The Study on Nationwide Water Resources Development and Management in the Socialist Republic of Vietnam JAPAN INTERNATIONAL COOPERATION AGENCY Figure 8.15 Huong River Irrigation Scheme F-17
SEA SEA Thuan An LAGOON Pha Tam Giang Dam Ha Trung LAGOON F-18 Ha Do Outlet An Xuan Outlet Quan Cua Outlet Thao Long Barrage Cu Lac Phu Dong sandy lands 1, 398 An Gia II An Xuan 200 271 117 An Lai B6 B4 An Gia I 263 590 233 150 Phuoc Ly Phu Long B Phu Long A Kim Doi B5 334 150 505 348 B7 154 B12 B16 130 Su Lo Phu Luong 812 490 sandy D My An 868 770 Vung Cau Hai area Niem Pho Thanh Ha Phong An Trieu Thanh Phu Thuong 338 Outlet 750 150 124 255 564 B3 Bac Vong C 480 Phong Hien Vinh Phu 126 Tan Thanh 300 944 510 Phu Ho LAGOON Thuy Van B1 435 100 recomm. flood HUE B60 564 Vung Highway No.1 Phu Thanh Dong Xuan control structures 60 B8 Cau 250 404 Trieu Son Tai 420 Hai Loi Thanh 415 B14 Thuy Thanh Phu Da B10 B11 Bo Auen 60 Phu O 42 425 540 147 340 304 357 Ttrieu Son Trung B Cong Quan 750 Outlet Co Bi La Chu Huong Long Thuy Duong N5 N6 540 308 450 2, 087 555 1, 472 Lai Bang Phong Son 615 Bo Pho N11 185 419 A Nham Bieu Intake Chau Son 357 An Luu A B Phu Cam Intake 807 C Dap Da Crossdam Phu Bai Truoi D La Y Spillway River Bo River Thui Bieu LEGEND 168 drainage boundaries (main outlets) irrigation boundaries (intakes) intake outlet Huong River dam+reservoir HUONG NORTH HUONG SOUTH Chau Son Nong River The Study on Nationwide Water Resources Figure 8.16 Development and Management Main Network (Schematic) of Huong River in the Socialist Republic of Vietnam Irrigation Scheme JAPAN INTERNATIONAL COOPERATION AGENCY
F-19
F-20
Tu Ha Tu Ha plant (cap. 4.000 m 3 /d) Hue Urban Water Supply (current situation) 0 2 4 km F-21 Da Vien plant (cap. 12.000 m 3 /d) Quang Te-1 (1926) (cap. 40.000 m 3 /d) Quang Te-2 (cap. 20.000 m 3 /d) Phu Bai plant to be linked to Hue system (cap. 5.000 m 3 /d) Intake site for Quang Te-1 and 2
Nham Bieu Intake Gate Phu Cam Intake Gate Dap Da Ovewrflow Weir La Y Spillway Shinh Thanh Ha Phu Nam Thao Long Barrage Sea The Study on Nationwide Water Resources Development and Management in the Socialist Republic of Vietnam JAPAN INTERNATIONAL COOPERATION AGENCY Figure 9.4 Location of Downstream Facilities for Flood Control and/or Irrigation F-22
Figure 10.1 Overall Implementation Schedule for Ta Trach Reservoir Project ( Earthfill Dam ) Description 2002 2003 2004 2005 Year 2006 2007 2008 2009 2010 2011 2012 2013 1. Study on Nationwide Water Resources Development and Management by JICA 2. Special Assistance for Project Formulation by JBIC 3. Financial Arrangement 4. Approval of Project and Arrangement by GOV 5. Procurement of Consultant F-23 6. Engineering Services (Basic Design, Detailed Design and Supervision) 7. Pre-qualification Tendering 8. International Competitive Bidding 9. Land Acquisition and Resettlement 10. Ta Trach Reservoir Project ( Earthfill Dam )
F-24 Description 1-A.Ta Trach Reservoir Project - Preparatory Works - Main Dam - Spillway - Outlet Works - Saddle Dams - Hydropower - Land Acquisition and Resettlement - Engineering Services by Consultants 1-B.Huu Trach Reservoir Project - Preparatory Works - Main Dam - Spillway - Outlet Works - Land Acquisition and Resettlement - Engineering Services by Consultants 2. Irrigation and Drainage Facilities - Preparatory Works - Improvement of Main Canal / Drain Network - Construction and Rehabilitation of Main Inlet and Outlet - Rehabilitation of Pumping Stations - Embankment of Dikes - Improvement of Secondary System - Improvement of Tertiary System / On-farm Works - Engineering Services by Consultants 3. Domestic and Industrial Water Supply - Preparatory Works - Phase 2 of Quang Te 2 Treatment Plant - Additional Pipeline - 45,000 house connection - Booster Station and Ancillaries - Small Projects - Engineering Services by Consultants Figure 10.2 Overall Implementation Schedule by Sector Year 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020