INTERNATIONAL CONFERENCE ROAD SAFETY

Similar documents
Traffic Calming Measures

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

Launceston and Tamar Valley Traffic Vision

Public Safety Management

The Railroad Commission of California

Egnatia Odos: An axis for development and co-operation

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

PERTH-ADELAIDE CORRIDOR STRATEGY

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Analysis of illegal parking behavior in Greece

ΙΕΝΕ 2011 Scientific Workshop. Highways and Wildlife: How do they coexist? Kastoria, September 22, 2011

Policy Transport. Policy highlights. Our plan

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

ELECTION SIGN GUIDELINES

Current Traffic Arrangements on. Korinthos-Patra. 16 kilometers of tunnels under construction on. Korinthos-Patra

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

Tourism In Evia (Euboea) : Travel Guide For Direct Holidays Near Athens Greece: Things To Do/places To Go/beaches Resorts/attraction/routes To

DEMIFER Demographic and migratory flows affecting European regions and cities

Response to the London Heathrow Airport Expansion Public Consultation

A Strategy Proposal for Road Infrastructure Development in Recession Times

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

20mph Speed Limit Zones

Road Rehabilitation Project

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

Agenda Cover Memorandum

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE

Public Safety Management

Crash and Behavioral Characteristics, and Health Outcomes, Associated with Vehicular Crashes by Tourists in Wisconsin,

South East Traffic Solution

Effects of Weather and Traffic controlled Variable Speed Limits in Sweden

Egnatia Odos Observatory. Egnatia Odos Observatory Monitoring of Egnatia Motorway s s Spatial Impacts

4. Safety Concerns Potential Short and Medium-Term Improvements

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

State Road Upgrades Northern Region

One year of Olympia Odos

Egnatia Odos, a tollway from the past to the future

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Mobility and transport

visits4u Case Studies: Historical Centre of Athens Athens, Greece

Quiet Zone Process. Background:

SH73 Route Security Strategic Study Project Summary

Bill M. Halkias, PE, F.ASCE, F. ITE CEO, Attikes Diadromes SA Athens, Greece

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

South Aegan Region (Greece)

Cammachmore. Community Action Plan Prepared by Newtonhill, Muchalls & Cammachmore Community Council

22-23 Pavement Marking Items. (Pages 7 & 8 removed)

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

Smart Safety Tidal Flow Barrier

REDD+ IN YUCATAN PENINSULA

Related Expertise Concession Projects - PPP

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

CHALLENGES IN DELIVERING SAFER ROADS IN ENGLISH LOCAL AUTHORITIES

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Communities and conservation in West Kilimanjaro, Tanzania: Participation, costs and benefits

Economic Geography of Japan. Ryoichi Imai

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

Better-resourced road policing across Europe is vital to cut casualties

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Theme A ECOTOURISM DEVELOPMENT IN TANZANIA : THE SUSTAINABILITY CHALLENGE

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

JOB DESCRIPTION FBO Manager

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

SAFETY IMPROVEMENT OF A DANGEROUS FOUR-LEG, STOP CONTROLLED INTERSECTION IN AFRAGOLA, ITALY

Standards for Snowmobile Trail Signing & Placement in British Columbia

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

NAPAIMUTE TRIBAL SAFETY PLAN Tribal Transportation Program

$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY

Non-Motorized Transportation

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

TRANSFRONTIER CONSERVATION AREAS (TFCAs)

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

7 TOWN OF BRADFORD WEST GWILLIMBURY OPA 15 INFORMATION REPORT ON THE BRADFORD BYPASS

Issue 02 Spring Works in progress. OLYMPIA PASS: quick and easy. The first 4 tunnels of the Korinthos- Patra Motorway. Alliance for Road Safety

Michigan s Engineering Safety Program for Local Roadways

New Jersey Department of Transportation

Auckland Transport Quarterly Indicators Report 2018/19

The Research Fund for Coal and Steel

Pattullo Bridge Replacement Project

UTTLESFORD DISTRICT COUNCIL LOCAL HIGHWAYS PANEL MINUTES 15 JANUARY :00 COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN

State Road Upgrades Southern Region

Council Policy Tourist Oriented Destination Signs

Georgia: Flash floods

For personal use only

Community Development

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

10 th INSULEUR FORUM Palma de Mallorca, 10-11/6/2010

Tunnelling Featured Projects

Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach

AIRSPACE PROTECTION. Guidance and considerations for development in the vicinity of Ohio s airports and heliports

Current Corridor Characteristics

STRATEGY FOR ADAPTING TO CLIMATE CHANGE

Cooperative systems for road safety Smart Vehicles on Smart Roads. the SAFESPOT Integrated Project

Transcription:

INTERNATIONAL CONFERENCE ROAD SAFETY Road Safety Problems of the National Road Network in Greece, especially in the Area of Evia Geotechnical Problems Antonis Kastis Transportation Engineer, Coordinator of Road Safety Observatory, Technical Chamber of Greece E-mail: akastis@tee.gr Halkida, 25-26 & 27 June 2009

Generally, we have to say that for Greece it is difficult to achieve the common European target for reducing deaths from road accidents 50% until the year 2010. The first years after 2000 until 2002 a big reduction was achieved in Greece, but after that there is a resistance for further reducing. The biggest progress has been made in the Attiki Prefecture where the law enforcement is more strict. Seat belt, helmet and drunk driving violations have been reduced as the drivers have understood the necessity of changing their behavior. The following graphics are very characteristic.

As we can observe from these graphics for Greece it is difficult to achieve the common European target. Our estimation is that for the year 2010 the number of deaths will range between 1.350-1.400 deaths. Therefore our country has to try hard with a new strategic plan for the decade 2010-2020. The Road Safety observatory of the Technical Chamber of Greece is preparing a new platform in order to assist the Greek State to device a new realistic strategic plan, as the TCG is the official Technical Consultant of the Greek State.

Project: Short-term Interferences with low cost at Black Spots and Improving the level of road safety for the main axis of Evia Halkida-Strofilia-Limni-Aidipsos Halkida-Lepoura-Kimi port.

The Ministry of Public Works elaborated a big project by the above title in order to improve the level of road safety in Evia by reducing the accidents. It was a big project considering the fact that the road maintenance was low, due to the serious Greek financial problems of the last years. The total budget of the programme was 8 million including VAT.

EVIA PERFECTURE has two major road axis The northern one HALKIDA-STROFILIA-LIMNI-AIDIPSOS and the southern one HALKIDA-LEPOURA-KIMI PORT.

These two road axis belong to the National Highway network and a small section of them belong to the provincial road network. However this section is considered as national level due to the traffic volume and the developing value that it has for the whole EVIA island.

Northern Road axis Halkida-Strofilia-Limni-Aidipsos

HALKIDA - AIDIPSOS AXIS Geotechnical Problems Geotechnical Problems

The total length is 112km. HALKIDA-AIDIPSOS AXIS The big traffic volume is located at the first section Halkida-Psachna. The section Psachna-Limni has a lower traffic volume. The last section Limni-Aidipsos has an increasing traffic volume due to the touristic coastal line Limni-Rovies-Ilia-Aidipsos. This section appears to be the most problematic because of the occurring serious geotechnical problems which will be referred later.

HALKIDA-AIDIPSOS AXIS Basic Road characteristics High traffic volume for the section Halkida-Psachna which is considered as urban area. Intense relief for the section Psachna-Strofilia which has high altitude with a lot of maintenance problems during winter. Serious Geological problems such as landsliding and consolidation, which results in frequent closure of the road. High touristic traffic volume during summer. A big number of Intersections. There are 48 Intersections with allocation of 1 Intersection/2.3km. The majority of these I/S has no efficient channelization. A lot of roadside obstacles without appropriate protection in front of them: Lighting Poles. PPC or Communication Poles. Big trees. Illegal advertising Signs.

