RITES LIMITED - RPO LUCKNOW Status of Tenders for the Month of November Nos. and names of parties qualified after techinical evaluation

Similar documents
RITES LIMITED RPO LUCKNOW

RITES LIMITED - RPO LUCKNOW Status of Tenders for the Month of June Nos. and names of parties qualified after techinical evaluation

RITES LIMITED RPO LUCKNOW Status of Tenders for the Month of JULY 2015

RITES LIMITED RPO LUCKNOW Status of Tenders for the Month of JUNE 2015

ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE

Warm Welcome. From K.K.SHARMA EXECUTIVE DIRECTOR PROJECT PLANNING AND MONITORING

ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE

RITES LTD RPO KOLKATA

BHEL:PSWR DETAILS OF CONTRACT (WORKS CONTRACT) CONCLUDED DURING MAY-2017

RPO/North SBU. Details of Contracts Awarded by RITES/in progress during Month-DEC, Tender No.

Sub: Status of tenders (Floated in FY ) dealt by RPO/Kol Division in the month of January, 2018

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.

COMPANY PROFILE. Quality & Work, Speaks.

Road Development in India Weekly Newsletter June 24 June 30,

SUB:- Status of Tenders dealt by CP Division for month of September, Nos and names of parties qualified after Technical evaluation

Development of Road Infrastructure in India

Network Size and Growth

DETAILS OF CONTRACTS AWARDED DURING THE MONTH OF SEPTEMBER ( ENGINEERING DEPARTMENT)

Rail Vikas Nigam limited Kolkata. Details of tenders/contracts awarded upto June'2012

Mailing list for DSM/RRAS Settlement Statement :

Table-A: List of Qualified Bidders, Bidding Route & Washeries of interest. Name of Bidder Bidding Route Name of Washeries. ii) Kusmunda Kolkata

Railways in India 2012

DETAILS OF CONTRACT AWARDED DURING THE MONTH OF OCTOBER ( ABOVE RS. 5 LAKHS) Nos. and names of parties qualified after technical evaluation

CONSTRUCTION PROJECT. INFORMATION REGARDING STATUS OF R/A/FINAL BILL PAYMENT OF CONTRACTOR'S BILL (November MONTH)

DETAILS OF CONTRACTS AWARDED DURING THE MONTH MATERIALS MANAGEMENT DEPARTMENT (MMD)

LIST OF ESIC HOLIDAY HOME

Company Profile DEAR SIR,

MEMBERS OF THE GOVERNING COUNCIL

Own a Property Nr. Airport

LIST OF PARTIES WITH WHOM BUSINESS DEALINGS HAVE BEEN BANNED/SUSPENDED THROUGHOUT NTPC. Address of the Agency

Presentation on City Gas Distribution (CGD) Pipeline Network Projects in Smart Cities

Nos. of Tenders Reeived. Nos. and Name of parties not qualified after technical bid

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

Airindia Domestic Fares (Apex & Instant Purchase Fares) TABLE IV LTC Fares updated as on TABLE IV- LTC Fares

VISHWAKARMA. (Online Monthly E-Journal of Construction Industry Development Council) Vol. 7 Issue VI E Journal of CIDC June, 2018

Names of parties qualified after technical evaluation M/s

An Overview of Airport Infrastructure in India. By V.P.Agrawal, Chairman, Airports Authority of India

RFP Corrigendum No. 01

Agra Varanasi Agra Mumbai Chennai Delhi Hyderabad

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

AIRPORT AT JEWAR An international airport with a capacity to handle million passengers per year will come up at Jewar in Greater Noida in the ne

INDICATIVE SEAT MATRIX - DNB CET CENTRALIZED COUNSELING (LAST ROUND) JANUARY 2014 ADMISSION SESSION. Total Seats

Domestic Travel Policy CMS

Pedro B. Ortiz MEGA-MUMBAI / MAHARASHTRA SOUTH ASIA S CAPITAL REGION

15-18 May 2018 Proposal for Government of Bihar to participate in GES 2018

M.P. POLICE HOUSING CORPORATION LTD. Multi-Storey Residential Complex for Police Personnel At 15 th Battalion, INDORE (Madhya Pradesh)

