NEW MAIN AURORA PUBLIC LIBRARY BID PACKAGE BP2 TABULATION January 14, 2014

Similar documents
New Indio Juvenile and Family Courthouse JCC Project No.: FSO JR Judicial Council of California Indio, CA Prequalified* Bidders List

Reviewed By Reiland Funderburk 10/20/2016 1:07:41 PM

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

Interior Design Unit Specifications. Unit Specifications. IMT - Diehl Trail. Austin, TX

PORTER S BAY HEATED SQFT*

Homes in Yauhanna Landing Overview

FOR SALE $895,000. ±10,836 SQFT Flex Warehouse & Office Space in South Asheville. Prime Location in South Asheville Corridor!

11-CON-52 Accurate Insulation 495 S. High Street, Ste 50 Columbus OH (614)

MetroView TM FG 501T Window Wall

COMMERCIAL LAND/BUILDING

Paris Block Consultant, Trade and Supplier Contact List

Outdoor Kitchen Collection

Giardino Series. Specification Sheet. Modular Refractory Pizza Ovens Kits. The Giardino Family. A Custom Pizza Oven Made Easy

GILBANE BUILDING COMPANY North Shore School District #112. Dan Sullivan Project Executive. Date: S. Mackall, D. Danker, J. Masters

Country Manor Park Models

University Park. 100 Howe Avenue

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016

ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE

Lockable Fasport. IFP-600 Dimensions Overall Height 9.5" Overall Width 10" Opening Dia. 6.5" Weight 9 lbs. Model

ALL WORK BASE BID NO. 0 GEN WORK BASE BID NO. 1. BB or ALT. BID NO. 1A ALT. BID NO. 0A CONTRACTOR BB 2,957, ,000.00

7. Heat pumps are installed. B & P will schedule a Site Visit for the week of November 20, 2011.

Alexandra Grove Westview Dr., Houston, TX Price range: $537,000 - $648,500. For More Information. Amanda Osborne Sales Consultant

Wissahickon School District

Build for New Zealand conditions, our units come with a 2 year warranty and look great on any site.

COMMERCIAL LAND/BUILDING Salmon Arm Industrial Park. For Sale $1,350,000

TWO BALLSTON PLAZA AVAILABLE SPACE AMENITIES. Leasing Information: 1110 N. Glebe Road, Arlington, VA 22201

THE LONDON FLATS C O L L E C T I O N

BIG CITY MEETS SMALL TOWN CHARM

Impressive semi-custom single story home with three bedrooms and 2 full baths. Entry foyer invites you into something special.

Distributed by Run On Sun Australia Pty Ltd Ph

White Oak Lake W. 15 ½ St. Houston, TX Starting at: $700k. For More Information. Sales Consultant

Kane County Randall Road Branch Court Planholders List

CONSTRUCTION COMMITTEE MEETING AGENDA

Contractors and Service Providers Registered to Work on Arrowhead Lake Association Properties April 1, 2019 March 31, 2020

Versatube building systems prices Versatube building systems prices

Case Study. New UK Head Office For The Global Market Leader in Chemical Distribution Design and installation of a new modern office interior.

CONSTRUCTION COMMITTEE MEETING AGENDA

THE LONDON FLATS C O L L E C T I O N

H E A R T O F A C I T Y. soul of an island.

Schedule of Finishes - Internal. South (Memorial Drive) Building - Memorial Drive Apartments Typical Apartments

2018 VAULT DOOR CATALOG VAULT DOORS STORM SHELTERS - SAFE ROOMS EMERGENCY ESCAPE HATCHES

VIRGINIA HOMES COLLECTION OF HOMES

The newest addition to iconic East Sydney.

