LYNNWOOD LINK EXTENSION FI NAL ENV I RO NM ENTA L IM PA C T S TATE M E N T

Similar documents
STRATHCONA COUNTY YELLOWHEAD NORTH ARTERIAL ROAD FUNCTIONAL DESIGN STUDY

Riverbend on the St. Johns River DeBa ry, Fl o r i d a March 03,

10 Free Airport Flyer: Santa Clara Transit Center to Metro Airport LRT Station via San Jose International Airport Effective Date 10/9/2017 Route Map

SOUTH BELLEVUE PARK AND RIDE

KENT/JAMES ST. PARK AND RIDE

Bonita to Bridgeport January 24, 2019


SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

4. Safety Concerns Potential Short and Medium-Term Improvements

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

BENEFITS OF YOUR FUTURE RIDE

Major Projects Overview

Public Information Center August 12, 2010

precincts legend legend Precinct E precincts Figure 1.0: Precinct E in Complete Communities E S M K Kilometers

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

Restoration of Historic Streetcar Services in Downtown Los Angeles

Metrolink Service Expansion Program

Travel Time Estimates

SAN RAFAEL City Council January 20, 2015

November 21, 2012 Barbara Kelleher, (954)

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Airports of the Future Taking the Terminal to the Traveler

East Link Extension. Redmond stations Open House November 17, 2016

Airport Obstruction Standards

Welcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements

PRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

Transportation TRANSPORTATION PROJECTS

PFC Quarterly Status Report September 30, 2016

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

Specification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE

25 th Avenue Grade Separation. September 13, 2017

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

TORONTO TRANSIT COMMISSION REPORT NO.

Hospital Link Project Project Update Winter 2018

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

Quiet Zone along FEC Corridor. Paul Calvaresi Regional Transportation Planner

25 th Avenue Grade Separation. December 13, 2017

Maryland Transit Administration. Master Plan Alignment Trail

Snohomish County Planning and Development Services Run Date: 03/06/2006

October 31, 2014 Chuck McGinness, (954)

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

2009 Regional Solicitation Selected Projects*

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Electric System Serving Pierce County Current system and future investments

Claremont Project Background and Update Community Meeting September 11, 2017

Technical Advisory Committee. May 14, 2013

MEMORANDUM. ~Department. TO: District Engineers DATE: February 3,2012. Texas. Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C /"

Florida East Coast Industries has deep roots in rail transportation dating back to the late 1800 s with American pioneer, Henry Flagler.

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Grove Field Airport Environmental Assessment

Palm Beach County Traffic Report July 13 through July 20, 2012

Grade Crossings in High Speed Rail Corridors

Additional Economic Development Strategy submissions- Klickitat County

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

CONTACT: Michelle T. Holland

DRAFT MASTER PLAN UPDATE

Maidenhead Bridge. Proposed Work

CONFIRMED BENCHMARKS UPDATED JUNE 26, 1991

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION

List of Our Ongoing Noise and Vibration Monitoring Projects

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

From personal to mass transit

Project Advisory Group. May 23, 2013

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

Title VI Analysis for Route Based Fares

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

North Beach Redevelopment Initiative Alternative 1 Corpus Christi, Texas

Approval of August 2019 Service Changes

PRIORITIES COMMITTEE MEETING

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

PACIFIC FISHERY MANAGEMENT COUNCIL CHAIR S RECEPTION. Saturday, March 5, :00 p.m. Second Floor Foyer Hilton Hotel Vancouver, Washington

ORDINANCE NO WHEREAS, Marina District Development, LLC is the fee simple owner of the following described real estate, to wit:

Historic Resources. of Sullivan s Island, South Carolina. Survey Supplement #2. Altered Historic Resources Evaluation September 2007 SCHNEIDER

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

Main Line System Recommendations

Quiet Zone Evaluation for Huron, Ohio

I-66 Inside the Beltway Feasibility Study

Town of Danvers Planning Board

Mid Region Metropolitan Planning Organization List Date: July 12, Cross Refrence List of TIP Projects by Project Title 1 of 15