(ii) DESCRIPTION OF DUTIES - PROJECT MANAGEMENT, FINANCIAL CURRICULUM VITATE 1. NAME: SUDHIR TENGSHE

Intercontinental Consultants and Technocrats Private Limited

Key Projects Carmichael Rail Line (CRL)

STATE NATIONAL ANDHRA PRADESH KERALA. CRI Pumps bags Rs.150 cr. pump order from EESL

SESSION JANUARY JUNE

TABLE IV- LTC Fares. DLTC (Executive Class) HLTC (Economy Class) S No SECTOR & V.V

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

Civil Aviation. LTI The Trusted Training Institute for Competitive Exams (

HLTC (Economy Class) DLTC (Executiv e Class)

ORDER. Subject : Constitution of the Working Group on Tourism for the Twelfth Plan ( ).

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

SUPREME COURT BAR ASSOCIATION Directory Membership no: Res: Res: Membership no: Res: Tel: Membership no: Res: Tel: Res: Tel: Res:

Sl. No. 1. God father Communication Pvt Ltd 9/36/2013-BP & L. Name of MSO Address of MSO Applied date and for Area Status

MORMUGAO PORT TRUST ENGINEERING MECHANICAL DEPARTMENT

Table Rajesh Khetterpal, Paschim Vihar, New Delhi and others 23/63/2010 (Pt-III) dated Commissioner of Customs(II), Chennai

Central Power Research Institute Civil Engineering Division. Monthly Vigilance Report for the month of JULY 2014

GPT Infraprojects Limited. Corporate Presentation February 2017

DCB Bank Regional Nodal Officers

Need of Urban & Regional Rail Based Transport

MINUTES OF PROJECT REVIEW MEETING HELD ON

NET India Trainings AUGUST th noon. 6 th pm. 8 th am. 9 th am. 13 th noon. 15 th noon. 16 th 11.

POYSHA INDUSTRIAL ESTATE. N.I.T. Faridabad

List of the projects to be taken-up in the 102 nd meeting of SEIAA held on at 12:00 PM

Contact and other details of SEZs established/notified prior to SEZ Act, 2005

August 30, Revised Cost Estimate for setting up of India Post Payments Bank from Rs. 800 crore to

HYDERABA D HSBC VISAKHAPA TNAM

PRACTICAL INFORMATION

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

Appendix No.5 List and Status of SEZ Proposals in Uttar Pradesh and on

Investment Opportunities DMIC UP Region

Aluminium hangar structures of minimum 4 mtr side height fire retardant roof and side covers for area 25m x 40m (exhibition)and 25m x 40m (dining

The Cabinet approved the consent memorandum between India and Canada for cooperation in science and technology.

Top News Current Affairs The Wake Up Show. 12 March (2018)

2 AGATTI Airports Authority of India, Agatti Airport Controller

GENSOL S SOLAR PV EPC PORTFOLIO

CORPORATE PROFILE 2017

Sl. No. 1. God father Communication Pvt. Ltd. 9/36/2013-BP & L. Name of MSO Address of MSO Applied date and for Area Status

Best State/UT Comprehensive Development of Tourism (North East, Jammu and Kashmir ) Jammu & Kashmir

Bridge & Roof Co.(India) Ltd. COMPANY PROFILE

LIST OF EXAMINATION CENTRES FOR SUMMER 2012 EXAMINATION

Multimodal Logistics Professionals

Integrated Design Services (IDS), NID, Ahmedabad. List of Clients

Name of Respondents Advocate - 1 -

NTPC Ltd. Gadarwara Super Th Power Plant Vendor Payments From To

Reference List for Cathodic Protection of LPG Mounded Bullets using AnodeFlex

DLF Limited. Q2 Analyst Presentation

SECTION DESCRPTIONS PAGE NOS.

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres

Details of existing Regulation

Our Swachhata journey. Swachhata Hi Seva 2018 (15 th September 2 nd October)

Regional Rapid Transit System in NCR Driver of Balanced and Sustainable Regional Development Vinay Kumar Singh, MD, NCR Transport Corporation

Rail Budget 2013: Highlights

Agenda. Jaypee Group Overview. Company Overview. Yamuna Expressway Progress. Real Estate Development. Financial Overview. Key Highlights.