HALKIDA-AIDIPSOS AXIS Black Spots According to the relevant design there are 24 Black Spots. The average allocation is 1 Black Spot / 4.6km. Geotechnical - Geological Problems of the Limni-Aidipsos section The serious geological problems of this section need a Geotechnical research with drills in order to gain slope stability. The construction of one or two tunnels for the difficult sections may be necessary for permanent solutions.

Retaining walls with nets. Section Psachna-Strofilia. HALKIDA-AIDIPSOS AXIS

Retaining walls with nets. Section Psachna-Strofilia. HALKIDA-AIDIPSOS AXIS

Landsliding. Section Rovies-Aidipsos. HALKIDA-AIDIPSOS AXIS

HALKIDA-AIDIPSOS AXIS Landsliding. Section Rovies-Aidipsos.

Section Rovies-Aidipsos HALKIDA-AIDIPSOS AXIS

Section Rovies-Aidipsos HALKIDA-AIDIPSOS AXIS

Southern Road axis Halkida-Lepoura-Kimi Port

HALKIDA- LEPOURA - KIMI AXIS Geotechnical Problems

HALKIDA-LEPOURA-KIMI PORT AXIS The total length is 82 km. The average AADT is about 5.000 veh/day. The highest traffic volume appears in the first section, Halkida-Amarynthos which includes the very famous touristic place of Eretria. The second section of Amarynthos-Lepoura has a lower traffic volume. The last section of Lepoura-Kimi port is a fully rural road which traverses a lot of villages.

HALKIDA-LEPOURA-KIMI PORT AXIS Basic Road characteristics The first and the second section of the road traverses to urban areas with a lot of country houses, hotels and other touristic settlements such as restaurants, cafés etc. The main safety problem of this section is the pedestrians who cross the roads to go at the beach in combination with a lot of bus stations without safe crosswalks. Due to these problems a lot of road accidents occur. Furthermore the typical section of the road is too narrow (about 5.50 6.00m) without the appropriate space of the shoulders for the safety barriers. There is not enough length to overtake, therefore a lot of head-on or side collisions occur. There is a big number of Intersections. There are 60 Intersections, the majority of which has no efficient channelization. The average allocation is of 1 I/S per 1.36km which is a very big number. Especially after Amarynthos the road traverses a lot of villages. The drivers, in general, don t obey the speed limit of 50km/h.

HALKIDA-LEPOURA-KIMI PORT AXIS Black Spots According to the relevant design, 32 Black Spots are located on the axis. The Average Allocation is 1 Black Spot / 2.6km. It is obvious that the allocation of Black Spots is enormous. Geotechnical - Geological Problems for the section Platana-Kimi Port Very serious geological problems are located in this section for a length of about 5km at Platana s area. Landslidings create problems to the road since there is no slope stability. Despite the efforts for about 20 years to solve the problems, there were no efficient results. Now it is clear that a very serious geotechnical research and design is necessary in order to give definite solutions to this longtime problem.

HALKIDA-LEPOURA-KIMI PORT AXIS Pavement Consolidation Barrier Problems Section Platana-Kimi port

Pavement Consolidation Section Platana-Kimi port HALKIDA-LEPOURA-KIMI PORT AXIS

Section Platana-Kimi Port HALKIDA-LEPOURA-KIMI PORT AXIS

Axis Lepoura-Karistos

LEPOURA-KARISTOS AXIS

Landsliding. Section Karistos-Marmari LEPOURA-KARISTOS AXIS

Landsliding. Section Karistos-Marmari LEPOURA-KARISTOS AXIS

Landsliding. Section Karistos-Marmari LEPOURA-KARISTOS AXIS

INTERNATIONAL CONFERENCE ROAD SAFETY Road Safety Problems of the National Road Network in Greece, especially in the Area of Evia Geotechnical Problems Antonis Kastis Transportation Engineer, Coordinator of Road Safety Observatory, Technical Chamber of Greece E-mail: akastis@tee.gr Halkida, 25-26 & 27 June 2009