Start Time:3:40 pm End Time:4:00 pm Distance:6.57 mi. Driver Sign-Off Time:04:05 pm

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

A. CONCLUSIONS OF THE FGEIS

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Fairfax County Parkway Widening Fairfax County

C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County


I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

Transcription:

LYNNWOOD LINK EXTENION FI NAL ENV I RO NM ENTA L IM PA C T TATE M E N T Conceptual Plans U..Department of Transportation Federal Transit Administration AP R IL 2015

OUND TRANIT LYNNWOOD LINK EXTENION PART 1 CONCEPTUAL PLAN FOR THE PREFERRED ALTERNATIVE APRIL 2015 paula ITO CADD services, llc

OUND TRANIT LYNNWOOD LINK EXTENION TITLE PAGE HEET INDEX HEET LAYOUT PREFERRED ALTERNATIVE - EGMENT A - TRACK PLAN & PRILE PREFERRED ALTERNATIVE - EGMENT B2 (MODIFIED) TRACK PLAN & PRILE PREFERRED ALTERNATIVE - EGMENT C3 (MODIFIED) - TRACK PLAN & PRILE PREFERRED ALTERNATIVE OPTION EGMENT A - NE 130TH TREET TATION - TRACK PLAN & PRILE PREFERRED ALTERNATIVE OPTION EGMENT A - NE 130TH TREET FUTURE TATION - TRACK PLAN & PRILE PREFERRED ALTERNATIVE OPTION EGMENT B (MODIFIED) - 220TH TREET W TATION - OPTION - TRACK PLAN & PRILE PREFERRED ALTERNATIVE TYPICAL ECTION PREFERRED ALTERNATIVE - NE 130TH TREET TATION OPTION ITE PLAN ECTION PREFERRED ALTERNATIVE - NE 145TH TREET TATION ITE PLAN ECTION PREFERRED ALTERNATIVE - NE 185TH TREET TATION ITE PLAN ECTION PREFERRED ALTERNATIVE - NE 185TH TREET TATION - HORELINE TADIUM GARAGE OPTION 1 ITE PLAN ECTION 1 2 3-11 12-17 18-20 21 22 23-24 25-29 30 31 32 33 34 35 36 37 PREFERRED ALTERNATIVE - MOUNTLAKE TERRACE TRANIT CENTER TATION ITE PLAN 38 ECTION 39 PREFERRED ALTERNATIVE - 220TH TREET W TATION OPTION ITE PLAN 40 ECTION 41 PREFERRED ALTERATIVE - LYNNWOOD TRANIT CENTER TATION ITE PLAN 42 ECTION 43 PREFERRED ALTERATIVE - LYNNWOOD TRANIT CENTER TATION OPTION ITE PLAN ECTION 44 45 PREFERRED ALTERNATIVE TRUCTURE OVER LRT AT NE 130TH T F-RAMP 46 WDOT BRIDGE REPLACEMENT AT NE 130TH T - NO TATION 47 PREFERRED ALTERNATIVE OPTION EGMENT A WDOT BRIDGE REPLACEMENT AT NE 130TH T - WITH TATION 48 PREFERRED ALTERNATIVE WDOT BRIDGE WIDENING AT NE 185TH T WDOT BRIDGE IDEWALK MODIFICATION AT NE 185TH T NEW WDOT PEDETRIAN BRIDGE AT NE 185TH T TRUCTURE OVER LRT AT NE 185TH T WDOT PEDETRIAN BRIDGE REPLACEMENT AT NE 195TH T GUIDEWAY TRUCTURE OVER 1T AVE NE AT NE 107TH T GUIDEWAY TRUCTURE OVER I-5 NEAR 236TH T W GUIDEWAY - TYPICAL ECTION RETAINING WALL - ECTION AND DETAIL HEET 1 RETAINING WALL - ECTION AND DETAIL HEET 2 RETAINING WALL UNDERCROING AT 228TH T W 49 50 51 52 53 54 55 56 57 58 HEET INDEX HEET