Transcription:

RITES LIMITED - RPO LUCKNOW Status of s for the Month of November.- of 1 LKO/5906/NT PC/ RHTPP/PKG- 3 Extension of existing, shed, construction of office building / service building & staff quarter, electrical s & other ancilliary s for NTPC Rihand STPP Stage - III. 09.07.14 Two 26.08.14 Four i)m/s Mehrotra ii)m/s S.T. Cons.(P) Ltd., Noida i)m/s VKS infrastructures New ii)m/s CZAR Cons. Patna LOA No. LKO/5906/8/V ol. XIV/1003259 05.02.2015 M/s S.T. Cons.(P) Ltd., Noida Rs. 204,016,965.84 18.02.16 20.02.15 31.05. - Completed 2 LKO/5925/NC L/ CTR-BINA dt. 12.09.14 Complete track renewval of Bina Siding, NCL, Sonebhadra U.P. 15.09.14 Two 10.10.14 Five i)m/s Awlesh Kumar i)m/s Rail Tech Singh Lucknow U.P. Infraventure (P) ii)m/s Mehrotra iii)m/s Gannon Ltd. Allahabad. ii)m/s Rohini Transport Corporation Dunkerley & Co. Ltd. Varanasi. LOA No. GM(C)/NCL/S GR/LOA- 06/2015/1230 06.05.2015 M/s Awlesh Kumar Singh Lucknow U.P Rs. 56,085,613.35 20.03.16 21.05.15 In progress Extended upto30.09.20 18 3 Signal & Telecom s for NTPC, LKO/5904/Vin Vindhyachal Stage IV, PKG-5 dhyachal/pkg- 5R dt. 29.10.14 31.10.14 Two 03.12.14 Two i)m/s Kiran Infra Engineers Ltd. Jaipur(RAJ) ii)m/s Bharat Rail Automations (P) LTD. Mumbai NIL LOA No. LKO/5904/Vin dhyachal/pk G-5R/Vol. XVI/1003451 27.03.2015 M/s Bharat Rail Automations (P) LTD. MUMBAI Rs. 182,486,115.38 10.10.16 11.04.15 In progress - Extended 30.06. 4 LKO/5934/NC L/ Amlori- Nigahi dt. 11.11.14 Earth in formation, of bridges, P way s, building, Electrical & other Misc. s in connection with PR siding at Amlori-Nigahi Project of NCL, Singrauli, M.P. 5 No. LKO/5925/NC L/CTR- JAYANT. Complete Track Renewal of Jayant Siding, NCL Singrauli. 21.11.14 Two 15.12.14 Four i)m/s Kalpataru Power Transmission Ltd. Noida (U.P) ii)m/s Track & Towers infratech (P) ltd.hydrabad iii)m/s Gannon Dunkerly & Co. Ltd. iv)m/s ATEPL-MBPL (JV),New 02.01.15 Two 21.01.15 Four i)m/s Awlesh Kumar M/s Rohini Singh Lucknow ii)m/s Rail Tech Transport Co. Varanasi, U.P. Infraventure (P) Ltd. Allahabad. iii)m/s Mehrotra NIL LOA No. GM(C)/NCL/S GR/LOA- 19/15/1390 22.05.2015 M/s Kalpataru Power Transmission Ltd. Noida (U.P) LOA No. M/s Rail Tech GM(C)/NCL/S Infraventure (P) GR/LOA- Ltd. Allahabad. 36/15/1690 26.06.2015 Rs. 645,692,913.94 04.09.16 05.06.15 In progress - Extended Rs 7,36,09,505.05 09.07.2016 10.07.2015 15.11.2016 - Completed

