EASWARI ENGINEERING COLLEGE, RAMAPURAM, CHENNAI 89. Department of Placement Summary of Placement Details for Batch UG

Similar documents
PLACEMENT BROCHURE to Don t dream about success; work for it.

PLACEMENT & TRAINING CELL

Institute Name Hindustan Institute of Technology and Science (HITS) Placement

List of Companies Visited for Campus Recruitment for the year

Name of the Company ZIFO TECHNOLOGIES, BANGALORE SURESOFT SYSTEM PVT LTD, CHENNAI WIPRO TECHNOLOGIES, CHENNAI VVDN TECHNOLOGIES, CHENNAI

Architecture 2014 ((Total No. of organizations in which student has been placed during the year = till )

Campus Placement Summary Total Offers Received: 410

Dr.N.G.P.Institute of Technology, Coimbatore - 48 Training & Placement Cell CAYm Placement Detail Batch

TRP Engineering college, Trichy Placed Students

RKGIT Batch Name of Company AEI Civil CSE ECE EEE IT ME MBA MCA B.Pharma A&A Healthcare 5 Acadecraft 1 1 ACCENTURE 1 Ace Hardware Pvt.

Placements of 2017 batch students (Placements in progress)

Rank Total Return (%) Within catagory Worst

NACHIMUTHU POLYTECHNIC COLLEGE: POLLACHI - 3 DEPARTMENT OF COMPUTER ENGINEERING

Walchand Institute of Technology, Solapur Placement

Central Power Research Institute Civil Engineering Division. Monthly Vigilance Report for the month of JULY 2014

Registered Status Appeared Status

Training & Placement Report

DIPLOMA. (SPEIFY) No. of Vacancy MODEM PRACTIC MECHAT OFFICE RONICS

Property at Devanahalli 25 Acres Suited for upscale Leisure resorts

Basix Internet Browser & Library Information Organiser

GROUP INSTITUTIONS Excel Campus

The future of automation in India. SPS Automation India 2015: Attending to the changing needs of India s manufacturing firms.

SEMESTER VI No. of No. of Internal External Total Part III Core Subjects 1

INDUSTRY-ACADEMIA PARTNERSHIP

ANNAMALAI UNIVERSITY DEPARTMENT OF BUSINESS ADMINISTRATION MANAGEMENT RRESEARCH FORUM (MRF)

oil and gas digital technology summit INDIA

PROJECT : IT/ RETAIL PARK

Designed Built Ecosystem for Smart Living. New Chennai Township Private Limited

Hyderabad Metro Rail in PPP Mode

M.L.V. TEXTILE & ENGG. COLLEGE, BHILWARA (RAJ.) PLACEMENT

C O M P A N Y P R O F I L E. Our Offices TRUSTED NAME SINCE 24 YEARS.

Table No.19 (a) RBI Regional Office

SUMMIT. A new height of excellence in offices and software B R I G A D E M E T RO P O L I S, W H I T E F I E L D R D

GROUP INSTITUTIONS. Excel Campus Sri. Satya Thoppali Associate Group Manager Tech Mahindra, Hyderabad

WORK HARD. PLAY HARDER.

24-26 June 2016 Chennai Trade Center, Chennai

Annamalai university result

COLLEGE @T LEVEL B) ,

Study on Hotel Management Graduates Perceptions and Preferences of Jobs in Hotel Industry in Chennai City

AN ICONIC BUSINESS ADDRESS

Overview: Go On Tours Presence

Company Profile SRI SATHYA SAI TOURIST

R.M.K. ENGINEERING COLLEGE

Magizhchiyaana aarambam in a 36-acre lifestyle at Guduvanchery

Singapore Styled Condominium. With Suspended Plunge Pool on the Terrace For the first time in India

LIST OF SEMINARS, CONFERENCES & COURSES PARTICIPATED

Top 20 IT Hubs of India

CENTRE FOR INDUSTRIAL LIAISON AND PLACEMENT

Summary of Key Events

HARIT HOMES. RESIDENTIAL Plots

OLYMPIC PARK DEVELOPMENT SITE 3 77 C entenn i a l O l y mp i c P a r k Dr ive - A t lan t a, G A

