Marcus Langseth Science Oversight Committee (MLSOC) Sunday December 8, 2013 JW Marriott Hotel 515 Mason St. San Francisco, California

Similar documents
L-DEO Office of Marine Operations: UNOLS Council and FIC Meetings June 5-7,2012 Boston, MA

University-National Oceanographic Laboratory System ~UNOLS ~ Research Vessel Technical Enhancement Committee (RVTEC) Meeting November 1-3, 2016

U.S. Navy Global Class AGOR Mid-Life Refits Managed by the Office of Naval Research (ONR) UNOLS Annual Meeting November 1, 2018

The field program has two main components: Underway Geophysics and On-site Sample collection and detailed mapping.

2008 Arctic Icebreaker and AICC Activities. Carin Ashjian, AICC Chair

R. Weller December 10, 2014 Version 1.3

R/V Maurice Ewing Replacement

Arctic Icebreaker Coordinating Committee (AICC) Summer Telcon- 9 June 2015 Draft Minutes- (ver17june2015)

University-National Oceanographic Laboratory System ~UNOLS ~ Summary of 2018 & 2019 opera2ons and the 2020 scheduling process

Fleet Improvement Committee 7/12/2012

replacement SONNE status report

NIOZ and OFEG Update 2010

FINAL REPORT West Coast Naval Training Range Demonstration of Glider-Based Passive Acoustic Monitoring

Airborne Remote Sensing Component of Marine Debris Monitoring

April 20, 2010 Arlington, VA. Kathy Crane

Teacher s Guide For. Glaciers

NIOZ Royal Netherlands Institute for Sea Research Ocean Facilities Exchange Group OFEG RV Newbuilds and plans elsewhere

ECONOMICS OF PROTECTED SPECIES

MAJOR REFIT OF R/V MARION DUFRESNE HÉLÈNE LEAU HEAD OF OCEANOGRAPHY DEPARTMENT INSTITUT POLAIRE FRANÇAIS, PAUL-EMILE VICTOR - IPEV

R/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel

Cruise Plan Coastal Pioneer 7 Deployment

OCEAN FACILITIES EXCHANGE GROUP update on. a bottom-up approach of research fleet. co-ordination & harmonisation

R/v Aranda Comeback to the Polar Seas Looking for International Co-operation

Pre-Cruise Meeting 1400 Eastern Time (1100 Pacific), July 1, 2015

Nature of MATE Internships in 2011 thru May UNOLS/USCG Interns

UPDATED International Cooperative Engagement Program for Polar Research (ICE-PPR) workshop Agenda Oct 2017 Anchorage, Alaska

Cruise Report HE-425, 23. May 07. June 2014

Deepwater Horizon Oil Spill Principal Investigator One Year Update Workshop

AGAP Antarctic Research Project Visualizing Data Learning About Antarctica From RADAR Data? Student Version

REPORT ON THE DEPLOYMENT OF RAPID-WAVE B. O. CORNIDE DE SAAVEDRA RADPROF0910 CRUISE 2010 VIGO-SANTANDER, 30 AUGUST-1 SEPTEMBER 2010

Great Science Adventures

CORALFISH 2009 Cruise Report: CF0609. Eastern Ionian, Cephalonia and Zakynthos

REPUBLIC OF SOUTH AFRICA

Coordination Center German Research Vessels

R/V Kairei Cruise Report KR Seismic study in the Japan Trench region. Dec. 10, 2012 Jan. 8, 2013

Cruise Plan Coastal Pioneer 3 Deployment Leg 2: R/V Knorr Cruise KN December 2014

Cruise Plan Coastal Pioneer 6 Deployment

Cruise Plan Coastal Pioneer 2 Deployment R/V Knorr Cruise KN April 2014

Summary THE FRAM STRAIT TOMOGRAPHY EXPERIMENT 2008

THE NEW VRL HALF YEAR RESULT COMMENTARY

SALE 7 DAY. EXCITING DEALS New Individual Bookings Only Effective: 7/31/18 8/6/18 MOVEABLE FEAST 7 NIGHT EASTERN CARIBBEAN CRUISE

PART 1. EXECUTIVE SUMMARY. English Translation of the Russian Original

GOING PLACES MACARTHURCOOK OFFICE PROPERTY TRUST

OCEANS 2014 MTS/IEEE. Discover the Eastern Edge of the Western World. St. John s, Newfoundland and Labrador, Canada