of 6 NPL/5A dt. 04.12.14 7 LKO/5933/NC L/Gorbi--Block B/1 dt. 30.12.14 8 NPL/6A Supply of PSC Sleepers, P Way materials(except Rails) including points & crossings / laying & linking of tracks including points & crossings inside plant in connection with construction of Rly. siding for MUNPL, Meja TPP(2x660 MW) Meja Dist. ALD, PKG - 5A. Earth in formation, of bridges, P way s, building, Electrical & other Misc. s in connection with PR siding at Gorbi Block -B, Project of NCL, Singrauli, M.P. of Two ROB (inside plant), One RUB (at NH-76E), Three RCC Arch Bridges, Two RCC Box Bridges and other ancillary s in connection with of Railway Siding for MUNPL, Meja TPP,Allahabad, U.P. (Package-6A) 08.12.14 Two 11.02.15 Eight i)m/s RVAG-SC Agarwal(JV), Ghaziabad ii)m/s Mehrotra iii)m/s Kalpataru Power Transmission Ltd. Noida iv)m/s COMSA- PSOVL(JV), New v)m/s SMS Infrastructure Ltd. Nagpur vi)m/s Shivakriti International Ltd. 02.01.15 Two 02.02.15 Four i)m/s Mehrotra ii)m/s Kalpataru Power Transmission Ltd. Noida. iii)m/s BBJ & NCTC. iv)m/s Gannon Dunkerly & Co. Ltd.. 27.03.15 Two 01.05.15 One i)m/s M.G Contractors Pvt Ltd. i)m/s Suresh Chandra Gupta, Jhasi. ii)m/s Awlesh Kumar Singh, Lucknow. NIL LOA No. GM(C)/NCL/S GR/LOA- 33/15/1638 22.06.2015 - - LOA No. LOA No. M/s RVAG - S.C. Agarwal LKO/5920/P- (JV), Ghaziabad 5A/Vol- (U.P.) XVI/1003805 03.07.2015 NPL/6A/VOL- IV/1003876 28.07.2015 M/s Mehrotra Buildcon (P) Ltd. M/s M.G. Contractors Pvt. Ltd. Panchcula Haryana Rs. 218,793,626.78 02.07.2015 17.07.2015 In progress Complete site has not been handed over by client till Extended 31.03. Rs 48,81,04,893.77 05.10.2016 06.07.2015 In progress - extension upto 31.12. Rs 43,17,13,215.00 27.10.2015 11.08.2015 In progress - Extended 10.03. 9 E- No. LKO/78-06/ BPCL Civil s for 2nd SPUR of Tank Wagon loading at BPCL, Bina E 23.04.15 Two - Three i) M/s Karinda s ii) M/s Suresh Chand Gupta iii) m/s K.N. International Ltd. - YES E&P. BDT DATE- 06.11.2015 M/s Karinda s Rs 6,61,94,377.92 05.04.201`6 21.11.2015 28.02. - Completed 10 TENDER NO Earth in formation, : RITES /R of ROB,RUB & Culverts, P-Way LKO /5900 /BRBCL / P3 s, Service Buildings,Electrical and Miscellaneous s for railway siding outside Plant of BRBCL, Nabinagar TPP(4X250 MW),District:Aurangabad, State: Bihar(PACKAGE-3). 27.08.2015 TWO 21.09.2015 one i) M/s GDCL YES LOA NO. BCL/P3/1004 297 DATE- 28.11.2015 M/s GDCL Rs 75,12,81,896.10 11.12.2016 12.12.2015 In progress Delay due to hindrance at site Extended upto 31-10- 11 TENDER NO: Fabrication,supply and Erection of 61.0m open Web Girder and 18.3m LKO/5934/NC Composite Girder for Railway L/ AMLORI- Bridges and other ancillary s in NIGAHI/BRID connection with PR siding at Amlori- GES Nigahi Project of NCL,Singrauli(MP). Tende 4.11.2015 TWO 20.11.2015 three i)m/s PILCON ENGINEER ii)m/s KIRAN infra engineers LTD. Iii)M/s Mehrotra Build Con(P)LTD. YES LOA NO:GM /NC L/SGR/LOA- O/16/05 29.04.2016 M/s Mehrotra Build Con(P)LTD. RS:3,50,10,486.12 12/1/2016 13/05/2015 Recommended for foreclosure

