A. Introduction Title: Power System Stabilizer (PSS)

Similar documents
A. Introduction Title: Power System Stabilizer (PSS) 2. Number: VAR 501 WECC

VAR-501-WECC-3 Power System Stabilizer. A. Introduction

Black Start Ancillary Service Schedule

DGAC Costa Rica. MCAR OPS 1-Subpart Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND REST REQUIREMENTS. 30-June-2009

HONDURAS AGENCY of CIVIL AERONAUTICS (AHAC) RAC-OPS-1 SUBPART Q FLIGHT / DUTY TIME LIMITATIONS AND REST REQUIREMENTS. 01-Jun-2012

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND

GUIDANCE MATERIAL CONCERNING FLIGHT TIME AND FLIGHT DUTY TIME LIMITATIONS AND REST PERIODS

Official Journal of the European Union L 186/27

Attachment F1 Technical Justification - Applicability WECC-0107 Power System Stabilizer VAR-501-WECC-3

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

COMMISSION IMPLEMENTING REGULATION (EU)

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COUNCIL OF THE EUROPEAN UNION ANNEX III

Jordan Civil Aviation Requlatory Commission (CARC) JCAR-OPS-1 - SUBPART- Q. FLIGHT AND DUTY TIME LIMITATIONS AND REST REQUIREMENTS 01-Jun-2014

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Fly Quiet Report. 3 rd Quarter November 27, Prepared by:

Grade Crossing Regulations

CHG 0 9/13/2007 VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS

AMC and GM to Part-CAT Issue 2, Amendment 3

ETHIOPIA ECAA CIVIL AVIATION RULES AND STANDARDS (ECAR) PART 8 OPERATIONS FATIGUE MANAGEMENT REST PERIODS, DUTY, AND FLIGHT TIME

Federal Aviation Regulations (including accident reporting, TSA security and light sport)

SAMTRANS TITLE VI STANDARDS AND POLICIES

Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand

AC-MMEL/MEL.060 (b) Contents. Subject. CARC Master Minimum Equipment List Preamble

[Docket No. FAA ; Directorate Identifier 2006-NM-178-AD; Amendment ; AD ]

All-Weather Operations Training Programme

EASTERN MILES MEMBERSHIP TERMS AND CONDITIONS

Scott Silveira, District 5 Supervisor SOCIAL MEDIA POLICIES AND PROCEDURES

Master Minimum Equipment Lists/Minimum Equipment Lists. Amendment Summary PART-MMEL/MEL. Amendment No. Effective Date Subpart Paragraph

SUPPLEMENTAL NOTE ON HOUSE SUBSTITUTE FOR SENATE BILL NO. 70

Air Carrier E-surance (ACE) Design of Insurance for Airline EC-261 Claims

CAAV VAR 15 DFR Jan-2011 Version 1.0

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XI

PRATT AND WHITNEY

ALASKA AIRLINES AND VIRGIN AMERICA AVIATION SAFETY ACTION PROGRAM (ASAP) FOR FLIGHT ATTENDANTS MEMORANDUM OF UNDERSTANDING

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

European Aviation Safety Agency NOTICE OF PROPOSED AMENDMENT (NPA) NO 2008-XX. Dd Mmm 200X

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017

CASS & Airline User Manual

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

MALDIVIAN CIVIL AVIATION REGULATIONS MCAR-OPS 1. Amendment July 2010 SUBPART Q REQUIREMENTS

Asia Pacific Regional Aviation Safety Team

Official Journal of the European Union L 7/3

Subpart H. 2042/2003

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

Short-Haul Operations Route Support Scheme (RSS)

This Section 1 contains the requirements for the approval of Master Minimum Equipment Lists and Minimum Equipment Lists.

