Temporary Uses at the New Central Harbourfront

Similar documents
Task Force on Harbourfront Developments on Hong Kong Island

HONG KONG OBSERVATION WHEEL AT CENTRAL WATERFRONT. Presented by THE HALL ORGANISATION LTD

CENTRAL HARBOURFRONT EVENT SPACE

Minutes of Meeting. Representing Hong Kong Institute of Urban Design. Architects

Signature Project Scheme in Central & Western District: Harbourfront Enhancement and Revitalisation ( HEAR ) at the Western Wholesale Food Market

Open Space Projects at Kai Tak Harbourfront Area. Harbour Unit 24 February 2017

Our Harbour Matters. Vincent Ng, HKIA, HKIUD Director, AGC Design Limited

FEDERATION SQUARE MELBOURNE, AUSTRALIA CORPORATE PLAN

Consultation on Town Quay Mooring Redevelopment Proposals

MERIDIAN DELTA LTD BRIEFING DOCUMENT

Island Eastern Corridor Boardwalk-Cycleway Feasibility Study

One Bangkok, Thailand s First Fully Integrated District, Begins Construction

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018

Innovative Property Developer in China

Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

IEC BOARDWALK CYCLEWAY FEASIBILITY STUDY

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands

Cirque du Soleil. Feedback on a proposed 10 year agreement. The Adelaide City Council invites engagement from the community about.

JOINTLY ANNOUNCES 2017/18 INTERIM RESULTS * * * RENTAL INCOME SURGES 25% STRENGTHS RECURRING INCOME STREAMS FOR SUSTAINABLE GROWTH

The decision on whether to take enforcement action falls outside the scope of delegated powers.

Shenzhen Longhua MAINLAND AND OVERSEAS GROWTH. total route length of railway operations outside of Hong Kong

Kinder Joy Discovery Bay Easter Egg Hunt on the Beach 2018

New World Group Structure

FOOD & BEVERAGE / RETAIL OPPORTUNITY

HOPEWELL HOLDINGS LIMITED ANNOUNCES FY 2018/19 INTERIM RESULTS

26 th Meeting of Harbour-front Enhancement Committee held at 2:30 pm on 13 May 2009 at 15/F, North Point Government Offices, 333 Java Road, Hong Kong

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Discovery Bay Easter Egg Hunt on the Beach 2019

PCAL Case Study Retail Areas: Rouse Hill Town Centre

PUFFING BILLY RAILWAY

New Ideas Form. LEADER Arwain Sir Benfro FORM 2. Discussed with PLANED staff member: Yes, Cris Tomos

For immediate release

Hiap Hoe Limited (Registration No. : Z)

Economic Development and Tourism

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Abstract. 1 Introduction

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

Hong Kong International Airport (Chek-Lap Kok Airport)

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

F6. Coastal Ferry Terminal Zone

Creating a High Quality Business District

Portfolio Overview. (i)

Glenn McGlashon, MCIP, RPP Director of Planning & Development

Harbourfront Commission

15. BEXLEY RESERVE NORTH AVON BMX CLUB FORMALISATION OF LEASE/LICENCE

Proposed Service Adjustment on Hong Kong Island Green Minibus Route No. 58, 59 series and 69A

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING Produced for information by the City of Markham

West of England. Priority Places Requiring Public Investment

Local Development Scheme

It is essential that planning take full account of air safety and efficiency of operations.

Hong Kong West Kowloon Station of High Speed Rail as New Gateway to Mainland China

2.2 For these reasons the provision of tourist signing will only be considered:

DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

The Edinburgh 12. Monthly Bulletin March City of Edinburgh Council. Steve McGavin Head of Business Partnerships

Hong Kong Countdown Celebrations Fact Sheet. New Year New World. Organiser. Hong Kong Tourism Board (HKTB) Title Sponsor

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces.

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY

Chapter 1 [Air Travel 機場買票 ]

E08. Kaufland Stores in Victoria Advisory Committee Epping. Request to be heard?:

ACI perspective of The Airport Planning Challenge

to provide a stimulating, educational, comfortable and entertaining destination venue to Victorians, and to interstate and international visitors.

