Morocco ASBU Implementation

Similar documents
ASBU-Bloc0 Moroccan achievements and planned activities

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

MID Region Air Navigation Strategy

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

Russian Federation ATM modernization program

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

ICAO provisions on data link implementation

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

ATFM/CDM ICAO s Perspective

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

(Presented by United States) EXECUTIVE SUMMARY

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

Home LIST OF ACRONYMS

ICAO ASBU Implementation/ Surveillance and ATS Automation

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Performance Based Navigation (PBN) Implementation Plan. The Gambia

ICAO GANP Requirements and Evolution

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

Air Navigation Bureau ICAO Headquarters, Montreal

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

SERVICE DEVELOPMENT ROADMAP

Bits to Blocks Aviation System Block Upgrades (ASBU)

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

Block 0 to Block 1 Vaughn Maiolla

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

CNS/ATM Systems Interoperability and Harmonization

Presented by: Trinidad and Tobago

TWELFTH AIR NAVIGATION CONFERENCE

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

2012 Performance Framework AFI

Global ATM System ~Interoperability and Harmonization ~

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

Dynamic Airspace Overview concepts, complexities, benefits and outlook

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

PENS Symposium How to join PENS

Free Route Airspace Maastricht (FRAM)

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

Trajectory-Based Operations (TBO)

Technology Roadmaps. CNS and IM plus Avionics. Vaughn Maiolla. Dakar, Senegal, September 2017

EUR/SAM corridor airspace concept

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office

Continuous Improvement of the Global Air Traffic Management System

SAMPLE TEMPLATE APPENDIX 3.5C-1

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

This page is left intentionally blank for printing purposes

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

Learning Objectives. By the end of this presentation you should understand:

Implementation of PBN in Armenian airspace

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

ORGANISER HOST LEAD SPONSOR

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

ASBU Block 0 Implementation and Regional ANPs

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

NATA 2018 AGM & CONFERENCE

(RN R A N V A V & & RN R P N

ATM processes automatization for Runway (Airport) Throughput Enhancement

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

ICAO Regional Seminar on Performance - Based Navigation (PBN) Nairobi, Developments and Benefits. 4 December 2008.

Connecting ASBU with your State Air Navigation Plan

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

PBN Airspace Concept. ATS requirements

What is an Airspace Concept? Module 5

Preparation for ASBU B1 (PBN)

APAC AIR NAVIGATION PLAN VOLUME III

Aeronautical Communications: Changes Ahead - FCI

ICAO framework for LPV

Transcription:

Morocco ASBU Implementation

Air Traffic policy Liberalization of air traffic sector; Integration of Morocco in the European single sky (agreement in 2006);

Effects of air traffic Liberalization Significant increase of air traffic flow due to new foreign companies operating to/from Morocco; Increased air traffic capacity and need for optimization of airspace; Configuration of the airspace must meet the operational needs of airspace users; Integration of new technologies and new ATM concepts to deal with the performance of new generation aircraft; Interoperability between adjacent FIRs for better coordination and interface of ATM systems.

Why ASBU in Morocco? ICAO guidelines (Doc 9854, Doc 9750 ) ASBU offers a clear roadmap of GANP for new technologies/techniques/procedures implementation, with a high confidence that the interoperability with airspace users and with regional partners is maintained.

Terminal Domain : B0-APTA Optimization of approach procedures including vertical guidance Enroute Domain : B0-FRTO Improved operations through enhanced en-route trajectories

B0-APTA Optimization of approach procedures including vertical guidance Accomplishments (1/2) : Publication of the second version of Morocco PBN Plan in 2017; Publication of AIC promulgating RNAV(GNSS) usage as primary procedure IN 2016;

B0-APTA Optimization of approach procedures including vertical guidance Accomplishments (2/2): Implementing RNAV(GNSS) in 10 airports : GMMW, GMMZ, GMMH, GMML, GMMD, GMTN, GMAT, GMMI, GMMX and GMFO.

B0-APTA Optimization of approach procedures including vertical guidance Next Steps Implementing RNAV(GNSS) in all Moroccan airports by 2019; Implementing PBN procedures with vertical guidance by 2019. Generalizing CDO and CCO in major airports; Implementing Point Merge Systems in major Airports; Implementing RNP-AR-APCH approaches for complex airports.

B0-FRTO Improved operations through enhanced en-route trajectories Accomplishments: Implementing Direct routes (DCT) and conditional routes (CDR) since 2012. Implementing C Classification of upper Airspace for better air traffic operations since 2013; Final draft for night Free-Route in West and Oceanic Sectors to be implemented in October 2019;

B0-FRTO Improved operations through enhanced en-route trajectories Next Steps : Implementing 24H free route in west and Oceanic Sectors in 2020; Implementing night Free-Route in continental sectors in 2021; Scheduling the implementation of 24H Free-route in Casablanca FIR/UIR 2023.

Phase 1 FRA within the AoR of Agadir ACC Implementation - 10 OCT 2019 Time availability: Night FRA (2200/0600 UTC); Vertical limits: From FL195 to FL660; ATS route network remains available.

Phase 2 FRA within the AoR of Agadir ACC Implementation - Spring 2020 Time availability: Change from Night to H24; Vertical limits: From FL195 to FL660; ATS route network planned to be removed.

Phase 3 FRA within the AoR of Casablanca ACC Implementation Spring 2021 Time availability: Night FRA; Vertical limits: From FL195 to FL660; ATS route network remains available.

CNS

CNS B0-FICE: Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration Object period Location End Goal Partners Cost Benifits Migration to IP infrastructure AMHS with Madrid Porto Santo Radar FOIA Radar Spain 1 Radar Spain 2 Radar OLDI/FMTP with LIS OLDI/FMTP with SEV OLDI/FMTP with GCC VoIP 2017 2017 2020 2018 2018 2017 2017 2017 2020 CNCSA CCR AGA Adj FIRs New Coordination Links for Data and voice. ONDA/PNA ENAIRE NavPortugal 40,000,000 MAD Conformity with ICAO SARPS and with ASBU guidelines Cost optimization Systems Interoperability Achievements and implementation: Implementation of the national and international IP network ATS OLDI coordination: commissioning of the FMTP links between Casablanca, Agadir Lisbon, Canary Island and Seville centers; Aeronautical messaging: AMHS commissioning between the Casablanca ACC and the, Lisbon and MADRID Centers Radar Data Sharing: TGR, Porto Santos, Foia, Taborno, Fuerteventura and ADS Madeira VoIP: Advanced Antenna Sharing and ATS Coordination between the two CCRs.

CNS B0-SURF: Safety and efficiency of surface operations (A-SMGCS levels 1-2) Object period Location End Goal Partners Cost Benifits Feasability study Done by PNA with its providers, Workshop planed in PNA quarters tree phases: 2020 2021 2022 Mohammed V Airport MAK Agadir Specifications for A-SMGCS PNA Airports DGAC Providers AOs - Conformity with ICAO SARPS and with ASBU guidelines Client satisfaction Call of tenders preparation Definition of technical specs with accordance to regulations late 2019 Mohammed V Airport Specificatio ns document PNA RI Cost optimization Launching of the call of tenders and implementation Start with pilot site Safety case study training 2020-2021 Mohammed V Airport Implementatio n of A-SMGCS PNA DGAC providers AOs - Assure a high level of safety. Increasing airport fees Implementation of the systems 2021 Mohammed V Airport

AIM