AMITY GLOBAL BUSINESS SCHOOL PTE LTD,

Press release. MEDICAL FAIR INDIA 2017 closes with a huge boom in visitors. New programme highlights were well received

8 Edition NOV INTERNATIONAL PHARMA SUMMIT & CONFERENCE TRADE ENGAGE INVEST DEVELOP. POST SHOW REPORT 2017

Watershed Report Lower Eleven Point River

HARIT HOMES. RESIDENTIAL Plots

Watershed Report Blue Mountain Lake-Petit Jean River

E-Brochure. Become. Toll Free:

The University Campus. Campus Masterplan: Staff update

National Business Excellence Awards 2012

National Committees. June - July 2013

Advances in Civil Engineering and Chemistry of Innovative Materials

Half yearly Portfolio Statement for the period ended 31 March 11 (Page I)

An exhibition on technologies for automotive manufacturing 4 6 July 2019

Industry Report. EXHIBITOR S Statistics. Visitor s Statistics. Overseas Visitors 50% 73% 27% India. Overseas A REPORT

LETTERS FOR ISSUE ON

INTERIM FINANCIAL RESULTS

Knight Frank. Residential. Research. Residential Glance

AGNI FIBER BOARDS PVT. LTD.

EPUB / CSA AIRPORT CUSTOMER AGENT USERS MANUAL

SUSTAINABLE BUSINESS OF THE DECADE

grow not just classes all things dreams start here expand learn President s Report 9/11/2014 are possible

AGENT LIST AGENT NAME STATUS CONTRACT EXPIRY DATE TERRITORY

24th Annual Production and Operations Management (POM) Conference, Denver May 3 6, 2013 Conference Agenda

DATE OF BIRTH PASS PORT NUMBER B , Date and Place of Issue: , Madras, Expiry Date:

Business Opportunity

OLYMPIC PARK DEVELOPMENT SITE 377 Centennial Olympic Park Drive - Atlanta, GA 30313

VOL 2 JULY DECEMBER 2011 ISSUE 4

National Conference on

SAIL TO PROSPER. A top-notch Maritime Training Institute Moulding Excellent Mariners Since 1999 RLINS

The University of Tasmania. Growing international student enrolments through investment, effective strategy and partnerships


drink technology India, PackTech India, FoodPex India surpass all expectations

REVIEW OF PERFORMANCE AGAINST TARGETS Q

About JetPrivilege + Benefits and Privileges

POST SHOW REPORT 2017

Issue - 10, October Olympia s quarterly newsletter. Aspiration soar with. Olympia

Providing cost effective and intelligent solutions...

HEALTHTECH INDIA 2019

Proposal to host R10 Meeting 2014 in Bangalore, India. Submitted by: Mr. Hitesh Mehta, Chairman, IEEE Bangalore Section

POST SHOW REPORT India s first and only trade fair dedicated to the automotive aftermarket

Global Electronics Network.

Dr.R.Sivakumar Assistant Professor. Resume

Expo Real 2017 Trade Fair Information African-Pavilion

Campus Business District

Ina. Urban a sis Slimming & Healthcare Center. Who are we?

Defense Base Act Case Summary by Employer

SECURED YOUR SECURED ADDRESS AT NOIDA. For Best Deal Call

Department Achievement

National Business Excellence Awards 2014 Tuesday, 16 December 2014 at Colombo Hilton

Transcription:

Sl.N o Date Company Name Specialization EASWARI ENGINEERING COLLEGE, RAMAPURAM, CHENNAI 89. Department of Placement Summary of Placement Details for 2014 2015 Batch UG Off Campus / On Campus CSE IT ECE EEE E& I 1 09.09.2014 & 10.09.2014 Tata Consultancy Services S/W On Campus 38 55 50 58 49 45 14 309 5 1 1 4 5 5 2 5 4 9-41 350 2 13.09.2014 & 14.09.2014 Wipro S/W On Campus 7 4 2 1 4-1 19 - - - - - - - - 1-1 20 3 17.09.2014 Athena IT Product Based Off Campus 0 0 0 - - - - 0 - - - - - - - - - 0-0 0 4 20.09.2014 HP IT Product Based Off Campus 0 3 1 0 1 0-5 - - - - - - - - - 1-1 6 5 25.09.2014 igate S/W On Campus 6 5 8 17 - - - 36 - - - - - - - - - 0-0 36 6 26.09.2014 & 27.09.2014 L & T Infotech S/W On Campus 9 8 4 10 7 - - 38 2 0 3 0 0 1-0 - 2-8 46 7 09.09.2014 & 10.09.2014 Jaro Education MBA On Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 8 26.09.2014 Excemplarr MBA On Campus - - - - - - - 0 - - - - - - - - - - 3 3 3 9 13.10.2014 Bajaj Capital MBA On Campus - - - - - - - 0 - - - - - - - - - - 13 13 13 10 13.10.2014 ELGI Equipments CORE Off Campus - - - - - 1-1 - - - - - - - - - - - - 1 11 27.10.2014 Vernalis Systems IT Product Based On Campus 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0-0 0 12 27.10.2014 Johnson Controls CORE Off Campus 1 - - - 1 - - 2 - - - - - - - - - - - 0 2 13 02.12.2014 VVDN Technologies PVT LTD CORE On Campus - - 2 0 - - - 2 - - - - - - - - - - - 0 2 14 30.10.2014 & 04.11.2014 Honey Well CORE On Campus - - - - 7 - - 7 - - - - - - - - - - - - 7 15 14.11.2014 Tata Tele Services MBA On Campus - - - - - - - 0 - - - - - - - - - - 3 3 3 16 04.11.2014 (Bharath Jaro Education MBA Off Campus - - - - - - - - - - - - - - - - - - 0 0 0 University) 17 05.11.2014 Mphasis S/W Off Campus 1 1 0 - - - - 2 - - - - - - - - - 0-0 2 18 06.11.2014 NewGenesis IT Product Based On Campus 0 0 - - - - - 0 1 0 - - - - - - - 0-1 1 19 12.11.2014 Naukri MBA On Campus - - - - - - - 0 - - - - - - - - - - 3 3 3 20 13.11.2014 99 acres MBA On Campus - - - - - - - 0 - - - - - - - - - - 2 2 2 21 28.11.2014 Sanmar CORE Off Campus - - - - - 0 - - - - - - - - - - - - - RNA 22 05.12.2014 CSC S/W On Campus 1 5 2 3 3 - - 14 - - - - - - - - - 1-1 15 23 08.12.2014 Steria S/W On Campus 6 - - - - - 6 - - - - - - - - - - - 0 6 24 10.12.2014 Trend Automation CORE On Campus - - - - 2 - - 2 - - - - - - - - - - - 0 2 25 13.12.2014 PEOL Technologies S/W On Campus - - - - - - - 0 0 0 0 0 0 0-0 - 0-0 0 26 20.12.2014 Softeon S/W On Campus - - - - - - - 0 - - - - - - - - - 0-0 27 22.12.2014 Saint Gobian CORE Off Campus - - - - - 0 0 0 - - - - - - - - - - - 0 0 28 24.12.2014 Maveric Systems IT Product Based On Campus 4 1 0 0 0 - - 5 - - - - - - - - - - - 0 5 29 26.12.2014 & 27.12.2014& Accenture S/W Off Campus 0 0 0 0 1 - - 1 - - - - - - - - - - - - 1 26.03.2015 30 26.12.2014 & 27.12.2015 KEC International CORE Off Campus - - - 0 - - 0 0 - - - - - - - - - - - - 0 31 29.12.2014 & 30.12.2014 Infosys S/W Off Campus 0 1 1 0 0 - - 2 - - - - - - - - - - - - 2 32 05.01.2015 IBM Girls Drive IT Product Based Off Campus 0 0 0 0 0 - - - - - - - - - - - - 0 MEC H CIV IL Sub Total CSE SE PE D VLS I CS PG ES T CI ED E St. E MC A MB A Sub Total Grand Total