of 12 TENDER of ROR (Bridge No. 9) NO:RITES/RP over existing Indian Railway track & O- proposed D.F.C track and Unchdih Viaduct including other ancillary NPL/6B 13 E-TENDER LKO/5906/NT PC/RhSTPP/P- 4 14 E-TENDER NPL/6C 15 E- No: NPL/6B /R1 s in connection with of Railway siding for MUNPL Meja TPP (2x 660 MW), MEJA, District: Allahabad, State : U.P., (Package- 6B). Augmentation of Signal and Telecom s for NTPC Rihand STPP, Stage- III, Rihand Nagar, Distt.: Sonebhadra, State: U.P.(Package-4). NAME OF WORK: of Workshop Building, Administrative Building, S&T Building, Washable Apron, Drainage inside plant and other ancillary s in connection with of Railway siding for MUNPL Meja TPP (2x660 MW), MEJA, District: Allahabad, State : U.P., (Package-6C). of ROR (Bridge No. 9) over existing Indian Railway track & proposed D.F.C track and Unchdih Viaduct including other ancillary s in connection with of Railway siding for MUNPL Meja TPP (2x 660 MW), MEJA, District: Allahabad, State : U.P., (Package- 6B). E- No: NPL/6B /R1 E 18.11.2015 TWO 05.01.2016 One NIL M/S Simplex Infrastructure limited E 11.01.2016 TWO 18.02.2016 TWO i)m/s bharat rail automation ii)m/s Kiran Infra Project E 12.01.2016 TWO 11.02.2016 Three M/S Highway Comp E 9.03.2016 TWO 04.04.2016 SEVEN i)m/s S.P singla construction pvt. Ltd. ii)m/s MGCPL - ATEPL JV. iii) M/S Simplex Infrastructure limited NIL LOA NO: M/s Kiran Infra Project LKO/5906/NT PC/RHSTPP/ P-4/1005201 (i) M/S Neeraj s. (ii)m/s Gupta Enterprises. i) M/S GPT- MBPL ii)m/s NCC Ltd. iii)m/s NDC- TANTIA (JV) iv)m/s Qingdao construction engineering group co. ltd. and M/S skylark securitas pvt. ltd. yes yes LOA NO: M/S Highway Comp NPL/6C/Vol- V/092 Dated:21-07- 2016 LOA M/S MGCPL - NO:RITES/R ATEPL JV. NPL/6B/R1 07/09/2016 Rs 6.96 Crore 14/06/2017 15/06/2016 In progress Extended upto 30-06- Rs14,92,98,656.83 4/8/2017 5/8/2016 In progress Extended upto 03-08- Rs:1,79,50,25,238.31 20/09/ 21/09/2016 In Progress 16 E- of road,electrical No:RITES/RP and miscellaneous s for railway O- siding outside plant of BRBCL,Nabinagar TPP(4 X BCL/P3A 250MW), District: Aurangabad, State: Bihar(package-3A). E-tender No: BCL/P3A E 6.4.2016 ONE 28.07.2016 ONE NIL i) M/S Classic coal 17 E- of road,electrical No:RITES/RP and miscellaneous s for railway O- siding outside plant of BRBCL,Nabinagar TPP(4 X BCL/P3A/R 250MW), District: Aurangabad, State: Bihar(package-3A). E-tender No: BCL/P3A/R E 13.07.2016 ONE 25.10.2016 TWO (i)m/s AMIT KUMAR (i)m/s ARVIND PRASAD GUPTA YES LOA:Rites/RP O- BCL/P- 3A/R/VOL- II/666 30.11.2016 M/S AMIT KUMAR Rs:3,66,78,912.00 7/8/2017 8/12/2016 In Progress Delay due to hindrance at site Extended upto 31-05- 31.10. 18 E- No:RITES/RP O- PC/VSTPP/B ALANCE/P-2 Balance of Earth, bridge, track construction and track maintenance for railway siding and MGR system of NTPC Vindhyachal Stage-IV Package II. E 09.08.2016 TWO 01.09.2016 TWO (i) M/S RAIL TECH INFRAVENTURE PVT. LTD (ii)m/s MEHROTRA BUILDCON PVT.LTD NIL YES M/S RAIL TECH INFRAVENTUR E PVT. LTD PC/VSTPP/B ALANCE/P- 2/VOL-IV/660 23.11.2016 RS:4,16,66,499.00 6/6/2017 7/12/2016 In progress Extended 31.03.

