A. KARANIKOLAS & ASSOCIATES S.A. CONSULTING ENGINEERS LIST OF SELECTED PROJECTS

Similar documents
Corporate Presentation

Corporate Presentation

INTRAKAT ANALYST PRESENTATION FY RESULTS 2013

Corporate Presentation

1. TU2 tunnel at Edessa Florina trunk road 2. Cut & cover (25x250m) Thessaloniki 3. Edessa bypass Cut & cover tunnel 4. Trunk tunnel road at

INTRAKAT. Analyst Presentation June 2012

Elvan S.A. COMPANY PROFILE. 20 km Lavriou Ave., Peania, Greece

Tunnelling Featured Projects

Egnatia Odos: An axis for development and co-operation

Greek Interoperable Tolling Systems (GRITS) Interoperability Travel faster and more conveniently using only one transponder

Novelty and opportunities in the Greek PPP market

MEGAPROJECT Case Study

Special Coordination Service for Implementation (SCOS) - ROLE

WORKING PAPER In the context of the placement in the Observatory of the Egnatia Odos A.E.

How, when, what & why to access Structural Funds in Romania

THE EXTENSIONS PROGRAMME

Team DEMITSIKIS Ch. - TENEKES N. & CO

Related Expertise Concession Projects - PPP

A Strategy Proposal for Road Infrastructure Development in Recession Times

HRADF: Putting Greek economy into long-term perspective

The Egnatia Motorway, Development and Combined Transports

Strategic investment of 47.37% * in ATHENA

INDICATOR RESULTS FACTSHEET TRA01: TRAFFIC VOLUME

Egnatia Odos Observatory. Egnatia Odos Observatory Monitoring of Egnatia Motorway s s Spatial Impacts

One year of Olympia Odos

CURRICULUM VITAE MAY 2013

P R O J E C T S L I S T

SOME OF OUR CUSTOMERS

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE

Greece: Bright opportunities for the future. December 2, 2010

NEW, POST-OLYMPIC ATHENS

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

CONTACT 2 Golgotha Str. Oasi Varipetrou GR Chania, GREECE Tel.: , Fax: Web:

Issue 02 Spring Works in progress. OLYMPIA PASS: quick and easy. The first 4 tunnels of the Korinthos- Patra Motorway. Alliance for Road Safety

Greece connecting Asia through her ports Regional developments

Operation Report of the NNGS for the Year 2015

Group Presentation. September 2008

Personal Information. Name : GEORGIOS MARGARITIS Tel.: , Date of birth: 01/11/1969 Fax:

PAGONI CONSTRUCTION COMPANY

Asset Development Plan. 31 January, 2017

WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS

Current Traffic Arrangements on. Korinthos-Patra. 16 kilometers of tunnels under construction on. Korinthos-Patra

HELLENIC STEEL Co S.A. in Liquidation Invitation for Expression of Interest

Apartment, Security - P - P P P P P P P P Sections 42.2 & Assisted Living Facility - C C C C C C - - C - Section 42.21

DEPA. Participations. Trading Activities. DESFA S.A. EDA S.A. IGI Poseidon S.A. Thessaloniki EPA. Eni

O T M PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE

Co-operative Systems in Infrastructure Operation

JP TRANSNAFTA PETROLEUM PRODUCTS PIPELINE SYSTEM THROUGH SERBIA. October 2017

Group Presentation. March 2009

S.Y.K.A.P. GREEK COORDINATION CENTRE AGAINST ILLICIT TRADE

THESSALONIKI PROPERTY MARKET. 1st Semester 2016

Have you got any real estate property?

Group Presentation. April 2008

Relocation of applicants for international protection

El Seif Group. Saudi leading privately owned group. Diverse business interests worldwide. Established in 1951

NEWSLETTER MARINA, HIGHWAY PRIVATIZATIONS

RESULTS FACT SHEET SE-S-2: ACCESSIBILITY OF INDUSTRIAL AREAS

THIS SUMMER IS OURS II ELIX Project details. Date: / Total places: 2 Age: Name: THIS SUMMER IS OURS II

reviewed paper Sustainability via Soft Natural Resource Management. The Coastal Area of Vouliagmeni Agisilaos Economou

3-day trip with rafting at Lousios, and not only!

