DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

Similar documents
DIRECTOR S REPORT TRANSPORTATION BOARD AUGUST 14, 2017

Nevada Transportation Conference

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA CAPITAL IMPROVEMENTS PROGRAM MOTOR VEHICLE FUEL TAX FUNDING APPROVED BY RTC 6/8/17

All Fund Expense Tracking Through: 3/31/2019

SPENCER AIRPORT INDUSTRIAL

FOR LEASE OFFICE/WAREHOUSE FLEX SPACE HIGHLAND INDUSTRIAL CENTER

FOR LEASE SPENCER AIRPORT PLAZA II 2057 EAST MAULE AVENUE, LAS VEGAS, NEVADA 89119

POST INDUSTRIAL PARK INDUSTRIAL UNITS FOR SALE 4717 WEST POST ROAD, #110 & 4731 WEST POST ROAD, #130, LAS VEGAS, NV 89118

5520 STEPHANIE STREET, LAS VEGAS >> ±36,019 SF OFFICE/WAREHOUSE/DISTRIBUTION, LAS VEGAS, NV 89122

I-15/Tropicana Interchange. Planning & Environmental Linkage Meeting

FOR SALE > ±0.88 ACRES

5 Investment Strategy

THE SHOPPES ON RAINBOW

±12.50 ACRES. Dean Martin Drive and Pyle Avenue Las Vegas, Nevada FOR SALE LAS VEGAS STRIP SUBJECT PROPERTY

CROSSROADS AT SUNSET WEST SUNSET ROAD, HENDERSON, NV 89014

WAGON TRAIL SOUTH INDUSTRIAL PARK

PARTELL MEDICAL CENTER

CLARK COUNTY (UNINCORPORATED) RECORD

4870 WEST OQUENDO ROAD

PARTELL MEDICAL CENTER

Notice of Workshop to Solicit Comments on Proposed Regulation


CROSSROADS AT SUNSET WEST SUNSET ROAD, HENDERSON, NV 89014

ELDORADO BUSINESS PARK

±3,200 SF RETAIL SPACE AVAILABLE 280 EAST FLAMINGO ROAD, LAS VEGAS, NEVADA 89109

DECATUR BELL COMMERCE CENTER

FOR LEASE: OFFICE/WAREHOUSE FLEX SPACE SUNSET BUSINESS CENTER 12 SUNSET WAY, HENDERSON, NV 89014

DECATUR BELL COMMERCE CENTER

DECATUR BELL COMMERCE CENTER

AABACUS INDUSTRIAL PARK

DECATUR BELL COMMERCE CENTER

MORE TIME PLACEMENT HIGH TRAFFIC LOCATIONS 10-SECOND AD SPOTS

CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings.

FLAMINGO PROMENADE W FLAMINGO ROAD, LAS VEGAS, NV 89147

2010 PHARMACY DIRECTORY

SHADOW PROFESSIONAL CENTER

TROPICAL DISTRIBUTION CENTER

SINGLE STORY MEDICAL OFFICE BUILDING AVAILABLE FOR LEASE SUITES FROM ±1,379 - ±18,300 SF

DEALERSHIP OPPORTUNITY VALLEY AUTO MALL

TROPICANA EAST SHOPPING CENTER

FOR SALE > ±2.39 ACRES FENCED M-I INDUSTRIAL YARD

TURNKEY CALL CENTER FOR LEASE CENTRALLY LOCATED AESTHTICALLY PLEASING 42,412 SF AVAILABLE MOVE-IN READY 6320 SOUTH PECOS RD :: LAS VEGAS, NEVADA 89120

TROPICANA EAST SHOPPING CENTER

FOR LEASE RETAIL SPACE +/- 2,400-4,565 SF

MIDDLEFORK INDUSTRIAL

NEC OF DEER SPRINGS WAY & HUALAPAI WAY

FOR LEASE ±53,200 SF INDUSTRIAL BUILDING ON ±2.57 ACRES 2020 MENDENHALL DRIVE NORTH LAS VEGAS, NEVADA 89081

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE, LAS VEGAS, NV 89102

CROSSROADS. AT SUNSET West Sunset Road Henderson, Nevada RETAIL SPACE AVAILABLE FOR LEASE ±2,040 SF - ±42,470 SF

CAMERON RENO BUSINESS PARK

LOCATION NEAR MCCARRAN AIRPORT!

