APPENDIX 5C Profile of Key Projects

Similar documents
Figure 5C.15 Sai Gon Moc Hoa Route. Grade Width Depth Present Target Present Plan Present Plan mainly III & partially I

THÀNH PHỐ HỒ CHÍ MINH A Nguyen Van Nghi Street, Ward 7, Go Vap District. 4 1C Nguyen Anh Thu Street, Trung My Tay Ward, District 12

Transport Infrastructure Investment in Viet Nam

MINISTRY OF TRANSPORT VIETNAM MARITIME ADMINISTRATION DEVELOPMENT OF CONTAINER PORTS VIETNAM

ANNEX 1 Subprojects List and Location Maps. Table A1.1: List of the first phase subprojects under Component 4 (5 provinces, 5 basins)

2.3 Seismic Conditions

OVERALL EXISTING CONDITION AND DEVELOPMENT STRATEGY OF EXPRESSWAY IN VIETNAM. BANGKOK - 13 June 2016

Known Producers/Exporters of Vietnamese Laminated Woven Sacks

New Challenge & 22 Years Experiences of Consumer Products in Vietnam

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

The Current Status and Conservation of Bears in Vietnam

Region/ Province/ State/ City 122 Phan Xich Long Str, Phu Nhuan District, HCM. STT Branch Name Branch Address

CTY CP TVTK GTVT PHÍA NAM - TEDI SOUTH

CHAPTER 3 PROVINCIAL PERFORMANCE IN 2012

F-92. Catchment Area : 11,250 km 2. Hình 7.1 Mô hình sơ đồ cân bằng nước (Lưu vực sông Bằng Giang & Kỳ Cùng) Bang Giang - Ky Cung River Basin

- Borrowing short term loans from State Bank under the form of regranting - Borrowing loans from credit institutions and financial companies.

TECHNICAL SPECIFICATION (OBJECTIVES, PROJECT SCALE)

- - PORTCOAST CONSULTANT CORPORATION PORT COAST. December 2018 GEOTECHNICAL SURVEY

Red River Delta Provinces. Phủ Lý, Hà Nam, 24/05/2013. A policy monitoring tool for middle-income Viet Nam

National project list for attracting foreign direct investment until 2020 (Enclosed to prime ministerial Decision 631/QD-TTg on April 29, 2014)

Ghi chú. Công ty TNHH MTV Dầu khí TP.HCM. 27 Nguyễn Thông, Phường 7, quận 3, TP.HCM. SP Saigon Petro

PORTCOAST CONSULTANT CORPORATION 92 Nam Ky Khoi Nghia, District 1

Measuring Governance and Public Administration in Viet Nam

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

UPDATED LIST OF 479 ESTABLISHMENTS NAFIQAD HAS APPROVED (Up to 07 May 2010) Commercial Name of Establishments

Nguyễn Ngọc Lan

Location map and area relationship of Viet Phat Industrial Zone and Urban Area

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management

LIST OF CO-MERCHANTS WITH DISCOUNT RATE FOR IVB'S CARDHOLDERS

Hoi Son Dam VAN CANH. -> Tan An - Dap Da Schemes are to be referred to Figure 13.4 DONG XUAN

ITE HCMC, Vietnam s Premier International Travel Trade Event, Returns To Impact World s Travel Patterns For 14 th Edition

TRAVEL & STAYS OFFERS

The Second Annual Coastal Forum Building Resilience to Climate Change Impacts: Coastal Southeast Asia

SAIGON NEWPORT CORPORATION

PAÍS SECÇÃO. Vietname Produtos da pesca. Em vigor desde 15/02/2018 Data de publicação 02/02/2018. Lista em vigor. Número de aprovação

Detail Offer/ Chi Tiết. Merchant/ Khách Sạn & Resorts Sofitel Legend Metropole Hanoi (Le Spa du Metropole)

BẢN TIN THÁNG 04/2015 1Q 2018 EARNINGS CALL

Cau River. Map of River. Table of Basic Data. Vietnam 5

REPORT ON CORPORATE GOVERNANCE OF LISTING COMPANY (the first 6 months of 2016)

THE MINING - GEOLOGY DESIGN SURVEY AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY PROFESSIONAL COMPETENCE

越南 ( 水产品 ) 生产企业在华注册名单 (2017/06/15 更新 ) 注册地址 注册类型 备注 NO.