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL

Administrative District Council 1 Signatory Tile and Terrazzo Contractors 660 N. Industrial Dr. Elmhurst, Il (630)

ASSEMBLY INSTRUCTIONS

INSPECTION HISTORY REPORT Friday, December 8, 2017

Muskoka Folding Glass Wall System

Class B+ Class C RV-NEXUS

Fabulous Home s Modern Style

THANK YOU. state leaders and taxpayers for investing in our schools! 1998 CAPITAL IMPROVEMENT PROGRAM BOULDER CITY HIGH SCHOOL

Jesύs A. Adame. Bill Bailey. Kevin Tracy. Shannon Burk. Thomas Shelton. Win Haggard. Chris Allen. Duane Davis

ECO-LABELLING CRITERIAS (ORDER FORM) ALL DOCUMENT AVAILABE IN PDF ONLY

Proposal Quote/Bid. Permit Required. Oversight AITE. Doors

FOR SALE $689,900. Medical Office Condo Overlook at Lake Julian SEE INSIDE FOR MORE INFORMATION! TURNKEY! 600 JULIAN LANE UNIT 640 ASHEVILLE NC

CONSTRUCTION COMMITTEE MEETING AGENDA

City of San Clemente NEW Business License Report By Issue Date For the Period 2/1/2018 thru 2/28/2018

9/16" deep socket Socket wrench (ratchet) 3/16" drill bit 5/8" spade bit Electric drill or power screwdriver Safety glasses

MORRISTOWN REIMAGINED OUNT KEMBLE

ECO-LABELLING CRITERIAS (ORDER FORM) ALL DOCUMENT AVAILABE IN PDF ONLY

2620 Windsor Centre Trail Flower Mound, Texas 75028

Cottage Grove Lake Kansas Street, Houston Price range: $335K to $700K. For More Information. Brandon Rufener Sales Consultant

Sunset Heights Harvard St. Houston, TX Price range: $ k. For More Information. Sales Consultant

PERIMETER SEVEN Carrington Mill Blvd morrisville, nc PERIMETERPARKOFFICE.COM

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

ECO-LABELLING CRITERIAS (ORDER FORM)

CONTENTS. 1. Types of confections. 2. Profile overwiev. 3. Setting the metallic reinforcements. 4. Millings, drillings. 5. Welding. 6.

August 2015 Price List

CONSTRUCTION COMMITTEE MEETING AGENDA

WESTON, WEST VIRGINIA

Muskoka Folding Glass Wall System

DESIGN CONCEPT. Aston Bogor. Aston Cirebon. Grand Aston Yogyakarta. Aston Banua - Banjarmasin

Tweed City Fitout Guidelines. Issue date : July 2011 Rev : 2

SCHEMATIC PACKAGE SHEET INDEX

High energy efficiency

For when you want something more than just a garage door. Selections

APPRENTICE PROGRAM Program valid 1/2/18 12/31/18

QUALIFIED CONTRACTORS

Start Living on Mountain Time

Modelo. Murano. Representación artística sujeta a posibles cambios sin valor contractual.

Orange Hill Place. Welcome to. From the $ 200 s. Convenient Cobb County location! NOW SELLING!

Plaza Leyenda N. Frank Lloyd Wright Blvd. Scottsdale, AZ Project No:

CONSTRUCTION COMMITTEE MEETING AGENDA

Sustainable Brisbane Walking Tour

Welcome Home. The Courtyards at Ashley Woods

The car is very unique in that it has a traditional business car floor plan but instead of the normal open platform it was equipped with a solarium ty

PERIMETER SEVEN Sync Street morrisville, nc PERIMETERPARKOFFICE.COM

HOME SPECIFICATIONS. Adagio II PLAN A2 PATIO. Key FEATURES

The Villas at Emerald Dunes 10 Condominium Units Emerald Dunes Dr. West Palm Beach, FL 33411

ECO-LABELLING CRITERIAS (ORDER FORM) ALL DOCUMENT AVAILABE IN PDF ONLY

PRINCETON, WEST VIRGINIA

fire tables & fire pits

Fabulous Homes International Realty Group Office: Direct Via what s App: / / / Website:

Home Inspection Report

Storm Windows. Tru-Channel. Comparative Air Infiltration Rates (CFM/FCP) The lower the number, the better the performance.

