Water Emergency Transportation Authority Program Update. Maritime Commerce Advisory Committee Port of San Francisco July 21, 2011

Similar documents
WATERBORNE TRANSIT. April 21, 2010

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

Draft SamTrans Service Plan Public Outreach Presentation

Dublin Corporate Center

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

1. Introduction. 2. Overview of Existing Conditions

Regional Measure 2 Regional Traffic Relief Plan

115 CENTER AVE, PACHECO, CA

Treasure Island Supplemental Information Report Addendum

Metro Green Line to LAX. January, 2012

Honorable Mayor and Members of the City Council. Submitted by: Scott Ferris, Acting Director, Parks Recreation & Waterfront

Ideas + Action for a Better City learn more at SPUR.org. tweet about this #FarePolicy

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012

SAMTRANS SERVICE PLAN

Village Marketplace. The Location. Demographics. Contact Us. FOR Lease E. 14th Street San Leandro, CA 94577

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

CITYWIDE FERRY SYSTEM: LONG ISLAND CITY HUNTERS POINT CIVIC ASSOCIATION BRIEFING

Hanger 8 AVAILABLE FOR LEASE. ±52,000 rsf SIGNATURE OFFICE BUILD-TO-SUIT

2 Shall voters authorize a Regional Traffic Relief Plan that does

WATERFRONT PROGRAM PROGRESS REPORT

FINAL. Summary Report 2017 On-Board Passenger Survey

CAPITOL CORRIDOR SERVICE PERFORMANCE

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018

New Orleans Municipal Yacht Harbor

Lathrop Industrial Complex

2018 Alaska General Contractors Annual Conference ALASKA MARINE HIGHWAY SYSTEM

Canaveral Port Authority Department of Infrastructure, Construction, Engineering & Environmental Port Projects Status Update. Updated 2 Weeks Ago

Claremont Project Background and Update Community Meeting September 11, 2017

TREASURE ISLAND AND YERBA BUENA ISLAND Treasure Island Development Authority Board. April 8, 2015

DRAFT PLAN & DRAFT EIR

Slide 1. Waterfront Plan Land Use Subcommittee. Port Seawall Lots

WEST COUNTY HIGH-CAPACITY TRANSIT STUDY

Link Union Station (LINK US)

Port Everglades 2014 Master/Vision Plan Update

Boston-Logan International Airport: Proposed Consolidation of Rental Car Operations

SUMMARY OF DEVELOPMENT ACTIVITY As of May 1, 2016

South Bay Metro Green Line Extension

SAN LEANDRO BUSINESS CENTER 100 HALCYON DRIVE SAN LEANDRO, CALIFORNIA ACCEPTING TENANT PROPOSALS FOR Q OCCUPANCY ±430,940 SF

DOWNLOAD OR READ : THE SAN FRANCISCO SYSTEM AND ITS LEGACIES PDF EBOOK EPUB MOBI

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018

Otay Mesa - Mesa de Otay Binational Corridor Strategic Plan. June 13, Project Background

MEMORANDUM DIRECTOR'S RECOMMENDATION: APPROVE HISTORIC VESSEL POLICY

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

This presentation is available online.

6384 Via Real Carpinteria, CA 93013

Port of San Francisco Water Taxi Feasibility Study

PLEASE READ Proposal for Sustainable Service

709 & 711 ADMIRAL CALLAGHAN LANE

tie lines September 2006 A monthly newsletter from the Port of Long Beach

Silver Line Operating Plan

Port Everglades 2014 Master/Vision Plan Update

San Diego Convention Center Phase III Expansion. SDCCC Presentation to Mayor s Task Force June 2, 2009

Metrolink Service Expansion Program

Dogpatch Community Task Force Meetings. April 24, 2017 Meeting #6

Community Work Session #2.1 Ketchikan Upland Planning to Support Expanded Marine Facilities and Larger Cruise Vessels.

Logan International Airport Right Sizing and Good Terminal Planning

Public Outreach Activities for San Francisco Groundwater Supply Project 2007 through 2014

Building The Golden Gate Bridge An Interactive Engineering Adventure You Choose Engineering Marvels

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

Aid to Local Ports FY19 Requests

Pier th St. Historic Buildings SPUR 1

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

SS METEOR AKR-9 Part 4: NAPA RIVER SCENES - July 2, 2015

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

±200,000 - ±4,400,000 SF (Approved Entitlements)

2 SITE ANALYSIS AND DESIGN CRITERIA

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012

Monday through Friday: Saturday: Sunday and Holidays:

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

C I T Y O F S A L E M

Downtown Cotati Mixed Use Development Site +/- 6.6 acres FOR SALE $3,950,000

The Americas. Port of the Americas. Rhonda M. Castillo Gammill, Esq., P.E. Executive Director, Port of the Americas Authority

Tri-Valley Residential Real Estate Market Update

Update on Palm Beach MPO Funded Projects

Downtown to Defiance Trolley Key Messages Jan. 2017

Solano County Transportation Authority Short Range Transit Plan SolTrans

/ A V A I L A B L E F O R L E A S E A L A M E D A \ C A L I F O R N I A

BABTA PRESENTATION CASSANDRA COSTELLO - MAY 2018

Pinellas Tourist Development Council

PORT OF GALVESTON PORT DIRECTOR S REPORT. May 22, 2018

Norwalk H.S. Norwalk Green Line Station. Lakewood Green Line Station NORWALK. Bellflower H.S. Studebaker Rd. Cerritos College. Gahr H.S.