33 05.01.2015 HCL ISD IT Product Based Off Campus 0 1 0 0 1 - - 2 - - - - - - - - - - - - 2 34 06.01.2015 Global Soft Solutions S/W On Campus 0 0 0 0 0 - - 0 - - - - - - - - - 2-2 2 35 07.01.2015 SRM Technologies S/W Off Campus 1 - - - - - - 1 - - - - - - - - - 2-2 3 36 07.01.2016 BNY Mellon MBA On Campus - - - - - - - 0 - - - - - - - - - - 5 5 5 37 09.01.2015 I-INTERCHANGE IT Product Based On Campus 2 2 1 0 0 - - 5 - - - - - - - - - 0-0 5 38 09.01.2015 Guidanz S/W Off Campus - - - - - - - - - - - - - - - - 0-0 0 39 14.02.2015 Zoho Corporation IT Product Based Off Campus 1 - - - - - - 1 - - - - - - - - 1-1 2 40 10.01.2015 AMERICAN MEGATRENDS S/W On Campus 0 0 0 0 - - - 0 - - - - - - - - 0-0 0 41 12.01.2015 GRE Edge MBA On Campus - - - - - - - - - - - - - - - - - - 1 1 1 42 13.01.2015 Indusind Bank MBA On Campus - - - - - - - - - - - - - - - - - - 0 0 0 43 14.01.2015 Pixint Technologies MBA Off Campus - - - - - - - - - - - - - - - - - - 0 0 0 44 19.01.2015 KIBIN TECHNOLOGIES S/W On Campus - - - - - - - - - - - - - - - - - 0-0 0 45 19.01.2015 Micro Chip CORE On Campus - - 0 0 0 - - 0 - - - 1 - - - - - - 1 1 46 20.01.2015 DHYAN INFOTECH IT Product Based On Campus 0 0 0 - - - - 0 - - - - - - - - - 0-0 0 47 20.01.2015 L & T Infotech (MBA) MBA On Campus - - - - - - - - - - - - - - - - - - 2 2 2 48 21.01.2015 & 14.02.2015 Doodle Blue IT Product Based On Campus 1 0 0 1 1 - - 3 - - - - - - - - - 0-0 3 49 14.01.2015 & 27.01.2015 TVS Sundaram Fasteners CORE On Campus - - - - - 2-2 - - - - - - - - - - - - 2 50 22.01.2015 Vortex Engineering IT Product Based Off Campus 0 0 - - - - - 0 - - - - - - - - - - - - 0 51 22.01.2015 & 23.01.2015 Cognizant S/W Off Campus 1 0 1 0 1 - - 3 - - - - - - - - - - - - 3 52 23.01.2015 Elitmus IT Product Based On Campus - - 0 0 0 0 0 0 - - - - - - - - - - - - 0 53 27.01.2015 Chain Sys (MCA) S/W Off Campus - - - - - - - - - - - - - - - - 0-0 0 54 28.01.2015 ICICI Securities MBA On Campus - - - - - - - - - - - - - - - - - 4 4 4 55 28.01.2015 & 29.01.2015 Virtusa S/W Off Campus 0 1 - - - - - 1 - - - - - - - - - - - - 1 56 29.01.2015 HCL Technologies S/W On Campus 1 - - - - - - 1 - - - - - - - - - - - - 1 57 29.01.2015 NTT Data S/W Off Campus 0 1 2 1 1 0 0 5 - - - - - - - - - - - - 5 58 02.02.2015 RBS MBA Off Campus - - - - - - - - - - - - - - - - - - 7 7 7 59 03.02.2015 IBM (Voice) IT Product Based Off Campus 1 0 0 0 0 1 0 2 - - - - - - - - - - - - 2 60 03.02.2015 AYAN TECH SOLUTIONS MBA Off Campus - - - - - - - - - - - - - - - - - - 0 0 0 61 04.02.2015 AstraZeneca S/W Off Campus 0 0 0 0 0 0 0 0 - - - - - - - - - - - - 0 62 04.02.2015 & 05.02.2015 BNP Paribas MBA On Campus - - - - - - - - - - - - - - - - - - 2 2 2 63 05.02.2015 & 06.02.2015 Wipro (MCA) S/W On Campus - - - - - - - - - - - - - - - - - 6-6 6 64 06.02.2015 Life Cell MBA Off Campus - - - - - - - - - - - - - - - - - - 1 1 1 13.02.2015 & 65 HP (2) IT Product Based Off Campus 1 2 0 1 - - - 4 - - - - - - - - - 1-1 5 13.02.2015 26.03.2015& 66 Amazon IT Product Based Off Campus 0 1 - - - - - 1 - - - - - - - 0-0 1 31.03.2015 67 17.02.2015 RR Donnelley MBA Off Campus - 0 0 - - - - - - - - - - - - - - - - - 0 68 17.02.2015 & 18.02.2015 Technip CORE Off Campus - - - 1 0 1-2 - - - - - - - - - - - - 2 69 18.02.2015 Verizon S/W Off Campus 0 0 0 0 0 - - 0 - - - - - - - - - 0-0 0 70 19.02.2015 Infoview Technologies Pvt ltd S/W On Campus 0 0 0 2 0 - - 2 - - - - - - - - - 0-0 2