PERIMETER SIX Carrington Mill Blvd morrisville, nc PERIMETERPARKOFFICE.COM

A LUXURY STANDARD BARRIER-FREE LUXURY LIVING

Modular Log Cabins & Log Homes Alan's Factory Outlet Luray VA

ParkSquareHomes.com SITEMAP. Edgewater at Bellalago

YONGE & WELLESLEY OFFICES ON THE PARK

Transcription:

PERMEABLE PAVERS BP2-01 A DDENDA BASE No. 1 No. 2 Voluntary Alternate 1) C. R. Schmidt Yes 1 4 1-3 $209,900.00 0 0 Yes 2) Beary Landscaping Yes 1 4 $225,955.00 0 0 No LANDSCAPING IRRIGATION BP2-02 BASE No. 1 No. 2 Voluntary Alternate 1) Breezy Hill Nursery Yes 1 4 1-3 $178,300.00 $3,500.00 $12,300 No 2) Pedersen Company Yes 1 2 1-2 $261,327.00 $3,295.00 $9,461.00 No 3) Sebert Landscaping Yes 1 4 1-2 $218,667.00 $2,963.00 $8,821.00 No 4) Beary Landscaping Yes 1 4 $158,800.00 $1,740.00 $5,732.00 No 5) Allied Landscaping Yes 1 4 1 3 $191,135.00 $4,195.00 $9,700.00 Yes 6) Twin Oaks Landscaping Yes 1-4 1 $190,517.00 $4,995.00 $10,135.00 No CONCRETE SLAB ON GRADE / FLATWORK BP2-03 BASE No. 1 No. 2 No. 12 No. 22 1) Manusos General Contracting, Inc. Yes 1 4 1-3 $669,000.00 $13,500.00 $4,955.00 $2,300.00 (-$28,360.00) No 2) M/M Peters Construction, Inc. Yes 1 4 1-3 $892,759.00 $27,100.00 $5,200.00 $3,800.00 (-$29,000.00) No 3) Eagle Concrete, Inc. Yes 1 4 1-3 $643,900.00 $12,900.00 $3,400.00 $3,900.00 (-$55,400.00) No 4) Matrix Concrete Construction, LLC Yes 1-4 1 3 $757,000.00 $14,000.00 $3,700.00 $5,000.00 (-$53,700.00) Yes 5) Builders Concrete Services, LLC Yes 1 4 1 3 $499,888.00 $10,370.00 $2,420.00 $2,300.00 (-$31,000.00) No 6) Don Bohr and Sons, Inc. Yes 3 4 1 3 $636,061.00 $9,059.00 $2,499.00 $3,250.00 (-$43,079.00) Yes Voluntary Alternate 1 of 11

MISCELLANEOUS METALS BP2-04 BASE No. 12 Voluntary Alternate 1) Waukegan steel, LLC Yes 1 4 1-3 $360,000.00 $5,000.00 No 2) Composite Steel Products, Inc. Yes 1-3 $684,978.00 $5,000.00 Yes 3) Construction Systems, Inc. Yes 1-3 $300,000.00 $0 Yes 6) Steel Management, Inc. Yes 1 4 1 3 $299,000.00 $5,000.00 No GENERAL TRADES BP2-05 BASE No. 1 No. 2 No. 11C 1) Manusos General Contracting, Inc. Yes 1 4 1-3 $419,750.00 $56,900.00 $6,950.00 $15,550.00 No 2) Hargrave Builders, Inc. Yes 1 4 1-3 $272,800.00 $44,400.00 $5,400.00 $10,200.00 No 3) L. J. Dodd Construction, Inc. Yes 1 4 1-3 $339,000.00 $50,500.00 $4,500.00 $2,400.00 No 4) J. C. Harris and Sons, Inc. Yes 1-4 1 3 $288,389.00 $46,500.00 $5,500.00 $10,300.00 No 5) L. J. Morse Construction Yes 1 4 1 3 $281,670.00 $47,640.00 $4,850.00 $4,680.00 No Voluntary Alternate 2 of 11