STRABAG SE Successful in Eastern Europe

Contents. 1 Overview 3. 2 Government Stakeholders 5. 3 NGOs and other interested parties (National & Regional) 7 LIST OF TABLES

Cyprus Investment Promotion Agency

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

Group Presentation. March 2009

Hospital Link Project Project Update September 2015

Welcome to Charles Mill Lake Park Master Plan Update

From Early Pioneer To Long-standing Partner. 50 years of dedicated service to the Middle-East

Elpida A. Epaminonda. TEN-T and CEF Coordinator Ministry of Transport, Communications and Works

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Electric System Serving Pierce County Current system and future investments

INTRODUCTION OF ELIX

INDICATOR RESULTS FACTSHEET ΤRA04: TRAVEL-TIME

PRESS RELEASE. ARRIVALS OF NON-RESIDENTS IN GREECE: January - June 2016 HELLENIC REPUBLIC HELLENIC STATISTICAL AUTHORITY. Piraeus, 13 October 2016

BUILDING AUTOMATION PROJECT LIST

Worldwide Experience of SALINI GROUP in working with Multilateral Development Banks - special focus on EBRD countries of operations

Tenders. Manitoba Infrastructure

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

Neighbourhood Committee NDG - Westmount. September 12, 2016

CITY OF HELSINKI. Introducing Major Urban Development Projects CITY OF HELSINKI - Introducing Major Urban Development Projects 1

MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference. November 2017

Group Presentation. September 2017

Local Information. Transportation, Venue and Accommodation. April 2017

Corridor Forum organisations list 23/01/2017

I would like to thank the organizers for the opportunity to address such an esteemed audience.

LIBRO CAMPOS PROYECTOS 2016

DIRECT PUBLIC INVESTMENT

Travel behavior as a determining factor for sustainable transport measures

1. Getting from Athens International Airport to the Liossion Coach Station:

Miltos P. Papadopoulos architects - engineers.

Innovation Week on Renewable Energy Systems

Corporate Environmental Leadership Seminar Yale School of Forestry & Environmental Studies June 4-15, 2000

Curriculum Vitae. Personal information. Mobile: (Personal) (Personal) Greek.

The re-emergence of Greece s Upstream Oil & Gas sector:

Mapping of the theoretical potential for wind energy and small hydropower plants in the region of Peloponnesus

We are stepping on the gas to complete the Project!

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

Municipality of Krosno

Technical Regulation

sailing on the LNG era POSEIDON MED ll

Transcription:

LIST OF SELECTED PROJECTS

2011 McArthurGlen Athens Designer Mall (72000m 2 ), Retail and parking building. (Structural preliminary, final and construction design and supervision) (2006 2011) 2011 New two storey precast building with one basement in Gortinia Arkadia 450 m 2, Owner Nikolaos Karagiannis(structural design check of precast system with bolts with 3D Robot model) 2011 Building with teaching rooms and labs of the Department of Agricultural Growth, Forest Department, Enviromental department of the Demokrition University of Thraki (Structural preliminary, final and construction design) 2011 New three storey precast building with one basement in Rafina Attikis 400 m 2, Owner Dimitrios Markantonis (structural design check of precast system with bolts with 3D Robot model) 2011 New two storey precast building with one basement in Salamina 200 m 2, Owner Nikolaos Denaxas (structural design check of precast system with bolts with 3D Robot model) 2011 New two storey commercial Building (Super Market) in Gianitsa Greece 8000 m 2 (Structural preliminary, final and construction design and supervision) (2010 2011) 2010 Civil Works for the settlement of the small river of Arhaggelos municipality in Rodos Greece (Structural Design of bridges) (2009 2010) 2009 "Design of new Railway line Kalampaka Ioannina Igoumenitsa, Section Kalampaka Ioannina, ch. 53+500 to 76+199 (Phase B') 1113. OSE (Hellenic Railways) Structural Preliminary Design of Railroad bridges : a. Bridge G60 L = 740m b. Bridge G57 L = 268m c. Bridge G58 L = 88m d. Bridge G59 L = 88m Structural Preliminary Design of Road Bridges a. Bridge G56 L = 25.30m 2009 «Contract No 4305000653 Four New Crude Oil Tanks, At Thessaloniki Plant (Hellenic Petroleum Thessaloniki Industrial Rafinery Complex), 60.000 M3 Gross Capacity Each, Together With Their Interconnecting And Fire Fighting Piping And The Earth/Civil And Electrical Instrument Materials & Works Required» (Layout design, steel tank structural design with Eurocodes, design of all technical works) (2007-2009) 2009 Three storey office building, total surface area of 10800 m 2 at Kimis Avenue and National Highway (Structural preliminary, final and construction design and supervision) (2008 2009) 2009 New Warehouses of Retail Stores of JUMBO SA at Inofyta Viotias Buildings E:10000m2, ST:30000m2, Z:12000m2, H:30000m2, K:9000m2, M:39000m2 (Structural Design) (2006-2009) 2008 Stores, offices and residence buildings complex, at Patra, Owner: OTE Estate (Structural preliminary, final and construction design) (2007-2008) 2008 New retail Megastore for Jumbo SA at Pireos Str. Renti, Attiki. (Structural design and supervision) (2007-2008) 2008 New retail Megastore for Jumbo SA at Marousi, Attiki. (Structural design and supervision) (2007-2008)

2008 Conference and Cultural Center of Komotini Fhase A. Contractor: AKTOR SA (Structural final tender and construction design) (2006-2008) 2008 Structural studies for all the prototype circular precast columns used for the distribution of high voltage electricity around Greece Public Company of Electricity (PPC) (Structural design) 2008 New Touristic village - Precast concrete Buildings in Pafos, Cyprus (Structural design and supervision) 2008 New Precast steel and concrete building for the Training Center and Sport facilities of the football team AEK FC 2007 Construction of Highway from Thermopyles interchange to New Sperchios river bed (ch. 18+000 to 26+800) and from Roditsa interchange to Agia Marina interchange (ch. 3+500 to 12+000) PATHE, section Skarfia-Lamia-Raches (2005-2007) : Construction design of large technical works (bridges) (Structural final and construction design) Underpass at Damasta L=10m H=5m on gravel piles (2005) Prestressed underpass at Brallos interchange L=21.50 H=5, foundation on piles (2006) Sperchios river bridge of service road SR2 Prestressed beams 3-span L=90m (3x30m) (2005) Agia Paraskevi bridge, Prestressed slab L=270.22m (2007) 1st section of 4 spans L=23.80+31.00+33.40+27.80=116.00m, 2nd section of 4 spans L=20.40+24.50+24.50+20.40=89.80m 3rd section of 3 spans L=19.20+24.00+19.22=64.02m Bridge TA10 7.30x4.00m (2007) Anthili underpass 8.00x5.00m (2007) Construction design of large technical works (bridges) (Preliminary design) (2006): High speed railway bridge on Service Road SR2 L=302.50m, 5 structurally independent sections (5x15.00m=75.00m, 4x15.00m=60.00m, 4x16.00m=64.00m, 4x16.00m=64.00m, 1x30.80m Construction design of small technical works (44 Nos) (2005-2006) 2007 Atherinolakkos 2x50 Mw Steam Power Plant Crete Contract Dmkt-No. 11 59 321, PPC (Structural preliminary, final and construction design) (2005-2007) 2006 Check and control of structural designs of the project: "Office Building At Calea Victoria No145, At Bucharest, Romania (appr. 13000m2) 2006 Check and control of structural designs of the project: "Olympia Office Building At B--Duldecebal No 25, 27, 29, At Bucharest, Romania (appr. 13000m2) 2005 Átakoy Wastewater Treatment Plant And Sea Outfall Construction, Istanbul Metropolitan Municipality, General Directorate Of Istanbul Water And Sewerage Administration, Structural Offer Design 2005 Extension of the Phychiatric Clinic of Sismanoglio General Hospital. New connecting pedestrian bridge. Reinforement of the existing structural concrete frame (Preliminary structural design) 2005 Small technical works for the repairing of Inoi-Dervenochoria Road New Geotechnical survey and design at ch. 5+100 (Structural design and Geotechnical design) 2005 Precast Pedestrian Bridge on Piles (Observation deck) of Dam for the Complementary rearrangement project at Agia Varvara, River Aliakmon (Structural final and construction design)