ENGINEERS FLYING CLUB OKLAHOMA CITY, OKLAHOMA OPERATIONS MANUAL

Airworthiness Directive

FAR Part 117 Flight and Duty Limitations and Rest Requirements: Flightcrew Members (with FAA Corrections as of November 19, 2013)

STOCKTON POLICE DEPARTMENT GENERAL ORDER UNMANNED AIRCRAFT SYSTEM SUBJECT. DATE: November 14, 2017 NO: V-6

Training and licensing of flight information service officers

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

kulula.com Ticket Audit and Agent Debit Memo Policy

AMC and GM to Part-SPO Amendment 3

(ii) Weight. Maximum gross weight for all tests, except where otherwise described in subparagraph (iii) below.

[Docket No. FAA ; Directorate Identifier 2004-NM-252-AD; Amendment ; AD ]

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose

WHEREAS, the City operates and manages Rapid City Regional Airport (RAP); and

Investor Update Issue Date: April 9, 2018

SUPERSEDED. [Docket No NM-217-AD; Amendment ; AD ]

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004

Sandusky Transit System ADA Paratransit Service Policy and Procedures Effective August 2017

Grow Transfer Incentive Scheme

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

CODE OF CONDUCT. Corporate Compliance 10.9 Effective: 12/17/13 Reviewed: 1/04/17 Revised: 1/04/17

[Docket No. FAA ; Directorate Identifier 2005-NM-222-AD; Amendment ; AD ]

NIAGARA MOHAWK POWER CORPORATION. Procedural Requirements

DHS does not define compelling circumstances but provides 4 examples: - Serious illness and disabilities;

Annex III to ED Decision 2017/023/R. AMC and GM to Part-CAT Issue 2, Amendment 13

Notification of a Proposal to issue an Airworthiness Directive

USCIS Update Dec. 18, 2008

Canada CAR s FTDT. Part VII - Commercial Air Services Subpart 0 - General Division III. Flight Time and Flight Duty Time Limitations and Rest Periods

Portable electronic devices

Part 129. Foreign Air Transport Operator - Certification. CAA Consolidation. 18 May Published by the Civil Aviation Authority of New Zealand

kulula.com Ticket Audit and Agent Debit Memo Policy Reference: 5/01/2014

2. CANCELLATION. AC 39-7B, Airworthiness Directives, dated April 8, 1987, is canceled.

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

e-romancecar Terms of Service

Criteria for an application for and grant of, or variation to, an ATOL: Financial

Comparison. Annex 1 to the ICAO Convention JAR-FCL 1

March 13, Submitted electronically:

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Government Decree on Inspecting Foreign Ships in Finland (1241/2010)

Official Journal L 362. of the European Union. Legislation. Non-legislative acts. Volume December English edition. Contents REGULATIONS

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

ISIN Quality Management

IATA Air Carrier Self Audit Checklist Analysis Questionnaire

OPS General Rules for Operations Manuals

Aircraft Maintenance Personnel Licensing

MRO 2017 Stakeholder Survey

Sample Regulations for Water Aerodromes

GUERNSEY ADVISORY CIRCULARS. (GACs) UPSET PREVENTION AND RECOVERY TRAINING GAC 121/135-2

Maritime Passenger Rights

EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS. EMAR 21 (SECTION A and B)

Transcription:

A. Introduction 1. 1. Title: Power System Stabilizer (PSS) 2. 3. 2. Number: VAR-501-WECC-2 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions by establishing the performance criteria for WECC power system stabilizers. 4. Applicability: that Power System Stabilizers (PSS) on 4.1 Generator Operator 4.2 Generator Owner 5. Facilities: This standard applies to synchronous generators shall be kept in service., connected to the Bulk Electric System, that meet the definition of Commercial Operation. 1. 4. Applicability: 4.1. Generator Operators 6. 5. Effective Date: On the The first day of the first quarter, following regulatory approval, except for Requirement R3. For units placed in first-time service after applicable regulatory approval., Requirement R3 is effective the first day of the first quarter following final regulatory approval. For units placed in service prior to final regulatory approval, Requirement R3 is effective the first day of the first quarter that is five years after regulatory approval. B. Requirements and Measures R1. Each Generator Owner shall provide to its Transmission Operator, the Generator Owner s written Operating Procedure or other document(s) describing those known circumstances during which the Generator Owner s PSS will not be providing an active signal to the Automatic Voltage Regulator (AVR), within 180 days of any of the following events: [Violation Risk Factor: Low] [Time Horizon: Planning Horizon] The effective date of this standard; The PSS s Commercial Operation date; or Any changes to the PSS operating specifications. Style Definition... Formatted: Font: Calibri, 14 pt, Font color: Auto Formatted: Indent: Left: 0", Widow/Orphan control, Tab stops: Not at 0.35" Formatted: Heading 3, Space Before: 0 pt, After: 0 pt, Add space between paragraphs of the same style, Numbered + Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Tab after: 0.5" + Indent at: 0.5", Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers, Tab stops: 1.25", Left Formatted: Font: Not Bold Formatted: Not Expanded by / Condensed by Formatted: Not Expanded by / Condensed by Formatted: Space Before: 6 pt, After: 0 pt, Add space between paragraphs of the same style, Numbered + Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Tab after: 0.5" + Indent at: 0.5", Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers, Tab stops: 1.75", Left Formatted: Heading 3, Right: 0", Space Before: 0 pt, After: 0 pt, Add space between paragraphs of the same style, Numbered + Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Tab after: 0.5" + Indent at: 0.5", Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers, Tab stops: 1.25", Left Formatted: Space Before: 6 pt, After: 0 pt, Add space between paragraphs of the same style, Numbered + Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Tab after: 0.5" + Indent at: 0.5", Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers, Tab stops: 1.75", Left Formatted: Indent: Left: 0.5", Space Before: 6 pt, After: 0 pt, Add space between paragraphs of the same style, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers Formatted: Font: Calibri, 14 pt, Font color: Auto Formatted: Font: Calibri, 14 pt, Font color: Auto Page 1 of 15

M1. Each Generator Owner will have documented evidence that it provided to its Transmission Operator, within the time allotted as described in the procedures required under Requirement R1, written Operating Procedures or other document(s) describing those known circumstances during which the Generator Owner s PSS will not be providing an active signal to the AVR. For auditing purposes, because Requirement R1 conditions are intended to be unchanged unless the Transmission Operator is otherwise notified, the Generator Owner only needs to provide the documentation to the Transmission Operator one time, or whenever the operating specifications change. For auditing purposes, if a PSS is in service but is not providing an active signal to the AVR as described in Requirement R1, the disabled period does not count against the Requirement R2 mandate to be in service except as otherwise allowed. R2. Each Generator OperatorR1. Generator Operators shall have PSS in service 98% of all operating hours for synchronous generators equipped with PSS. Generator Operators may exclude hours for R1.1 through R1.12 to achieve the 98% requirement. its PSS in service while synchronized, except during any of the following: [Violation Risk Factor: Medium] [Time Horizon: OperationsOperating Assessment] R1.1. The Component failure Testing of a Bulk Electric System Element affecting or affected by the PSS Maintenance As agreed upon by the Generator Operator and the Transmission Operator A PSS that is out of service for less than 30 minutes does not create a violation of this Requirement, regardless of cause. M2. Each Generator Operator will have documentation of each claimed exception specified in Requirement R2. Documentation may include, but is not limited to: A written explanation covering the bulleted exception that describes the circumstances of the exception as allowed in Requirement R2. Documented evidence that the Generator Operator and the Transmission Operator agreed the PSS would not be operating during a specified set of circumstances, where the exception is claimed under the last bullet of Requirement R2. For auditing purposes, the presumption is that the PSS was in service unless otherwise exempted in Requirement R2. Evidence need only be provided to prove the circumstances during which the PSS was not in service for periods in excess of 30 minutes. R3. Each Generator Owner shall tune its PSS to meet the following inter-area mode criteria, except as specified in Requirement R3, Part 3.5 below: [Violation Risk Factor: Formatted: Font color: Black Formatted: Font: Not Bold, Font color: Black Formatted: Font: Not Bold, Not Expanded by / Condensed by Formatted: Font: Not Bold Formatted: Not Expanded by / Condensed by, Kern at 12 pt Formatted: Indent: Left: 0.25", Hanging: 0.38", Space Before: 6 pt, After: 0 pt, Add space between paragraphs of the same style, Line spacing: Multiple 1 li Formatted: Kern at 12 pt Formatted: Not Expanded by / Condensed by, Kern at 12 pt Formatted: Kern at 12 pt Formatted: Not Expanded by / Condensed by, Kern at 12 pt Page 2 of 15