INSPIRADA MASTER PLAN

FOR LEASE WESTECH BUSINESS CENTER SOUTH DECATUR BOULEVARD LAS VEGAS, NEVADA 89118

Valley Vista Masterplan Decatur Boulevard & Elkhorn Road North Las Vegas, Nevada

STONE CANYON PROFESSIONAL PARK

ELDORADO BUSINESS PARK

This page intentionally left blank

Regional Transportation Commision of Southern Nevada Indexed Fuel Revenues Project List

Emerald Business Plaza

Your #1 Source for Construction Leads Since 1953!

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

FOR LEASE ±2,000 - ±20,000 SF OFFICE AND MEDICAL SUITES

FOR SUBLEASE AIRPORT INDUSTRIAL PARK 3245 E. PATRICK LANE, LAS VEGAS, NV 89120

Southern Nevada 10 - Year Unfunded Project List - DRAFT

FOR LEASE RETAIL & OFFICE SUITES AVAILABLE

HENDERSON FREEWAYS CROSSING

HARSCH INVESTMENT PROPERTIES

WINDMILL PARKWAY Henderson, Nevada 89074

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE LAS VEGAS, NV 89102

HENDERSON FREEWAYS CROSSING

GOLDEN HORIZON CENTER

VRD INDUSTRIAL FOR SALE ±7,160 SF ON ±1.01 ACRES 4245 PRODUCTION COURT NORTH LAS VEGAS, NEVADA 89115

Sterling Park FOR SALE OR LEASE OWNER-USER OPPORTUNITY! 7432 WEST SAHARA AVENUE LAS VEGAS, NEVADA 89117

SAHARA COMMERCIAL CENTER 8701 W Sahara, Las Vegas, NV 89117

CRAIG DISTRIBUTION CENTER

4840 SOUTH EASTERN AVENUE LAS VEGAS, NEVADA 89121

HENDERSON FREEWAYS CROSSING

NORTHWEST MEDICAL CENTER

TROPICANA EAST SHOPPING CENTER

RESTAURANT WITH DRIVE THROUGH 9595 WEST TROPICANA, LAS VEGAS NV >> SPACE FOR SUB-LEASE

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

FOR SALE 4700 DECKOW LANE, LAS VEGAS, NV LAND 4700 DECKOW LANE LAS VEGAS, NEVADA AL TWAINY, CCIM

All Fund Expense Tracking Through 5/31/18

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

FOR SALE > ±13,090 SF WAREHOUSE/DISTRIBUTION BUILDING

THANK YOU. state leaders and taxpayers for investing in our schools! 1998 CAPITAL IMPROVEMENT PROGRAM BOULDER CITY HIGH SCHOOL

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE LAS VEGAS, NV 89102

Fourth Quarter NEVADA 2014 VOLUME XXII COMMISSION ON TOURISM. A Digest of Statistical Information on the Nevada Tourism Industry.

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

UNIVERSITY GATEWAY 4730 SOUTH MARYLAND PARKWAY LAS VEGAS, NEVADA FOR LEASE. FRANK MARRETTI Owner/Licensee

LAKE MEAD MEDICAL ARTS PAVILION

FOR LEASE MEDICAL & PROFESSIONAL SPACE

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions

THE CENTER AT SPRING MOUNTAIN

NORTHGATE DISTRIBUTION CENTER

FOURTH QUARTER 2016 VOLUME XXIV DISCOVER THE FACTS

FOR SALE > ±5,800 SF FREESTANDING INDUSTRIAL BUILDING WITH FENCED YARD ON

SECOND QUARTER 2016 VOLUME XXIV DISCOVER THE FACTS

APPENDIX A2 PROJECT LISTINGS

Transcription:

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1

US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES WERE INCURRED IN JULY 2018, NDEP AND US EPA CONCURRED THAT NDOT MET ALL REQUIREMENTS AND APPROVED TERMINATION OF THE CD JUDGE SIGNED ORDER TERMINATING THE CONSENT DECREE ON SEPTEMBER 17 TH 2

EMERGENCY OPERATIONS SR 164, NIPTON RD.; $3.45 M CONTRACT WAS AWARDED LAST MONTH NIPTON ROAD WAS RE-OPENED TO TRAFFIC ON OCTOBER 2 ND SR 164, NIPTON ROAD $200K EMERGENCY REPAIR OF DAMAGED STORM DRAIN PIPES ON KIETZKE LANE AWARDED TO Q&D CONSTRUCTION 3