71 20.02.2015 TCS (2) S/W Off Campus 0 0 0 0 0 0-0 0 0 0 0 0 0 0 0-0 - 0 0 72 20.02.2015 Flipkart IT Product Based Off Campus 0 0 - - - - - 0 - - - - - - - - - - - - 0 73 21.02.2015 HVL Pesticides MBA Off Campus - - - - - - - - - - - - - - - - - - 1 1 1 74 23.02.2015 Ideas2IT IT Product Based On Campus 0 0 0 0 0 1-1 - - - - - - - - - 0-0 1 75 23.02.2015 SAP Lab - Scholar Programme IT Product Based Off Campus 0 0 0 0 0 0-0 - - - - - - - - - 0-0 0 76 23.02.2015 HDFC Bank MBA On Campus - - - - - - - - - - - - - - - - - - 2 2 2 77 24.02.2015 Surprise Solutions MBA On Campus - - - - - - - - - - - - - - - - - - 1 1 1 78 25.02.2015 Protech Soft Technologies PVT Ltd S/W On Campus - - - - - - - - - - - - - - - - - 0-0 0 79 26.02.2015 Tata Communications IT Product Based Off campus - - 0 - - - - 0 - - - - - - - - - - - - 0 80 28.02.2015 Congruent S/W Off Campus - - - - - - - - - - - - - - - - - - 0 0 0 81 03.03.2015, 04.03.2015 & 05.03.2015 Consolidated Contractor Company CORE On Campus - - - - 0 - - - - - - - - - - - - RNA 82 03.03.2015 Coca Cola MBA Off Campus - - - - - - - - - - - - - - - - - - 2 2 2 83 04.03.2015 CSC (MBA) MBA On Campus - - - - - - - - - - - - - - - - - - 2 2 2 84 10.03.2015 & 11.03.2015 Saint Gobian(Only Girls) CORE Off Campus - - - - - - 0 0 - - - - - - - - - - - - 0 85 11.03.2015 HIL Ltd MBA Off Campus - - - - - - - - - - - - - - - - - - 1 1 1 86 12.03.2015 HCL (MBA) MBA On Campus - - - - - - - - - - - - - - - - - - 1 1 1 87 12.03.2015 Ernst & Young IT Product Based Off Campus 0 0 0 - - - - 0 - - - - - - - - - - - - 0 88 12.03.2015 & 13.03.2015 Torry Harris IT Product Based Off Campus 0 1 0 0 - - - 1 - - - - - - - - - - - - 1 89 14.03.2015 Josco Leather Division MBA On Campus - - - - - - - - - - - - - - - - - - 0 0 0 90 14.03.2015 Kaar Technologies MBA On Campus - - - - - - - - - - - - - - - - - - 0 0 0 91 16.03.2015 Shriram Finance MBA Off Campus - - - - - - - - - - - - - - - - - - 0 0 0