EASA Safety Information Bulletin

Through comprehensive medium- and long-term development plans for HKIA, AAHK contributes to Hong Kong s economic growth.

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

@ENERGETICA_UK ENERGETICA.UK.COM BUSINESS PARKS

Newcastle Transport Program Newcastle Light Rail Determination Report

JOINTLY ANNOUNCES 2018/19 INTERIM RESULTS * * * EMPEROR INTERNATIONAL S RENTAL INCOME GROWS 10% TO HK$600M NET PROFIT SURGES 57% TO HK$2.

Terms of Reference: Introduction

The optimum gross floor areas for the predominant land uses within Precinct Five are outlined below in Table 8.1.

Dear Delegate, We hope your planning goes well, and we look forward to meeting you in Hong Kong! Best regards,

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

CATHAY PACIFIC AIRWAYS LIMITED 國泰航空有限公司 (Incorporated in Hong Kong with limited liability) (Stock Code: 293)

IAT Annual Conference 'Driving Forward

(STOCK CODE: 3633.HK)

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar

Plan, host and run an event to remember. It s easy at Elmore Events Centre.

Decision Strategic Plan Commission Paper 5/ th May 2017

Building Connections to SUPPORT LIFE S JOURNEYS

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Notes form the North of Horsham development Parish Liaison Meeting. at Roffey Millennium Hall Crawley Road, Horsham.

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

Regenerating Coastal Communities Seminar 27 th January 2017

: Activity Room No. 1, G/F, Hong Kong Central Library 66 Causeway Road, Causeway Bay, Hong Kong

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

CITIC Pacific Officially Names Luxury Residential Development in Lok Wo Sha The Entrance

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

Consultation Meeting regarding Merger of Southern and Gatwick Express

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Catchment and Lake Research

Bravo to Tsing Yi Promenade!

VICTORIA QUAY COMMERCIAL PRECINCT PLAN

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No.

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

Transcription:

For discussion on 21 September 2015 Temporary Uses at the New Harbourfront PURPOSE This paper aims to update Members on the latest progress of the two temporary uses in the new Harbourfront, and seek Members views on the way forward. BACKGROUND 2. Victoria Harbour is the most precious public asset of Hong Kong and a symbol of the city. The Government has been striving to enhance the harbourfront and improve its accessibility. Subject to the actual circumstances of harbourfront sites and through effective allocation of resources, the Government gradually enhances both sides of the harbour for public enjoyment. 3. Having regard to the actual circumstances, the Government is gradually taking forward permanent development of the eight key sites in the new harbourfront, taking into account the recommendations of the Urban Design Study for the New Harbourfront (UDS). After consulting the Harboufront Commission and the and Western District Council (C&W DC), the Development Bureau (DEVB) has implemented a number of temporary uses since 2012 to optimise utilising harbourfront sites whereby works were completed in order to enable early public enjoyment and add vibrancy to the harbourfront, pending permanent development. 4. For locations of the key sites and the respective temporary uses, please refer to the Annex. THE LATEST PROGRESS 5. Area A off Piers Nos. 9 and 10 is close to one hectare in size. Through an open tender, the area is let to an operator through

short-term tenancy (STT) for operating observation wheel and ancillary facilities. The three-year tenancy was awarded by the Lands Department (LandsD) in May 2013. The observation wheel was open for public enjoyment on 5 December 2014, and the subject STT will expire in June 2016. 6. On the other hand, Areas D and E opposite to the City Hall to the north of Lung Wo Road are about 3.6 hectares in size. Through an open tender, the area is let to an operator through STT for organising different types of events and activities. A three-year tenancy was awarded by LandsD in April 2014. The first event was organised in August 2014 and the subject STT will expire in May 2017. LONG-TERM DEVELOPMENT 7. Area A comprises a portion of Sites 3 and 7 respectively, while Areas D and E comprise the entire Site 4 and part of Site 7. 8. In accordance with the recommendations of the UDS, Site 3 will be used for comprehensive development mainly office and retail uses. There will also be a large landscaped deck and at-grade public open space, as well as a continuous pedestrian connection between the Statue Square and the Piers. With gradual completion of infrastructural works within the site and the preparation for relocating existing Government facilities being underway, we expect that the site could be made available for long-term development over the next two or three years upon completion of the relevant works and relocation of Government facilities. 9. Sites 4 and 7 are major components of the recommended Waterfront Promenade in the UDS. Together with Site 6, the entire Waterfront Promenade has a total length of 1.3 kilometres and an area of about 10 hectares. The Waterfront Promenade will link up with the Tamar Park to provide a unifying green open space to create an oasis for the city, while attraction nodes are proposed at different spots along the promenade to provide waterfront food and beverage facilities for public enjoyment. The eastern part of Site 7, as well as Site 6, will remain occupied for infrastructural works of the Wan Chai Development Phase II and the -Wan Chai Bypass projects over Page 2