FEDERAL UPDATE MANY CONGRESSIONAL MEMBERS CONCENTRATING ON CAMPAIGNING FOR MID-TERM ELECTIONS FFY 19 APPROPRIATIONS BILL FOR TRANSPORTATION AND HOUSING IS EXPECTED BEFORE DECEMBER 7 TH FIVE YEAR FAA REAUTHORIZATION BILL PASSED WORKING WITH NATIONAL ADVISORY COMMITTEE ON TOURISM AND TRAVEL INFRASTRUCTURE (NACTTI) TO IDENTIFY NEVADA PROJECTS THAT COULD SUPPORT TOURISM. (STEVE HILL FROM LVCVA IS ON THE COMMITTEE) 4

FEDERAL UPDATE NDOT HAS IDENTIFIED BRIDGES FOR FHWA COMPETITIVE HIGHWAY BRIDGE PROGRAM GRANT FOR RECONSTRUCTION AND REHABILITATION OF BRIDGES; $225M NATIONAL PROGRAM WITH A FOCUS ON RURAL STATES I-515 EASTERN & DESERT INN STRUCTURES LOCKWOOD BRIDGES OVER UPRR AND OVER THE TRUCKEE RIVER LOVELOCK BRIDGES (INCLUDES THE OLDEST BRIDGE IN THE STATE, BUILT IN 1919 ON NDOT CONTRACT NO. 0001) 5

FEDERAL UPDATE DC COURT OF APPEALS AGREED TO DELAY UNTIL FEBRUARY 16, 2019, A CONTROVERSIAL AIR QUALITY DECISION IT MADE BACK IN FEBRUARY 2018 THE DC COURT OF APPEALS REQUIRED MPOs IN 82 AFFECTED AREAS IN 24 STATES TO SHOW AIR QUALITY CONFORMITY FOR TRANSPORTATION PROJECTS TO A 1997 AIR QUALITY STANDARD THE FEBRUARY 2018 DC COURT VERDICT AFFECTED THE LAS VEGAS AREA AIR QUALITY CONFORMITY IS REQUIRED FOR NEW PROJECTS ADDED TO RTC s REGIONAL TIP, WHICH WAS DELAYING ADDING SEVERAL MAJOR FRI 2 FUNDED PROJECTS IN CLARK COUNTY 6

FEDERAL UPDATE US DOT ISSUED VERSION 3.0 OF THEIR FEDERAL GUIDANCE FOR AUTOMATED VEHICLES THE TERM DRIVER DOES NOT REFER EXCLUSIVELY TO A HUMAN OPERATOR; IT NOW CAN REFER TO AN AUTOMATED SYSTEM ANNOUNCES SEVERAL UPCOMING RULEMAKINGS BY USDOT AGENCIES AFFIRMS USDOT SUPPORT FOR PRESERVATION OF 5.9 GHz SPECTRUM 7

VISIT TO COLORADO DOT AND PANASONIC MOBILITY CENTER RTC of SOUTHERN NEVADA AND NDOT LEADERSHIP VISITED WITH COLORADO DOT DIRECTOR AND STAFF AND TOURED PANASONIC FACILITY ON OCTOBER 4 TH LEARNED MORE ABOUT COLORADO DOT s ROAD X PROGRAM DISCUSSED THE BENEFITS TO SAFETY AND MOBILITY FROM CONNECTED VEHICLES INVESTIGATING THE FEASIBILITY OF A MULTI-STATE PARTNERSHIP WITH UTAH AND COLORADO; MORE INFORMATION TO COME 8

UPDATE THE SHORT-LISTED TEAMS HAVE RECEIVED THE DRAFT RFP; THE FINAL VERSION OF THE RFP IS EXPECTED THIS WEEK DBE WORKSHOP WAS HELD RECENTLY DRAFT EIS IS OUT FOR AGENCY REVIEW RENO-TAHOE AIRPORT REQUESTED FLYOVER RAMP BE INCLUDED IN DRAFT EIS; COULD NOT INCLUDE WITHOUT DELAYING NEPA SCHEDULE WORKING TO INCLUDE SB FLYOVER RAMP IN FINAL EIS, SUBJECT TO FHWA APPROVAL 9

I-80 UNSOLICITED PROPOSAL CONTINUING FORMAL REVIEW 10

ELECTRIC HIGHWAY UPDATE DESERT ENGINEERING MOBILIZED IN SEPTEMBER FOR TONOPAH EVCS SITE 11

PROJECT NEON UPDATE CHARLESTON BOULEVARD ON RAMP TO SOUTHBOUND I-15 OPENED ON OCTOBER 3 RD US 95 CLOSURE CONDUCTED OVER THE WEEKEND MAJOR I-15 TRAFFIC SHIFT EXPECTED IN NOVEMBER; TRANSPORTATION BOARD MEETING WILL BE HELD IN LAS VEGAS ON NOVEMBER 14 TH 12

