LONDON OVERGROUND RAIL OPERATIONS LTD CONSULTATION DOCUMENT & MINOR MODIFICATION PROPOSAL ( Proposal )

Similar documents
22 nd February Proposed changes to Govia Thameslink Railway Ticket Offices and introduction of Station Hosts

Making rail accessible: helping older and disabled customers

Making Rail Accessible Helping our Older and Disabled Guests

Making rail accessible: Helping older and disabled customers. October 2018

Chapter 2 Route window W25 Maidenhead station. Transport for London

SHREWSBURY ABERYSTWYTH RAIL LIAISON COMMITTEE MINUTES. of a meeting held at The Town Hall Welshpool on

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

Travel Information London Borough of Hillingdon

Maidenhead Bridge. Proposed Work

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Travel Alternatives London Borough of Hounslow

Elizabeth line Services

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential

Making Rail Accessible: Guide to Policies and Practices. TfL Rail May 2018

Minutes. Steering Group. Apologies: Description: Action

Making rail accessible

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Dear Parent(s) TRANSPORT TO THE SCHOOL SITE

EAST SUFFOLK LINES. Stations Investment Plan. Produced by the East Suffolk Lines Community Rail Partnership

Top specification with an excellent BREEAM rating. High sustainability

Proposed closure of King s Cross Thameslink station and parts of the railway network at Blackfriars station and London Bridge station.

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

West Sussex Local Authority Parking Enforcement Agreement

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

For Sale/To Let High Quality Office Accommodation. Altrincham Business Park. St George s Court. Edward Court.

Network Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

NORTH GOWER STREET, LONDON NW1 A CENTRAL LONDON UNBROKEN RESIDENTIAL INVESTMENT OPPORTUNITY

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Finchley and Golders Green Area Committee 27 April 2017

PRINCES STREET, IPSWICH IP1 1QJ PRIME DEVELOPMENT SITE CURRENTLY INCOME PRODUCING 1.05 ACRES (0.42 HECTARES) SITE APPROX.

BARKING GOSPEL OAK LINE USER GROUP

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Prince Albert Road Towpath Ramp, Camden Feasibility Report

ONECROYDON. Offices To Let In Croydon s Most Iconic Building

Vodafone UK Travel to Work Policy

Crossrail / Elizabeth Line An Update

London TravelWatch response to the Southeastern franchise extension consultation

London All-on-One: Buses, Tubes, Train, Streets, Post Codes By Quickmap READ ONLINE

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016

ONECROYDON. Offices To Let In Croydon s Most Iconic Building

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

Introduction Government 6

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

STANDARD HOUSE. for sale. High Quality Office Investment. 14,132 sq ft / 1,313 sq m GODALMING SURREY GU7 1XE

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

London and Crossrail 2. Chris Moores Transport for London

TORONTO TRANSIT COMMISSION REPORT NO.

Penalty Fares Scheme. Comments by Transport Focus. Abellio East Anglia Ltd. 16 October Abellio East Anglia Operating Route October 2016

A PROMINENT RETAIL INVESTMENT OPPORTUNITY. London NW8 7NL

Phase 1A North, Brent Cross Cricklewood Regeneration Area, London NW2

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9

Metro Senior. pocket guide

Decisions To authorise revised costings of the existing Design Services Agreement between the Council and Network Rail, from 921,100 to 1,340,642.

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

Board meeting

Current Contents of Website, and Version History V5.17

Minutes of the 40 th meeting of the UK Roads Board meeting held at the Chartered Institution of Highways & Transportation on the 19 June 2012

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line.

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

TORONTO TRANSIT COMMISSION REPORT NO.

Passenger Focus report to Cheshire County Council on access requirements for. Crewe Railway Station

OPPORTUNITY +SPACE CHIFLEY BUSINESS PARK 3B CHIFLEY DRIVE MOORABBIN AIRPORT, VIC

Shenzhen Longhua MAINLAND AND OVERSEAS GROWTH. total route length of railway operations outside of Hong Kong

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

The resignalling scheme

Multi-storey station car park opens in New Year

HIGH YIELDING CITY CENTRE OFFICE INVESTMENT WEST GLAMORGAN HOUSE ORCHARD STREET SWANSEA SA1 5AD

317a & 400 Hoe Street, Walthamstow, E17 9AA

Accessible Transport The London 2012 Legacy. Mark Dyer Olympic Delivery Authority

How Network Rail is collaborating with Community Rail

DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

Application for Authority to Operate a Penalty Fares Scheme

Edgware Road Colindale London NW9 6TD

Passengers priorities for new franchises

EALING BUSINESS PARTNERSHIP (EBP)

Transport Delivery Committee

June-December TBD, to be coordinated with Accessibility Ramps Project

ONECROYDON. Offices To Let In Croydon s Most Iconic Building

Valid from 1 March 2015 until further notice. Making Rail Accessible. Helping Older and Disabled Passengers. virgintrainseastcoast.

prime residential investment

Making rail accessible. Helping older and disabled passengers

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

BUSINESS BROUGHT TO LIFE. Up to 50,000 sq ft (4,645 sq m) of premium office space available in Peterborough; one of the UK s fastest growing cities.

