Central Power Research Institute Civil Engineering Division. Quarterly Progress Report for the period ending February 2012

Similar documents
Central Power Research Institute Civil Engineering Division. Monthly Vigilance Report for the month of JULY 2014

ARMED FORCES TRIBUNAL, REGIONAL BENCH, CHENNAI

EXHIBITORS DIRECTORY. Ms Neha Shukla American Physical Society C/o Balani Infotech Pvt. Ltd Mobile:

ELECTRONIC MANUFACTURING CLUSTER - II

ARMED FORCES TRIBUNAL, REGIONAL BENCH, CHENNAI

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.

CONSTRUCTION PROJECT. INFORMATION REGARDING STATUS OF R/A/FINAL BILL PAYMENT OF CONTRACTOR'S BILL (November MONTH)

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report

Names of parties qualified after technical evaluation M/s

Friday, 25 March, Copyrights 2014 Business Standard Ltd. All rights reserved. Business Standard - Mumbai; Size : 221 sq.cm.

PROPINSIGHT A Detailed Property Analysis Report

ARMED FORCES TRIBUNAL, REGIONAL BENCH, CHENNAI

8. Karnataka Cooperative Consumers Federation Ltd. No. 4, Pampamahakavi Road, Chamarajpet, Bangalore (Karnataka)

Sri. M.Narayan, ICI (KBC)-Ultratech Award for Outstanding Concrete Engineer of Karnataka-2014.

P W BCA. BC(F ) LAC SEBC Prov.Remarks OBC OBC (A) (B) Hospital Name Address State Speciality Others OBC. Kothapet, Guntur Andhra Pradesh

green channel Tr a v e l F o r e x

Notification No. 25/2018-Customs (N.T./CAA/DRI) New Delhi, dated the 16 th November, 2018

3 Day s of Intense Business Networking. VENUE : D.D.A Ground, Behind Japanese Park, Near Rithala Metro Station, Sector-10, Rohini, New Delhi

DETAILS OF CONTRACTS AWARDED DURING THE MONTH OF SEPTEMBER ( ENGINEERING DEPARTMENT)

PROPINSIGHT A Detailed Property Analysis Report

VOL 2 JULY DECEMBER 2011 ISSUE 4

DETAILS OF CONTRACTS CONCLUDED DURING JANUARY, 2018

ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE

PROPINSIGHT A Detailed Property Analysis Report

Industrial Training & Industrial Visits Academic Year ( to ) Nature of From To. Name of the. Students

PROPINSIGHT A Detailed Property Analysis Report

File No: 14-7/ /RMNH(MY) Dated 17/ 07 / 2012 NOTICE INVITING QUOTATIONS

List of hospitals empanelled under CGHS Hyderabad as on

SPORTSWOOD ARCADE SECTOR-79, NOIDA

PROPINSIGHT A Detailed Property Analysis Report

Table-A: List of Qualified Bidders, Bidding Route & Washeries of interest. Name of Bidder Bidding Route Name of Washeries. ii) Kusmunda Kolkata

Akshara Lotus Garden

Sl. No. 1. God father Communication Pvt Ltd 9/36/2013-BP & L. Name of MSO Address of MSO Applied date and for Area Status

Phase-1 & 2 For happy lives

List of Past Presidents:


PROFILE. Diploma in Civil Engineering with first division in the year 1992 & B.A (maths)

ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE

EMC-Basics, HIRF/HERF Electromagnetic Effects (EME) in Aircraft

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

hba Adjoining Tech Zone, Sector 27, Yamuna Expressway (Opp. Gautam Budh Universrty & Night Safari)

SmartCity (Kochi) Infrastructure Private Limited SEZ

RITES LIMITED RPO LUCKNOW

LIST OF COMPANIES HIRING AERONAUTICAL AND AEROSPACE ENGINEERS

Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity. November 18 th, 2016.