MILLWORK, CABINETRY & COUNTERTOPS BP 2-06 BASE S 1) Carroll Seating Company Yes 1 4 1 4 $323,000.00 No 2) Con-Temp Cabinets, Inc. Yes 1 4 1 3 $384,380.00 No 3) Ameriscan Design Yes 1 4 1 3 $332,625.00 No 4) J. C. Harris and Sons, Inc. Yes 1-4 1-3 $306,740.00 No 3 3-A 3-B 3-C 3-D 3-E 3-F 3-G 3-H 1) $150,275.00 $13,103.00 $30,403.00 $17,364.00 $30,043.00 $12,226.00 $19,614.00 $17,364.00 2) $232,000.00 $43,860.00 $56,845.00 $19,110.00 $44,075.00 $8,865.00 $17,605.00 $19,110.00 3) $464,655.00 $60,860.00 $27,870.00 $33,260.00 $62,860.00 $14,175.00 $20,375.00 $33,260.00 4) $77,312.00 $8,020.00 $11,561.00 $7,879.00 $19,625.00 $7,473.00 $8,571.00 $7,879.00 4 4-A 4-B 4-C 4-D 4-E 4-F 4-G 4-H 1) $143,847.00 $12,355.00 $30,052.00 $17,131.00 $29,496.00 $12,030.00 $19,391.00 $17,083.00 2) $230,200.00 $43,520.00 $56,365.00 $18,940.00 $43,710.00 $8,795.00 $17,465.00 $18,940.00 3) 4) $71,169.00 $7,305.00 $11,232.00 $7,657.00 $19,130.00 $7,285.00 $8,359.00 $7,611.00 5 5-A 5-B 5-C 5-D 5-E 5-F 5-G 5-H 1) $143,362.00 $12,072.00 $29,984.00 $17,084.00 $29,386.00 $11,984.00 $19,347.00 $17,083.00 2) $228,864.00 $43,270.00 $56,005.00 $18,820.00 $43,440.00 $8,740.00 $17,360.00 $18,820.00 3) 4) $70,706.00 $7,034.00 $11,166.00 $7,611.00 $19,025.00 $7,241.00 $8,396.00 $7,611.00 7 14 1) (-$63,500.00) $11,500.00 2) (-$65,890.00) $7,395.00 3) (-$31,950.00 $40,300.00 4) (-$48,000.00) $4,700.00 3 of 11

FIREPROOFING BP 2-07 BASE 1) ASC Fireproofing, Inc. Yes 1-4 1-3 $230,000.00 No 2) American Fireproofing, Inc. Yes 3-4 1-3 $316,820.00 No 3) Wilkin Insulation Company Yes 1-4 1-3 $214,300.00 No DOORS / FRAMES / HARDWARE BP 2-08 BASE No. 18 1) Security Builders Supply Co. Yes 1-4 1-3 $134,950.00 No $11,900.00 OVERHEAD DOORS / DOCK EQUIPMENT BP 2-09 BASE No. 11B 1) House of Doors, Inc. Yes 1-3 1-2 $39,498.00 No $1,395.00 INTERIOR ALUMINUM AND GLAZING BP 2-010 BASE No. 17 1) 3F Corporation Yes 1-4 1-3 $424,000.00 No $28,000.00 2) Alumital Corporation Yes 1-4 1-3 $510,000.00 No (-$23,478.00) 3) Accurate Glass, Inc. Yes 1-4 1-3 $449,960.00 Yes (-$28,500.00) 4 of 11