Port of San Diego Overview and Updates. September 2017

General Issues Committee Item Transit Operating Budget Ten Year Local Transit Strategy

UK Port Infrastructure Project Pipeline Analysis Report

COASTAL CONSERVANCY. Staff Recommendation October 21, 2010 PETALUMA TRESTLE REHABILITATION DESIGN

2018 Service Implementation Plan Executive Summary

Ridership Projection: Direct Ferry to Midtown W 39th St.

THREE STATE-OF-THE-ART INDUSTRIAL BUILDINGS RANGING FROM 60,923 SF TO 105,047 SF AVAILABLE

Miami Orlando Passenger Rail Project Overview

Downtown Office Building for Sale Owner/user Opportunity - Reduced Price $2,700, E Street Santa Rosa CA

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering

Update on Monarch Bay Shoreline Development Project. City Council Work Session October 9, 2017

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

STA MOVING FORWARD A plan for more and better transit services

Metro Gold Line Eastside Extension Review Advisory Committee October 9, 2008

St. Clair West Station Easier Access Project Community Update Open House

Exclusively Offered by:

Transcription:

Water Emergency Transportation Authority Program Update Maritime Commerce Advisory Committee Port of San Francisco July 21, 2011

Agency Background Authorized by California State Legislature Water Transit Authority 2000 Water Emergency Transportation Authority 2008 Regional Ferry System for the San Francisco Bay Expansion service development Emergency response coordination Regional service consolidation

Transfer of Existing Services to WETA Alameda Services Alameda/Oakland and Harbor Bay 568,000 annual passenger trips $7.2 million annual operating budget 4 vessels, 3 terminals Transfer Completed April 2011 Vallejo Service Vallejo Baylink and Route 200 Bus 685,000 passenger trips $14 million annually 4 vessels, 1 terminal Transfer Planned for Winter 2011

System Rehabilitation/Replacement Vessel Mid-life Re-power/Refurbishment Vallejo Mare Island Intintoli Alameda Bay Breeze Harbor Bay Float and Piles Clay Street Float and Gangway

System Operations System Operations and Maintenance RFP Alameda/Oakland, Harbor Bay, Vallejo, South San Francisco routes Released May 2011 Award August/September 2011 Customer Relations System Operating Name/Brand System Website

Future WETA Expansion Ferry Services System Expansion Plans Completed in 2003 8 New Routes Identified Redwood City South San Francisco Treasure Island Berkeley Richmond Hercules Martinez Antioch Programmatic EIR Completed Service Level EIRs in Process

Expansion Projects Planned for Next Five Years New Service Implementation South San Francisco to Alameda/Oakland Berkeley/Albany to San Francisco Treasure Island to San Francisco Core System Projects New Vessels Maintenance and Operations Facilities Downtown SF Terminal Expansion

WETA Vessels Gemini & Pisces 149 passenger 25 knot In service: 2009 Scorpio & Taurus 199 passenger 25 knot In service: 2010 Highest Environmental Standards 85% cleaner than Federal EPA standards Low wake/wash

South San Francisco Ferry Terminal Route: Ridership: Status: South San Francisco to Alameda/Oakland 902/daily Under Construction Timeline: Service Start Early 2012 Design Team: Construction: ROMA Design Group (Lead) Moffatt & Nichol Manson Construction Power Engineering

South San Francisco Ferry Terminal

South San Francisco Ferry Terminal

South San Francisco Ferry Terminal

Berkeley Ferry Terminal Route: Ridership: Berkeley to Downtown San Francisco 1,716/daily Timeline: Final EIR/EIS (Winter 2011) PS&E (Fall 2012) Start Construction (Summer 2013) Operate Service (Fall 2014) Design Team: Winzler & Kelly (Lead) Marcy Wong Donn Logan Environ Team: URS Corporation

Berkeley Ferry Terminal

Berkeley Ferry Terminal

Berkeley Ferry Terminal

Treasure Island Ferry Terminal Route: Ridership: Treasure Island to Downtown San Francisco 3,406/daily Timeline: Final EIR/EIS (Summer 2011) PS&E (Summer 2013) Start Construction (Spring 2014) Operate Service (2015) Design Team: Skidmore Owings & Merrill (Lead) Moffatt & Nichol Environ Team: TIDA

Treasure Island Ferry Terminal

Treasure Island Ferry Terminal

Treasure Island Ferry Terminal

Central Bay Operations and Maintenance Facility Route: Ridership: All Central Bay Routes N/A Timeline: Environmental Clearance (Summer 2011) PS&E (April 2012) Start Construction (Fall 2012) Operate Facility (Winter 2013) Design Team: Environ Team: KPFF Consulting Engineers (Lead) ROMA Design Group ICF International

Central Bay Operations and Maintenance Facility

Central Bay Operations and Maintenance Facility

Downtown San Francisco Ferry Terminal Expansion Project

The Ferry Building with the Freeway

Project Area

Existing Conditions Phase 1

Existing Conditions Phase 1

Existing Conditions Phase 1 Pier 14 Gate E Gate B

Expansion Project - Phase 2 (2015 2017)

Expansion Project - Phase 2 (2015 2017)

North Basin Conceptual Rendering

Expansion Project - Phase 2 (2015 2017)

South Basin Conceptual Rendering

Expansion Project Phase 3 (2020-2030)

Project Schedule Milestone Date Release Draft EIS/EIR Spring 2012 Release Final EIS/EIR Winter 2012 PS&E Summer 2014 Start Construction (Phase 2) Fall 2014 Start Construction (Phase 3) TBD

www.watertransit.org