AIXM/WXXM CONFERENCE 2010

Similar documents
QMS for AIS/MAP Service Implementation Workshop

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

30 SEP - 02 OCT, 2014

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

AIS-AIM Study Group Working Status

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

Introduction to Amendment 40 to Annex 15

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

International Civil Aviation Organization. Performance Framework for AIM implementation in the MID Region

Work Programme of ICAO Panels and Study Groups

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

Avitech GmbH AIXM Capabilities & Experiences

Aeronautical Information Management

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

TWELFTH AIR NAVIGATION CONFERENCE

AIS-AIMSG-Memo/1 8/10/2008 MEMORANDUM. Members, Aeronautical Information Services-Aeronautical Information Management Study Group (AIS-AIMSG)

Safety Management 1st edition

International Civil Aviation Organization. Second Meeting (AIM SG/2) (Kish Island, Iran, 31 August-2 September 2015)

TWELFTH AIR NAVIGATION CONFERENCE

ICAO EUR Region Performance Framework

AIM in support of ATM

ICAO GANP Requirements and Evolution

International Civil Aviation Organization. ICAO Updates. 13 th COSCAP-NA Steering Committee Meeting

Sharing UAE experience in. AIM implementation

TWELFTH AIR NAVIGATION CONFERENCE

MEETING OF THE METEOROLOGY PANEL (METP) WORKING GROUP MOG

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

Development of the Global AIM Strategy (AIM Projects)

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

MIDAD Project IDS Vision

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

The Importance of AIM and the Operational Concept

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Meteorological Service for International Air Navigation

Providing the Context Air Navigation Integrated Work Programme

Regional implementation of Electronic Terrain and Obstacle data (e-tod) (Presented by Jeppesen)

Airport AIM as a Service Presented at World ATM Congress 2016

International Civil Aviation Organization ASSEMBLY 38TH SESSION EXECUTIVE COMMITTEE PROPOSED ROADMAP TO STRENGTHEN GLOBAL AIR CARGO SECURITY

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

COSCAP CAAM COOPERATION

SAMPLE TEMPLATE APPENDIX 3.5C-1

ICAO EXPERT GROUPS PROPOSAL

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

UPCOMING AMENDMENTS TO ANNEX 14 VOLUME I

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20

Quality Management System (QMS)

NOTICE OF PROPOSED RULE MAKING

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

ICAO. Here is how the ICAO legal framework for drones is developed.

International Civil Aviation Organization

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009

AIM WG: Contributing to ATM Success. Roland Baumann Head Planning & Development AIM skyguide

Aeronautical Information Services Issue 1 30 May 2012

MID Region Air Navigation Strategy

TWELFTH AIR NAVIGATION CONFERENCE

COST RECOVERY OF AERONAUTICAL INFORMATION. Presented by Julián de la Cámara (ICAO EPM) AIS-AIMSG First Meeting Montreal, 2-4 December 2008

AIM AUTOMATION. Raul Martinez, RO/AIM International Civil Aviation Organization North American, Central American and Caribbean Office

ADQ Regulators Working Group

Terms of Reference for a rulemaking task

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

AIXM Coding guidelines for the ICAO data sets

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Agenda Item 6: Aviation Security and Facilitation

Introduction to the Data Catalogue

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

IRELAND SAFETY REGULATION DIVISION

TWELFTH AIR NAVIGATION CONFERENCE

Global Information Management. Status Report: AIXM

TWELFTH AIR NAVIGATION CONFERENCE

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

TWELFTH AIR NAVIGATION CONFERENCE

What is safety oversight?

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

FLIGHT OPERATIONS PANEL (FLTOPSP)

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Technical Resources - Automation European AIS Database (EAD)

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

Regional implementation ASBU Bn-AMET

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)

INTERNATIONAL CIVIL AVIATION ORGANIZATION REPORT OF THE FIFTH MEETING OF THE MIDAD TASKFORCE (MIDAD TF/5) AND

ICAO Universal Safety

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Regional Air Navigation Plan - Planning Methodologies and Tools. H. Sudarshan

Accept, Sir/Madam, the assurances of my highest consideration.