92 17.03.2015 BNP Paribas (Engg) S/W Off Campus 0 0 0 0 - - - 0 - - - - - - - - - 0-0 0 93 20.03.2015 Symantec IT Product Based On Campus 7 0 1 2 0 - - 10 - - - - - - - 0-0 10 94 20.03.2015 Systech Solutions S/W Off Campus - 0 - - 0 - - 0 - - - - - - - - - - - - 0 95 24.03.2015 Turbo Energy CORE On Campus - - - - - - - - - - 1 - - - - - - - - 1 1 96 25.03.2015 Matrimony IT Product Based On Campus 0 0 0 - - - - 0 - - - - - - - - - - - - 0 97 26.03.2015 Sanmina IT Product Based Off Campus 0 0 0 0 - - - 0 - - - - - - - - 0-0 0 98 26.03.2015 Acenture Global Services S/W Off Campus - - - - - - - - - - - - - - - - - 1-1 1 99 27.03.2015 Vyshnavi Information Technologies (India) Private Limited (VIT Infotech) S/W Off Campus 0 0 - - - - - 0 - - - - - - - - - 0-0 0 100 27.03.2015 Sutherland Global Services S/W On Campus 0 3 11 11 0 13 2 40 0 0 0 0 0 0 0 0 0 1-1 41 101 30.03.2015 Vi Solutions S/W On Campus - - 2 - - - - 2 - - - - - - - - - - - - 2 102 30.03.2015 EMBED UR CORE On Campus - - - 2 - - - 2 - - - - - - - - - - - - 2 103 30.03.2015 Edufic Digital MBA Off Campus - - - - - - - - - - - - - - - - - - 3 3 3 104 30.03.2015 Harsha Vidya Mandir MBA Off Campus - - - - - - - - - - - - - - - - - - 1 1 1 105 01.04.2015 CSS Corp S/W On Campus 0 6 2 3 4 - - 15 - - - - - - - 2-1 - 3 18 106 01.04.2015 Thyrocare MBA Off Campus - - - - - - - - - - - - - - - - 0 107 06.04.2014 Systech Solutions(2) MBA On Campus - - - - - - - - - - - - - - - - - - 0 108 07.04.2015 Sutherland Global Services(2) S/W On Campus 9 7 1 5 4 2 7 35 0 0 0 0 0 0 0 3 0 1-4 39 109 07.04.2015 Quattro Global Services MBA Off Campus - - - - - - - - - - - - - - - - - - 1 1 1 110 10.04.2015 Photon Infotech MBA Off Campus - - - - - - - - - - - - - - - - 1 1 1 111 16.04.2015 Bosch CORE Off Campus - - - - - - - - - - - - - - - RNA 112 16.04.2015 Amazon Logistics & Transportation MBA Off Campus - - - - - - - - - - - - - - - - - - RNA 113 17.04.2015 HCL Bserv S/W On Campus 0 0 0 1 0 0 0 1 0 0 0 0 0 1 0 0 0 0-1 2 114 18.04.2015 Indegene Life Systems PVT Ltd MBA On Campus - - - - - - - - - - - - - - - - - - RNA 115 20.04.2015 Veryx Technologies S/W Off Campus - - - - - - - - - - - - - - - - RNA 20.04.2015 & Cranedge India PVT Ltd 116 CORE On Campus - - - - - 2-2 - - - - - - - - - - - - 2 21.04.2015

