2018

In-flight Digital Options on Jet Airways

Domestic Travel Policy CMS

(ii) DESCRIPTION OF DUTIES - PROJECT MANAGEMENT, FINANCIAL CURRICULUM VITATE 1. NAME: SUDHIR TENGSHE

PROPINSIGHT A Detailed Property Analysis Report

VOICE 2014 Voice of India s Citizens Survey Salient Findings Snapshot. Voice of India's Citizens Survey

Railways in India 2012

SAAB TEAMING UP WITH INDIA

For a long period We are Serving to Big Brands of Automobile Industry, Banking & Insurance Sector Companies, Home Appliances, Real Estate, Heavy

AVIATION. List of airports, where HPCL is extending refueling services are given below:

PROPINSIGHT A Detailed Property Analysis Report

PRESENTATION ON INDIA JAPAN BILATERAL RELATION

CONFIRMED EXHIBITORS 2013

VOL 2 JULY DECEMBER 2011 ISSUE 4

Department Achievement

RAMCO SYSTEMS LIMITED

न दय ल जन आव स य जन क अतग

OFFICE CIVIL AVIATION AVIATION. 1. Introduction: of aircraft for acquiring applicant. nts. licence. test (skill test). written papers: a) Paper I Air

PROPINSIGHT A Detailed Property Analysis Report

Partial List of Customers for Celfrost - All India

Fujitec - Global. Fully challenged to deliver customers highly innovative, safe and reliable solutions.

GENSOL S SOLAR PV EPC PORTFOLIO

EXHIBITORS DIRECTORY. Ms Neha Shukla American Physical Society C/o Balani Infotech Pvt. Ltd Mobile:

SAIL TO PROSPER. A top-notch Maritime Training Institute Moulding Excellent Mariners Since 1999 RLINS

Ashok Leyland Head Office 19, Rajaji Salai Chennai India Tel.: +(91)-(44) Fax: +(91)-(44) Website-

Study to gauge public perception on environmental pollution in India

List of Life members of IWP as on 4 th July 2016.

Names of parties qualified after technical evaluation M/s

POYSHA INDUSTRIAL ESTATE. N.I.T. Faridabad

Invitation to Exhibit

VISHWAKARMA. (Online Monthly E-Journal of Construction Industry Development Council) Vol. 7 Issue VI E Journal of CIDC June, 2018

BHARTI REALTY LIMITED

BUSINESS OPPORTUNITIES SHOW Considering Business Partners. Region wise, Consider this. 3 Years, 150 Shows. Multi City Business Development Show

A Brief Company Profile

DETAILS OF CONTRACTS AWARDED DURING THE MONTH MATERIALS MANAGEMENT DEPARTMENT (MMD)

List of unaccredited applications (closed/ delisted/ withdrawn) (A+B) -183

4Q FY2011/12 Investor Presentation

Contact and other details of SEZs established/notified prior to SEZ Act, 2005

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

BESTECH GROUP. BESTECH has an envious portfolio to its credit, with a formidable in-house construction arm engaged across the four verticals.

New bridges will ease traffic snarls TNN Feb 3, 2012, 07.10AM IST

WESTERN INDIA REGIONAL COUNCIL OF THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA

An Overview of Airport Infrastructure in India. By V.P.Agrawal, Chairman, Airports Authority of India

Proposal to host R10 Meeting 2014 in Bangalore, India. Submitted by: Mr. Hitesh Mehta, Chairman, IEEE Bangalore Section

Adequate infrastructure facilities are a pre requisite for industrial development. The infrastructure facilities available in Assam are as follows:

YOUREKA. Always Charged. Schedule Summer. Adventure Calling...

Capability Statement SUNJAAY ATHANKI PROJECTS MANAGEMENT PVT LTD

Orientation Programme (Tier - 1) Newly recruited JETs/ MGR of HR Discipline 1-26 April, Ms. Santosh Singh

CORPORATE OFFICE : 3 rd Floor, Nukkula Arcade, Above Canara Bank, Near Masabtank, Vijayanagar Colony, Hyderabad-57 M: ,

Government of India Ministry of Road Transport & Highways Transport Research Wing New Delhi

Airindia Domestic Fares (Apex & Instant Purchase Fares) TABLE IV LTC Fares updated as on TABLE IV- LTC Fares

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

TCS-Nielsen India's Biggest IT Outsourcing Deal. Australia discovered missing submarine 103 years after World War I

Transcription:

Placement for 2013-2014 B.Tech 2014 batch ( of organizations in which student has been placed during the year 2013-14 = till ) of students in final year Eligible of students placed through Placement Cell 1 Elect.& Comm. Engg 84 81 63+30* 77.77 2 Comp.Sc. & Engg. 70 61 54+16* 88.52 3 Electrical Engg. 76 69 43+3* 62.31 4 Mechanical Engg. 90 84 42+2* 50.00 5 Civil Engg. 78 66 38 57.57 : 400 361 240+51* 66.48 Marked* students have got more than one job. Architecture 2014 (( of organizations in which student has been placed during the year 2013-14 = till ) of students in final year Eligible 1 Architecture 32 32 of students shortlisted through Placement Cell M.Tech 2014 (( of organizations in which student has been placed during the year 2013-14 = till ) of students of students in final year placed through Eligible Placement Cell 1 Environmental Engg. 03 03 03 100% 2 Geotechnical Engg. 12 09 9+1 100.00 3 Structure Engg. 15 12 09 75.00 4 Transportation Systems Engg. 15 15 10 66.66 5 Water Resource Engg. 05 04 02 50.00 6 12 11 9 81.81 (CAD-CAM) (ME) 7 THERMAL ENGG. 13 12 11+2* 91.66 (MECH. ENGG.) 8 Condition Monitoring, 04 04 02 50.00 Protection & Control of Electrical Apparatus (EEE) 9 Signal Processing & Control (EEE) 12 12 05 41.66 10 Power Systems (EEE) 12 12 08 66.66 11 VLSI Design & 15 13 10 66.66 Automation Techniques (ECE) 12 Comm. Systems & 17 12 04 33.33 Networks (ECE) 13 Comp.Sc. & Engg. 16 16 11 68.75 14 Mobile Computing 06 06 04 66.66 15 Energy Technology 02 02 16 Material Sc. & Engg. 03 03 17 Architecture 01 01 : 163 147 97+3* 65.98

NATIONAL INSTITUTE OF TECHNOLOGY, HAMIRPUR (HP) CAMPUS PLACEMENT RECORD OF B.TECH / B.ARCH / M.TECH YEAR 2013 2014 (as on June 2014) B.Tech App.Pay Pac. (Rs. Lakhs per annul Students Selected E&CE CSE EE ME CE 1 Balzabar Cse/ECE - Interview held on 10-12.8.2013 but not selected 2 Samsung India Electronics CSE/ECE 7.75 4 4 - - - 08 Noida /Bangalore 3 Belzabar CSE 6.48-1 - - - 01 4 Verizon CSE/ECE/EEE 5.46 11 3 2 - - 16 5 Mahindra & Mahindra ME 5.30 - - - 3-03 6 Indian Navy CE/CSE/ME/ECE/E - - - - - - - EE/M.Tech 7 Winshuttle CSE 7.50 lacs - 01 - - - 01 8 Maruti Suzuki ME - - - 3-03 9 Tata Consulting Engineers CE/ME 3.50 - - - 3 1 04 Bangalore 10 Play Buff (Arch Mobile) CSE/ECE 3.60 3 1 - - - 04 11 Tata Housing Dvelopment CE 4.25 - - - - 2 02 Mumbai 12 L&T Construction Chennai CE,EEE,ME 3.77 - - 8 7 14 29 13 IBM Gurgaon CE.EEE,ME,CSE,E 3.40 10 7 5 3 2 27 CE 14 Samsung R&D Institute India CSE 7.75-5 - - - 05 Bangalore 15 Ocewaneering International Services Chandigarh ME 5.20 - - - 3-03 16 Mu Sigma Bangalore EE 6.00 - - 1 - - 01 17 Hero Motocorp New Delhi ME/ECE 6.00 1 - - 2-03 18 Samsung Engg. Lab CSE - Interview held on 22-23.10.13 but not selected 19 ABB Bangalore EEE/ME 4.50 - - 3 1-04 20 Infosys Bangalore EEE/ECE/CSE/ME/ CE 3.25 18 11 7 7 3 46 21 Polarisft Chennai CSE/EEE/ECE 4.50 1 5 2 - - 8 22 Sapient Gurgaon CSE/EEE/ECE 4.50 12 8 - - - 20 23 Subros ME,EEE 3.00 - - 1 3-04 24 Rancore Mumbai ECE,CSE 5.00 4 6 - - - 10 25 Aakash Engineers EEE 7.20 - - 2 - - 02 26 Orient Electricals ME/EEE 3.75 - - 1 3-04 27 Aricent New Delhi ECE,EEE,CSE 3.50 6 1 8 - - 15 28 Nucleus Software Noida ECE,CSE,EEE 4.50 9 5 2 - - 16 29 Avery Dennison ME - Interview held on 22.1.2014 but Not selected 30 Ericsson India Noida ECE,CSE 3.45 12 8 - - - 20 31 Technip KT Noida ME 4.60 - - - 2-02 32 Newgen Software CSE 5.50-02 - - - 02 Technology New Delhi 33 SKEngineering Gurgaon CE 5.71 - - - - 1 01 34 Era Group Noida CE 2.40 - - - - 2 02 35 WSP India Noida CE 4.56 - - - - 1 01 36 Indag Rubber Nalagarh ME/EEE 3.00 - - 01 - - 01 37 Teerthanker Mahaveer CE/ME 3.00 - - - 01 04 05 Uni.Moradabad 38 Drishti Soft Solution CSE 8.00-01 - - - 01 Gurgaon 39 Chandigarh University CE 4.20 - - - - 3 03 Mohali 40 AFCON Mumbai CE 3.86 - - - 01 2 03