GYPSUM BOARD ASSEMBLIES BP 2-011 CM ADDEND A 5 of 11 BASE 1) International Decorators, Inc. Yes 1-4 1-3 $1,377,534.00 No 2) The Rockwell Group Yes 1-4 $1,477,000.00 No 3) Doherty Construction, Inc. Yes 1-4 1-3 $1,348.800.00 No 4) Heitkotter, Inc. Yes 1-4 1-3 $1,554,084.00 No 5) Champion Drywall, Inc. Yes 1-4 1-3 $1,384,400.00 No 6) L. J. Morse Construction Yes 1-4 1-3 $1,351,961.00 Yes 3 3-A 3-B 3-C 3-D 3-E 3-F 3-G 3-H 1) (-$8,064.00) (-$5,893.00) (-$7,712.00) (-$2,440.00) (-$2,780.00) (-$1,055.00) (-$2,252.00) (-$2,440.00) 2) (-$39,700.00) (-$5,700.00) (-$6,200.00) (-$2,900.00) (-$9,600.00) (-$4,200.00) (-$5,400.00) (-$2,600.00) 3) (-$10,030.00) (-$315.00) (-$1,150.00) (-$1,450.00) (-$2,750.00) (-$750.00) (-$2,500.00) (-$1,350.00) 4) (-$17,378.00) (-$569.00) (-$2,734.00) 5) (-$24,000.00) (-$3,200.00) (-$1,200.00) (-$800.00) (-$2,100.00) (-$1,200.00) (-$4,000.00) (-$800.00) 6) (-$17,407.00) (-$9,018.00) (-$6,279.00) (-$1,623.00) (-$7,322.00) (-$2,630.00) (-$2,275.00) (-$2,282.00) 4 4-A 4-B 4-C 4-D 4-E 4-F 4-G 4-H 1) (-$8,064.00) (-$5,893.00) (-$7,712.00) (-$2,440.00) (-$2,780.00) (-$1,055.00) (-$2,252.00) (-$2,440.00) 2) (-$39,700.00) (-$5,700.00) (-$6,200.00) (-$2,900.00) (-$9,600.00) (-$4,200.00) (-$5,400.00) (-$2,600.00) 3) (-$10,030.00) (-$315.00) (-$1,150.00) (-$1,450.00) (-$2,750.00) (-$750.00) (-$2,500.00) (-$1,350.00) 4) (-$17,378.00) (-$569.00) (-$2,734.00) 5) (-$24,000.00) (-$3,200.00) (-$1,200.00) (-$800.00) (-$2,100.00) (-$1,200.00) (-$4,000.00) (-$800.00) 6) (-$17,407.00) (-$9,018.00) (-$6,279.00) (-$1,623.00) (-$7,322.00) (-$2,630.00) (-$2,275.00) (-$2,282.00) 5 5-A 5-B 5-C 5-D 5-E 5-F 5-G 5-H 1) (-$8,064.00) (-$5,893.00) (-$7,712.00) (-$2,440.00) (-$2,780.00) (-$1,055.00) (-$2,252.00) (-$2,440.00) 2) (-$39,700.00) (-$5,700.00) (-$6,200.00) (-$2,900.00) (-$9,600.00) (-$4,200.00) (-$5,400.00) (-$2,600.00) 3) (-$10,030.00) (-$315.00) (-$1,150.00) (-$1,450.00) (-$2,750.00) (-$750.00) (-$2,500.00) (-$1,350.00) 4) (-$17,378.00) (-$569.00) (-$2,734.00) 5) (-$24,000.00) (-$3,200.00) (-$1,200.00) (-$800.00) (-$2,100.00) (-$1,200.00) (-$4,000.00) (-$800.00) 6) (-$17,407.00) (-$9,018.00) (-$6,279.00) (-$1,623.00) (-$7,322.00) (-$2,630.00) (-$2,275.00) (-$2,282.00)

9 13 14 18 1) $4,285.00 $11,107.00 $1,814.00 $14,204.00 2) $11,100.00 $12,200.00 $1,300.00 $19,200.00 3) $3,650.00 $3,450.00 $3,450.00 $11,475.00 4) $5,603.00 $6,304.00 $6,304.00 $13,684.00 5) $26,000.00 $8,000.00 $8,000.00 $14,000.00 6) $12,580.00 $9,280.00 $9,280.00 $16,395.00 ACOUSTICAL & SPECIALTY CEILINGS BP2-012 CM BASE 1) International Decorators, Inc. Yes 1-4 1-3 $510,000.00 No 2) Just Rite Acoustics Yes 1-4 1 3 $540,233.00 Yes 3) Heitkotter, Inc. Yes 1-4 1 3 $481,582.00 No 6 6-A 6-B 6-C 13 14 1) $3,300.00 $24,900.00 $26,000.00 (-$2,870.00) $28,000.00 2) $37,709.00 $29,658.00 $19,251.00 (-$2,240.00) $35,200.00 3) $80,658.00 $21,872.00 $28,333.00 (-$1,991.00) $25,804.00 6 of 11

FLOOR COVERING BP 2-013 BASE 1) DTI of Illinois, Inc. Yes 1-3 1-3 $576,590.00 Yes 2) Rockford Carpetland USA, Inc. Yes 1-4 1-3 $540,200.00 No 3) Noland Sales Corporation Yes 1-4 1-3 $578,122.00 No 4) Douglas Floor Covering Yes 1-3 1-2 $416,300.00 No 5) Libertyville Tile and Carpet, Ltd Yes 1-4 1-3 $559,207.00 No 6) Mr. David s Flooring Int., Ltd. Yes 1-3 $461,941.00 No 7) TSI Commercial Flooring Yes 1-4 1-3 $586,525.00 No 8) Boss Carpet One, LLC. Yes 1-4 1-3 $425,408.00 No FLOOR AND WALL TILE BP 2-014 BASE 1) DTI of Illinois, Inc. Yes 1-3 1-3 $499,950.00 Yes 2) Douglas Floor Covering Yes 1-3 1-2 $492,800.00 No 3) Mr. David s Flooring Int., Ltd. Yes 1-3 $380,038.00 No 8 8-A 8-B 1) $71,140.00 (-$68,360.00) 2) $37,000.00 (-$83,000.00) 3) $38,861.00 7 of 11