SOUTHERN NV PROJECTS FUEL REVENUE INDEXING (FRI 2) FRI 2 REVENUE MUST BE SPENT IN THE COUNTY OF ORIGIN (CLARK COUNTY) THERE IS NO DIVERSION OF FUNDING TO OTHER AREAS OF THE STATE AS A RESULT OF THE ADDITIONAL FRI 2 REVENUE IN SOUTHERN NEVADA DIRECTOR MALFABON PRESENTED CONCEPTUAL LIST TO RTC OF SOUTHERN NEVADA BOARD LAST MONTH TRANSPORTATION BOARD APPROVAL WILL BE REQUESTED AS THE PROJECTS ARE ADDED TO THE STIP (PRELIMINARY LIST AT THIS TIME; SUBJECT TO AVAILABLE FUNDS AND PROJECT SCHEDULES) 13

NDOT FRI 2 LIST PROJECT 2016 ESTIMATED FRI COST ESTIMATE (AUGUST 2018) ESTIMATED FRI (AUGUST 2018) ESTIMATED OTHER NDOT CONTRIBUTION BOULDER HWY SAFETY IMPROVEMENTS $55,000,000 UNKNOWN $40,000,000 UNKNOWN FUTURE I-11 CORRIDOR (NEPA/PE) $20,000,000 $10,000,000 $9,000,000 $1,000,000 I-515/215/I-11 OPERATIONAL IMPROVEMENTS (HENDERSON BOWL) $100,000,000 $221,000,000 $101,200,000 $119,800,000 I-15N/CC 215 N INTERCHANGE CONSTRUCTION $150,000,000 $93,000,000 $0 $93,000,000 I-15 TROPICANA INTERCHANGE RECONSTRUCTION $150,000,000 $199,000,000 $199,000,000 $0 14

PROJECT NDOT FRI 2 LIST 2016 ESTIMATED FRI COST ESTIMATE (AUGUST 2018) ESTIMATED FRI (AUGUST 2018) ESTIMATED OTHER NDOT CONTRIBUTION I-515 CAPACITY IMPROVEMENTS PACKAGE 1 (ELIMINATE SB LANE DROP AT I-15 UNDERPASS; AUX LANE FROM I-15 TO CHARLESTON) $94,200,000 $58,000,000 $0 $58,000,000 I-515 CAPACITY IMPROVEMENTS PACKAGE 2 (INTERCHANGE IMPROVEMENTS AT LV BLVD., CASINO CENTER AND EASTERN) $27,700,000 $100,000,000 $39,400,000 $60,600,000 I-515 CAPACITY IMPROVEMENTS PACKAGE 3 (NB RAMP BRAIDING FOR I-15 AND LV BLVD./CASINO CENTER RAMPS) $61,700,000 $100,000,000 $54,400,000 $45,600,000 I-515 CAPACITY IMPROVEMENTS PACKAGE 4 (NEW INTERCHANGES AND CITY PARKWAY AND PECOS/STEWART) $70,100,000 UNKNOWN NA $20,000,000 I-515 CAPACITY IMPROVEMENTS PACKAGE 5 (INTERCHANGE IMPROVEMENTS AT BOULDER HIGHWAY, FLAMINGO, TROPICANA, RUSSELL) $25,500,000 UNKNOWN NA UNKNOWN I-515 CAPACITY IMPROVEMENTS PHASE 6 (SEISMIC RETROFIT AND DECK REHAB) $146,300,000 $27,000,000 $0 $27,000,000 15

NDOT FRI 2 LIST PROJECT 2016 ESTIMATED FRI COST ESTIMATE (AUGUST 2018) ESTIMATED FRI (AUGUST 2018) ESTIMATED OTHER NDOT CONTRIBUTION I-15 INTERCHANGE IMROVEMENT AT SLOAN $50,000,000 $95,000,000 $54,400,000 $40,600,000 I-215 WIDENING $20,000,000 UNKNOWN NA UNKNOWN I-215 INTERCHANGE IMPROVEMENT AT EASTERN $17,500,000 UNKNOWN NA UNKNOWN US 95/CC 215 N SYSTEM INTERCHANGE (INCLUDING LOCAL ACCESS ROADWAYS) $155,000,000 $142,000,000 $42,000,000 $100,000,000 16