(Presented SUMMARY. the meeting. Action by 1.1. respectively. arrangements the World published. There is a pressing counter to 1.3.

LATVIAN AIP DATA SET

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline

Transcription:

AIXM/WXXM CONFERENCE 2010 ICAO Aeronautical Information Services Aeronautical Information Management Study Group (AIS-AIMSG) Development of Standards and Recommended Practices (SARPS) Presented to: AIXM/WXXM CONFERENCE 2010 By: Gregory Pray and Marvin Hoffman Date: 4 May 2010

Overview International Civil Aviation Organization (ICAO) Standards and Recommended Practices (SARPS) ICAO Aeronautical Information Services Aeronautical Information Management Study Group (AIS-AIMSG) AIS-AIMSG Ad-hoc Group on Annex 15 Concluding Remarks 2 2

ICAO AIS-AIMSG Background Tasks Challenges Actions Roadmap Amendment 36 to Annex 15 Guidance Materials Follow-up actions 3 3

AIS-AIMSG Background Established March 2008 by the ICAO Air Navigation Commission (ANC) To assist the Secretariat with the AIS-AIM transition tasks and AIM work program Study group formed September 2008 15 members act as independent experts AIS-AIMSG Meetings Hosted by HQ ICAO Air Navigation Bureau (ANB) MET/AIM Section, Aeronautical Information Unit, Montreal Two meetings: December 2008 and November 2009 Next meeting: November 9-12, 2010 ICAO AIM web page: http://www2.icao.int/en/anb/met-aim/aim 4 4

Tasks To satisfy new requirements arising from the Global ATM Operational Concept - Transition from AIS to AIM Develop a global AIS-AIM strategic roadmap Develop SARPS and guidance material to: Enable global exchange of aeronautical information Provide for exchange models and their evolution Ensure uniform, timely and quality-assured presentation to users throughout the ATM system Establish Quality Management Systems Provide AIM staffing and training guidelines/materials Guidance for legal and institutional issues 5 5

Challenges ICAO SARPS and guidance development Global, transparent process Amendment timelines Global acceptance required Transition from product-centric to data-centric processes supporting global ATM Information and data management processes that assure data quality and integrity from originators to users ATM system-wide 6 6

Challenges Performance Based Approach Manual on Global Performance of the Air Navigation System A decision-making method based on three principles: strong focus on desired/required results; informed decision-making driven by those desired/required results; and reliance on facts and data for decision-making National, Regional and Global planning and implementation capabilities Implementation assistance Incremental approach 7 7

AIS-AIMSG Actions Roadmap completed and noted by ANC On the web in six languages: http://www2.icao.int/en/anb/metaim/aim/pages/roadmapfromaistoaim.aspx Living document under ongoing review can be amended Amendment 36 to Annex 15 Aeronautical Information Services Interim SARPS for AIM Effective 12 July 2010 and applicable 18 November 2010 Some etod SARPS applicable 12 November 2015 Amendment 56 to Annex 4 Aeronautical Charts Applicable 18 November 2010 Except Aerodrome Terrain and Obstacle Chart ICAO applicable 12 November 2015 8 8

AIS-AIMSG Actions Development of Annex 15 Amendments 37 and 38 underway Continue development of interim SARPS for AIM Major revision of Annex 15 in Amendment 38 Development of Annex 4 Amendments 57 and 58 also in process Prepare for planned MET/AIM Divisional Meeting in 2014 9 9

Roadmap: Transition Phases from AIS to AIM 1 Consolidation now/ongoing: Quality, AIRAC, WGS-84, electronic terrain and obstacle data 2 Going digital - began Nov 2009: Introduce database-driven processes Aeronautical information conceptual model guidance developed 3 Information management begin Oct 2011: Meet Global ATM requirements Quality assured new products and services Development of Standards (Already underway) Implementation of Standards Performance and business driven 10 10

