Exhibition Place Service Level Review

Similar documents
exhibition place

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

Exhibition Place Waste Diversion Program

Committee. Presentation Outline

MINISTRY OF TOURISM AND RECREATION

Crown Corporation Business Plans. Trade Centre Limited

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

MINISTRY OF TOURISM MINISTRY OF TOURISM THE ESTIMATES,

Implementation Strategy for the Lethbridge Destination Management Organization (LDMO)

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

Tulsa Airports Improvement Trust Strategic Plan Update

Accelerating Indigenous Tourism Growth

TORONTO 2015 Pan Am / Parapan Am Games Staff Recommended 2015 Operating Budget & 2015 Capital Budget

(905) , Extension 2725

BRISBANE CITY COUNCIL PLANNING FOR TENNIS TOGETHER FEBRUARY 2017

Colorado Springs & Pikes Peak Region Destination Master Plan

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

Ministry of Tourism, Culture and Sport 2017 Year in Review

ISSN # Ce document est disponible en français

Accountability Report

Municipal and Regional District Tax Imposition Bylaw No and Metro Vancouver Letter of Support

Conexus is committed to innovation and bringing financial services to market with speed. We have a long history of innovation, including:

FEDERATION SQUARE MELBOURNE, AUSTRALIA CORPORATE PLAN

Metrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report

MONROE CONVENTION CENTER EXPANSION UPDATE

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

2017/ /20 SERVICE PLAN

ARTS & VENUES BUDGET REVIEW SEPTEMBER 25, BUDGET

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE

The Challenges for the European Tourism Sustainable

THE CARICOM REGIONAL IMPLEMENTATION PLAN

communication tower means a tower or structure built to support equipment used to transmit communication signals;

Presentation to Regional Council

I ll give you an overview of financial results for the first half of fiscal year 2017 and topics of each business, mainly Shopping Complex Business.

People. Product. Promotion. Tourism Industry Priorities for Election 2018

BC Pavilion Corporation 2016/ /19 SERVICE PLAN

A SMARTER HOTEL INVESTMENT

Nature Conservation and Developing Sustainable tourism in Myanmar

Exhibition Place Strategic Plan DRAFT

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs)

The Hydro Tasmania group

THIRTEENTH AIR NAVIGATION CONFERENCE

An outdoor waterpark is a facility offering three or more waterslides and other aquatic facilities.

2018/2019 Indigenous Tourism BC Action Plan

The Strategic Commercial and Procurement Manager

Applewood Heights Community Open House

Frequently Asked Questions

Strengthening the Ontario Trails Strategy. Report on Consultations and the Environmental Bill of Rights Registry

Defining & Understanding M.I.C.E. Meetings

ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY ~Strengthening the foundations of the business and looking into the future~

CANADIAN ROCKIES INTERNATIONAL AIRPORT

The Great Wolf Difference. History. Today s Agenda. North America s Largest Family of Indoor Waterpark Resorts. Manteca City Council Meeting

MAC Meeting. February 2, 2017

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

MEDIUM SIZE STADIUM STRATEGY

LIST OF OPEN TRAINING TRAINING PLANNER 2018 Course location: Lagos, Abuja, Port Harcourt, Kaduna.

Draft Executive Summary

Strategic Objectives, Initiatives and Actions

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

2005 Tourism Overview Presentation to City of Greater Sudbury Council January 27, 2005

Gold Coast: Modelled Future PIA Queensland Awards for Planning Excellence 2014 Nomination under Cutting Edge Research category

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

2013 Priority Initiatives March 19, 2013

The Airport. p a g e 2

Performance Clackamas Clackamas County Strategic Plan

Canada s Largest Facility for Conventions, Exhibitions and Events

BHP Billiton Global Indigenous Peoples Strategy

The results of the National Tourism Development Strategy Assessments

YUKON TOURISM DEVELOPMENT STRATEGY GROWING TOURISM. OUR FUTURE. OUR PATH.

The Vision for the San Juan Islands Scenic Byway

Town of Caledon 2013/14 update. October 8 th, 2013

The Role of the State in Tourism. in Manitoba. Doug Ramsey Department of Rural Development Brandon University

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED FEBRUARY 8, 2016

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

National Market Report

America s Most Recommended!