Meeting Minutes A copy of these minutes is available as a pdf. Appendices

National Marine Facilities

5750 Ser C0/ May 02. From: Commanding Officer, USS McCLUSKY (FFG 41) To : Chief of Naval Operations (N09BH)

DRAFT TEN August 23 rd, Climate Change Impacts On The Alpine: The Future of Our Mountains

Beaver Island Airport Terminal Building Project Q & A Prepared by Mead & Hunt

BERING STRAIT NORSEMAN II 2017 MOORING CRUISE REPORT

PUBLIC NOTICE The Greater Boise Auditorium District will hold a Regular Board Meeting on Thursday, December 20, 2018 at 2 p.m. Boise Centre West Room

ANNUAL REPORT

BLACK KNIGHT HPI REPORT

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

1 of 5 9/19/2014 3:24 PM

Vessel Traffic Risk Assessment Ed Page Executive Director Marine Exchange of Alaska

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

CTBTO Contribution to the Global Earthquake Data Collection: a view from the International Seismological Centre (ISC)

ITINERARIES

NOAA s s Ship and Aircraft Support Office of Marine and Aviation Operations (OMAO)

MARINE PROTECTED AREAS LESSON PLAN Water Parks

b y A l l T h i n g s H o s p i t a l i t y DoubleTree by Hilton Evansville Indiana

Hydrographic Commission on Antarctica. National Report by ESPAÑA SPAIN

Department of Marine Transportation

Cruise Report. FDS Submarine Channels RV Koca Piri Reis. 9 th -26 th May 2010

IOC Intergovernmental Coordination Group for the Tsunami and Other Coastal Hazards Warning System for the Caribbean and Adjacent Regions

R/V NEW HORIZON Scripps Institution of Oceanography CRUISE PLAN 1 (Draft = 29 August 2004)

Ship based measurements on sea ice morphology during the CHINARE Antarctic and Arctic cruises

PROCESSING RECORD SCRIPPS INSTITUTION OF OCEANOGRAPHY ARCHIVES. PHYSICAL DESCRIPTION: 10 Lmss, charts in oversize, film, audio, video, photographs

Cruise Report for NSF OCE : R/V Endeavor Cruise 531

THE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG

New innovations and possibilities an extension to old traditions

NOTIFICATION OF PROPOSED RESEARCH CRUISE

INMARTECH 2004 PROGRAMME 21 SEPTEMBER TO BE HELD AT THE BRITISH ANTARCTIC SURVEY, CAMBRIDGE

UNOLS FIC Meeting. October 13, 2004 UNOLS Office Reports

PETROLEUM INDUSTRY ORAL HISTORY PROJECT TRANSCRIPT

Amendment Docket No. FAA ; Directorate Identifier 2008-NM-220-AD

California State University Maritime Academy

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

SAN HYDROGRAPHIC OFFICE NATIONAL REPORT to the 14 TH SOUTHERN AFRICA AND ISLANDS HYDROGRAPHIC COMMISSION CONFERENCE (SAIHC) 6-8 September 2017

Bonne Shipyard (Belgium) Pictures showing the application of Zinga by roller to the blasted hull of a typical fishing vessel.

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

CORALFISH 2010 Cruise Report: CF0910-ROV. Eastern Ionian, Cephalonia Island

Costa Rica Sports Tour

Kansas City Aviation Department. Community Listening Session

Regulation to Reduce Hotelling Emissions from Ships in California Ports (Adopted 12/6/07)

Arctic Icebreaker Coordinating Committee (AICC) Meeting January 14 & 15, 2014

Update on the Center for Interdisciplinary Remotely- Piloted Aircraft Studies (CIRPAS)

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships. Submitted by the Cruise Lines International Association (CLIA) SUMMARY

Noise Oversight Committee

CURRICULUM VITAE Full scholarship for Master in Science program in School of Sustainability, Arizona State University.

Coherence and Spectra Analysis of the USARRAY TA PY Posthole Test Array

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014

Mapping the Snout. Subjects. Skills. Materials

LAKE COVE HOTEL RESORT / REND LAKE

Meeting Minutes Del Mar San Dieguito Lagoon Committee. Chair: Jim Tucker Vice Chair: Terry Kopanski Secretary: Ellen Breen

Eastern Snow Conference: 2017 Student Award Recipient

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

Third Quarter Marketing Report B R A N SON/LAKES A R EA C VB N OVEMBER, 2013

Transcription:

Marcus Langseth Science Oversight Committee (MLSOC) Sunday December 8, 2013 JW Marriott Hotel 515 Mason St. San Francisco, California Executive Summary The Marcus Langseth Science Oversight Committee, (MLSOC) met in San Francisco on Sunday December 8, 2013. This was the winter meeting of this committee and brought together the UNOLS-MLSOC committee, L-DEO Office of Marine Operations, members of the marine seismic community, and federal agency representatives. In addition participants from the early career scientist workshop which had been held on Saturday December 7, 2013 attended this meeting. This provided an opportunity for more information exchange with these early career scientists. Meeting Minutes Dale Sawyer/MLSOC Chair opened the meeting at 10:00 am with introductions and a brief overview of the Early Career Workshop held on Saturday, Dec. 7 th. This was our first workshop with a focus on bringing early career scientists and members of the marine seismic community together to introduce the national seismic facility at Lamont-Doherty Earth Observatory. We had 13 early career scientists from 9 different universities in attendance. Agency Reports Donna Blackman/NSF Donna gave this report and provided a Power Point presentation. She opened with a re-emphasis that NSF recognizes the importance of marine seismic studies. MGG is working on improving the management of the Program budget, working to minimize out-year mortgaging, and improving the scheduling process. She explained the recommended target date of August 15 th for large field proposals, how the Ocean Bottom Seismograph Instrument Pool management office at IRIS is working, and a brief outline of some potential geographic areas where proposal pressure suggests work could happen over the next few years. At present NSF/Integrated Program Section can support approximately 180 days of support for the R/V Marcus Langseth, although a little less if they are 3-D cruises. MGG has typically supported 50-150 days per year. For 2014, the numbers are a little low with 119 days. The outlook for MGG support for Langseth in 2015 is probably reduced with several proposals needing to address some reviewer concerns before the science is ready for support. If done well, the number of science-ready projects could increase for 2016, and if funds are available MGG may be able to bring the number of days up again.

Agency Reports Tim Schnoor/ONR Tim gave the ONR report and while MG & G research at ONR has decreased in recent years, ONR continues to support 6 UNOLS ships. Tim updated us on the ONR ships and reported in 2013 ONR has 601 days and in 2014 there are presently ~ 400 days on UNOLS ships. The new ocean class R/V Neil Armstrong and the R/V Sally Ride are on schedule at the shipyard in Anacortes, Washington. UNOLS report Jon Alberts/UNOLS provided an overview Power Point of recent UNOLS efforts and news within the UNOLS organization. Some of the recent highlights for UNOLS include for following. The National Academy of Sciences is conducting a NSF Decadal Survey and has requested UNOLS participation in their meeting on December 5-6, 2013 in San Francisco. The entire NSF/GEO portfolio is being reviewed and the community is being asked to provide their input on the web site: http://nas-sites.org/dsos2015/ UNOLS is currently planning for the Ocean Sciences Meeting to be held in Honolulu on Feb23-28, 2014. An early career workshop is planned for Sunday February 23, 2014 and UNOLS will be active in this workshop and a UNOLS booth is also planned. UNOLS worked with Maritime Training Services in Seattle this past year on a new gender climate at sea and harassment prevention film which was released in June and is available through Maritime Training Services. Their web site is: http://www.maritimetraining.com The new UNOLS Research Vessel Operators Committee Safety Orientation film which is shown at the start of each voyage was released in December 2013 and is available through the UNOLS Office. Copies of the film have been sent to all the UNOLS Operator Institutions. Lamont-Doherty Earth Observatory Operator s Report Sean Higgins/L-DEO provided the operators report for the R/V Marcus Langseth. See Power Point in the appendices. Sean has asked the MLSOC for their input on a proposal to trade the BAROVANE 46 to GeoVentures and in exchange GeoVentures would through CONCEPT Systems purchase for L- DEO/OMO- 2 new Power rtnu(s) valued at approximately $125,000. The Langseth is set up to stream 4 cables and without significant expensive modifications, these BAROVANE 46 would not be used. The MLSOC agreed with this plan, NSF approved it, and L-DEO will move forward on this. A letter will be sent from L-DEO to NSF to document this.