2005 Multistory office and retail building with underground parking on 132 Kifisias ave. (Vioiatriki head offices and Labs) (Construction: J&P Diolkos Development) (Structural preliminary, final and construction design) (2003-2005) 2004 Ronovation of Katerini Railway Station and design (phase B ) for the construction of Sindos Underpass (Contract 332) OSE (Hellenic Railways) (Structural design) 2004 Water Supply of Steam-Electric Plant at Kardia and Agios Dimitrios new pipeline PPC (Construction Michaniki SA.): Pumping Station A3 with Top-Down construction method (Structural construction design) Temporary Steel Dam 10m high at the inbound canal (Structural construction design) Temporary Steel Dam 3.500m high at the joint with the inbound canal (Structural construction design) Foundation design of Air tank of Pumping Station A4 (Structural construction design) 30 concrete thrust blocks for the anchoring of the Steel Pipe (Structural construction design) 2003 EGNATIA ODOS Section Igoumenitsa interchange Selles interchange Design of steel frames of highway signs (Structural final and construction design) 2003 Geotechnical design at the site of the future building for the General Hospital Health Center of Naxos (DEPANOM) Geotechnical design 2003 New Kotsovolos Megastore at the Athens International Airport El. Venizelos (Structural preliminary, final and construction design) (Construction AKTOR SA) 2003 Construction of New Surgery and Intensive Care Wing at the 401 General Military Hospital of Athens (Structural construction design) 2003 New Sports and Recreation Center at Nea Philadelfia AEK Athletic Union (Preliminary structural design, Final structural design, structural design for construction permit) 2003 Republic Of Bulgaria, Ministry Of Regional Development And Public Works, Road Executive Agency And The Commission Of The European Union Phare CBC Programme, Border Approach Roads to Greece Construction of Tunnel Service Building At Gotse-Drama Border Crossing (Structural final and construction design) 2003 New Flour Silos complex, Mili Asopou AEBE (Structural final and construction design) 2003 EGNATIA ODOS Section Derveni-Nymphopetra (9.1-9.2) contract 931 (J/V ETEP-Themeli- Vioter-Techniki Enosis) small structural works (Structural final and construction design) 2003 New Multistory Automated Parking Building (Sarillaki Bros) (Structural design) 2002 EGNATIA ODOS Section Neohori-Kristallopigi (1.1.5/1.1.6) contract 907 (J/V Mochlos- Atemke-Vioter) small structural works (Structural final and construction design) 2002 Residential, office and retail building with underground parking areas at Zografou (13 Zografou str.) (Structural preliminary and final design)