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

City of Penticton: Financial Plan Reporting Structure

Creative Economy Plan

MUSIC CITY CENTER, NASHVILLE KAY BAILEY HUTCHINSON CONVENTION CENTER, DALLAS ALBANY CAPITAL CENTER

Belize Tourism Board Ministry of Tourism Institutional Vision of the BTB


Greene County Tourism Economic Impact Analysis and Strategic Goals

DIRECTOR, ENVIRONMENT, FLEET, & SOLID WASTE UPDATE: REGIONAL RIDESHARE PROGRAM RECOMMENDATION

Inner Harbor 2.0. The resulting Inner Harbor 2.0 Plan provides a road map for a more sustainable, attractive and active Inner Harbor.

Thank you for participating in the financial results for fiscal 2014.

Official Journal of the European Union L 337/43

ASSEMBLY 39TH SESSION

Transport Canada Civil Aviation Transformation (TCCAT) Initiative

STRATEGIC BUSINESS PLAN 2017

Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada

Message from the Managing Director... r...

Keith Henry President & CEO, Aboriginal Tourism Association of Canada

Tourism Development of the RA Vision Strategy Action plan 2017

Silvia Giulietti ETIS Conference Brussels An EEA reporting mechanism on tourism and environment and ETIS

Visit Belfast Recruitment Communications and PR Manager (Maternity Post Fixed Term Contract)

Transcription:

Exhibition Place Service Level Review Standing Committee Presentation June 30, 2015

Overview Recommended Service Levels by Program Program Map Service Levels and Service Performance Service Challenges and Opportunities Strategies to Address Issues/Opportunities Priority Actions to Achieve Results - 2 -

Exhibition Place 2015 Program Map EXHIBITION PLACE To foster Exhibition Place as an inclusive and accessible parkland and business destination for conventions, exhibitions, entertainment, recreation and sporting events, and public celebrations, and in doing this, operate as a self-sustaining and environmentally-responsible entity Exhibition and Events Conventions, Conferences & Meetings Exhibition Place Asset Management Exhibition Place Parking Access Purpose: Direct Energy Centre is the largest trade and consumer show facility in Canada and the sixth largest in North America with over 1.1 million square feet of contiguous space. In addition, Exhibition Place has a 192-acre site that allows for public celebrations and events, such as the Honda Indy Toronto, and Toronto Caribbean Festival, and CNE. The Exhibitions and Events service has a direct annual economic impact of more than $400 million to Toronto. Purpose: Allstream Centre reopened in 2009 after $50.0M of renovations to the historic Automotive Building. It provides new meeting rooms, exhibit space, and a Class A ballroom. The new 134,000 square foot facility complements the event activities at the Direct Energy Centre, by attracting more international conferences, consumer and trade shows, and festivals to the City of Toronto. Purpose: To provide building & infrastructure maintenance and construction services to Exhibition Place facilities and structures Purpose: To provide convenient access to public parking for Exhibition Place events, BMO Field and Ricoh Coliseum sporting events, and general public use. To provide professional management expertise to effectively run the operations, and to actively seek out business development, sponsorship, and partnership opportunities - 3 -

Service Levels and Service Performance

Key Service Levels 2015-2016 Service Exhibitions & Events Service Levels Activity 2015 Approved 2016 Requested Event - Trade & Consumer 100% compliance with negotiated terms 100% compliance with negotiated terms Event - Meetings & Corporate 100% compliance with negotiated terms 100% compliance with negotiated terms Event - Community / Festivals / City of Toronto / Sporting / Photo & Film Event - Major Citywide celebrations & special events 100% compliance with negotiated terms 100% compliance with negotiated terms 100% compliance with negotiated terms 100% compliance with negotiated terms Guest Services: Food & Beverage $4.67 food & beverage sales per attendee $11.33 food & beverage sales per attendee Guest Services: Facility Support $0.75 of Service Revenue per $1 of Rent Revenue $0.53 of Service Revenue per $1 of Rent Revenue Long-term Tenant Support Outsourcing Electrical/Mechanical Service $11.10 per Square foot of long term tenant space supported $11.61 per Square foot of long term tenant space supported Conventions, Conference & Meetings Event Space 100% compliance with negotiated terms 100% compliance with negotiated terms Guest Services: Food & Beverage $90.21 food and beverage sales per attendee $88.86 food and beverage sales per attendee Guest Services: Facility Support $0.32 of Net Service Revenue per $1 of total revenue $0.30 of Net Service Revenue per $1 of total revenue Guest Services: Parking Labour Cost ratio of 9% of revenue Labour Cost ratio of 8.2% of revenue - 5 -