PAINTING AND WALL COVERING BP 2-015 CM ADDEND A 8 of 11 BASE 1) Nedrow Decorating, Inc. Yes $179,394.00 No 2) Five Star Decorating, Inc. Yes 1-4 1-3 $229,000.00 No 3) Durango Painting Yes 1-4 1-3 $166,800.00 No 4) LeCuyer Painting and Decorating, Inc. Yes 1-4 1-3 $268,800.00 No 3 3-A 3-B 3-C 3-D 3-E 3-F 3-G 3-H 1) (-$3,800.00) (-$400) (-$150.00) (-$600.00) (-$250.00) (-$200.00) (-$150.00) 2) (-$2,800.00) (-$200.00) (-$400.00) (-300.00) (-$600.00) (-$200.00) (-$300.00) (-$300.00) 3) (-$1,900.00) (-$2,300.00) (-$1,500.00) (-$400.00) (-$1,200.00) (-$1,000.00) (-$1,000.00) (-$430.00) 4) (-$4,000.00) (-$9,000.00) (-$400.00) (-$100.00) (-$300.00) (-$200.000 (-$100.00) (-$100.00) 4 4-A 4-B 4-C 4-D 4-E 4-F 4-G 4-H 1) (-$3,800.00) (-$400) (-$150.00) (-$600.00) (-$250.00) (-$200.00) (-$150.00) 2) (-$2,800.00) (-$200.00) (-$400.00) (-300.00) (-$600.00) (-$200.00) (-$300.00) (-$300.00) 3) 4) (-$4,000.00) (-$9,000.00) (-$400.00) (-$100.00) (-$300.00) (-$200.000 (-$100.00) (-$100.00) 5 5-A 5-B 5-C 5-D 5-E 5-F 5-G 5-H 1) (-$3,800.00) (-$400) (-$150.00) (-$600.00) (-$250.00) (-$200.00) (-$150.00) 2) (-$2,800.00) (-$200.00) (-$400.00) (-300.00) (-$600.00) (-$200.00) (-$300.00) (-$300.00) 3) 4) (-$4,000.00) (-$9,000.00) (-$400.00) (-$100.00) (-$300.00) (-$200.000 (-$100.00) (-$100.00) 9 12 13 14 1) $900 $390.00 2) 3) $1,200.00 $820.00 $820.00 $820.00 4) $2,500.00 $1,200.00 $1,200.00

ELEVATORS BP 2-016 BASE No. 11A 1) United Technologies Otis Elevator Yes 1-4 1-3 $450,000.00 No $21,600.00 2) ThyssenKrupp Elevator Yes 1-4 $248,900.00 No $6,300.00 3) Schindler Elevator Corporation Yes 3-4 1-3 $207,000.00 No $5,000.00 FIRE PROTECTION BP2-017 BASE No. 6A No. 6B No. 6C 1) Automatic Fire Systems, Inc. Yes 1 4 1-2 $342,870.00 $2,500.00 $800.00 $1,000.00 Yes 2) Nelson Fire Protection Yes 1 4 1-3 $315,415.00 $7,704.00 $5,136.00 No 3) Valley Fire Protection Systems, Inc. Yes 1 2 $421,500.00 No 4) United States Alliance Fire Protection, Inc. Yes 1-4 1 3 $356,775.00 Voluntary Alternate No PLUMBING BP 2-018 BASE No. 10 1) Stanton Mechanical Yes 1-4 1-3 $767,950.00 No $31,500.00 2) A&H Plumbing and Heating Yes 1-4 1-3 $868,800.00 Yes $27,111.00 3) J. L. Wagner Plumbing Yes 1-4 1-3 $711,000.00 Yes $32,000.00 4) Cannonball Mechanical Yes 1-4 1-3 $691,150.00 No $42,580.00 5) Action Plumbing Yes 1-4 1-3 $680,480.00 Yes 6) Arrow Plumbing Yes 1-4 1-3 $716,341.00 Yes $30,384.00 7) Commercial Mechanical Yes 1-4 1-3 $789,700.00 No $35,700.00 8) MOST Plumbing Yes 1-4 1-3 $653,000.00 No 9) R. J. Kuhn Plumbing Yes 1-3 $967,791.00 No $53,340.00 10) Jensen Plumbing Yes 1-2 $764,500.00 No 11) Dodson Plumbing Yes 1-4 1-3 $758,500.00 No $36,000.00 9 of 11

