EXPRESSION OF INTEREST EOI 0008

Similar documents
TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Briefing Pack for the role of Executive Manager, Roads and Drainage Whitsunday Regional Council

Assessment of Flight and Duty Time Schemes Procedure

Cairns Airport Pty Ltd Disability Access Facilitation Plan

Application for ATO Approval in accordance with ORA.ATO.105

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

AUSTRALASIAN AIRPORTS REAL ESTATE & COMMERCIAL CONFERENCE. 6 7 August Palm Cove, Cairns, Queensland, Australia

Casque Isles Hiking Trail Upgrade Project

The GMC protocol for making revalidation recommendations: Guidance for responsible officers and suitable persons Fifth edition (March 2018)

AIRWAYS/CAMIC ATC TRAINING PROGRAMME working smarter together

Request for quotation

Air Operator Certification

Request for quotation

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

RESPONSE TO INQUIRIES. Operator: TORNGAT MOUNTIANS BASE CAMP AND RESEARCH STATION (Base Camp)

Issued by the Department of Transportation on the 12 th day of February, 2016 FINAL ORDER ISSUING INTERSTATE CERTIFICATE

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY (585) Established 1789

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0

Airline Studies. Module Descriptor

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations

Gatwick Airport Limited operator determination

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

AIR SAFETY SUPPORT INTERNATIONAL

4. DEFINITIONS: OFFICE OF HUMAN CAPITAL. TSA MANAGEMENT DIRECTIVE No HIRING PRIVATE SCREENERS FOR FEDERAL TSO POSITIONS

COMMISSION IMPLEMENTING REGULATION (EU)

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

PHASE SPACES NOW RELEASED

The Strategic Commercial and Procurement Manager

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

City of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator

GUERNSEY ADVISORY CIRCULARS. (GACs) TECHNICAL CO-ORDINATOR GAC 39-1

Request for Quotation Site Operations Services

ANGLIAN WATER GREEN BOND

National Certificate in Aviation (Introductory) (Level 2) Level 2. Credits 41. Purpose. Special Notes. Credit Range

Tender Evaluation Report. Procurement of Non-Emergency Patient Transport Services (NEPTS)

Airworthiness Standards Department CAMO Approval Process Form. S/N Activity Started Completed Initial Remarks*

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

TERMS OF REFERENCE (TOR) FOR PROVISION OF MOBILE ACCESSIBILITY SERVICE - RFQ/UFAA/015/

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

AERODROME SAFETY COORDINATION

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for:

Sponsorship prospectus. New Zealand. Thursday 25 July rics.org/nzawards

DISABILITY ACCESS FACILITATION PLAN

LOCAL BUYING. Supporting Western Australia through local buying. PROGRAM BUILDING OUR FUTURE TOGETHER

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

CAPABILITY STATEMENT TRANSPORT

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

Santos Tour Down Under Tour Village and Bike Expo

Quality Management System (QMS)

TENDER NO: KCAA/038/ EXPRESION OF INTEREST (EOI)

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition

Queensland Treasury s primary role is to advance the performance of Queensland s economy and to manage the State s finances.

Park Board Chair and Commissioners

Department of Defense DIRECTIVE

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

City of Rockingham. Secret Harbour Surf Life Saving Club Redevelopment Project

Implementation Framework. Expression of Interest. Queensland Ecotourism Investment Opportunities. Ecotourism Facilities on National Parks

Monash University Procedure. Cooling Tower Management Procedure. PROCEDURE STATEMENT

C LINDSTRAND HOT AIR BALLOONS LTD

capability profile PO Box 8102 Suite 4, Level 2, 85 Lake St Cairns QLD 4870 Phone

GM1DTO.GEN.110 Scope GM1 DTO.GEN.115(a) Declaration GM2 DTO.GEN.115(a) Declaration AMC1DTO.GEN.115(a)(2) Declaration

Sustainable Procurement Policy for Heathrow Airport Limited

Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

FBO Request for Proposal Lake Cumberland Regional Airport

Oklahoma State University Policy and Procedures

NZQF NQ Ref 1385 Version 3 Page 1 of 7

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Revalidation of UKPHR s registrants: Guidance

Cert II in Aircraft Line Maintenance MEA20515 CASR Part 66 A licence

[Docket No. FAA ; Product Identifier 2017-NE-23-AD] Airworthiness Directives; Zodiac Seats France, Cabin Attendant Seats

TORONTO TRANSIT COMMISSION REPORT NO.

L1584-D1 North Service Area Improvements Program

[Docket No. FAA ; Directorate Identifier 2015-NM-124-AD] Airworthiness Directives; The Boeing Company Airplanes

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

December 2017 Quarterly Report

Safety Management System Coordinator. Position Number Community Division/Region Yellowknife Air, Marine and Safety/HQ

[Docket No. FAA ; Product Identifier 2017-CE-042-AD] Airworthiness Directives; GA 8 Airvan (Pty) Ltd Airplanes

Further Scottish Leasing Round (Saltire Prize Projects) Discussion Paper on Proposed Geographic Areas March 2010

Qualification Details

Sierra Sacramento Valley EMS Agency Program Policy. EMS Aircraft Operations

GENERAL ADVISORY CIRCULAR

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Official Journal of the European Union L 7/3

This qualification has been reviewed. The last date to meet the requirements is 31 December 2020.

GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS ON-CALL AVIATION PLANNING SERVICES

Invitation to tender for the provision of PR support services for Visit Belfast

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601.

Request for Proposal (RFP) Fixed Wing Aircraft Transportation Services. For Matawa First Nations

Transcription:

EXPRESSION OF INTEREST EOI 0008 Construction Contract Cairns Airport Office Co-location Project CAIRNS AIRPORT PTY LTD JULY 2017

TABLE OF CONTENTS 1 Registration of Interest Submission... 3 2 About Cairns Airport... 3 3 The Purpose and Structure of this EOI... 3 4 Scope of EOI... 4 5 Selection Criteria... 4 6 Submissions... 5 7 Reservation of Rights... 5

1 REGISTRATION OF INTEREST SUBMISSION Cairns Airport Pty Ltd invites Expressions of Interest for the Cairns Airport Office Co-location Project for the Cairns Airport owned and operated Airport Administration Centre located on Caudron Avenue at Cairns Airport. Organisations with appropriate experience in the supply of office construction and fitout services, are invited to register their interest by responding to the issues and matters contained in this Expression of Interest (EOI). Respondents should have the appropriate experience, capabilities, personnel, resources, capital, insurances and certification to deliver the requirements detailed in this EOI. Organisations should forward their Expression of Interest to: Alicia Prince Manager Terminals & Security alicia.prince@cairnsairport.com.au EOI 0008 Cairns Airport Office Co-location Project On or before 4.00 pm on Friday, 28th July 2017. Submissions should include a primary document that addresses the nominated Short Listing Selection Criteria detailed below. This primary document should be concise but sufficiently detailed to fully address all the selection criteria. All enquiries prior to submission should be directed to: Alicia Prince Manager Terminals & Security alicia.prince@cairnsairport.com.au 2 ABOUT CAIRNS AIRPORT Cairns Airport Pty Ltd owns and manages the Cairns Airport which includes all airside and landside operations, terminals, car parking and associated land holdings. Cairns Airport is part of the North Queensland Airports group. The consortium comprises IIF Cairns Mackay Investment Ltd (an entity advised by JP Morgan Asset Management), The Infrastructure Fund (TIF) managed by Hastings, Perron Investments and Auckland International Airport Limited (AIAL). 3 THE PURPOSE AND STRUCTURE OF THIS EOI The purpose of this EOI is to short list tenderers for a formal tender. The basis of the tendered works are to demolish and refit office spaces on the second floor of the Airport Administration Centre to facilitate the Cairns Airport Office Co-location.

4 SCOPE OF EOI Works performed under the contract will comprise: General demolition of approximately 1300m 2 of previously occupied office space; Supply and install new office fitout to accommodate approximately 80 staff including meeting rooms of various sizes, kitchen facilities, bathroom renovations and various office work stations. Full details, specifications and drawings to be supplied with the Tender Documentation. 5 SELECTION CRITERIA Organisations submitting an Expression of Interest must provide a detailed response to each of the criteria listed below. Responses should be fully indexed and referenced. Failure to provide information in this format will impact negatively on evaluation scores. 5.1 Provide Company Details Registered name of Organisation Ownership of Organisation Management / Supervisory structure of the company including experience of key personnel, relevant qualifications. Number of employees, full and part time. 5.2 Provide Occupational Health and Safety Details Occupational Health and Safety Policy Management of Occupational Health and Safety processes o Hazardous Material Management o Risk Management Process o Site Safety Processes o Details of lost injuries during previous two (2) years 5.3 Provide Relevant Recent Experience Experience on similar sized contracts (provide size and value) Current or similar contracts (approximate contract value) Referees contact details for current contracts (Name, Title, Contact Number) Established performance measurement systems Operational approach to contract implementation 5.4 Availability and Capability Construction works to be delivered on a tight timeline between September and November 2017. Outline capability and commitment to utilising local subcontractors and material supply chain

5.5 Details of your quality management processes Quality Assurance accreditation (copy of certification) Quality systems in place 5.6 Details of your Information Technology System Internal operating systems and hardware capability Web and email address 5.7 Details of your environmental management System Environmental Policies and Procedures Environmental initiatives implemented 5.8 Innovation and service delivery Demonstrate your organisation s capacity to deliver innovative approaches to maximising competitive outcomes. 6 SUBMISSIONS Cairns Airport will assess the Expressions of Interest in accordance with Section 5. Each item above must be addressed. Failure to do so, may result in the EOI being considered incomplete warranting no further consideration of the EOI. Based on responses to the proceeding requirements and reference checks a short list of proponents will be established from whom Tenders will be invited. This select tender process will involve addressing Cairns Airport s specific needs as will be outlined in the tender documentation. 7 RESERVATION OF RIGHTS Cairns Airport reserves the right to consider all possible options in regard to this EOI and no reimbursement of costs will be paid to proponents registering their interest or tendering for this work. Cairns Airport reserves the right to modify or depart from the procedures set out herein, to terminate the selection process or to conclude negotiations with any other party in relation to the work described as EOI 0008 Cairns Airport Office Co-location Project.