2002 Indoor Swimming pool complex at Chania, Crete (Structural final tender and construction design) 2002 Olympic Main Press Center (MPC) (For the 2004 Olympic games) (Total design (tender and construction)) (2001-2002) 2001 City of Athens Sewage Treatment Works Phase B, Psyttalia Island; New Storage Building at Akrokeramos, (Structural preliminary, final and construction design) 2001 Emergency steel staircase for Building 1020-16 of the Greek Ministry of Interior (Central Intelligence Service) (Structural preliminary, final and construction design) 2001 Olympic shooting facilities at Markopoulo, Attiki (2001) (Tender design for the 2004 olympic games) 2001 NEW GENERAL HOSPITAL OF PYRGOS (DEPANOM) Building Á, (Structural final and construction design) (1997-2001) 2001 SOFITEL HOTEL (MAIN TERMINAL HOTEL CONCESSION EL. VENIZELOS AIRPORT - SPATA ATHENS) (Structural preliminary, final and construction design) (1999-2001) 2000 NEW GENERAL HOSPITAL OF SERRES (DEPANOM) Buildings & surrounding area (Structural final and construction design) (1997-2000) 2000 Makrigialos interchange L=18.71m (Contract: PATHE Additional works - Section Makrigialos - Katerini Chainage 44+100 to 63+500) (Structural final and construction design) 2000 Bridge T1 Krania stream Oblique, prestressed L=40.20m (Contract: PATHE Additional works - Section Makrigialos - Katerini Chainage 44+100 to 63+500) (Structural final and construction design) 2000 Bridge T2 Krania stream Oblique, prestressed beams L=21.20m ch. 0+161,95 0+295,60 (Contract: PATHE Additional works - Section Makrigialos - Katerini Chainage 44+100 to 63+500) (Structural final and construction design) 2000 Bridge T3 Gerakari stream Oblique, prestressed beams L=40.20m ch. 0+255,30 0+183,15 (Contract: PATHE Additional works - Section Makrigialos - Katerini Chainage 44+100 to 63+500) (Structural final and construction design) 2000 Makrigialos interchange Bridge T2N overpass of High Speed Railway L=63.38m 3 spans (Contract: PATHE Additional works - Section Makrigialos - Katerini Chainage 44+100 to 63+500) (Structural final and construction design) 2000 City of Athens Sewage Treatment Works Phase B, Psyttalia Island; Structural Design of 4 Nos. Sludge Digesters (30m diameter, 17m height), c/w ancillary structures, i.e. culverts, Digester, Service Bldg, Tunnels (Structural final and construction design) 2000 Dyehouse building at Akrokeramos and Fuel Truck Building at the City of Athens Sewage Treatment Works Phase B, Psyttalia Island (Structural final and construction design) 2000 Toll Curved Steel Shelter, service tunnel, service building (PATHE Additional works Section Rahes Pelasgia Ag. Theodori) (Structural preliminary, final and construction design)

2000 Pilewall T2, Pilewall T4 branch ÄSR10 áðü ch. 3+343.29 to 3+522.69, pilewall T23 (PATHE Additional works Section Rahes Pelasgia Ag. Theodori) (Structural preliminary, final and construction design) 2000 Chapel at the new General Hospital of Serres (DEPANOM) (Structural final and construction design) 2000 Bridge Argos-Pyrgela L=22m Prestressed slab with openings (Municipality of city of Argos) (Structural final and construction design) 2000 Bridge Argos-Pyrgela L=22m Prestressed slab with openings (Municipality of city of Argos) (Geotechnical design) 2000 Government Of Abu Dhabi, United Arab Emirates, Municipality And Town Planning DepartmentParking Structure - Sector E-6 (Structural Design for ATHENA S.A., Alternative Proposal) 2000 Structural design of Abu Dhabi Industrial City Residential Area Dorm Accomodation Type 2 For ATHENA S.A 2000 City of Athens Sewage Treatment Works Phase B, Psyttalia Island; New administration building for EYDAP (Structural preliminary, final and construction design) 2000 City of Athens Sewage Treatment Works Phase B, Psyttalia Island; Building connection steel bridges at Akrokeramos, Retaining walls Silo platform foundation (Structural preliminary, final and construction design) 2000 Korinos overcrossing Bridge T29N Prestressed 5-span L=108,80m (16,90-25,00-25,00-25,00-16,90) (Contract: PATHE Additional works - Section Makrigialos - Katerini Chainage 44+100 to 63+500) (Structural final and construction design) 2000 EGNATIA ODOS 2nd SUBSECTION ch. 9+514.41 ch. 20+300. 33 Nos small structural works (2x2 to 6x2 and 5x4.5) and scaffolding of bridges (Structural final and construction design) (1999-2000) 2000 NEW CARGO BUILDING OF OLYMPIC AIRWAYS AT THE NEW INTERNATIONAL AIRPORT OF ATHENS ELEFTHERIOS VENIZELOS (Structural tender final design and construction design) (1999 2000) 2000 Hydroelectric Plant of Mesohora _ Greece (PPC) (Construction Structural Design for VIOTER S.A.) (1994-2000) 1999 Renovation and restoration of 7-Storey Builiding in Athens (Panepistimiou St. 54) (former hotel Palladion) into office and commercial building. (Structural final and construction design) 1999 Bridge of Anthohori (Prestressed) L=24m at Viotikos Kifissos (Contract: exploitation of water resources of Viotikos Kifissos Additional works at Viotikos Kifissos ) (Structural final and construction design) (Structural final and construction design) 1999 STADIUM G. KARAISKAKIS AT NEW FALIRO ADDITION OF 2 NEW BUILDINGS (FOR THE 2004 OLYMPIC GAMES) (GREEK OLYMPIC COMITEE) (Structural preliminary and final design)