Temporary Structure Permit Guide

Civil Aviation Authority INFORMATION NOTICE. Number: IN 2016/082

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Business Park Luton. High quality business space available within an attractive parkland setting

For Sale. Bristol House, Victoria Street, Bristol BS1 6BY. Office Investment Opportunity

FERRY TERMINAL ST LUCIA

Summary of questions and discussion

Transcription:

South Tottenham Minor Modification Proposal Issued for Consultation 22 August 2013 LONDON OVERGROUND RAIL OPERATIONS LTD CONSULTATION DOCUMENT & MINOR MODIFICATION PROPOSAL ( Proposal ) In accordance with Section 35 of the Railways Act 2005 ( the Act ) Note this document will be distributed by email. Please contact us if you require a hard copy to be sent to you. 1.0 Introduction This document describes the proposed closure of the existing entrance on the north side of South Tottenham station and its replacement with a new entrance to be created on the south side of the station where sufficient space exists to allow the installation of ticket gates and to allow the entrance ramp to be regraded so that the slope is no greater that 15%. 2.0 Background South Tottenham station is located on the Gospel Oak to Barking Line. London Overground Rail Operations Limited (LOROL) manages the station and operates the train service under a Concession Agreement with Transport for London (TfL). Raised levels of ticketless travel on the Gospel Oak to Barking Line have prompted LOROL and TfL to promote the gating of additional stations on the line, which includes South Tottenham. At other stations across the network automatic ticket gates have proved effective in reducing ticketless travel and anti-social behaviour (which often involves passengers travelling without a ticket).

At present ticket gates are provided at Gospel Oak, Blackhorse Road and Barking stations. Plans are being developed to install automatic ticket gates at South Tottenham, Leytonstone High Road and Leyton Midland Road stations. In addition a scheme is being progressed to install lifts at this station (funded through the DfT s Access for All initiative). The proposed repositioning of the station entrance to the south side of the station will facilitate the construction of the lifts and enable an accessible route to be created from the street to the new lifts that is compliant with DfT guidance. 3.0 The Proposal This Minor Modification Proposal concerns the proposed closure of the existing entrance to the station on the north side of the railway which comprises a ramped entrance from the street to an intersection with the subway where the customer flow splits depending on whether they wish to travel west or east. Under these proposals a new entrance will be constructed on the south side of the station which will likewise provide a link between the street and the existing subway. The existing facilities located on the existing entrance ramp comprising a ticket vending machine, poster boards, CIS displays and staff facilities will be relocated to the new entrance. In addition enhanced cycle facilities will be provided on the new entrance and an automatic ticket gateline installed in order to deter ticket less travel. The proposed relocation of the entrance from the north to the south side of the entrance has come about because the existing entrance ramp is too steep and there is insufficient land on the north side of the station to allow automatic ticket gates and other additional facilities to be installed. At present the land on the south side of the station is occupied by a former Network Rail commercial tenancy which is now vacant. This area will be brought into the station lease and, subject to any applicable planning requirements, the majority of the existing buildings on this site will be demolished to create the new entrance. 4.0 Benefits The main benefits of the proposals are as follows: Improving passenger and staff safety by making it more difficult for passengers without tickets to board London Overground trains and gain access to the platforms at South Tottenham station.

The installation of automatic gatelines will reduce ticketless travel on this line and help promote a culture of ticket buying before travelling. The new entrance will be less steeply graded providing a more accessible route into the station for mobility impaired passengers. 5.0 Temporary Arrangements and Timing Until the new entrance and ticket gateline is installed the existing entrance will remain open. A month prior to the gateline being brought into operation a notice will be displayed at the station notifying everyone of the date when the current entrance will be closed. LOROL does not intend physically removing the existing entrance since this could provide an alternative emergency access to the station, although this will be secured at both ends. 6.0 Prior Consultation This documentation is the consultation required prior to contacting the Department of Transport. A response is requested within 28 days to the address given below. Mark Eaton Concession Director LOROL Overground House 125 Finchley Road Swiss Cottage London NW3 6HY Email: mark.eaton@lorol.co.uk Copy to Virginia Munrow (email address below) If you require further information or clarification on any point in this proposal please contact: Virginia Munrow Email: virginia.munrow@lorol.co.uk Consultees RfL / TfL London Travelwatch DB Schenker Rail (UK) Ltd Network Rail London Borough of Haringey Council Andrew McIntosh Tim Bellenger Stewart Smith John Gower / Christopher Machado Malcolm Smith

Appendix 1 Current and proposed plans for South Tottenham station 1.1 Current plan of South Tottenham station, as shown on Network Rail s website This area to be renovated into the new station entrance

1.2 Indicative Design for the Proposed New Entrance to the Station The proposed automatic gatelines are highlighted by the blue shaded area.

Appendix 2 : Current location and lease plans at South Tottenham Station 2.1 South Tottenham Station location plan area highlighted in green is the proposed area to be closed.

2.2 Current lease plan for South Tottenham station