Pai Mobiles - Byadarahalli. Pai Mobiles - Kengeri Pai Mobiles - Nandini Layout. Ramamurthynagar

OFFICE CIVIL AVIATION AVIATION. 1. Introduction: of aircraft for acquiring applicant. nts. licence. test (skill test). written papers: a) Paper I Air

Category B : Scientific Instruments (Imported) *cost less than 5 lakhs+

PROPINSIGHT A Detailed Property Analysis Report

CENTRAL RESEARCH INSTITUTE FOR DRYLAND AGRICULTURE SANTOSHNAGAR, HYDERABAD List of Hospitals /Diagnostic Centres

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

16 Edition Friday, 5 to Monday, 8 April 2013 Himachal Bhawan, Madhya Marg, Sector 28 B, Chandigarh RETROSPECT

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

LIST OF ESIC HOLIDAY HOME

SmartCity (Kochi) Infrastructure Private Limited SEZ

2-3 B Action taken on decisions of previous meeting 4 C To consider the following :

07/01/ /09/ /09/ /11/2014

UNIVERSITY CAMPUSES IRRIGATION CANALS PLAYING A KEY ROLE IN INFRASTRUCTURE DEVELOPMENT

National Seminar and Exhibition on Recent Developments In Design and Construction Technologies

Indian Media Industry Overview

HEALTHTECH INDIA 2019

QUARTER III (JULY SEPTEMBER, 2018)

RITES LTD RPO KOLKATA

Fujitec - Global. Fully challenged to deliver customers highly innovative, safe and reliable solutions.

ÉAUÀ¼ÀÆgÀÄ. ÀÄ ÀÛPÉÆÃvÀÀìªÀ Supported by. Federation of Publishers & Booksellers Association

China Products. (Mumbai India) Exhibition 2016 POST SHOW REPORT

Master in Computer Applications

INDUSTRY-ACADEMIA PARTNERSHIP

Name, Designation, other particulars of the Appellate Authority / Central Public Information Officers /

Capability Statement SUNJAAY ATHANKI PROJECTS MANAGEMENT PVT LTD

India. French Business Delegation. Chaired by. Mr. Pierre GATTAZ - President of MEDEF. And led by

FREQUENTLY ASKED QUESTIONS (FAQs)

PPP Days 2010 PPPs Lessons from the Last 18 Months

Anna University Asia s Largest Technological University offers Distance Mode Professional Degree Programmes

Date: Dear Sirs,

DIVYASREE TECHNOPARK SEZ. 23 RD APPROVAL COMMITTEE MEETING (2/2015 series) DATE:

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

BHARTI REALTY LIMITED

City Address State. No. 14, 80 Feet Road, Srinivasa Nagar, B.S.K. 1st Stage Bangalore

Details Covered in Presentation Township Land Allotment Details About Developer. Township Features Development at Site (Actual pictures)

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

Architecture 2014 ((Total No. of organizations in which student has been placed during the year = till )

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)

AIR INDIA LIMITED HEADQUARTERS Address/Telephone no./ ID

Public Information Officer at Corporate Office

secretary rinan/- Government of West Bengal Department of Finance- PPP Cell Date:

List of Members of MM (M) (O) (F) (TF) (M)

Best State/UT Comprehensive Development of Tourism (North East, Jammu and Kashmir ) Jammu & Kashmir

DOMESTIC LPG STOVE. Profile No.: 46 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

JAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation

Distribution Transformers

DCB Bank Regional Nodal Officers

Arrival and Departure Transport Request. Sl. No. Names Track Attending Dinner on 6 th / 7 th Mark 6 or 7 or 6,7

Part 9 MAINTENANCE MANUAL. Distribution Construction Standards Handbook

1/14/2016 Panel Doctors

Network Size and Growth

SOUTHEAST ASIA s Biggest Metal Forming Exhibition

Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, The Mumbai Metro Line-3

Transcription:

Central Power Research Institute Civil Engineering Division Quarterly Progress Report for the period ending February 2012 Mode of enquiry of s s and names of parties qualified after s and names of to lowest er / Contract & date / Work Order / Letter of Acceptance 1 Centre for Life Cycle Management and condition monitoring of sub station equipments By Press Single bid system 03.11.2009 5 7 s Nil M/s.Ashraya Construction, # 190, 10th cross, Health layout, Annapoorneshwari nagar, Bangalore - 560 091 Times of India, Bangalore 21.10.2009 M/s Cherenjeevi Bangalore The Deccan Herald, Bangalore 20.10.2009 M/s K Babu Raju, Bangalore M/s Bildvel Corporation, Bangalore Shri H N Vijaya Raghava Reddy, Bangalore M/s Swathi Constructions, Bangalore Shri Krishna Shelters, Pvt Ltd, Bangalore M/s Ashraya Constructions, Bangalore CPRI/CED/DCCD-LCM/2009-10 Dtd: 27.11.09 M/s.Ashraya Construction, # 190, 10th cross, Health layout, Annapoorneshwari nagar, Bangalore - 560 091 21630528.00 Extended date of 31.12.2011 Laboratory portion roofing (GI Sheets) done. Stone cladding work in Plastering work (SF) in 2 Supply of Manpower various Categories Zone - 1 By Press Single bid system 23.01.2009 5 5 s Nil M/s. Sridevi Business Solutions CPRI/CED/519/2009 Date: Pvt.Ltd, #27/A,126, 1st Floor, 1st 13.02.09 Block,Rajajinagar, Bangalore - 10 M/s. Sridevi Business Solutions Pvt.Ltd, #27/A,126, 1st Floor, 1st Block,Rajajinagar, Bangalore - 10 3197161.00 Extended date of 31.03.2012 Ongoing Supply of Manpower various Categories Zone - 2 Prajavani, Bangalore 08.01.2009 M/s Cleanway Management Systems, Bangalore M/s. Cleanway management,# 137, 138, 9th main,1st cross, MSR colony, Mathikere, Gokul, Bangalore - 54 CPRI/CED/519/2009 Date: 13.02.09 M/s. Cleanway management,# 137, 138, 9th main,1st cross, MSR colony, Mathikere, Gokul, Bangalore - 54 3526564.00 Extended date of 31.03.2012 Ongoing Sri Manjunatha Enterprises, Bangalore E. Mohan Raju, Bangalore Sri Devi Business Solutions Pvt Ltd., Bangalore Sri Panorama Enterprises, Bangalore Construction of Ultra High 3 Voltage Laboratory at UHVRL, Hyderabad Sh: Civil works By Press Single bid system 06.11.2009 8 12 s Nil Yes - L1 CPRI/CED/HYD/2009 dated 10.12.2009 Times of India, Hyderabad 06.10.2009 M/s K Babu Raju, Hyderabad The Deccan Cronicle, Hyderabad 06.10.2009 M/s NPCC Ltd, Hyderabad The New Indian Express - all india editions 06.10.2009 M/s IVRCL Infrastructures, Hyderabad 06.10.2009 M/s V D Jaganmohan Rao, Hyderabad M/s Meda Narasimhalu & Company, Hyderabad M/s Raus Construction, Hyderabad M/s Sri Sai Constructions, Hyderabad Ch. Veeraraghavalu Constructions, Vizag M/s DEC Infrastructures, Hyderabad M/s N Janardhan Rao, Hyderabad M/s BPR Infrastructure, Hyderabad M/s Sri Balaji Constructions, Hyderabad M/s Meda Narasimhulu & Co, 6-3-609/161/1, Anand Nagar Colony, Hyderabad 500 004 M/s Meda Narasimhulu & Co, 6-3-609/161/1, Anand Nagar Colony, Hyderabad 500 004 38635755.76 31.03.2012 Finishing work viz. Painting in, processing of raw materials for main laboratory flooring in