Key Service Levels 2015-2016 Service Asset Management Activity Parking Lots, Roads & Sidewalks Service Levels 2015 Approved 2016 Requested Maintain Parking Lots, Roads & Sidewalks in good condition for public access; increase sustainability and reduce failure of Exhibition Place Assets; effective investment of Capital funds; ensure preservation of Historical site and area Maintain Parking Lots, Roads & Sidewalks in good condition for public access; increase sustainability and reduce failure of Exhibition Place Assets; effective investment of Capital funds; ensure preservation of Historical site and area Waste Management Fleet & Equipment Maintenance Waste Management: Achieve higher than 2013 actual of waste diversion of 85.15% Fleet & Equipment Maintenance: Maintain current 43 vehicles and 73 pieces of equipment and additional acquisitions Waste Management: Achieve higher than 2014 actual of waste diversion of 85.74% Fleet & Equipment Maintenance: Maintain current 43 vehicles and 73 pieces of equipment and additional acquisitions Exhibition Place Parking Access Surface Underground 100% of parking spaces available and accessible for all major events. Variable labour cost ratio of 9% of revenue. 100% of parking spaces available and accessible for all major events. Variable labour cost ratio of 9% of revenue. 100% of parking spaces available and accessible for all major events. Variable labour cost ratio of 8.2% of revenue. 100% of parking spaces available and accessible for all major events. Variable labour cost ratio of 8.2% of revenue. - 6 -

Performance Measures Tenants Rent & Net Show Services ($ s millions) 2.5 2.40 2.11 2.0 1.95 1.46 1.50 1.52 1.61 1.5 1.31 1.36 1.0 0.5 0.11 0.18 0.13 0.13 0.12 0.12 0.13 0.13 0.13-2008 2009 2010 s 2011 2012 2013 2014 2015 Forecast 2016 Budget Rent Show Serv - Net Trend: From 2014-2015 rent includes from Princes Gate Hotel, and rate increase from Ricoh 2016 budget includes rent from Raptors training facility - 7 -

Performance Measures Utilities Savings from ERP Projects (000 s) $800 $739 $780 $765 $783 $742 $688 $688 $700 $589 $600 $505 $500 $391 $400 $300 $200 $100 $- 2007 2008 2009 2010 2011 2012 2013 2014 2015 Forecast 2016 Budget Trend: 2015 forecast and 2016 budget decrease to reflect actual savings realized from the boilers project Budget/s include savings from various Energy Retrofit Projects: Photovoltaic at the East and West of the Horse Palace and East Annex, Direct Energy Centre halls lighting, Five Exhibition Place Buildings (QE, GS, EA, HP, BLC) retrofit, LED Pathway lights, Back Pressure Steamturbine, Press Building Geothermal, Underground Parking lights - 8 -

Performance Measures Events building rent Direct Energy Centre($ s millions) 8.46 10.73 9 7.77 7.49 7.87 7.34 7.46 7.02 7.27 8.28 8 7 6 5 4 3 2 1-2007 2008 2009 2010 2011 2012 2013 2014 2015 Forecast 2016 Budget Trend: 2010 was high due to contribution from G8/G20 Media 2013-2014 decrease due to lost of major events: CMTS, Toronto Ski Show, CFA Exams, IIDEX 2015 includes contribution from Pan Am games 2016 includes contribution from NBA Jam Session - 9 -

Performance Measures Parking Revenue and Direct Wages ($ s millions) 8 6.96 7.30 7.18 7.29 7 5.86 6.33 6.39 6.65 6.68 6.73 6 5 4 3 2 1 0.61 0.61 0.57 0.53 0.51 0.54 0.61 0.73 0.65 0.60-2007 2008 2009 2010 2011 2012 2013 2014 2015 Forecast 2016 Budget Revenue Labour - 10 -

Service Challenges & Opportunities

Service Challenges & Opportunities Challenges High demand and shortage of labour resources from all trades in order to provide service to clients (i.e BMO Field, 14 tenants, events, Princes Gate Hotel) Unforeseen costs such as hotel contaminated soil removal Loss of parking revenue due to hotel, BMO Field and Raptors Training Facility construction Increasing cost of unionized labour (based on contractual agreements) Increase cost of wages, taxable benefits & health benefits Increase cost of hydro, and water - 12 -