Roadmap Steps High Level Actions for Transition Phase 3 Phase 2 Phase 1 11 11

Amendment 36 to Annex 15 Quality management system (QMS) Metadata SARPS support the aeronautical data chain (traceability) Recommendations for digital data exchange: Use of automation - enabling digital data exchange Use of the public Internet Electronic aeronautical information publications (eaip) NOTAM Format enhancements cancellations, effective date and time Reporting of radioactive material, toxic chemicals and volcanic ash deposition runway contamination Strengthen AIRAC use and adherence Automated preflight information system SARPS upgraded from a recommendation to a standard Electronic terrain and obstacle data (etod) significant revisions achievable SARPS 12 12

Use of Automation Enabling Digital Data Exchange 3.6.5 Use of automation Recommendation. Automation enabling digital data exchange should be introduced with the objective of improving the speed, quality, efficiency and costeffectiveness of aeronautical information services. Note. Guidance material on an aeronautical conceptual and data exchange model for the development of databases and the establishment of data exchange services is contained in Doc 8126. 13 13

Electronic Aeronautical Information Publications (eaip) 14 14

Guidance Materials Amendment No 3 to Doc 8126 will include: Digital Data Exchange Guidance No specific version of AIXM specified in consideration of possible significant investments in older versions AIXM 5 described as general performance requirements Mentioned as a possible means of compliance Description of AIXM 5 and CD with complete documentation eaip Guidance New Quality Management System Manual A welcome addition for States developing a quality system will help harmonize the global quality goal Final draft to be submitted to ICAO May 2010 15 15

Follow-up Actions Revise and restructure Annex 15: Include new definitions related to AIM Refine data integrity requirements Introduce AIM services and separate data from publications Digital AIM services manual Establish AIXM Governance AIS-MET Data link Aerodrome mapping databases (AMDB) Training Manual Update Aeronautical Chart Manual (Amendments 56 and 57) Safety Management System Legal and institutional issues MET component considerations Consequential amendments to other ICAO Annexes and Guidance Materials 16 16

Follow-up Actions AIS-AIMSG members and groups are assigned to action items All members encouraged to make an input Ad-Hoc Groups: Including AIM in Annex 15 (+ guidance Docs) AIM Quality Manual Aeronautical Chart Manual Doc 8697 Training Legal and Institutional Issues 17 17

AIS-AIMSG Ad-hoc Group on Annex 15 Revise Annex 15 SARPS Scope/Responsibilities New AIM processes and services Clarity in definitions Information and data management Aeronautical information and data quality assurance from originator to ATM system-wide Integrity in the data handling and exchange processes Products and Services Classic AIS products New Services Communications Quality Management System 18 18

Development of Amendments 37 and 38 in Parallel plus Guidance Materials Amendment 37 Provide SARPS and guidance materials necessary for initial transition to AIM Applicable November 2013 Amendment 38 Provide mature SARPS and the process for full transition to AIM Draft SARPS to be considered by States attending the planned MET/AIM Divisional Meeting in 2014 Applicable November 2016 Guidance materials for classical AIS products and the new AIM products and services 19 19

CONCLUDING REMARKS Revisions to SARPS and guidance materials for AIS-AIM transition are underway States should follow the Roadmap Complete the steps in Phase 1 Continue Phase 2 Implement Annex 15 Amendment 36 Consider AIXM and eaip guidance in Doc 8126 Prepare for Phase 3 20 20

CONCLUDING REMARKS Performance Requirements SARPS Provide for the facts and data for necessary to support informed decision-making SARPS for Data-Centric Operations SARPS for information management system-wide SARPS for data quality and integrity requirements AIXM Governance Process under Development 21 21

THANK YOU ANY QUESTIONS? 22 22