Mode of enquiry of s s and names of parties qualified after s and names of to lowest er / Contract & date / Work Order / Letter of Acceptance 4 Construction of Regional By Press Single bid system 12.02.2009 3 s 3 s Nil Yes - L1 5/14/CED/Civil(1)/2008-09 Testing Laboratory at 3A, Dtd : 12.06.2009 Sector 62, NOIDA(U.P) ( 2nd & 3rd floors of Institute building 1 and 2 ) Sub Head : Civil Works The Times of India, New Delhi edition 23.01.2009 M/s Vir Bahan Mittal, New Delhi M/s. Ved Contracts, 2nd floor, Vats Complex, W-158, Shankarpur, Main Vikas marg, opp. Sub Way, Delhi - 110092 Hindustan Hindi, Delhi edition 24.01.2009 M/s Supreme Furniture, Gurgaon M/s Ved Contractors Pvt Ltd., Delhi M/s. Ved Contracts, 2nd floor, Vats Complex, W-158, Shankarpur, Main Vikas marg, opp. Sub Way, Delhi - 110092 17963239.00 31.03.2012 2nd floor roof casing in 5 Capital project for infrastructure protection of CPRI under XIth plan. SH Construction of boundary wall for CPRI office campus at UHVRL, Uppal, Hyderabad CPRI/CED/HYD/700/2011 dated 09.08.2011 By Press 10 s Nil Yes L1 Dhirubai D Thumer & Co 14167300.00 12.03.2012 Deccan Cronicle, Hyderabad 08.06.2011 Single Bidding System 22.03.2011 Six T. Subba Rao, Hyderabad Patel Chambers New Indian Express, Southern edition 08.06.2011 Srinivasulu, Hyderabad Dhirubai D Thumer & Co 10-3-152/8, First Floor 08.06.2011 Dhirubhai D Thumer, Hyderabad Patel Chambers East Marredpally Kesha Constructions, Hyderabad 10-3-152/8, First Floor Secunderabad 500 026 A.K. Subba Rao, Hyderabad East Marredpally N. Prasad, Hyderabad Secunderabad 500 026 Arudra Constructions, Hyderabad V K Bhatta & Company, Hyderabad Meda Narsimhulu, Hyderabad Quality Construction Company, Hyderabad Construction of boundary wall adjoining to forest area in 6 Capital project for infrastructure protection of CPRI under XIth plan. SH Construction of boundary wall for CPRI office campus and staff colony at Bangalore CPRI/CED/708/2011 By Press 12.07.2011 3 s 5 s Nil Yes - for L1 only dated August 9, 2011 YS Venkat Reddy 15548700.00 25.03.2012 Times of India, Bangalore edition 08.06.2011 Single bidding system Shetty's Construction Company Pvt Ltd, Hubli YS Venkat Reddy 454/5 6th Main Road Deccan Herald, Bangalore edition 08.06.2011 Y S Venkat Reddy, Bangalore 454/5 6th Main Road 13th Cross Road The Hindu, Bangalore edition 08.06.2011 K C P Projects Ltd., Bangalore 13th Cross Road Vyalikaval 07.06.2011 G. Babu Naidu, Bangalore Vyalikaval Bangalore 560 003 K. Ramachandra Raju, Bangalore Bangalore 560 003 Publication of corrigendum by Press Times of India, Bangalore edition 16.06.2011 Deccan Herald, Bangalore edition 16.06.2011 The Hindu, Bangalore edition 16.06.2011 15.06.2011 Construction of boundary wall rising of wall and pillar of colony in Publication of corrigendum by Press Times of India, Bangalore edition 29.06.2011 Deccan Herald, Bangalore edition 29.06.2011 The Hindu, Bangalore edition 29.06.2011 28.06.2011 7 CPRI Infrastructure By press protection against security threat by construction of boundary wall and peripheral road at Bangalore, Hyderabad & Bhopal and extension of CCAR building. SH Vertical extension of CCAR building, Guest House 1, Guest House 2, CPRI campus Bangalore CPRI/CED/709/2011 Single bidding system 20.05.2011 4 s 6 s Nil Yes - for L1 only dated 09.08.2011 Bildvel Corporation 21840313.00 28.02.2012 New Indian Express, Southern edition 02.03.2011 Bildvel Corporation, Bangalore 2532, 27th Cross, 22nd Main Deccan Cronicle, Hyderabad 02.03.2011 Veeraraju Pasala, Bangalore Banashankari 2nd Stage 01.03.2011 Thirupathi Engineering Works, Bangalore Bangalore Accent Builders Pvt Ltd., Bangalore Veerasay Reddy & Sons, Bangalore P.G. Sudhakar Rao, RR Nagar, Bangalore Shuttering for roof in. Brickwork in