1999 Bridge of Solinari (Prestressed) L=10+26+10m at Viotikos Kifissos (Contract: exploitation of water resources of Viotikos Kifissos Additional works at Viotikos Kifissos ) (Structural final and construction design) 1999 Retaining wall Chainage 2+040 2+440 (Contract: Highway Larisa Thessaloniki Section of end of Sikouri interchange) (Structural final and construction design) 1999 Structural works of Kalamitsa river Bridge T4 Chainage 5+557 Highway - Lè=36m (Prestressed) (Contract: Highway Larisa Thessaloniki Section of end of Sikouri interchange) (Structural final and construction design) 1999 Structural works of Kalamitsa river Bridge T9 Chainage 5+634 Highway - Lè=36m (Prestressed) (Contract: Highway Larisa Thessaloniki Section of end of Sikouri interchange) (Structural final and construction design) 1999 Makrihori Bridge Highway: Chainage 4+000 - Lè=14m (Contract: PATHE Section from Girtoni interchange to Tempi interchange Chainage 368+000 to 377+500) (Structural final and construction design) 1999 EGNATIA ODOS SECTION 1.1.3, Cut and Cover Tunnel ch. 11+730 ch. 11+995 and Section 1.1.5 ch. 17+557 ch. 17+717 (Structural preliminary, final and construction design) 1999 Nursery school at the new General Hospital of Alexandroupoli (DEPANOM) (Structural final and construction design) 1999 Chapel at the new General Hospital of Alexandroupoli (DEPANOM) (Structural final and construction design) 1999 Check and control of structural designs of bridges for Elefsina- Spata Airport Motorway (Attiki odos) (Subcontractor of GIBB Hellas SA) 1998 Triton complex Relocation of the Greek Center for Sea Studies (Saronida-Attiki) (Structural final tender design and construction design) 1997 NEW PORT OF IGOUMENITSA SUPPORTING BUILDINGS (Structural construction design) 1983 Ground Storage Tanks for total capacity of 8,000,000 gallons in Ruwais Housing Complex 2 Nos. 2.0 MG water storage reservoirs in post-tensioned concrete 1982 ZADCO Multi- Storey Car Park for 400 Nos. vehicles, near Corniche Road, Abu Dhabi 1981 Workshop and Stores, Zuara Fishing Port, Zuara, Libya 1981 Zakum Development Company (ZADCO) Housing Apartments, near Corniche Road, Abu Dhabi A 14-storey Bldg, 29388 m2 total area of floors 1980 ADNOC Housing Apartments Corniche Road, Abu Dhabi A 12-storey Bldg, 39100 m2 total area of floors 1976 ADNOC Headquarters Office Building on Corniche Road, Abu Dhabi A 14-storey Bldg, 26520 m2 total area of floors 1971 Greek Telecommunications Corp. (O.T.E.) HQ Bldg, Maroussi, Attica A 15-storey Bldg with 3 Nos. basements. 423,000 m3 building volume Is one of the ten tallest buildings in Athens.

1970 Ministry of Public Order Bldg, Katechaki St., Athens. A 15-storey Bldg with 3 Nos. basements. 35,000 m2 total area of floors Is one of the ten tallest buildings in Athens.