of 19 E- No: Design, Manufacture, supply, Erection, Commissioning, Testing and prove out of Electric Overhead PC/VSTPP/ST travelling (EOT) CRANES 40T/ 5T & AGE- 25T / 5T Capacity For NTPC IV/EOT/CRAN Vindhyachal, Stage-IV, ES Vindhyanagar. 20 E-TENDER NO: Design, Manufacture, Supply,installation,Commissioning,testing and prove out on a turnkey basis of adouble ended,roll-in,roll-out type PC/VSTPP/ST CNC Surface wheel sets of broad AGE-IV/BG gauge diesel locos and wagons for CNC Surface NTPC Vindhyachal,Stage- Wheel Lathe. IV,Vindhyanagar,Distt.Singrauli,Stat e: Madhya Pradesh 21 E-TENDER Design, Manufacture, Supply, NO:RITES/RP Commissioning, testing & prove O_LKO/5904/ out of hydraulic Re-railing NTPC/VSTPP Equipment for NTPC Vindhyachal, /Stage- Stage-IV, Vindhyachal, Distt. IV/Hydraulic Singrauli, State: Madhya Pradesh. re-railing Equipment 22 E-TENDER S&T s for P.R.Siding at Amlohri- NO:RITES/RP Nigahi Project of NCL, O- Singrauli,(M.P) LKO/5934/NC L/AMLOHRI- NIGAHI/S&T 23 E-TENDER LKO/5920/ MUNPL/5B Supply of PSC Sleepers, P-Way materials (Except Rails) including Points & Crossings, Laying and Linking of track including Points & Crossings outside plant in Connection with of Railway Siding for MUNPL, Meja TPP (2 X 660 MW), Meja, District: Allahabad, State: Uttar Pradesh, (Package 5B). E 02.09.2016 TWO 23.9.2016 FIVE (i) M/S KRANE MFG.(INDIA)PVT.LT D (ii)m/s GRIP ENGINEERS PVT.LTD (iii)m/s CRANEX LIMITED (iv) M/S UEK ENGINEERS PVT LTD (v)m/s REVA INDUSTRIES LTD. E 17.10.2016 TWO 4.11.2016 ONE (i)m/s HYT Engineering Comp Private LTD. E 17.10.2016 TWO 28.11.2016 ONE (i) M/S PREMIER INDIA Agencies. E 19.09.2016 TWO 21.10.2016 THREE (I) M/S SHIVAKRITI INTERNATIONAL LTD., JAIPUR (II) M/S DKC PROJECTS PVT. LTD., KOLKATA (III) M/S BHARAT RAIL AUTOMATIONS PVT. LTD., MUMBAI E 07.12.2016 TWO 28.12.2016 ONE M/S SHIVAKRITI INTERNATIONAL LTD., JAIPUR NIL YES M/S KRANE MFG.(INDIA)PV PC/VSTPP/S T.LTD TAGE- IV/EOT CRANES/621 NO:15.11.201 6 NIL YES PC/VSTPP/S TAGE- IV/BG CNC/SURFA CE WHEEL LATHE/VOLU ME-V/1089 NO:10/02/201 7 (i)m/s HYT Engineering Comp Private LTD. NIL YES (i) M/S PREMIER PC/VSTPP/S INDIA Agencies. TAGE- IV/HYDRAULI C/RE- RAILING/151 5 NO:16/05/201 7 NIL YES GM (C)/SDG/NCL /SGR/17/209 19.07.2017 M/S DKC PROJECTS PVT. LTD., KOLKATA NIL YES M/S SHIVAKRITI NPL/5B/VOL.- INTERNATIONA VI/1431 L LTD., JAIPUR - 24.04.2017 RS:1,24,11,180.00 28/06/2017 29/11/2016 31.03. Completed Rs:5,52,35,773.00/- 24/10/2017 25/02/2017 31.03. Completed Rs:1,68,35,140.00 30/10/2017 31/05/2017 31.03. Completed Rs. 7,50,97,821.30 8/2/ 8/2/2017 In progress Rs.33,24,79,315.74 10/9/ 5/9/2017 In progress