Service Challenges & Opportunities (Cont.) Opportunities Implementation of the Festival Plaza Master Plan to create a flexible new open space for major outdoor events and at the same time introduce features that will make the last big surface parking lot more pedestrian friendly Continue to examine possibilities to expand Direct Energy Centre and to improve older facilities such as the Industry Building and Better Living Centre The Province is currently undertaking a major planning exercise to reimagine Ontario Place. Exhibition Place will work with the Province to explore possibilities for synergies between the two sites Continue Exhibition Place s measured and financially responsible renaissance, turning it into an even more vibrant part of the city. The site will be the largest venue for the 2015 Pan American Games Completion of Phase 1 of Hotel development Outsourcing for Electrical/Mechanical show services Completion of Phase 1 of BMO Field expansion from 20,000 to 30,000 seats Construction of Raptors Training Facility is in progress Finalization of naming agreement with Ener-Care - 13 -

Strategies to Address Challenges & Opportunities: New Strategies Strategies Business Development: Integrate and develop each of the business enterprises across Exhibition Place and pursue new complementary business enterprises to stimulate local and regional economic growth and promote Exhibition Place as an international centre of business excellence. Public Space and Infrastructure: Enhance and sustain our dynamic and diverse public assets and integrate these assets into the urban fabric for the benefit of the community Environmental: Exemplify and demonstrate environmental stewardship and leadership in all aspects of our businesses and operations. Safety and Security: Ensure a safe and secure environment for employees, guests, and for our property and assets Recognition and Public Understanding: Sustain a high level of public understanding that builds confidence and recognition of excellence within the marketplace and local, national, and international communities. Organizational and Staffing: Encourage a high-performing organization through alignment of people, processes, and systems to ensure we continue to be an employer of choice. Financial: Maintain a positive operating financial performance across Exhibition Place and all its businesses - 14 -

Priority Actions to Achieve Results

Priority Actions to Achieve Results Service: Exhibtion and Events, Convention and Meeting, Parking Access, Exhibition Place Assets Management Service Objectives: Achieve our recurring events business revenue; Grow our new events business; Actively support the expansion and enhancement of entertainment facilities; Expand exhibition and convention space Priority Actions to be Taken: Re-evaluate all aspects of our customer service promise Develop plans, protocols, and processes for the MICE market reflecting the new on-site hotel Review our sales and marketing package to ensure competitiveness for building rates and rental services Continue to deliver contractual obligations pursuant to the CNEA Master Agreement Develop an annual marketing plan Maintain a strong relationship with Tourism Toronto Work with the City to bring new types of events and programming to the site Support significant international events Maintain and upgrade technology across the grounds and within our key event spaces to stay current with customers needs Continue to analyze and explore expansion opportunities for BMO Field including improvements related to Festival Plaza Hosting Toronto Argonauts football games at BMO Field starting in 2016 Explore opportunities for the private sector to locate a multi-use sports / entertainment / education / community facility on the site Add expansion of Direct Energy Centre to the 10-year capital plan and explore the feasibility of additional MICE facilities Explore opportunities for permanent trade exhibit space - 16-16

Priority Actions to Achieve Results Service: Exhibtion and Events, Convention and Meeting, Parking Access, Exhibition Place Assets Management Service Objectives: Enhance our public assets through major new builds and/or renovations; Integrate our assets with the surrounding urban fabric; Sustain our public assets and rolling equipment; Establish Exhibition Place as a destination and gathering place for the community; Improve all forms of transportation needs for the grounds; Ensure integration between Exhibition Place and Ontario Place Priority Actions to be Taken: In partnership with the private sector, complete Phase 1 of the hotel and Stanley Barracks Park Develop plans to upgrade our Class B event space Implement Phase 1 of the Festival Plaza Master Plan and develop future funding options Develop a plan for a covered walkway from the GO Station to Festival Plaza Improve signage / wayfinding on the site Upgrade the northern edge to improve pedestrian flow and act as a gateway to the surrounding communities Upgrade our preventative maintenance program systems Develop a 10-year program to maintain our competitive event space at Class A level Identify funding mechanisms for major underground infrastructure In partnership with the private sector, enhance public amenities to service our patrons and local community visitors Increase community use of the grounds by animating and/or programming our parks Continue to provide the necessary parking facilities for our businesses Enhance the on-street bicycle network and supporting infrastructure Actively support public transit improvements to Exhibition Place Work with the Province to ensure that the relationship of Ontario Place to Exhibition Place within the context of Toronto s western waterfront is taken into account in planning for redevelopment Work with Ontario Place to ensure a transformative upgrade to area transit services - 17-17