HVAC & CONTROLS BP2-019 CM BASE No. 19 No. 20 No. 121 1) Dekalb Mechanical Yes 1 4 1-3 $2,900,000.00 $1,600.00 $71,000.00 $12,300.00 Yes 2) Dodson Pumbing Yes 1 4 1-3 $2,987,000.00 $1,600.00 $61,000.00 $12,300.00 Yes 3) Oakbrook Mechanical Yes 1 4 1-3 $3,120,000.00 $2,200.00 $88,000.00 $14,500.00 No 4) Flo-Tech Mechanical Systems, Inc. Yes 1-4 1 3 $2,688,000.00 $1,600.00 $60,100.00 $12,300.00 No 5) C. Acitelli Heating & Piping Cont. Inc. Yes 1 4 1 $2,846,000.00 $1,900.00 $65,000.00 $14,000.00 Yes 6) Commercial Mechanical, Inc. Yes 1 4 1-3 $2,781,000.00 $1,700.00 $75,500.00 $13,000.00 No 7) F. E. Moran Yes 1 4 1-3 $3,086,000.00 $1,776.00 $61,700.00 $13,660.00 Yes 8) Amber Mechanical Contractors, Inc. Yes 1 3 1-3 $3,025.000.00 $2,700.00 $96,000.00 $14,800.00 No 9) Premier Mechanical, Inc. Yes 1 4 1-3 $3,028,000.00 $1,700.00 $82,000.00 $12,900.00 Yes 10) Mechanical Concepts of IL., Inc Yes 1 4 1-3 $2,959.000.00 $1,600.00 $64,000.00 $12,300.00 Yes 11) M. G. Mechanical Contracting, Inc. Yes 1 4 1-3 $2,763.000.00 $1,760.00 $77,880.00 $13,530.00 No 12) Quality Controls Systems, Inc. Yes 1 4 1-3 $3,436,000.00 $1,600.00 $66,000.00 $13,000.00 No 13) Monaco Mechanical, Inc. Yes 1 4 1-3 $4,297.000.00 $3,000.00 $180,000.00 $15,200.00 No 14) Usher Bros. Ideal Heating Company Yes 1 4 1-3 $3,450,000.00 $1,700.00 $95,000.00 $13,000.00 No 15) Artlip and Sons, Inc. Yes 1 4 1-3 $3,020,000.00 $1,700.00 $86,000.00 $13,650.00 No HVAC TESTING, ADJUSTING & BALANCING BP 2-020 BASE 1) International Test & Balance, Inc. Yes 1-4 1-3 $30,800.00 No Voluntary Alternate 10 of 11

ELECTRICAL & LOW VOLTAGE BP2-021 CM BASE 1) HUEN Yes 1-4 1-3 $3,122,827.00 No 2) Titan Electric Yes 1-4 1 2 $3,775,000.00 Yes 3) Cipher, LTD Yes 1-4 1 3 $2,727,272.00 No 4) Fitzgerald Electrical Contracting, Inc. Yes 1-4 1-3 $2,646,800.00 No 5) Kellenberger Electric, Inc. Yes 1-4 1 3 $2,770,700.00 No 6) R & R Electrical Contractors, Inc. Yes 1 3 $2,515,140.00 No 15 16-A 16B 20 21 1) $39,477.00 $18,067.00 $1,340.00 $48,177.00 $1,000.00 2) $59,000.00 (-$29,000.00) $5,350.00 $36,600.00 3) $7,225.00 $3,320.00 $22,350.00 $29,066.00 $1,500.00 4) $19,900.00 (-$19,000.00) $31,500.00 5) $32,780.00 $3,450.00 (-$19,170.00) $27,700.00 $860.00 6) $16,618.00 (-$3,440.00) (-$200.00) $23,395.00 $3,000.00 11 of 11