Medium] [Time Horizon: Operating Assessment] 3.1. PSS shall be set to provide the measured, simulated, or calculated compensated Vt/Vref frequency response of the excitation system and synchronous machine such that the phase angle will not exceed ± 30 degrees through the frequency range from 0.2 Hertz to the lesser of 1.0 Hertz or the highest frequency at which the phase of the Vt/Vref frequency response does not exceed 90 degrees. 3.2. PSS output limits shall be set to provide at least ±5% of the synchronous machine s nominal terminal voltage. 3.3. PSS gain shall be set to between 1/3 and 1/2 of maximum practical gain. 3.4. PSS washout time constant shall be no greater than 30 seconds. 3.5. Units that have an excitation system or PSS that is incapable of meeting the tuning requirements of Requirement R3 are exempt from Requirement R3 until the voltage regulator is either replaced or retrofitted such that the PSS becomes capable of meeting the tuning requirements. M3. Each Generator Owner will have documented evidence that its PSS was tuned to meet the specifications of Requirement R3. If the exception under Requirement R3, Part 3.5, is claimed, the Generator Owner will have documented evidence describing: 1) the conditions that render the PSS incapable of meeting the tuning requirements, and 2) the date the voltage regulator was last replaced or retrofitted. R4. Each Generator Owner shall install and complete start-up testing of a PSS on its generator operates for less than five percent of all hours during any calendar quarter.within 180 days of either of the following events: [Violation Risk Factor: Medium] [Time Horizon: Operational Assessment] R1.2. Performing maintenance and testing up to a maximum of seven calendar days per calendar quarter. R1.3. PSS exhibits instability due to abnormal system configuration. R1.4. Unit is operating in the synchronous condenser mode (very near zero real power level). R1.5. Unit is generating less power than its design limit for effective PSS operation. R1.6. Unit is passing through a range of output that is a known rough zone (range in which a hydro unit is experiencing excessive vibration). Page 3 of 15

R1.7. The Generator Owner connects a generator AVR is not in service. R1.8. Due to component failure, the PSS may be out of service up to 60 consecutive days for repair per incident. R1.9. Due to a component failure, the PSS may be out of service up to one year provided the Generator Operator submits documentation identifying the need for time to obtain replacement parts and if required to schedule an outage. R1.10. Due to a component failure, the PSS may be out of service up to 24 months provided the Generator Operator submits documentation identifying the need for time for PSS replacement and to schedule an outage. R1.11. The synchronous generator has not achievedto the BES, after achieving Commercial Operation, and after the Effective Date of this standard. R1.12. The Transmission Operator directs the Generator Operator to operate the synchronousowner replaces the voltage regulator on its existing excitation system, after achieving Commercial Operation for its generator that is connected to the BES, and after the Effective Date of this standard. M4. Each Generator Owner will have evidence that it installed and completed start-up testing of a PSS is unavailable for on its generator within 180 days of either of the conditions described in Requirement R4, and when those conditions occur after the Effective Date of this standard. For auditing purposes of Requirement R4, bullet one only applies to equipment on its initial (first energization) connection to the BES. R5. Each Generator Owner shall repair or replace a PSS within 24 months of that PSS becoming incapable of meeting the tuning specifications stated in Requirement R3. [Violation Risk Factor: Medium] [Time Horizon: Operational Assessment] M5. Each Generator Owner will have evidence that it repaired or replaced its PSS within 24 months of that PSS becoming incapable of meeting the tuning specifications of Requirement R3. Evidence may include, but is not limited to, documentation of the date the PSS became incapable of meeting the Requirement R3 tuning specifications, and the date the PSS was returned to service, demonstrating that the span of time between the two events was less than 24 months. Page 4 of 15