Mode of enquiry of s s and names of parties qualified after s and names of to lowest er / Contract & date / Work Order / Letter of Acceptance 8 Construction of Ultra High Voltage Laboratory at UHVRL, Hyderabad - SH: Fabrication and erection of structural steel work along with CGI sheet roofing and shielding Times of India, Hyderabad edition 05.10.2010 Single bidding system 09.11.2010 6 s 7 s Nil Yes L1 CPRI/CED/HYD/2011 dated 23.02.2011 Kotagi Structurals 65393036.40 31.03.2012 Times of India, Hyderabad edition 08.10.2010 Anustructures & Galvanising Industries, Hyderabad Plot : 31, Phase : 1 The Indian Express - All India Edition 06.10.2010 Geodesic Techniques Pvt Ltd., Hyderabad IDA Cherilapally Deccan Cronicle, Hyderabad 06.10.2010 Kotagi Structures, Hyderabad Hyderabad 500 051 05.10.2010 Janardhan Rao, Hyderabad IVRCL, Hyderabad Koneru Constructions, Hyderabad Vardhaman Projects Ltd., Hyderabad Erection of 2nd lift of structural steel columns and bracing beams in. Fabrication of other components in 9 SETTING UP OF PRE- QUALIFICATION OF TEST FACILITIES ON 400 KV XLPE CABLES AT CPRI OFFICE CAMPUS, BANGALORE. SH : CPRI/CED/597D/2010 CIVIL WORKS By press Single bidding system 11.03.2011 3 s 5 s Yes - L1 Dtd: 31.03.11 Bildvel Corporation 28284600.00 05.04.2012 New Indian Express, Southern edition 26.01.2011 Bildvel Corporation, Bangalore 2532, 27th Cross, 22nd Main Deccan Herald, Bangalore edition 25.01.2011 V M Ganesh, Bangalore Banashankari 2nd Stage 25.01.2011 Vinyasa, Bangalore Bangalore Subba Reddy, Bangalore By press - KBR Infotech Ltd., Bangalore New Indian Express, Southern edition 09.02.2011 Deccan Cronicle, Hyderabad 09.02.2011 08.02.2011 By press - - 2 New Indian Express, Southern edition 08.03.2011 Deccan Cronicle, Hyderabad 08.03.2011 08.03.2011 Raising columns shuttering beams of for in 10 Construction of building for Establishment of Comprehensive EMI / EMC Test (Radiated Immunity & Radiated Emission) facility. Sub Head : Civil Works By press (SECOND CALL) Single bidding system 25.01.2012 4 s Mycon Constructions Limited, Bangalore Nil Yes L! Deccan Herald, Bangalore edition 22.12.2011 Shri Purushotham Raju, Bangalore Vijaya Karnataka 22.12.2011 Shri M V Subba Reddy, Bangalore Times of India, South India edition 23.12.2011 M/s KBR Infratech Limited, Bangalore Prajavani, Bangalore 23.12.2011 Deccan Cronicle, Bangalore 23.12.2011 Deccan Cronicle, Chennai 23.12.2011 Deccan Cronicle, Hyderabad 23.11.2011 The Hindu, South India edition 24.12.2011 New Indian Express, Southern edition 24.12.2011 22.12.2011 CPRI/CED/WORKS/679/2 011-12 dated 15.02.2012 Shri C. Purushothama Raju, Bangalore 34291982.00 Five Months Marking of building is in. Excavation proposed to be undertaken from 08.03.2012 Deccan Herald, Bangalore edition 14.01.2012 Vijaya Karnataka 14.01.2012 Times of India, South India edition 14.01.2012 Prajavani, Bangalore 14.01.2012 Deccan Cronicle, Bangalore 14.01.2012 Deccan Cronicle, Chennai 14.01.2012 Deccan Cronicle, Hyderabad 14.01.2012 The Hindu, South India edition 14.01.2012 New Indian Express, Southern edition 14.01.2012 14.01.2012