Building hotel, entertainment, conference and exhibition center, approximate area of 130 ha 1,500

Vietnam Marine Protected Area Management Effectiveness Evaluation

越南 ( 水产品 ) 生产企业在华注册名单 (2017/06/19 更新 )

Vietnam Heritage Tour 15 days Destinations: Code: B Breakfast, L Lunch, D Dinner, G - Guide Details: Day 1: Hanoi Arrival (G)

Socio-economic and Tourism Conditions 1999

, GIAY CHUNG NHAN BANG KY DOANH NGHIEP CONG TY CO PHAN

SHIPBUILDING INDUSTRY CORPORATION (SBIC) VIETNAM MARITIME INDUSTRY (Presentation at ASEF 9 th Forum)

Conservation And Aquatic Resources Development in Vietnam

Index. 000 Map pages 000 Photograph pages. Lonely Planet Publications 540

The foundation for the sustainable development Welcome to KINHBACCITY

FLC GROUP JSC. INTRODUCTORY PRESENTATION

Viet Nam Situation Report No. 3 Floods Central Vietnam October 8, pm (Viet Nam time)

THE SECOND ANNUAL COASTAL FORUM BUILDING RESILIENCE TO CLIMATE CHANGE IN COASTAL SOUTHEAST ASIA OCTOBER 2013 SOC TRANG PROVINCE, VIET NAM

8. Projects/ Programs and Provincial Tourism Development Plans

Shipbuilding Industry Corporation (SBIC) Head Office: 172 Ngoc Khanh Str. Ba Dinh Dist. Hanoi Tel: (84.4) / Fax: (84.

TERMS & CONDITIONS HOME&AWAY OFFERS. Offer Detail: - 15% off on mooncake bill

SNORTH VIETNAM AND LAOS DISCOVERY

Regional Development along Economic Corridors: Southern Coastal and Northern Sub-Corridors in Vietnam

Train time table in Vietnam Air Route Hydrofoil services. - Car (4seats): Toyota Corolla, Toyota Altis, Ford Laser, Mazda, Accord, Deawoo

Sales points. No. Name of Agency Address

TPP ADVANTAGES INDUSTRIAL ESTATE SOLUTION. By Nguyen Chi TOAN Marketing Manager of VSIP JV 27 November 2015

Upon your arrival at the Tan Son Nhat International Airport, you will be greeted and transferred to your hotel.

BRIEF ENVIRONMENT REPORT

Beauty of nature in Northern Vietnam (10D9N) Page 1/3

BEAUTY OF NORTH VIETNAM

Culinary Tour Across Vietnam

INDOCHINES CONSULTANT & COMMERCIAL JSC

VAN DON INTERNATIONAL AIRPORT. The new gateway to the heritage land DEVELOPED BY. Add

REDEMPTION CATALOGUE

Belgium Address: Tel.: Fax: E-m ail: Website: Schedule: Consulate in Ho Chi Minh City Address: Tel.: Fax: E-m ail: Website: Schedule:

542 Lonely Planet Publications Pty Ltd

Countries» Sourcing From Guides» About» Contact us

Mekong Eyes Cruise Mekong Tour 2 Days 1 Night

10/1/2012. Hạch toán Thu nhập Quốc dân

14-Day North to South Vietnam Tour

Motorbike Tour LAOS Vietnam 1 - ITINERARY

Exploring Vietnam. 13 days - 12 nights TIME PLACE ACTIVITY MEAL

Table Number of Tourism Resources by Tourism Regions in Vietnam Type of Resources. Tourism Regions North (share) Central South

Vietnam Insight. Duration: 14 days / 13 nights Overview: Hanoi - Halong - Hue - Hoian - Saigon - Mekong - Phu Quoc

Sika at Work. Sika Vietnam Industrial Factory Projects in Vietnam. Các dự án Nhà máy Công nghiệp tại Việt Nam

Vietnam Member s report on activities to ICRI. Presented by Nguyen Van Long. Reporting period November April 2007