41 Welspun Noida EEE 5.00 - - 1 - - 01 42 Power Grid Corpotation EEE/ECE 13.40 02-1 - - 03 of India Limited New Delhi. 43 Vaisno Institute of CE 2.60 - - - - 03 03 Engineering Pathnkot 44 Continental Automotive CSE 3.40-01 - - - 01 Components Technical Center Bangalore 45 Lemon Tree Hotels New EEE 2.20 - - 01 - - 01 Delhi 46 Honda Cars Ltd Alwar ME 4.20 - - - 2-02 93 70 46 44 38 291 B.Arch 2014 batch No 1 2 App.Pay Pac. (Rs. Lakhs per annum) B.Arch

No M.Tech 2014 batch App.Pay Pac. (Rs. Lakhs per annum) Students Selected ECE CSE EE ME CE Mat.Sc. Ene rgy 1 Tata Consulting 1 - - 01 Structures 3.50 - - - - Bangalor 2 IBM Gurgaon All 3.75 1 1 1 - - - - 03 3 Samsung R&D Institute CSE 7.75-1 - - - - - 01 India Bangalore 4 Infosys Bangalore All 3.25 2 - - 1 - - - 3 5 Engineering Design and Research Pvt. Ltd Delhi structure 4.20 - - - - 1 - - 1 6 Aakash Engineers VLSI 7.20 1 - - - - - - 1 7 L&T Constraction Chennai Thermal/Structure 3.77 - - 3 3 4 - - 10 8 Aricent ECE,CSE.EEE 3.50 2 6 1 - - - - 9 9 Era Group Noida CE 3.00 - - - - 1 - - 01 10 Teerthanker EE,ECE,SCE.CE,M 4.20 5 1 5 3 7 - - 21 E Mahaveer Uni 11 Swami Vivekanand CE,CSE,ME 3.60-1 - 2 6 - - 09 Institute of Engg. Tech Banur 12 Chandigarh CE.ME.EE.CSE 4.20-1 1 3 6 - - 11 University Mohali 13 Power Grid EE 13.40 - - 1 - - - - 01 Corpotation of India Limited New Delhi. 14 Himalayan Group CE,ME.ECE.EEE 3.60 3-1 5 4 - - 13 Kala Amb 15 PSIT Kanpur EE 4.20-1 - - - - - 01 16 Sirda Poly.Mandi EE,ME.CSE 3.00-1 1 1 1 - - 04 17 Vaisno Institute of Engineering Pathankot 18 Samsung India Electronics Pvt. Noida 19 Graphic Era Dehradun 20 Parul Arogya Seva Mandal Vadodara 21 Lovely Professional University ME/CE 2.60 - - - 2 - - - 02 CSE 7.50-1 - - - - - 1 CE 5.00 - - - - 1 - - 1 CSE/CE/ME 4.80-2 - 1 2 - - 5 ME 4.80 - - - 1 - - - 1 14 16 14 22 34 100

Nos. of organizations in which students placed from UG = 46 Nos. Highest Package offered = Rs. 13.40 Lacs PA Lowest package offered = Rs. 2.20 lacs PA Average package offered = Rs. 4.30 lacs PA Nos. of organizations in which students placed from PG = 21 Nos Highest Package offered = Rs.13.40 lacs PA Lowest package offered = Rs.2.60 lacs PA Average package offered = Rs. 4.05 lacs PA Branch wise B.Tech students: Branch Highest Package offered Lowest Package Offered Average package offered Civil Engineering Rs. 5.71 Lcs Rs.2.40 Lacs Rs.3.60 Lacs Electrical Engg. Rs.13.40 Lacs Rs.2.20 Lacs Rs.4.15 Lacs Electronics & Rs.13.40 Lacs Rs.3.25 Lacs Rs.4.40 Lacs. Comm. Engg. Computer Science Rs.8.00 Lacs Rs.3.25 Lacs Rs.4.70 Lacs. Mechanical Engg. Rs.6.00 Lacs Rs.3.00 Lacs Rs.4.06 Lacs.