of 24 E-TENDER NPL/P-3/RA Earth in Formation, of Bridges from KM. 12/000 to Br. No. 15 on NH-76 ( Km 7/600) or at other location in connection with of Railway Siding for MUNPL, Meja TPP (2X660 MW), Meja, District: Allahabad, State: Uttar Pradesh, Package-P-3/RA. E 20.12.2016 TWO 11.01.2017 TWO (i)m/s SMS LIMITED (i) M/s KALYAN TOLL INFRASTRUCT URE LIMITED DISCHARGED DUE TO HIGH QUOTED RATE 25 E-TENDER NPL/P-3/RB Earth in Formation, of Bridges from Downside of Meja Road Station to Rail over bridge (km 6/450) or at other location in connection with construction of Railway Siding for Uttar Pradesh, Package-P-3/RB. E 20.12.2016 TWO 18.01.2017 THREE (i) M/s Mehta Co. (ii) M/s BKB Transport (III) M/s Ram Kripal Singh NIL YES M/s Ram Kripal Singh NPL/P- 3/RB/VOL.- VI/1277-23.03.2017 Rs.21,15,48,207.13 10/8/2017 4/8/2017 In progress Extended upto 30-06- 26 E-TENDER NPL/P-3/RC Earth in Formation, of Bridges from Downside of Unchdih Station to Meeting pt. of Meja Leg & Unchdih Leg (km 3/600) and from Rail over Rail bridge (km 6/650) to Br. No. 15 on NH-76 (Km 7/525) or at other location in connection with construction of Railway Siding for Uttar Pradesh, Package-P-3/RC. E 20.12.2016 TWO 18.01.2017 TWO NIL (i) M/s KALYAN TOLL INFRASTRUCT URE LIMITED (iii) M/s BKB Transport Pvt. Ltd. DISCHARGED as bidders were not found technically qualified 27 E-TENDER NPL/P- 3/RC/MAR Earth in Formation, of Bridges from Downside of Unchdih Station to Meeting pt. of Meja Leg & Unchdih Leg (km 3/600) and from Rail over Rail bridge (km 6/650) to Br. No. 15 on NH-76 (Km 7/525) or at other location in connection with construction of Railway Siding for Uttar Pradesh, Package-P- 3/RC/MAR. E 09.03.2017 TWO 30.03.2017 ONE NIL (i) M/s Skylark Infra Engineering 28 E- No.: LKO/5920/ MUNPL/P- 3/RC/APR Earth in Formation, of Bridges from Downside of Unchdih Station to Meeting Pt. of Meja Leg & Unchdih Leg (Km 3/600) or at other location in connection with of Railway Siding for Uttar Pradesh, Package-P- 3/RC E 27.04.2017 TWO 18.05.2017 THREE (I) M/S RAM KRIPAL SINGH CONSTRUCTION PVT. LTD., GURGAON (I) M/S ST CONSTRUCTI ON PVT. LTD., GAUTAM BUDDHA NAGAR (II) M/S JK CONSTRCUTI ON PVT. LTD., ALLAHABAD YES M/S RAM KRIPAL SINGH NPL/P- CONSTRUCTIO 3/RC/APR/VO N PVT. LTD., L.-I/1972 GURGAON - 11.08.2017 Rs. 14,82,53,848.58 21.02. 8/21/2017 In progress Extended upto 30-06-