C.Measures M1. Generators Operators shall provide quarterly reports to the compliance monitor and have evidence for each synchronous generator of the following: Formatted: Font: Not Bold, Font color: Black M1.1 The number of hours the synchronous generator was on line. M1.2 The number of hours the PSS was out of service with generator on line. M1.3 The PSS in service percentage M1.4 If excluding PSS out of service hours as allowed in R1.1 through R1.12, provide: M1.4.1 The number of hours excluded, M1.4.2 The adjusted PSS in-service percentage, M1.4.3 Date of the outage. D. Compliance 1. Compliance Monitoring Process 1.1 Compliance Monitoring Responsibility Compliance Enforcement Authority Formatted: Indent: Left: 0", Space Before: 0 pt, Widow/Orphan control, Tab stops: Not at 0.35" Formatted: Font: Calibri, 14 pt, Font color: Auto NERC or the Regional Entity, or any entity as otherwise designated by an Applicable Governmental Authority, in their respective roles of monitoring and/or enforcing compliance with mandatory and enforceable Reliability Standards in their respective jurisdictions. 1.2 Compliance Monitoring Periodand Assessment Processes Self-Certifications Spot Checking Compliance Audits Compliance Enforcement Authority may use one or more of the following methods to assessinvestigations Self-Reporting Complaints Page 5 of 15

1.3 Evidence Retention The following evidence retention periods identify the period of time an entity is required to retain specific evidence to demonstrate compliance:. For instances where the evidence retention period specified below is shorter than the time since the last audit, the Compliance Enforcement Authority may ask an entity to provide other evidence to show that it was compliant for the full time period since the last audit. - Reports submitted quarterly - Spot check audits conducted anytime with 30 days notice - Periodic audit as scheduled by the Compliance Enforcement Authority - Investigations - Other methods as provided for in the Compliance Monitoring Enforcement Program The Reset Time Frame shall be a calendar quarter. 1.3 Data Retention TheEach Generator OperatorsOperator shall keep evidence for Measures M1 forall Requirements of the document for a period of three years plus calendar current year, or since the last audit, whichever is longer. 1.4 Additional Compliance Information None 1.4.1 The sanctions shall be assessed on a calendar quarter basis. 1.4.2 If any of R1.2 through R1.12 continues from one quarter to another, the number of days accumulated will be the contiguous calendar days from the beginning of the incident to the end of the incident. For example, in R1.8 if the 60 day repair period goes beyond the end of a quarter, the repair period does not reset at the beginning of the next quarter. 1.4.3 When calculating the adjusted in-service percentage, the PSS out of service hours do not include the time associated with R1.1 through R1.12. Page 6 of 15

1.4.4 The standard shall be applied on a generating unit by generating unit basis (a Generator Operator can be subject to a separate sanction for each non- compliant synchronous generating unit or to a single sanction for multiple machines that operate as one unit). ED. Regional Differences None Formatted: Indent: Left: 0", Space Before: 0 pt, Widow/Orphan control, Tab stops: Not at 0.35" Formatted: Font: Calibri, 14 pt, Font color: Auto Page 7 of 15

