ASBU Block 0 Implementation and Regional ANPs

Similar documents
(Presented by United States) EXECUTIVE SUMMARY

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

GUATEMALA State Air Navigation Plan

New Barbados State Air Navigation Plan

BELIZE Air Navigation Plan

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

Date Planned/Implemented Status Not commenced. Status Details Planned for m new MMMX airport 2 Element Description: Airport CDM tools

Block 0 to Block 1 Vaughn Maiolla

Connecting ASBU with your State Air Navigation Plan

NAM ASBU Handbook Supporting analysis and implementation reporting of the ICAO ASBU Modules

MID Region Air Navigation Strategy

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

ICAO ASBU Implementation/ Surveillance and ATS Automation

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

SAMPLE TEMPLATE APPENDIX 3.5C-1

United States Block 0 Status Summary Table

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

Approach to implementation Process and checklist

ATFM/CDM ICAO s Perspective

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

Connecting ASBU with your State Air Navigation Plan

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

Objective. To show how the aviation system block upgrades (ASBUs) can help to improve safety at airport level and some regional initiatives.

International Civil Aviation Organization. Fifth Meeting of MID Region AIM Database Task Force Fourth Meeting of MIDANPIRG AIM Sub-Group

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

APIRG/20. Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Yamoussoukro, Cote d Ivoire 30 November 2 December 2015

Russian Federation ATM modernization program

AFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION

MET/SG/12-WP/05 REV2-23/11/14

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

APAC AIR NAVIGATION PLAN VOLUME III

AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP DEVELOPMENTS RELATED TO AIR NAVIGATION CAPACITY AND EFFICIENCY IN OTHER ICAO REGIONS

AFI/MID Workshop on Aviation System Block Upgrades (ASBUs)

PBN Implementation CAR/NAM Regions

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

ASSEMBLY 39TH SESSION

ASBU modules mapped to Work Programme

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

ATM processes automatization for Runway (Airport) Throughput Enhancement

THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION (DRAFT 2016)

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

21 States 19 Territories 26 Civil Aviation Authorities (CAAs) 44 Flight Information Regions (FIRs) 29 FIRs in NAM 15 FIRs in CAR.

INTERNATIONAL CIVIL AVIATION ORGANIZATION

AIR NAVIGATION REPORT ICAO Middle East Region

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

Packaging Tomorrow s Aviation System

Prosper Zo o Minto o

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

SERVICE DEVELOPMENT ROADMAP

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Aviation System Block Upgrades

P/01REV. Accountability and Performance Report of the ICAO NACC Regional Office to Member States. Nassau, Bahamas, May 2016

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) v3.1 April 2014 International Civil Aviation Organization

THE UGANDA ASBU PLAN- HIGHLIGHTS ASBU WORKSHOP 18 TH TO 22 RD SEPT, DAKAR

ICAO GANP Requirements and Evolution

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

TWELFTH AIR NAVIGATION CONFERENCE

GANP ASBU Symposium 2017

NAM/CAR AND SAM REGIONAL AIR NAVIGATION PLANS (SURVEILLANCE SYSTEMS)

Bits to Blocks Aviation System Block Upgrades (ASBU)

ASBU-Bloc0 Moroccan achievements and planned activities

ICAO No Country Left Behind (NCLB) Campaign: NACC Regional Assistance Strategy

INTERNATIONAL CIVIL AVIATION ORGANIZATION. SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016)

Aviation System Block Upgrades

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

Aviation Security (AVSEC) and Facilitation (FAL) 7.3 Other Aviation Security and Facilitation Matters

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

ASBU Ready Solutions. A Global ATM Solution Provider s Response. Shankar Satish KUMAR Business Development India 20 th October 2014

AVIATION SECURITY (AVSEC) AND FACILITATION (FAL) TRAINING AND ASSISTANCE ACTIVITIES IN THE NAM/CAR REGIONS. (Presented by the Secretariat)

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

International Civil Aviation Organization

The evolving air navigation system and the impact on avionics

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

NACC/WG/4 WP/08 20/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

States, Territories and International Organizations. Subject:

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS December 4, 2014

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

TECHNICAL SEMINAR ON TOURISM INVESTMENTS IN THE AMERICAS Asuncion, Paraguay. May 17-18, 2011

REVIEW OF REGIONAL AIR NAVIGATION PERFORMANCE INDICATORS AND METRICS. (Presented by Secretariat) EXECUTIVE SUMMARY

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

Presented by: Trinidad and Tobago

ORGANISER HOST LEAD SPONSOR

Transcription:

ASBU Block 0 Implementation and Regional ANPs For: Joint ACAO/ICAO ASBU Symposium for EUR/NAT and MID Region Prepared by: Midori Tanino, FAA, ATO International Global ATM Program Manager Date: December 10-13, 2018 1

Contents 1. USA/FAA Block 0 Implementation Status 2. North American (NAM) (electronic) Air Navigation Plan (eanp) Volume III 3. Central America and Caribbean Region - ANP Status (inc. ASBU B0 Implementation Status) 4. Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) ICAO NACC RO ANP 2

Following the Process B0 PIA Modules Elements PIA 1 5 23 PIA 2 3 18 PIA 3 7 18 PIA 4 3 10 Total 18 69 3

Analysis and Results Need Analysis Implementation Status (if Element is needed) Module Elements Not Started In Progress Need N/A Planning Developing Partially Implemented Implemented Performance Improvement Area 1: Airport Operations 1. Interconnection between aircraft operator & ANSP systems to share surface operations information 2. Interconnection between aircraft operator & airport operator systems to share surface operations information ACDM 3. Interconnection between airport operator & ANSP systems to share surface operations information 4. Interconnection between airport operator, aircraft operator & ANSP systems to share surface operations information 5. Collaborative departure queue management 30 30 30 30 30 1. PBN approach procedures with vertical guidance to LNAV/VNAV minima 1 29 Airportcentric Elements 2. PBN approach procedures with vertical guidance to LPV minima 1 29 APTA 3. PBN approach procedures without vertical guidance to LNAV minima 30 4. GBAS Landing System (GLS) procedures to CAT I minima 28 2 1. AMAN via controlled time of arrival to a reference fix 30 2. Departure management 3 26 1 RSEQ 3. Departure flow management 3 27 4. Point merge 30 1. A-SMGCS with at least one cooperative surface surveillance system 30 2. ADS-B APT 30 SURF 3. A-SMGCS alerting with flight identification information 30 4. EVS for taxi operations 30 5. Airport vehicles equipped with transponders 4 11 15 1. New PANS-ATM wake turbulence categories and separation minima 30 2. Dependent diagonal paired approach procedures for parallel runways with 20 8 2 centrelines spaced less than 760 meters (2,500 feet) apart 3. Wake independent departure and arrival operations (WIDAO) for parallel 30 WAKE runways with centrelines spaced less than 760 meters (2,500 feet) apart 4. Wake turbulence mitigation for departures (WTMD) procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) 10 20 apart based on observed crosswinds 5. 6 wake turbulence categories and separation minima 4 9 17 Statecentric Elements AMET DATM FICE Performance Improvement Area 2: Globally Interoperable Systems and Data 1. WAFS 2. IAVW 3. T CAC forecasts 4. Aerodrome warnings 30 5. Wind shear warnings and alerts 30 6. SIGMET 7. Other OPMET information (METAR, SPECI and/or TAF) 30 8. QMS for MET 1. Standardized Aeronautical Information Exchange Model (AIXM) 2. eaip 30 3. Digital NOTAM 4. etod 5. WGS-84 6. QMS for AIM 1. AIDC to provide initial flight data to adjacent ATSUs 2. AIDC to update previously coordinated flight data 3. AIDC for control transfer 4. AIDC to transfer CPDLC logon information to the Next Data Authority ACAS ASEP ASUR FRTO NO PS Performance Improvement Area 3: Optimum Capacity and Flexible Flights 1. ACAS II (TCAS version 7.1) 2. APFD function 3. TCAP function 1. ATSA-AIRB 2. ATSA-VSA 1. ADS-B 2. Multilateration (MLAT) 30 1. CDM incorporated into airspace planning 2. Flexible Use of Airspace (FUA) 3. Flexible routing 4: CPDLC used to request and receive re-route clearances 1. Sharing prediction of traffic load for next day 2. Proposing alternative routings to avoid or minimize ATFM delays OPFL 1. ITP using ADS-B 1. Short Term Conflict Alert implementation (STCA) SNET 2. Area Proximity Warning (APW) 3. Minimum Safe Altitude Warning (MSAW) 4. Medium Term Conflict Alert (MTCA) Performance Improvement Area 4: Efficient Flight Paths 1. Procedure changes to facilitate CCO 30 CCO 2. Airspace changes to facilitate CCO 30 3. PBN SIDs 30 1. Procedure changes to facilitate CDO 30 CDO 2. Airspace changes to facilitate CDO 30 3. PBN STARs 30 1. ADS-C over oceanic and remote areas TBO 2. CPDLC over continental areas 3. CPDLC over oceanic and remote areas 4. SATVOICE direct controller-pilot communications (DCPC) 4