Mode of enquiry of s s and names of parties qualified after s and names of to lowest er / Contract & date / Work Order / Letter of Acceptance 11 Modernization of Short Circuit Test Facilities and Augmentation of Power Transformer Test Facilities" Sub Head : Construction of New Low voltage Test Cell- Civil Works By press Single bidding system 30.11.2011 3 s Shri R Srinivas Gowda, Bangalore Nil CPRI/CED/WORKS/746/2 011-12 dated 05.01.2012 Deccan Herald, Bangalore edition 16.11.2011, Bangalore Shanthinagar Shanthinagar Times of India, Bangalore edition 17.11.2011 M/s Balaji Projects, Bangalore Bangalore 560027 Bangalore 560027 The Hindu, Bangalore edition 18.11.2011 16.11.2011 Deccan Herald, Bangalore edition 18.11.2011 Times of India, Bangalore edition 18.11.2011 18.11.2011 7003781.00 4 months Excavation, RCC & reinforcement laying of footings over. Shuttering for footings in 12 Construction of additional CPRI/CED/WORKS/727/2 Test Bay for Short Circuit 011-12 dated 05.01.2012 Testing of Transformers at SC lab in the CPRI office campus at Sadashivanagar, Bangalore SH : Civil works at Work shop By press Single bidding system 25.10.2011 5 T.V. Ramakrishna Reddy, Shanthinagar, Bangalore Nil Yes L1 Deccan Herald, Bangalore edition 05.10.2011 Balaji Projects, Malleswaram, Bangalore Shanthinagar Times of India, Bangalore edition 07.10.2011 KBR Infratech, Sahakarnagar, Bangalore Bangalore 560027 The Hindu, Bangalore edition 08.10.2011 Keshavaraju, RMV II Stage, Bangalore 05.10.2011 Susheela Construction Company, Bangalore By press - Deccan Herald, Bangalore edition 19.10.2011 Times of India, Bangalore edition 19.10.2011 The Hindu, Bangalore edition 19.10.2011 18.04.2011 3536606.00 Four months Clearance of site outside working for civil works is being done 13 Construction of a Lab Building for Test Facility for Setting up of Test Facility for LED Lighting System at CPRI, Bangalore. SH: Civil Works CPRI/CED/WORKS/689/2 011-12 dated 23.11.2011 By press Single bidding system 25.10.2011 5 Balaji Projects, Malleswaram, Bangalore Nil Yes L1 Deccan Herald, Bangalore edition 05.10.2011 Ramakrishna Reddy, Bangalore Shanthinagar Times of India, Bangalore edition 07.10.2011 Susheela Construction Company, Bangalore Bangalore 560027 The Hindu, Bangalore edition 08.10.2011 R. Chandrashekar, K R Pura, Hosur 05.10.2011 KBR Infratech, Sahakarnagar, Bangalore By press - Deccan Herald, Bangalore edition 19.10.2011 Times of India, Bangalore edition 19.10.2011 The Hindu, Bangalore edition 19.10.2011 18.04.2011 10112472.86 Five months Excavation of foundation for RCC footings, RCC columns, steel fabrication and earth filling in

Mode of enquiry of s s and names of parties qualified after s and names of to lowest er / Contract & date / Work Order / Letter of Acceptance 14 Modernization of Short Circuit Test Facilities and Augmentation of Power Transformer Test Facilities" Sub Head : Construction of New Low voltage Test Cell- Civil Works By press Single bidding system 30.11.2011 3 s Shri R Srinivas Gowda, Bangalore Nil 4 months Deccan Herald, Bangalore edition 16.11.2011, Bangalore Shanthinagar Shanthinagar Times of India, Bangalore edition 17.11.2011 M/s Balaji Projects, Bangalore Bangalore 560027 Bangalore 560027 The Hindu, Bangalore edition 18.11.2011 16.11.2011 Excavation of pits completed and footing reinforcement laid centring and shuttering in Deccan Herald, Bangalore edition 18.11.2011 Times of India, Bangalore edition 18.11.2011 18.11.2011 15 Capital Project for Infrastructure protection of CPRI under XI Plan : SH Construction of Approach Road to XLPE Laboratory and hard standing in the laboratory premises at CPRI, Sadashivnagar, Bangalore By press Single bidding system 09.01.2012 5 s Shri Manjunath M K, Bangalore Nil Yes L! CPRI/CED/WORKS/750/2 011-12 dated 30.01.2012 Shri Abbu Samba Siva Reddy Deccan Herald, Bangalore edition 14.12.2011 Shri Abbu Sambasiva Reddy, Bangalore 1341/20, 1st Cross Road Times of India, Bangalore edition 15.12.2011 Shri Pasala Veeraraju, Bangalore 2nd Main Road, K N Extn 14.12.2011 Shri Karthik Enterprises, Bangalore Yeshwanthpur Shri Srinivas Gowda, Bangalore Bangalore 560 022 Deccan Herald, Bangalore edition 24.12.2011 Times of India, Bangalore edition 24.12.2011 24.12.2011 Rs.36,22,250/-` Ninety days Clearing of bushes and alingment of roads in HEAD, CED JOINT DIRECTOR ENGINEERING OFFICER GR 4 ENGINEERING OFFICER GR 2 ENGINEERING OFFICER GR 2 ENGINEERING OFFICER GR 2 ENGINEERING OFFICER GR 2