WECC Standard VAR-501-WECC-2 3 Power System Stabilizer None Formatted: Header, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers, Border: Bottom: (No border) Formatted: Font: Verdana, 10 pt Formatted: Font: Not Bold Formatted: Indent: Left: 0.88", Space Before: 0 pt, After: 0 pt, Add space between paragraphs of the same style, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers Table of Compliance Elements R R1 R1 R2 Time Horizon Planning Horizon Operational Operations Assessment Low VRF Medium Violation Severity Levels Lower VSL Moderate VSL High VSL Severe VSL NA NA NA The Generator Owner failed to provide its PSS operating specifications to the Transmission Planner as required in Requirement R1. There shall be a Lower Level of noncompliance if PSS is in service less than 98% but at least 90% or more of all hours during which the synchronous generating unit is on line for each calendar quarter. Each Generator Operator not having its PSS in service while There shall be a Moderate Level of noncompliance if PSS is in service less than 90% but at least 80% or more of all hours during which the synchronous generating unit is on line for each calendar quarter. Each Generator Operator not having its PSS in service while There shall be a High Level of noncompliance if is in service less than 80% but at least 70% or more of all hours during which the synchronous generating unit is on line for each calendar quarter. Each Generator Operator not having its PSS in service while There shall be a Severe Level of non-compliance if PSS is in service less than 70% of all hours during which the synchronous generating unit is on line for each calendar quarter. Each Generator Operator not having its PSS in service while Formatted: Font: Calibri, Font color: Custom Color(RGB(32,76,129)), Not Expanded by / Condensed by Formatted: Indent: Left: 0", Space Before: 0 pt, Line spacing: single, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers Formatted: Font: 12 pt, Bold, Font color: Custom Color(RGB(32,76,129)) Formatted: Indent: Left: 0" Formatted: Indent: Left: 0", Space Before: 6 pt, After: 6 pt, Tab stops: Not at 1.5" Formatted: Space Before: 6 pt, After: 6 pt Formatted: Space Before: 6 pt, After: 6 pt, Add space between paragraphs of the same style Formatted Table Formatted: Space Before: Auto, After: Auto, Don't add space between paragraphs of the same style Formatted: Space Before: 6 pt, After: 6 pt, Add space between paragraphs of the same style Formatted: Space Before: 6 pt, After: 6 pt, Add space between paragraphs of the same style Formatted: Space Before: 6 pt, After: 6 pt, Add space between paragraphs of the same style Formatted: Font: 9 pt, Bold Formatted: Page Number, Font: 9 pt, Bold Formatted: Tab stops: 9", Right + Not at 3" + 6" Page 8 of 15

WECC Standard VAR-501-WECC-2 3 Power System Stabilizer R Time Horizon VRF Violation Severity Levels Lower VSL Moderate VSL High VSL Severe VSL synchronized in accordance with Requirement R2, for more than 30 minutes but less than 60 minutes. synchronized in accordance with Requirement R2, for more than 60 minutes but less than 120 minutes. synchronized in accordance with Requirement R2, for more than 120 minutes but less than 180 minutes. synchronized in accordance with Requirement R2, for more than 180 minutes. Formatted: Font: Verdana, 10 pt Formatted: Header, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers, Border: Bottom: (No border) Formatted: Indent: Left: 0", Space Before: 6 pt, After: 6 pt, Tab stops: Not at 1.5" Formatted: Space Before: 6 pt, After: 6 pt Formatted: Space Before: 6 pt, After: 6 pt, Add space between paragraphs of the same style R3 Operations Assessment Medium The Generator Owner s PSS failed to meet any of the required performances in Requirement R3, two times or fewer during the audit period. The Generator Owner s PSS failed to meet any of the required performances in Requirement R3, three times during the audit period. The Generator Owner s PSS failed to meet any of the required performances in Requirement R3, four times during the audit period. The Generator Owner s PSS failed to meet any of the required performances in Requirement R3, five times or more during the audit period. R4 Operational Assessment Medium NA NA NA The Generator Owner failed to install on its generator a PSS, as required in Requirement R4. R5 Operational Assessment Medium NA NA NA The Generator Owner failed to repair or replace a nonoperational PSS as Formatted: Font: 9 pt, Bold Formatted: Page Number, Font: 9 pt, Bold Formatted: Tab stops: 9", Right + Not at 3" + 6" Page 9 of 15