117 20.04.2015 Telliant Systems MBA On Campus - - - - - - - - - - - - - - - - - - RNA 118 21.04.2015 Kumaran Systems S/W Off Campus - - - - - - - - - - - - - - - RNA 119 07.05.2015 TVS Logistics Services Ltd CORE On Campus 0 1 - - - 1-2 - - - - - - - - - - - - 2 120 09.05.2015 NewGenesis IT Product Based On Campus - 1 - - - - 1 - - - - - - - - - 1-1 2 121 27.04.2015 Covenant MBA On Campus - - - - - - - - - - - - - - - - - - 0 0 0 122 06.04.2015 Scintel Technologies S/W On Campus - - - - - - - - - - - - 1 - - - - - - 1 1 123 06.04.2015 Sundaram BPO S/W Off Campus RNA 124 12.05.2015 Magnetic Auto Control India PVT LTD CORE On Campus - - - 3-0 - 3 - - - - - - - - - - - - 3 125 13.05.2015 GRE Edge(Valued Epistemics Private Limited) S/W On Campus - - - - - - - - - - - - RNA 126 15.05.2015 Youngshin Automotive India PVT LTD CORE Off Campus - - - - - 9 - - - - - - - - - - - - - 9 127 16.05.2015 & 17.05.2015 Aspire Systems S/W Off Campus - - - - - - - - - - - - - - RNA 128 22.05.2015 Yokogawa CORE On Campus - - - - - - - - - - - - - - - - - 129 21.05.2015 & 22.05.2015 130 25.05.2015 Hexaware S/W On Campus 0 0 1 2 0 - - 3 - - - - - - - - - 0 - - 3 Island Pacific Retail Systems PVT LTD S/W Off Campus - - - - - - - - - - - - - - - 131 25.05.2015 DELL S/W Off Campus - - - - - - - 0 - - - - - - - - - 1-1 1 132 01.06.2015 Excelacom S/W Off Campus - - - - - - - - - - - - - - - - 133 03.06.2015 SAVEETHA ENGINEERING COLLEGE TEACHING Off Campus - - - - - - - - - - - 1 - - - - - - 1 1 134 04.06.2015 SKR ENGINEERING COLLEGE TEACHING Off Campus - - - - - - - - - - - 1 - - - - - - 1 1 135 04.06.2015 ST JOSEPHS ENGINEERING COLLEGE TEACHING Off Campus - - - - - - - - - - - - - - 1 - - - 1 1 136 05.06.2015 RMD ENGINEERING COLLEGE TEACHING Off Campus - - - - - - - - - - - - - - 1 - - - 1 1 137 10.06.2015 HCL Technologies - BPO S/W Off Campus - - 1 - - - - 1 - - - - - - - - - - - - 1 138 10.06.2015 Reliance Resq Industries S/W Off Campus - - - - - - - 0 - - - - - - - - - 1-1 1 139 10.06.2015 Precision Equipments CORE Off Campus - - - - - 1-1 - - - - - - - - - - - 0 1 140 10.06.2015 Five Cails - KCP Group CORE Off Campus - - - 1 - - - 1 - - - - - - - - - - - 0 1 141 10.06.2015 Blue Scope Buildings, North America CORE Off Campus - - - - - - 1 1 - - - - - - - - - - - 0 1 142 11.06.2015 Microflow Sterile Concepts CORE Off Campus - - - 1 - - - 1 - - - - - - - - - - - 0 1 143 11.06.2015 Covenant Consulting MBA Off Campus - - - - - - - 0 - - - - - - - - - - 4 4 4