OUND TRANIT LYNNWOOD LINK EXTENION EGMENT A P PP04 PP 08 PP09 PP 10 PP11 PP12 PP13 PP1 4 15 PP 236TH T W PP07 EGMENT C 220TH T W PP03 PP06 NE 185TH T 2 P05 NE 145TH T PP0 NE 130TH T NE NORTHGATE WAY PP01 EGMENT B 52ND AVE W PP 16 18 PP 17 PP 44TH AVE W PLAN & PRILE HEET INCLUDED IN DRAWING ET: PREFERRED ALTERNATIVE : PR-PP01 - PR-PP18 (HEET 3-20) PREFERRED ALTERNATIVE OPTION EGMENT A : MD2-PP03 (HEET 21) MD3-PP03 (HEET 22) PREFERRED ALTERNATIVE OPTION EGMENT B (MODIFIED) : MD10-PP13 (HEET 23) MD10-PP14 (HEET 24) HEET LAYOUT HEET 2

OUND TRANIT LYNNWOOD LINK EXTENION EXTENION EXTENION 2000 2500 R=1950' RETAINING WALL 0 END NORTHGATE LINK 1500 BEGIN LYNNWOOD LINK 1000 1500 B TRACK CENTERLINE TRUCTURE 1T/107TH CROING EE HEET 54 T = 1733.75 GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW C = 1903.75 TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL DETENTION POND C = 3043.03 T = 3213.03 REALIGN ROAD RECONTRUCT TRAIL T = 3537.63 3500 C = 3707.63 MATCHLINE 3700.00 C = 3832.45 LVC 250.00' END NORTHGATE LINK EXTENION. BEGIN LYNNWOOD EXTENION LINK PVI 1000.00 EL 312.85 225.00' 2.00% PVC 1225.00 EL 317.348 PVI 1350.00 EL 319.85 1T AVE NE PVT 1475.00 EL 321.13 NE NORTHGATE WAY TOP RAIL AT NB TRACK NB I-5 RAMP 1T AVE NE 2975.00' 1.03% 115TH TRAIL 280 280 260 260 240 240 1000 1500 2000 2500 0 3500 3700 PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET

OUND TRANIT LYNNWOOD LINK EXTENION C = 3707.63 MATCHLINE 3700.00 C = 3832.45 R=2000' T = 4002.45 4000 T = 4163.24 RECONTRUCT ROAD C = 4333.24 C = 4420.16 R=2000' REBUILD DRIVEWAY ACCE 4500 5000 T = 40.16 T = 4787.75 C = 4917.75 R=2600' 5500 DETENTION POND WATER QUALITY FACILITY RAIE POWER LINE RECONTRUCT RAMP 6000 C = 93.76 T = 6123.76 RECONTRUCT ROAD (GRADE EPARATED) MATCHLINE 6400.00 T = 6330.40 C = 6450.40 6500 C = 6551.80 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC 815.00' PVC 4450.00 EL 351.641 LVC 450.00' PVI 4675.00 EL 353.95 PVT 4900.00 EL 361.20 187.50' 3.22% PVC 5087.50 EL 367.251 PVI 5495.00 EL.39 PVT 02.50 EL 376.98 655.00' -0.84% 2977.50 1.03% TOP RAIL AT NB TRACK 3700 4000 4500 5000 5500 6000 6400 PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET

242-43AC-127,129 PACIFIC NW BELL D.B. CABLE D.B. CABLE 242-43AC-127,129 PACIFIC NW BELL OUND TRANIT LYNNWOOD LINK EXTENION DETENTION POND BIORETENTION POND T = 6330.40 MATCHLINE 6400.00 1500 C = 6450.40 6500 C = 6551.80 RECONTRUCT RAMP R=3' B TRACK CENTERLINE TRUCTURE T = 6671.80 CONTRUCT TRUCTURE OVER LRT AT F-RAMP. EE HEET 46 RECONTRUCT ROAD(GRADE EPARATED) T = 6979.65 7000 C = 7069.65 R=5000' C = 7241.13 GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW T = 7331.13 RECONTRUCT BRIDGE - EE HEET 47 EE NOTE * HIGH RAIL VEHICLE ACCE 7500 8000 8500 9000 TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL NOTE: 1. FOR OPTION EGMENT A, NE 130TH TREET TATION, EE HEET 21. 2. FOR OPTION EGMENT A, NE 130TH TREET FUTURE TATION, EE HEET 22. IGNAL/COMM BUNGALOW INFILTRATION FACILITY MATCHLINE 9100.00 LVC 355.00' LVC 750.00' 655.37-0.84% PVC 6557.50 EL 371.494 NEW I-5 F RAMP PVI 6735.00 EL 370.01 PVT 6912.50 EL 371.34 NB I-5 F RAMP 497.50' 0.75% PVC 7410.00 EL 375.070 NEW NE 130TH T BRIDGE PVI 7785.00 EL 377.88 PVT 8160.00 EL 367.22 TOP RAIL AT NB TRACK HIGH RAIL VEHICLE ACCE 1107.50' -2.84% 6400 6500 7000 7500 8000 8500 9000 9100 PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET

OUND TRANIT LYNNWOOD LINK EXTENION MATCHLINE 9100.00 9000 9500 10000 10500 11000 DETENTION VAULT CLOE EXITING TRANIT RAMP 11500 R=1000' V=40 MPH MATCHLINE 11800.00 T = 11750.90 12000 GUIDEWAY DIPERION T = 11022.49 DETENTION FACILITY C = 11522.49 C = 11620.90 RECONTRUCT ROAD 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC 895.00' 1114.64-2.84% PVC 9267.50 EL 335.716 LVC 1235.00' PVI 9885.00 EL 318.15 TOP RAIL AT NB TRACK PVT 10502.50 EL 338.08.00' 3.23% PVC 10862.50 EL 349.699 NB I-5 F RAMP PVI 11310.00 EL 364.14 NE 145TH T PVT 11757.50 EL 358.55 1574.46-1.25% 280 280 9100 9500 10000 10500 11000 11500 11800 PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET

C = 12391.34 OUND TRANIT LYNNWOOD LINK EXTENION NE 145TH TREET TATION EE HEET 32 & 33 PC = 461.09 T = 11750.90 MATCHLINE 11800.00 PT = 571.87 EP = 663.76 CLOE EXITING TRANIT RAMP 12000 T = 12271.34 R=3100' R=3100' TP C = 12431. 12500 T = 12551. T = 12725.29 C = 12845.29 C = 12885.54 NO. 10 DOUBLE CROOVER 10 13500 14000 14500 T = 15.54 IGNAL/COMM. BUNGALOW RECONTRUCT 30" EWER RAIE POWER LINE T = 14481.67 MATCHLINE 14500.00 C = 14671.67 WATER QUALITY & DETENTION FACILITY DETENTION POND RECONTRUCT ROAD 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC 375.00' NE 145TH TREET TATION NEW I-5 ON RAMP 1572.50' -1.25% NO. 10 DOUBLE CROOVER PVC 13330.00 EL 338.891 TOP RAIL AT NB TRACK LVC 750.00' PVI 13705.00 EL 334.20 PVT 14080.00 EL 346.03 172.50' 3.15% PVC 14252.50 EL 351.464 NE 155TH T PVI 14440.00 EL 357.37 280 280 11800 12000 12500 10 13500 14000 14500 PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET

OUND TRANIT LYNNWOOD LINK EXTENION MATCHLINE 14500.00 14500 T = 14481.67 C = 14671.67 15000 INFILTRATION FACILITY R=2000' RECONTRUCT ROAD 15500 C = 15736.61 T = 126.61 RECONTRUCT ROAD WATER QUALITY & INFILTRATION FACILITY 16000 16500 RIDGECRET PARK T = 16380.15 C = 16520.15 RECONTRUCT WALL 17000 RAIE POWER LINE R=2500' MATCHLINE 17200.00 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC 200.00' LVC 375.00' PVT 14627.50 EL 3.79 1397.50' 1.29% TOP RAIL AT NB TRACK PVC 16025.00 EL 377.755 PVI 16125.00 EL 379.04 PVT 16225.00 EL 379.77 3812.00' 0.73% 14500 15000 15500 16000 16500 17000 17200 PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET

OUND TRANIT LYNNWOOD LINK EXTENION R=2' 17000 MATCHLINE 17200.00 1500 R=2500' 17500 RAIE POWER LINE B TRACK CENTERLINE TRUCTURE 18000 C = 17618.52 T = 17758.52 GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW T = 18091.43 C = 18231.43 IGNAL/COMM BUNGALOW TRADDLE BENT 18500 REVIED OR NEW TRAFFIC IGNAL RAIE POWER LINE 19000 RECONTRUCT ROAD WATER QUALITY & INFILTRATION FACILITY 19500 C = 192.30 EX. WDOT BEAUTIFICATION AREA T = 19732.30 T = 19896.37 C = 20036.37 20000 MATCHLINE 19900.00 TOP RAIL AT NB TRACK 1T AVE NE 3812.00' 0.73% 17200 17500 18000 18500 19000 19500 19900 PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET

T = 19732.30 T = 19896.37 C = 20036.37 C = 20401.42 T = 20541.42 T = 22218.66 C = 22338.66 MATCHLINE 19900.00 20500 21000 21500 22000 20000 R=2700' EX. WDOT BEAUTIFICATION AREA EX. WDOT BEAUTIFICATION AREA RAIE POWER LINE R=1500' V=45 MPH RECONTRUCT ROAD 480 480 NE 175TH T 19900 20000 20500 21000 21500 22000 22500 22700-1.05% 2193.00' PVC 22580.00 EL 384.053 PVI 22680.00 EL 383.00 LVC 350.00' LVC 200.00' 0.73% 3813.64' PVC 20037.00 EL 407.717 PVI 20212.00 EL 409.00 PVT 20387.00 EL 407.16 TOP RAIL AT NB TRACK MATCHLI 2600.00 OUND TRANIT LYNNWOOD LINK EXTENION 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET

C = 24801.65 OUND TRANIT LYNNWOOD LINK EXTENION HORELINE TADIUM GARAGE OPTION EE HEET 36 & 37 CONTRUCT 185TH TREET TATION PARKING GARAGE EE HEET 34 & 35 RECONTRUCT ROAD TA 24500.00 END EGMENT A BEGIN EGMENT B MATCHLI 2600.00 WATER QUALITY & INFILTRATION FACILITY INFILTRATION POND R=1500' V=45 MPH C = 22807.94 T = 22927.94 WIDEN BRIDGE FOR PEDETRIAN ACCE EE HEET 49 FOR OTHER OPTION EE HEET 50 & 51 CONTRUCT TRUCTURE OVER LRT EE HEET 52 NE 185TH TREET TATION CENTER PLATFORM INFILTRATION POND HIGH RAIL VEHICLE ACCE IGNAL/COMM BUNGALOW TP INFILTRATION TRENCHE 24000 24500 RAIE POWER LINE INFILTRATION POND T = 24671.65 25000 R=0' EX WDOT BEAUTIFICATION AREA MATCHLINE 25.00 RECONTRUCT ROAD 1500 B TRACK CENTERLINE TRUCTURE GRADING LIMIT RELOCATED HIGHWAY NOIE WALL WDOT/T COMPATIBILITY LIMIT WDOT ROW TRADDLE BENT REVIED OR NEW TRAFFIC IGNAL LVC 200.00' PVI 22680.00 EL 383.00 PVT 22780.00 EL 383.50 NE 185TH T NE 185TH TREET TATION HIGH RAIL VEHICLE ACCE 1570.00' 0.50% 22600 20 23500 24000 24500 25000 25 PVC 24350.00 EL 391.350 LVC.00' PVI 24500.00 EL 392.10 TA 24500.00 END EGMENT A BEGIN EGMENT B PVT 24650.00 EL 390.70 TOP RAIL AT NB TRACK 2600.00' -0.93% PREFERRED ALTERNATIVE - EGMENT A TRACK PLAN & PRILE HEET