WECC Standard VAR-501-WECC-2 3 Power System Stabilizer R Time Horizon VRF Violation Severity Levels Lower VSL Moderate VSL High VSL Severe VSL required in Requirement R5. Formatted: Font: Verdana, 10 pt Formatted: Header, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers, Border: Bottom: (No border) Formatted: Indent: Left: 0", Space Before: 6 pt, After: 6 pt, Tab stops: Not at 1.5" Formatted: Space Before: 6 pt, After: 6 pt Formatted: Space Before: 6 pt, After: 6 pt, Add space between paragraphs of the same style Formatted: Font: 9 pt, Bold Formatted: Page Number, Font: 9 pt, Bold Formatted: Tab stops: 9", Right + Not at 3" + 6" Page 10 of 15

Version History Version Date Action Change Tracking 1 April 16, 2008 1 October 28, 2008 Permanent Replacement Standard for VAR-STD-002b-1 Adopted by NERC Board of Trustees Formatted: Centered, Indent: Left: 0", Space Before: 0 pt Formatted: Space Before: 0 pt Formatted: Centered, Space Before: 0 pt Formatted Table Formatted: Indent: Left: -0.02", First line: 0.02", Right: 0", Widow/Orphan control Formatted: Indent: Left: 0" 1 April 21, 2011 FERC Order issued approving VAR- 501-WECC-1 (FERC approval effective June 27, 2011; Effective Date July 1, 2011) Formatted: Indent: Left: -0.02", First line: 0.02", Right: 0", Widow/Orphan control Formatted: Indent: Left: 0" 2 November 13, 2014 Adopted by NERC Board of Trustees Formatted: Left, No widow/orphan control, Don't adjust space between Latin and Asian text, Don't adjust space between Asian text and numbers 2 March 3, 2015 3 TBD TBD FERC letter order approved VAR-501-WECC-2 Formatted: Left, No widow/orphan control, Don't adjust space between Latin and Asian text, Don't adjust space between Asian text and numbers Formatted: Space Before: 0 pt, Line spacing: single, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers Formatted: Space Before: 0 pt, Line spacing: single Formatted: Indent: Left: 0.06", Space Before: 0 pt, Line spacing: single, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers Page 11 of 15

Guideline and Technical Basis PSS systems are used to minimize real power oscillations by rapidly adjusting the field of the generator to dampen the low-frequency oscillations. It is necessary for large numbers of PSS devices to be in operation in the Western Interconnection to provide the required system damping while still allowing for some of these units to be out of service whenever necessary. Mandate to Install a PSS Nothing in this Regional Reliability Standard (RSS) should be construed to require installation of a PSS solely because a PSS is not currently installed as of the Effective Date of this RRS. Rather, installation is only mandated on the occurrence of either of the triggering events described in Requirement R4, Bullet 1 or Bullet 2, after the Effective Date of the RRS. It should be noted that a PSS is neither Transmission nor generation. Requirement R1 Requirement R1 addresses normal operating conditions. Requirement R1 recognizes that PSS systems have varying states, such as on, off, active, and non-active. As long as the PSS is operating in accordance with the documentation provided to the Transmission Planner, this is not considered a status change for purposes of this standard. This Requirement eliminates the requirement to count hours as required in the previous version of this standard while also allowing the Generator Owner to create a unit-specific operating plan. The intent of Requirement R1 is to provide the Transmission Planner, the PSS operating zone in which the PSS is active providing damping to the power system. Some PSS may be programmed to become active at a specified megawatt loading level and above while others may be programmed to be active in a particular band of megawatt loading levels and are non-active only when passing through the rough zone or some other band. A rough zone is a megawatt loading band in which the generator-turbine system could contribute to system instability. Requirement R2 This Requirement only applies when the PSS is out of service for a period greater than 30 minutes. Unlike Requirement R1, Requirement R2 addresses exceptions to normal operation. The intent of Requirement R2 is to remove the previous requirement to log hours for PSS in service. In this standard s previous version, the logged hours were totaled quarterly to meet the Page 12 of 15