In January 2014, the Langseth will go into a drydock with an expected work package in the range of $2-2.5 million dollars of work planned. The Glosten Winch Plan and the Long Core/Sponson study is continuing. The list of equipment on the SSSE and Ocean Instrumentation proposals was reviewed and comments from the MLSOC were encouraged. There was considerable discussion on the Lead-In terminations as parts are no longer available. At present there are four left and one spare. See the Power Point slides. L-DEO will send the report to MLSOC. An overview of the 2013 cruises was given and the outlook for 2014 was presented. MLSOC Committee Business Dale led a discussion on the current MLSOC membership and that we still have one vacant position open for an industry type representative. The committee needs to take this item for action. Closed Executive Session The meeting then moved into a closed session to discuss operating models. It was attended by the MLSOC committee members, NSF program managers, and the UNOLS Office. Afternoon Sessions- Dec. 8th Young Career Scientists Workshop During this afternoon session the participants from the Early Career Workshop were introduced and gave short presentations on their research interests, where they are in their careers, area of study they are interested in, recent work they have done, and what they hope to do in the near future. The short Power Point presentations in are in the appendices. Science Presentations Several of the Principal Investigators & Chief Scientists from cruises on the R/V Marcus Langseth gave presentations on recent cruises as well as some upcoming programs. The presentations are in the appendices. Upcoming GeoPrisms Eastern North American Margin Community Seismic Experiment Donna Shillington/L-DEO covered this project and encouraged the early career community to apply to sail on this cruise. This ENAM project is scheduled for 2014 on the R/V Endeavor in April and September 2014 and on the R/V Marcus Langseth in September. Reykjanes Ridge Cruise Fernando Martinez/UH presented early data results from this cruise which was on the R/V Marcus Langseth for 13 August to 15 September 2013. This was a non-seismic cruise using the EM 122 multibeam to conduct bathymetric surveys along the ridge south of Iceland. Magnetics and gravity data was also collected. Early results are showing this was a very successful cruise.

Line Islands Coring Cruise Pratigya Polissar/L-DEO presented an overview and some data results from the Line Islands Coring cruise which was conducted on the Marcus Langseth from May 1-26, 2012. This was a piston, gravity, and multi-coring cruise and was also very successful. Deposition and Evolution of the Baranof Fan- Gulf of Alaska Cruise Maureen LeVoir Walton/UT covered this Extended Continental Shelf cruise which ran on the Langseth from June 6-26, 2011. USGS Bering Sea Cruise Elizabeth Yankovsky/ Univ. of South Carolina reported on a project using data from MGL 1111 to compare this data with synthetic seismic sections. ROV Jason Cruise Maurice Tivey/WHOI reported on the Jason cruise which was scheduled on the R/V Marcus Langseth from Aug 16-26, 2012. This was a Jason program which had been scheduled on the R/V Thomas Thompson, but had to be rescheduled due to a Z-drive failure on the Thompson. The cruise was successful although it did present some challenges on the deck layout and lab space. Low-Energy, (3-D) P-Cable Cruise within the Inner California Borderlands Graham Kent/Univ of Nevada/Reno presented cruise details on the use of the P-cable system which was deployed from the Scripp s R/V New Horizon from Aug 16 to Sept 1, 2013 off of San Diego. R/V Marion Dufresne Long Core Quality Helene Leau/IPEV, Head of the Oceanography Department for the Institut Polaire Francais, which operates the R/V Marion Dufresne gave a talk on the long coring system which is known as the Calypso. She presented data from recent cruises which highlighted the core quality and the recent changes they have made to the system to be able to monitor the core penetration. The issue of core stretching has been eliminated and cruise results will soon be published. Galicia-3D Cruise Dale Sawyer/Rice presented a report on the Galicia cruise which was on the R/V Marcus Langseth. Due to engine failure issues, this cruise had to be run as two legs in and out of Vigo, Spain from June 1-25 and July 15 to August 2, 2013. From early results, this was a successful cruise. Mariner Integrated Seismic and Geophysical Mapping Experiment- Robert Dunn reported out on this cruise which ran from April 11 to May 19, 2013. The Power Point presentation highlighted data from this cruise which studied the massifs on the Mid_Atlantic Redige south of the Azores.

Costa Rica 3-D Seismic Imaging Project Nathan Bangs/UT-Austin presented additional data results from this cruise which ran from April 9 th to May 12 th, 2011. Shatsky Rise Will Sager/UH presented a Power Point presentation on the MGL 1004 and MGL 1206 cruises to Shatsky Rise. These cruise legs were from July 17-30, 2010 and March 24 to April 16, 2012. This presentation titled: Shatsky Rise, Shooting the World s Largest Volcano and the data from this cruise are included in the appendices. Meeting Adjourned The meeting finished at 5:15 pm on Sunday 8 December, 2013. The next meeting will be scheduled at a date to be determined in 2014.