Sample Entries 5

FAA B0 Implementation Status Airport-centric Elements Analysis In Progress 1% Planning 1% Legend Developing 9% Partially Implemented 3% N/A 20% Implemented 66% Need (not started) 0% Analysis Not Started 0% 6

FAA B0 Implementation Status State-centric Elements Legend Planning 3% Partially Implemented 3% NA 11% Developing 0% Need (not started) 0% Analysis in progress 0% Analysis Not Started 0% Implemented 83% 7

NAM eanp Volume III Guidance from ICAO NACC RO Two states: Canada and USA ASBU B0 Implementation Status NAM Regional Aviation System Improvements (RASI) Target delivery: Fall 2019 8

NAM Region (draft as of Nov 14, 2018) Sample Entries 9

NAM Region (draft as of Nov 14, 2018) ASBU B0 Implementation Status Analysis Not Started 2% Analysis In Progress 9% Planning 2% Developing 9% Partially Implemented 4% N/A 26% Analysis Not Started 1% Analysis in Progress 1% Planning 7% N/A 9% Developing 4% Partially Implemented 4% Implemented 48% Implemented 73% Need (not started) 0% Airport centric Elements Need (not started) 0% State centric Elements 10

Central America and Caribbean Region - ANP Status (inc. ASBU B0 Implementation Status) Performance target: All 21 state/organizations to have ANPs that are aligned with the GANP/Regional ANP Bidirectional feedback between RPBANIP and state/organization ANPs 11

ASBU Element Analysis and Implementation Process Concept 12

Simple and Realistic Process B0 PIA Modules Elements PIA 1 5 23 PIA 2 3 18 PIA 3 7 18 PIA 4 3 10 Total 18 69 13

Using the Template ASBU RASI SASI 14

GANP Coming Soon Antigua & Barbuda Bahamas Barbados Belize COCESNA RPBANIP Coming Soon Costa Rica Cuba Curacao Dominican Republic El Salvador ANP Coming Soon Coming Soon For CAR, there will be 21 ANPs: 19 States 1 Territory 1 Organization (As of Nov 2018) Mexico Grenada Nicaragua Guatemala Haiti Honduras Jamaica Coming Soon St Kitts & Nevis Saint Lucia St. Vincent & Trinidad & Grenadines Tobago 15

ASBU B0 Information Availability Central America and Caribbean Region ASBU 2013 version 10% NI 14% Available 76% 16

ASBU B0 Implementation Status Central America and Caribbean Region NI 24% NI 24% N/A 22% ANS 6% AIP 3% Need 2% Planning 2% Developing 9% Partially Implemented 6% N/A 41% Implemented 15% Airport centric Elements ANS 6% AIP 3% Need 2% Planning 4% Developing 9% Implemented 23% Partially Implemented 6% State centric Elements 17

RPBANIP ICAO NACC Regional ANP RPBANIP ver 3 21 state/ organization ANPs RPBANIP ver 4 18

Questions? Thank you! Midori.Tanino@faa.gov 19