NDOT FRI 2 LIST PROJECT 2016 ESTIMATED FRI COST ESTIMATE (AUGUST 2018) ESTIMATED FRI (AUGUST 2018) ESTIMATED OTHER NDOT CONTRIBUTION I-15 FRONTAGE ROAD, WASHINGTON AVE. TO LAKE MEAD BLVD AND OWENS AVE. $14,500,000 UNKNOWN NA UNKNOWN I-15/MEADE AVE. HOV DIRECT CONNECT $20,000,000 UNKNOWN NA UNKNOWN US 95/SMOKE RANCH RD. HOV DIRECT CONNECT $20,000,000 UNKNOWN NA UNKNOWN US 93 COMPLETE STREETS (BOULDER CITY PARKWAY) $2,500,000 NA NA NA I-15 NORTH PACKAGE 3 NA $82,100,000 $32,300,000 $49,800,000 17

CLARK COUNTY 215 BELTWAY ROAD TRANSFER STATUS CLARK COUNTY BOARD OF COMMISSIONERS APPROVED ON OCTOBER 2 ND TRANSFERS MAINTENANCE RESPONSIBILITY FOR PORTIONS OF THE FOLLOWING NDOT ROADS CHARLESTON BOULEVARD; CC215 BELTWAY TO HUALAPAI, SOUTH HALF (NORTH HALF IS CITY OF LAS VEGAS AND WILL BE TRANSFERRED TO CITY SEPARATELY) SAHARA AVENUE; RAINBOW TO TAM; SOUTH HALF (NORTH HALF IS IN CITY OF LAS VEGAS AND WILL BE TRANSFERRED TO THE CITY SEPARATELY) RUSSELL ROAD; POLARIS TO LV BLVD. TROPICANA AVENUE; LV BLVD. TO MARYLAND PKWY. NDOT TAKES ON MAINTENANCE RESPONSIBILITY FOR THE 215 BELTWAY FROM STEPHANIE AVENUE TO WARM SPRINGS (PECOS TO WARM SPRINGS WIDENING WILL BE PERFORMED BY CLARK COUNTY, THEN TRANSFER TO NDOT) APPROXIMATELY 18 MONTHS TO TRANSFER OWNERSHIP (AFTER NDOT RIGHT- OF-WAY ESTABLISHES LEGAL DESCRIPTIONS FOR HIGHWAYS BEING TRANSFERRED) REQUEST TRANSPORTATION BOARD CONSENT IN NOVEMBER; MAINTENANCE RESPONSIBILITY STARTS 30 DAYS AFTER THE TRANSFER AGREEMENT IS EXECUTED. 18

WALK TO SCHOOL DAY OCTOBER 10 TH EVENTS PLANNED IN WASHOE, CARSON CITY, CLARK, DOUGLAS, LYON AND OTHER COUNTIES NDOT ISSUED A PRESS RELEASE PROVIDING TIPS FOR WALKING SAFELY TO SCHOOL 19

TRAFFIC SAFETY SUMMIT 20

MOVE OVER LAW NHP ENFORCEMENT VIDEO NDOT THANKS NHP FOR ENFORCEMENT AND EDUCATION ON THE MOVE OVER LAW, WHICH IMPROVES THE SAFETY OF OUR ROADSIDE WORKERS 21

UPCOMING PUBLIC MEETINGS RESCHEDULING PUBLIC MEETING FOR PROPOSED CHANGES TO NEVADA ADMINISTRATIVE CODE, 484D; COMMERCIAL VEHICLE OVERSIZE LOAD PERMITS; BRING TO TRANSPORTATION BOARD FOR ADOPTION BEFORE THE END OF THE YEAR OCTOBER 11 TH PUBLIC INFORMATION MEETING ON NDOT DISPARITY STUDY OCTOBER 25 TH PUBLIC WORKSHOP ON NRS 408 REGULATIONS RELATED TO PARTNERING WITH TELECOMMUNICATION COMPANIES FOR USE OF NDOT ROW AND INFRASTRUCTURE TO EXPAND FIBER INSTALLATION THROUGHOUT THE STATE 22

RECENT SETTLEMENTS & VERDICTS $75,000 SETTLEMENT WITH FLP HOLDINGS, LLC, AT OCTOBER 2018 BOE; ASSOCIATED WITH A BILLBOARD AT THE CACTUS I-15 INTERCHANGE PROJECT SETTLEMENT WITH JACKSON LLC EXPECTED AT NOVEMBER BOE MEETING (PROJECT NEON) 23

QUESTIONS? 24