THE DEVELOPMENT OF RURAL TOURISM IN VIETNAM: OBJECTIVES, PRACTICAL EXPERIENCES AND CHALLENGES

EXPLORING VIETNAM. 12 Days / 11 Nights DATE PLACE ACTIVITY MEAL

Absolute Vietnam Package Tour 19 days / 18 nights

Vietnam s Transport Sector Outlook and Engineering Opportunities

COMPANY PROFILE THIEN VU ADVERTISING JOINT STOCK COMPANY

Lâm sàng thống kê Ước tính khoảng tin cậy 95% cho một biến số đã hoán chuyển sang đơn vị logarít

TOURISM DEMAND ANALYSIS AND FORECASTS

Welcome. In this issue

2018 Calendar. Connecting people and possibilities.

Don t believe everything you read in the media about the Vietnam Property Market

CUSTOMERS LIST OF TOAN CAU PUMPS CO.,LTD

Terms and Conditions of 'Shopping is GREAT' cash back campaign Điều khoản và Điều kiện của Chương trình tặng tiền Mua sắm Tuyệt vời

TOKYU BINH DUONG GARDEN CITY

North Vietnam Discovery 12 days / 11 nights EAST NORTH

The UNIVERSITY WITHOUT BORDERS Journal of ECONOMICS & BUSINESS

Năm 2015 A E. Chứng minh. Cách 1.

DETAILED LIST OF CUSTOMERS I. BUSINESS VALUATION

7 DAYS DA NANG HOI AN HUE SAI GON MEKONG DELTA Valid Till : 31 Mar 18

Transcription:

APPENDIX 5C Profile of Key s

1) Waterway s (1) Northern Region ANNEX 5C: PROFILE OF KEY PROJECTS (a) Hai Phong Ha Noi Route (i) Route from Hai Phong to Ha Noi goes along Kinh Thay River or Kinh Mon River. (ii) Along Kinh Thay River, it is 154.5km long rooting from Hai Phong Port via rivers of Cam, Han, Kinh Thay, Thai Binh, Duong to Ha Noi Port on Hong River. Along Kinh Mon River, it is 166km long starting from Hai Phong Port via rivers of Cam, Kinh Mon, Kinh Thay, Thai Binh, Duong to Ha Noi Port on Hong River. (iii) The route connects with the waterway to Quang Ninh beyond Hai Phong. (iv) Main ports located along this route are Hai Phong Port, Pha Lai Port and Ha Noi Port. Role of the route (i) Connection of Thai Binh River system with Hong River system via Duong River and Luoc River (ii) Transportation of sand, rock, gravel for flatten province, fuel for Hai Phong, Hoang Thach cement factory etc. (i) Grade II (ii) Width 70m (iii) Depth more than 2.0m Figure 5C.1 Hai Phong Ha Noi Route N1-1 Quang Ninh,Hai Phong Hanoi Grade width Depth Present Present Plan Present Plan 166 III, partially I II 40 50 70 2.0 2.5 2 Upgrading 5C-1

(b) Ha Noi Lach Giang Route (i) Route from Ha Noi Port to the mouth of Lach Giang River along Hong River and Ninh Co River with total length of 192km. (ii) Ha Noi and other inland area shall be connected with the south and central areas through this route. (iii) Main ports located along this route are Hanoi Port and Khueyen Loan Port. (i) Inland waterway route to the sea via Lach Giang estuary connecting the southern and central regions with Nam Dinh and Khuyen Luong Ports by river and sea vessels. (ii) Transportation of cements, raw material of shipbuilding and repair for dockyards at Hai Thinh (at Ninh Co River) and others (i) Grade I (ii) Width 70m (iii) Depth more than 3.0m Figure 5C.2 Ha Noi Lach Giang Route N1-2 Lach Giang Hanoi Present Future Present Future Present Future 192 II I 30 60 70 0.9 2.4 3 Upgrading (c) Ha Noi Lao Cai Route (i) Route goes along Hong and Thao River to Lao Cai with length of 362km. (ii) Section from Yen Bai to Lao Cai is 166km long characterized as mountainous river. (iii) The transportation route shall be connected to the border of China. (iv) Main ports located along this route are Hanoi Port, Viet Tri Port and Lao Cai Port. 5C-2