98% in-service requirement. Instead of documenting the number of hours excluded, this Requirement simplifies the process by allowing the Generator Operator to communicate to the Transmission Operator the circumstances that render the PSS unavailable to the Transmission Operator (such as component failure, maintenance, and testing). Requirement R3 Nothing in this RSS should be construed to mandate the design criteria for the equipment used to produce the tuning output of the PSS. Rather, Requirement R3 is intended to address the design criteria for the tuning output of the PSS. Unlike the language in Requirement R5 that looks backward to address units that were once operating but are no longer capable of operating, Requirement R3 looks forward, requiring that units be tuned to the specified parameters. The PSS transfer function should compensate the phase characteristics of the generator, exciter, and power (GEP) system transfer function so the compensated transfer function ((PSS(s) * GEP(s)) has a phase characteristic of ± 30 degrees in the frequency range. The GEP(s) transfer function is a theoretical transfer function and its phase characteristic cannot be directly measured during field tests (only via simulation). Thus, the Requirement recognizes the practical approach of measuring the frequency response between voltage reference set point and terminal voltage (Et/Vref) and using the phase characteristic of such frequency response as being the phase characteristic of GEP(s). The phase characteristic of Et/Vref is a better approximation to the phase characteristic of GEP(s) when the frequency response Et/Vref is obtained with the generator synchronized to the grid at its minimum stable power output. In an effort to allow for reasonable wash-out time constants, the Requirement specifies 0.2 Hz as the applicable threshold. The 0.2 Hz threshold more closely aligns with the observed oscillation frequencies. A properly tuned PSS should provide positive damping to the local mode of oscillation, which typically has a frequency higher than 1.0 Hz. This Requirement modifies the requirement associated with the adjustment of the PSS gain. The standard no longer defines the PSS gain in terms of gain margin but instead requires the final PSS gain to be between 1/3 (10 db) and 1/2 (6 db) of the maximum practical gain that could be achieved during PSS commissioning. The maximum practical gain might be associated with the excessive noise or raised higher-frequency oscillations in the closed loop response (exciter mode) or any other form if there is inadequate closed-loop performance, as determined during PSS commissioning. It is now part of Measure M3 to show the field test results that led to the determination of the maximum practical gain. Page 13 of 15

Requirement R4 Requirement R4 requires a Generator Owner to install a PSS on new applicable units or when excitation systems are replaced or retrofitted on existing applicable units. This Requirement applies to new excitation systems and not to existing systems that do not have PSS. The Requirement also allows a reasonable amount of time for the commissioning of new PSS. Requirement R5 Unlike the language in Requirement R3 that looks forward to ensure that a unit is tuned, Requirement R5 looks backward. Specifically, the language in Requirement R5, becoming incapable, indicates the unit was previously capable of meeting the tuning requirements in Requirement R3, but is no longer capable. Restated, Requirement R5 addresses units that were previously working but are now no longer working. The intent of Requirement R5 is to remove the tiered approach to PSS repair/replacement following a failure. A simple, streamlined approach to allow the Generator Owner sufficient time to repair or replace a broken PSS has been written. Consideration has been given for the need to procure parts or new equipment, schedule an equipment/unit outage, and install and test the repaired or replaced PSS. It is recognized that in some instances, it may require (1) replacement of an AVR, and (2) the existence of a PSS, or both the AVR and the PSS may need to be replaced to achieve a functioning system. The 24-month time frame is sufficient to return a functional, operating PSS to service. Page 14 of 15

* FOR INFORMATIONAL PURPOSES ONLY * Enforcement Dates: Standard VAR-501-WECC-3 Power System Stabilizer United States Standard Requirement Enforcement Date Inactive Date VAR-501-WECC-3 TBD TBD Formatted: Font: 12 pt, Font color: Black Formatted: Space Before: 6 pt, Line spacing: single, Widow/Orphan control, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers Page 15 of 15