the next few years. Taking these and the estimated development timetable into account, it is expected that long-term development of the subject sites will not commence before 2020. PUBLIC RESPONSE 10. The two temporary uses are generally welcomed by the public since their commencement. The observation wheel in Area A, nearly 60 metres in height, offers air-conditioned gondolas in which passengers may enjoy comfortable rides in any season and weather. Since its commencement of operation, the facility has become a new attraction in Hong Kong and a new landmark s coastline. Meanwhile, ancillary facilities such as food kiosks are also available in the vicinity of the observation wheel for the convenience and enjoyment of the public and tourists alike. 11. On the other hand, the temporary event site at Areas D and E hosted 63 events of different types by the end of July 2015. Among these are several large-scale activities, such as a carnival that offered a variety of amusement rides; the internationally renowned equestrian show Cavalia ; the first-ever Art art exhibition, as well as the Lai Yuen Super Summer that brings back memories of old times to the public, etc. According to the operator, these activities have attracted a patronage of over one million as of July 2015, and it has significantly enhanced the vibrancy of the new harbourfront. PROPOSED TEMPORARY USES 12. Taking into account the long-term development timetable of the subject sites and public response to the temporary uses, the Development Bureau (DEVB) proposes, after the expiry of current tenancies, to: (a) continue using Area A for operating an observation wheel with ancillary facilities for one year until mid-2017. Page 3

(b) continue using Areas D and E for organising events and activities for three years until mid-2020. HARBOUR PLANNING PRINCIPLES 13. We consider that the proposal aligns with the Harbour Planning Principles in the following aspects Preserving Victoria Harbour The proposal would not cause any harm to the Victoria Harbour, but attract local residents and tourists alike to enjoy this special public asset. Public Engagement In addition to the Task Force, we have consulted the Culture, Leisure & Social Affairs Committee of the C&W DC on 10 September 2015 and obtained their support on the proposed temporary uses. Public reception as outlined in paragraphs 10 and 11 also indicate general support of the two temporary uses. Sustainable Development and Integrated Planning The proposal would not affect the long-term development of the sites concerned both in terms of design and time table. As both sites are distant from major residential areas in the vicinity, the proposed temporary uses should not have caused any nuisance to local residents since their commencement. Proactive Harbour Enhancement The proposal aims to allow early public enjoyment and add vibrancy to the harbourfront. Vibrant Harbour and Public Enjoyment Existing temporary uses are welcomed by the public, as marked by high patronage recorded in both sites. The proposal would allow local residents and tourists alike to continue to be given the choice. DEVB will continue to work with other Government departments to monitor the Page 4

operation of the tenants. We would also suggest retaining the requirements on provision of free public events in the tenancy of the event site, so that more members of the public can participate in the various activities hosted at the harbourfront. WAY FORWARD 14. If the proposal is supported by the Task Force, DEVB would work with various Government departments to work on the procedures in administering the two proposals. 15. Members are invited to give views on the proposal. Development Bureau September 2015 Page 5

Annex 7 號碼頭 Pier 7 8 號碼頭 Pier 8 Area A: currently used for observation wheel and anciliary facilities 9 號碼頭 Pier 9 國際金融二期 IFC II 10 號碼頭 Pier 10 Areas D&E: currently used for temporary event site 香港站 Hong Kong Station Areas F&G: currently used for tempoary open space and pet garden 大會堂 City Hall 龍和道 Lung Wo Road 添馬公園 Tamar Park 中環新海濱主要用地和臨時用途位置圖 Location Map of Key Sites and Temporary Uses at the New Harbourfront