Role (i) Support for economic development of Lao Cai Province by transporting apatite ore (ii) Support for connection between Van Nam Province connect and the sea (iii) Transportation of coal for Bai Bang paper, Viet Tri chemical, Lam Thao phosphate and cement for Vinh Phuc, Phu Tho, Yen Bai Province (i) Ha Noi Viet Tri: II, 70m, more than 2m (ii) Viet Tri Yen Bai: III, 50m, more than 1.5m (iii) Yen Bai Lao Cai: IV, 30m, more than 1.2m (III, 50m, 1.5m in case of dry dock) Figure 5C.3 Ha Noi Lao Cai Route Present Present Plan Present Plan N1-3 Hanoi-Viet Tri LaoCai 362.0 IV,V,VI II, III, IV 30 40 70 less than 1.0 2.2 2 Upgrading (d) Quang Ninh Ninh Binh Route (Dao River, Hai Phong) (i) Route from Hon Gai Port, along Ba Mom channel via Cai Trap canal, Bach Dang River, Dinh Vu canal, Cam River, Dao Noi Thanh River, Lach Tray River, Van Uc River, Khe canal, Thai Binh River, Luoc River, Hong River, Dao River to Ninh Binh Port on Day River with length of 266.5km (ii) Route through Lach Tray estuary provides another waterway bypassing area of Hai Phong Port. (iii) Main ports located along the route are Hong Gai Port, Hai Phong Port, Nam Dinh Port, Ninh Phuc Port and Ninh Binh Port. (i) Connection between north-eastern provinces (most important sites of coal mining) with industrial areas which such factories as Ninh Binh thermo-electricity, But Son, Bim Son, Tam Diep, Duyen Ha, Vinakansai and Phu Son cement are located. 5C-3

(i) Grade III (ii) Width 50m (iii) Depth more than 1.5m Figure 5C.4 Quang Ninh Ninh Binh Route(Dao River, Hai Phong) N2-1 Quang Ninh,Ninh Binh (Dao River,Hai Phong) 266.5 Present Present Plan Present Plan I and III, partially IV III 25 150 50 1.6 4.5 1.5 improving: widening etc. (e) Cua Day Ninh Binh Route (i) Route from Ninh Binh to Cua Day which provides a route to the sea via Day estuary with 47km in length (ii) Transport in Day River is regulated by Phung Dam. (iii) Main port located along the route is Ninh Binh Port. (i) Navigation of sea and river ships approaching to Ninh Binh and Ninh Phuc Ports. (ii) Connection between provinces in the northern region and other provinces in the south and central regions directly (i) Grade I (ii) Width 70m (iii) Depth more than 3m 5C-4

Figure 5C.5 Cua Day Ninh Binh Route Grade width Depth Present Present Plan Present Plan N2-2 Cua Day Ninh Binh 74.0 II I 40-80 70 2.5 3.0 3 Upgrading (f) Quang Ninh Pha Lai Route (i) Route from Hon Gai Port to Pha Lai Port with 128km in length (ii) Section from Hon Gai Port to Chanh River mouth goes along Ba Mom channel and other sections go through rivers of Chanh, Da Bach, Phi Liet, Kinh Thay and Thai Binh. (iii) Main ports located along the route are Hong Gai Port and Pha Lai Port. (i) Connection between Quang Ninh Province and northern provinces. (ii) Transportation of coal for factories such as Pha Lai thermo-electricity, Bac Giang nitrogenous fertilizer, Dap Cau Glass, and Hoang Thanh and Phuc Son cement (iii) Transportation of imported goods from Cai Lan Port to Bac Ninh and Bac Giang Provinces. (i) Grade II (ii) Width 70m (iii) Depth more than 2m 5C-5

Figure 5C.6 Quang Ninh Pha Lai Route Present Present Plan Present Plan N3-1 Quang Ninh Pha Lai 128.0 Mainly III, some I II 30 60 70 2.3 2.5 2 Upgrading (g) Pha Lai A Lu Route (i) Route via Thuong River from Lác confluence to A Lu Port on Thuong River with length of 33km (ii) Main ports located along the route are Pha Lai Port and A Lu Port. (i) Transportation of coal and raw materials for Bac Giang, Cao Bang Provinces (ii) Transportation of fertilizer produced at Ha Bac Nitrogenous Fertilizer (i) Grade III (ii) Width 50m (iii) Depth more than 1.5m 5C-6