144 12.06.2015 RBS MBA Off Campus - - - - - - - 0 - - - - - - - - - - 4 4 4 145 12.06.2015 Hi Voltage Engineering Ltd CORE Off Campus - - - - - - - 0 - - - - - - - - - - 0 0 0 146 12.06.2015 Hi Voltage Engineering Ltd - MBA Drive MBA Off Campus - - - - - - - 0 - - - - - - - - - - 0 0 0 147 12.06.2015 Value Global LLC S/W Off Campus - - - - - - - 0 - - - - - - - - - - - 0 0 148 12.06.2015 SUNGWOO GESTAMP HI-TECH INDUSTRIES CORE Off Campus - - - - - 11-11 - - - - - - - - - - - 0 11 149 13.06.2015 CSS CORP -II S/W Off Campus - - - - - - - 0 - - - - - - - - - - - 0 0 150 13.06.2015 ArdelisysTechnologies Pvt Ltd CORE Off Campus - - - - - - - 0 - - - - - - - - - - - 0 0 151 13.06.2015 HID India Pvt Ltd S/W Off Campus - - - - - - - 0 - - - - - - - - - - - 0 0 152 13.06.2015 VG IT Solutions S/W Off Campus RNA 153 15.06.2015 ANAND INSTITUTE OF HIGHER TECHNOLOGY TEACHING Off Campus - - - - - - - - - - - - - - 1 - - - 1 1 154 19.06.2015 TCS - R&D S/W Off Camps - - - - - - - - - 1 - - - - - - - - - 1 1 156 07.05.2015 RBS -III MBA Off Campus - - - - - - - 0 - - - - - - - - - - 2 2 2 157 09.05.2015 State Street HCL Services MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 158 11.05.2015 QUATRRO - II MBA Off Campus - - - - - - - 0 - - - - - - - - - - 2 2 2 159 13.05.2015 THE HINDU MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 160 15.05.2015 HCL -II MBA Off Campus - - - - - - - 0 - - - - - - - - - - 2 2 2 161 21.05.2015 Kone Elevators MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 162 23.05.2015 Tata E-NXT Financial Services limited MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 163 24.05.2015 APPCO Group of companies MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 164 12.06.2015 Pelatis Consulting services MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 165 15.06.2015 Casa Grande MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 166 07.05.2015 Deepam Traders MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1

167 09.05.2015 Ellakiya Constructions MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 168 11.05.2015 ABSA Marine sea foods MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 169 13.05.2015 Venketeshwara Traders MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 170 14.05.2015 Schwing Stetter MBA Off Campus - - - - - - - 0 - - - - - - - - - - 1 1 1 171 15.04.2015 KENDRA VIDYALAYA, DURGAPUR TEACHING Off Campus - - - - - - - 0 1 - - - - - - - - - - 1 1 172 15.05.2015 SRM UNIVERSITY - KTL TEACHING Off Campus - - - - - - - 0 1 - - - - - - - - - - 1 1 173 15.05.2015 INDIAN AIR FORCE GOVT SECTOR Off Campus - - - 1 - - - 1 - - - - - - - - - - - 0 1 174 25.06.2015 Msys Technologies S/W Off Campus 1 - - - - - - 1 - - - - - - - - - - - 0 1 175 27.06.2015 HI-TECH ENGINEERS PVT LTD CORE Off Campus - - - 1 - - - 1 - - - - - - - - - - - 0 1 176 27.06.2015 Commvault system CORE Off Campus - - - - - 0-0 - - - - - - - - - - - - 0 177 29.06.2015 Prodexnet CORE Off Campus - - - - - 0-0 - - - - - - - - - - - - 0 178 30.06.2015 L cube CORE Off Campus - - - - - 0-0 - - - - - - - - - - - - 0 179 3.07.2015 BLUE SUN Hi Tech Solutions CORE Off Campus - - - - - 2-2 - - - - - - - - - - - - 2 180 4.07.2015 KONE ELEVATORS -II CORE Off Campus - - - - - 1-1 - - - - - - - - - - - - 1 181 8.07.2015 ARDELYSIS TECHNOLOGIES S/W Off Campus - - - 1 - - - 1 - - - - - - - - - - - - 1 182 9.07.2015 AMAZON DEVELOPMENT CENTRE S/W Off Campus - - - - - - - 0 - - - - 1 - - - - - - 1 1 183 06.07.2015 CEI INDIA PVT LTD S/W Off Campus - - - - - 0-0 - - - - - - - - - - - - 0 184 12.06.2015 SYNTEL S/W Off Campus - - - - - 0-0 - - - - - - - - - - - - 0 185 16.07.2015 GRUPPO BANCA SELLA S/W Off Campus 93 116 93 129 87 93 25 636 10 2 5 5 9 7 2 13 4 33 89 179 815