of 29 E- No.: LKO/NCL/593 1/KRISHNAS HILA Earth in formation, construction of Bridges, P-way s, Building s, Electrical and other miscellaneous in connection with P.R. Siding at Krishnashilla Project of NCL, Sonebhadra, U.P. E 2/4/2017 TWO 3/8/2017 Three (I) M/s ISC Projects (II) M/s Railtech Infraventure (III) M/s Mehrotra Buildcon (I) M/s Mehrotra Buildcon Pvt. Ltd. DUE TO DELAY IN ACCEPTANCE OF THE BID OF LOWEST BIDDER M/s RAILTECH INFRAVENTURE Pvt. Ltd, THE L-1 BIDDER HAS NOT EXTENDED HIS BID VALIDITY. 30 E-TENDER LKO/00012/T ANDA-TPP/P- 1/R Earth in Formation, of Bridges, P-Way s, Building s, Road s and other ancillary s in connection with construction of coal transportation system Package for Tanda Thermal Power Project Stage- II (2x660 MW) at Vidyutnagar, Distt.: Ambedkar Nagar, Uttar Pradesh (Package-1). E 03.06.2017 TWO 18.07.2017 TWO (I) M/s Gannon Dunkerley& co. Ltd. (II) M/s MehrotraBuildcon 31 E-TENDER Modification of Krishnashilla E 6/23/2017 TWO 7/17/2017 TWO (I)M/s Laxyo Energy Exchange yard of UPRVUNL at Limited Krishnashilla Railway Station of (II)M/s Railtech LKO/00016/U E.C. Railway for Coal & Fuel Infraventure PRVUNL/KRI Transportation System for SHNASHILLA 2x500MW Anpara D TPP, Anpara, Sonebhadra. 32 E- No: Earth in Formation, P-Way E 03.08.2017 TWO 29.08.2017 One NIL (i) M/s Senger s, of Buildings, LKO/5936/NT Drains, FOB and other ancillary PC/FGUTPP/ s in connection with P-2/ construction of Railway Siding and S &T system Package for NTPC, Feroze Gandhi Unchahar Thermal Power Project, Stage-IV (1x500 MW) at Unchahar, Distt. Raebareli, Uttar Pradesh (Package-2) 33 E- No: LKO/5936/NT PC/FGUTPP/ P-2/R 34 E-TENDER LKO/UPRVUN L/00023/HGJ- Ext./U-A 35 E-TENDER BCL- NABINAGAR/ P-2A Earth in Formation, P-Way s, of Buildings, Drains, FOB and other ancillary s in connection with construction of Railway Siding and S &T system Package for NTPC, Feroze Gandhi Unchahar Thermal Power Project, Stage-IV (1x500 MW) at Unchahar, Distt. Raebareli, Uttar Pradesh (Package-2) of Railway Net for Coal Transportation for Harduaganj Thermal Power Project Ext. Unit-A at Harduaganj District Aligarh (UP) Balance for Earth in Formation, of ROB, RUB and Bridges, P-Way s, Workshop, Service Building,Foot Over Bridge, Electrical and Miscellaneous s for Railway siding and MGR system of BRBCL Nabinagar TPP (4x250 MW) at Nabinagar, Distt.: Aurangabad, State Bihar E 31.01. TWO 21.02. FOUR (I)M/s SURESH (II)M/s HARI CONSTRUCTION AND ASSOCIATES PRIVATE LIMITED (III)M/s LAXYO ENERGY LIMITED (IV)M/s RAILTECH INFRAVENTURE PVT LTD E 18.01. TWO 04.04. TWO (I)M/s SURESH (II)M/s MEHROTRA BUILDCON E 30.11.2017 TWO 22.12.2017 ONE (I) M/S HARI CONSTRUCTION AND ASSOCIATES PVT. LTD., NIL NIL NIL YES No.: M/s SURESH Rs. 21,89,31,783.21 11/07/2019 12/07/ LKO/5936/NT PC/FGUTPP/ P-2/R/VOL.- XIII Dated: 27.06. NIL YES No.: 494/UNL/CE (C- NP)/HTPS/LO A/Rail Net Dated: 29.06. NIL YES No.: BCL- NABINAGAR/ P-2A/TF-Vol- II/4519 Dated: 10.08. M/s SURESH Rs. 47,81,83,570.83 26/07/2019 27/07/ M/s Hari WORK HAS BEEN TRANSFERRED TO RNORTH DUE TO DELAY IN ACCEPTANCE OF THE BID OF LOWEST BIDDER M/s RAILTECH INFRAVENTURE Pvt. Ltd, THE L-1 BIDDER HAS NOT EXTENDED HIS BID VALIDITY. Rs. 3,27,281,277.00 25.08.2019 25.08.

36 E-TENDER of Railway Net for Coal and Fuel Oil Transportation for Obra Thermal Power Project (Obra- LKO/UPRVUN C) at Obra, District:- Sonebhadra L/00013/Obra- (UP). C/R 37 E- No.: LKO/5920/P- 6C/1 of Junction Cabin for S&T at Railway Siding of Meja Urja Nigam Limited (MUNPL) at chainage KM 6/400 from Meja Road Railway Station end in Connection with of Railway Siding for MUNPL, Meja TPP (2 X 660 MW), Meja, District: Allahabad (Now Prayagraj), State: Uttar Pradesh, Package 6C/1 of E 27.11. TWO 27.12. To be opened on 28.12. Re - E 29.11. Single 17.12. To be opened on 18.12. Limited Estimated cost put to : Rs. 1.01 Crore 38 E- No.: LKO/5920/P- 6C/2 of Relay Hut, EI Huts and Station Building at Meja Road Railway Station in Connection with of Railway Siding for MUNPL, Meja TPP (2 X 660 MW), Meja, District: Allahabad (Now Prayagraj), State: Uttar Pradesh, Package 6C/2 E 29.11. Single 17.12. To be opened on 19.12. Limited Estimated cost put to :Rs. 99.46 Lakh