Figure 5C.7 N3-2 Pha Lai A Lu Route Present Present Plan Present Plan N3-2 Pha Lai A Lu 33.0 IV III 30 50 2.0 1.5 Upgrading (h) Pha Lai Da Phuc Route (i) Route in Cau River rooting from Lac confluence at the intersection of Cau and Thai Binh River to Da Phuc Port with length of 87km (ii) Main Port located along the route is Dap Cau Port (i) Transportation of coal, cement, ore and gravel for Thai Nguyen, Bac Can and Soc Son provinces (i) Grade III (ii) Width 50m (iii) Depth more than 1.5m 5C-7

Figure 5C.8 Pha Lai Da Phuc Route Present Present Plan Present Plan N3-3 Pha Lai Da Phuc 87.0 V III 20-30 50 1.0-2.0 1.5 Upgrading (i) Viet Tri Tuyen Quang Na Hang Route (i) Route starting from Viet Tri Port to Tuyen Quang Port with length of 115km on Lo River (ii) Main ports located along the route are Viet Tri Port and Lao Cai Port (i) Transportation of construction materials such as sand and gravel at Lo River (ii) Transportation of coal for Bai Bang paper factory Viet Tri Tuyen Quang (i) Grade III (ii) Width 50m (iii) Depth more than 1.5 Tuyen Quang Na Hang (i) Grade V (ii) Width 30m (iii) Depth more than 1.2 5C-8

Figure 5C.9 Viet Tri Tuyen Quang Na Hang Route N3-4 Viet Tri Tuyen Quang Na Hang Grade width Depth Present Present Plan Present Plan 115.0 IV III,V 30 50 1.2 1.5 Upgrading (j) Hong Đa Confluence Hoa Binh Route (i) Route from Hong Da confluence to Hoa Binh Port on Da River with 58km in the length (ii) Main port located along the route is Hoa Binh Port. (i) Transportation of raw material and machines for construction of Son La hydroelectricity (ii) Transportation of goods for daily life and agricultural materials for Hoa Binh, Son La and Lai Chau Provinces. (i) Grade III (ii) Width 50m (iii) Depth more than 1.5m 5C-9

Figure 5C.10 Hong Da Confluence Hoa Binh Route N3-5 Da rover's Hydropower dam down stream section (Hong Da T junction Hoa Binh Port) Present Present Plan Present Plan 58.0 III III 30 50 2.0 1.5 improving: widening and deepening etc. (k) Ninh Binh Tainh Hoa Route (i) Route from Ninh Binh to Tainh Hoa (i) Grade III (ii) Width 30-50m (iii) Depth more than 1.2m Present Present Plan Present Plan N3-6 Ninh Binh Tainh Hoa III IV 30 50 1.2. (2) Southern Region (a) Waterways between Ho Chi Minh and North Western Region of Mekong Delta (i) Sai Gon Kien Luong/Lap Vo Canal Route Route connecting Ho Chi Minh City with Western sea at Ba Hoan and Ha Tien via Provinces of Tien Giang, Dong Thap; Hau Giang, Kien Giang. The route is 315km long via Cho Gao canal to Tien River, Lap Vo Sa Dec canal to Hau River, Rach Soi Hau Giang and Rach Gia Ha Tien to Ha Tien, Ba Hon Canal to Ba Hon mouth. Main river ports located along this route are ports in Ho Chi Minh City, My Tho Port, 5C-10

Sa Dec Port and Ha Tien Port. Role Main route connecting Ho Chi Minh City with the northern region of Mekong Delta Transportation of clinker from Kien Luong to Ho Chi Minh City Grade III Width 30 40m Depth more than 2.5m Figure 5C.11 Sai Gon Kien Luong/Lap Vo Canal Route Grade width Depth Present Present Plan Present Plan Obstacle S1-1 Sai Gon Kien Luong (Lap Vo canal) 315 I and III III 16-300 30 40 1.5 10.0 2.5 bridge improvement: widening and deepening, removal of obstacles (ii) Sai Gon Kien Luong Route (Dong Thap Muoi area) Hub point from Ho Chi Minh city via Dong Thap Muoi, Tu giac Long xuyen, to the western coast in Kien Giang, crossing provinces of Long An, Tien Giang, Dong Thap, An Giang and Kien Giang. Main route is 334km long from Sai Gon River via Te canal, Doi canal, Cho Dem Ben Luc River to Vam Co Dong River; via Thu Thua canal to Vam Co Tay River; via Lagrang Dong Tien canal (Thap Muoi N1) to Tien River; via Vam Nao River to Hau River; via Tri Ton Hau Giang canal, Tam Ngan Canal to Rach Gia Ha Tien canal in Kien Luong. Main route connecting Ho Chi Minh City with the northern region of Mekong Delta Support for agriculture-industries at newly developing areas of Dong Thap Muoi 5C-11