Priority Actions to Achieve Results Service: Exhibtion and Events, Convention and Meeting, Parking Access, Exhibition Place Assets Management Service Objectives: Develop a green promotion strategy both externally and internally; Ensure sufficient funding of all environmental programs; Reduce the impact of our operations and our business on all aspects of the environment Priority Actions to be Taken: Continue to build a culture of environmental sustainability across the organization at all levels Rethink and Retool the GREENSmart program to address the organization at all levels and external customers needs Develop an outreach plan for the Pan/Parapan American Games to promote our green initiatives Promote tours and training about Exhibition Place s green infrastructure and practices Seek project funding from partnerships with external parties Develop a rolling 10-year capital budget for green initiatives Develop strategies to address rain water run-off issues Upgrade the Building Automation System across the grounds to control and conserve energy Reduce grid supplied electricity use Reduce use of potable water Develop a plan to reach zero waste for Exhibition Place operations Work with the Pan/Parapan American Games and NBA All-Star Game to establish and pursue ambitious environmental targets - 18-18

Priority Actions to Achieve Results Service: Exhibtion and Events, Convention and Meeting, Parking Access, Exhibition Place Assets Management Service Objectives: Coordinate a security and public safety program; Promote safe work practices for all staff Priority Actions to be Taken: Implement a program focused on our guests, property, and assets to reduce claims in all categories Design, seek necessary funding, and implement a full security program for the Pan/Parapan American Games Implement a capital program to upgrade the fire system in Direct Energy Centre Develop and implement the next phase of the Accessibility Plan for the grounds Implement programs and procedures designed to achieve zero lost time injuries Continue to expand the Young Workers Safety Training program Design and implement an indoor environmental program within the older non-heated building spaces - 19-19

Priority Actions to Achieve Results Service: Exhibition Place Assets Management Service Objectives: Foster awareness of our heritage assets; Foster awareness and understanding of our leadership role in local, national, and international business communities Priority Actions to be Taken: Work with the developer on the plans for heritage displays in the hotel Undertake an archaeological review of the Bandshell Park area Develop an international / national / local brand for Exhibition Place Use the Pan/Parapan American Games to brand Exhibition Place as a site for major outdoor events /festivals Implement an outreach plan featuring the new hotel - 20-20

Priority Actions to Achieve Results Service: Exhibtion and Events, Convention and Meeting, Parking Access, Exhibition Place Assets Management Service Objectives: Deliver a Customer Service strategy; Review and revise our corporate governance systems; Ensure hiring and training processes address organizational needs Priority Actions to be Taken: Implement programs to meet our customer service expectations and core competencies Continue to develop annual departmental objectives based on the new Strategic Plan Continue to encourage employee engagement at all levels Review, revise, and develop new policies and processes that address general organizational matters Implement the consolidation of staff within one area of the site Complete an annual review of By-Laws and Board policies and procedures Monitor new City Council directions and recommendations, and their application to Exhibition Place Examine our organizational structure to ensure we can meet the future needs of Exhibition Place Participate in the City s commitment to employment equity initiatives Develop a staffing strategy for the Pan/Parapan American Games - 21-21

Priority Actions to Achieve Results Service: Exhibtion and Events, Convention and Meeting, Parking Access, Exhibition Place Assets Management Service Objectives: Effectively monitor costs and revenues; Seek additional revenue opportunities; Establish new funding mechanisms within the City; Demonstrate the economic impact of Exhibition Place Priority Actions to be Taken: Develop a 3-year net forecast for all business enterprises that has no year-over-year negative impact for the consolidated budget Ensure operating budgets are met or show a positive surplus to budget Review and revise financial and organizational systems to strengthen controls and processes Seek efficiencies with the public funds under our control and continue to evaluate our provision model to ensure that services offered are best provided either internally or externally Seek new and/or expand revenue opportunities within our existing operations Increase rental revenues from existing tenants / facilities Maintain and enhance naming sponsorship for Direct Energy Centre Seek opportunities for business development through negotiations of collective agreements Work with the City to increase our State of Good Repair budget or find other funding mechanisms for both capital and rolling assets Quantify the economic impact of Exhibition Place s events on the City - 22-22

Thank You