and Tu Giac Long Xuyen Grade III Width 30m Depth more than 2.5m Figure 5C.12 Sai Gon Kien Luong Route (Dong Thap Muoi area) Grade width Depth Present Present Plan Present Plan Obstacle S1-2 ai Gon Kien Luong ( Thap Muoi canal) 334 I and III III 20 100 30 1.9 9.0 2.5 bridge improvement: widening and deepening, removal of obstacles (b) Waterways between Ho Chi Minh and South Western Region of Mekong Delta (i) Sai Gon Ca Mau (Xa No Canal) Route Route connecting Ho Chi Minh City with the western coastal area via provinces of Tien Giang, Vinh Long, Hau Giang, Can Tho, Ca Mau and South of Kien Gian. This route is 335.8km long and consists of such sections as a section via Cho Gạo canal to Tien River, a section connecting Tien River with Hau River via Cho Lach, Mang Thit Tra On canal and a section from Hau River to western coastal area via Can Tho, Xa No, Trem Canh Den canal, Genh Hao River to Ca Mau, Luong The Tran canal, Bay Hạp canal, Nam Can town to Bay Hap mouth. Main ports located along the route are Ports in Ho Chi Minh City, My Tho Port and Ca Mau Port. Main route connecting Ho Chi Minh City with south-west provinces of Mekong Delta. 5C-12

Grade III Width 30 40m Depth more than 2.5m Figure 5C.13 Sai Gon Ca Mau (Xa No Canal) Route S2-1 Sai Gon Ca Mau (through Xa No canal) Grade width Depth Present Present Plan Present Plan Obstacle 336 I and III III 22 300 30 40 2.7 6.5 2.5 bridge improvement: widening, removal of obstacles (ii) Sai Gon Ca Mau Route (coastal) Role Route connecting Ho Chi Minh City with the southern east area of Ca Mau through provinces within Tien River, Hau River The longest route from Ho Chi Minh City to Ca Mau running through populous towns such as Soc Trang, Bac Lieu. Main route is 368km long with a beginning section from Ho Chi Minh city to Tien River, a middle section of Tien and Hau River belonging to Ben Tre, Tra Vinh area via canal of Chet Say, Mo Cay, Tra Vinh, Lop, Cau Chong and some sections of natural rivers and an ending section from Hau River to Ca Mau via canal of Dai Ngai, Phu Huu Bai Sau and Bac Lieu Ca Mau. Main ports located along the route are Ports in Ho Chi Minh city, Giao Long Port, An Phuc Port, Long Duc Port, Soc Trang Port, Bac Lieu Port and Ca Mau Port. Main route connecting Ho Chi Minh City with the south-west provinces of Mekong Delta 5C-13

Support for economic development of the area separated by large rivers. Grade III Width 3040 m Depth more than 2.5m Figure 5C.14 Sai Gon Ca Mau Route (coastal) S2-2 Sai Gon Ca Mau (coastal) Present Present Plan Present Plan Obstacle 367 I, III & IV III 16 450 30 40 1.0 9.0 2.5 bridge improvement: widening and deepening, removal of obstacles (c) Waterways between Ho Chi Minh and industrial areas in its Periphery (i) Sai Gon Moc Hoa Route Role Route connecting Dong Thap Muoi with ports in Ho Chi Minh City This route is 95.6km long starting from Sai Gon Port on Sai Gon River to Moc Hoa on Vam Co Tay River via river of Nha Be, Soai Rạp, Can Giuoc, Vam Co and Nuoc Man Canal. Transverse route connecting Dong Thap Muoi areas to ports at Ho Chi Minh, Dong Nai, Ba Ria Province and China sea Grade III Width 50 70m 5C-14