OFFSHORE WIND FARM.

Similar documents
WEST Of DUDDON SaNDS. OffshOre Wind farm.

West of Duddon Sands Offshore Wind Farm

Photo Mike Page. Sheringham Shoal Wind Farm.

DDC. DUTCH DRILLING CONSULTANTS Reference List

Invest in North East Lincolnshire Grimsby Cleethorpes Immingham

Activities in the Regional Offshore Wind Sector

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014

Community newsletter. Construction progress for Galloper Offshore Wind Farm. Community drop-in sessions. Issue 5 Construction newsletter March 2017

Islay Offshore Wind Farm

Where the coast meets the countryside

SESSION 1: Q&A summary of session with Will Apps (Head of Energy Development) and Helen Elphick (Senior Development Manager)

INVESTMENT CITY CENTRE INVESTMENT GROUND FLOOR AND BASEMENT WESTLEGATE, NORWICH NR1 3LR LET TO EVANS CYCLES

For Sale. gva.co.uk/7247. Little Haven Holiday Park. Landseer Avenue Chapel St Leonards Lincolnshire PE24 5QZ. Guide Price 900,000

Further Scottish Leasing Round (Saltire Prize Projects) Discussion Paper on Proposed Geographic Areas March 2010

RETAIL/LEISURE TO LET

Real Estate. We provide a full real estate service to the firm s clients. Our practice includes:

LITTLE HAVEN HOLIDAY PARK, CHAPEL ST LEONARDS, PE24 5QZ FOR SALE NEW PRICE

WÄRTSILÄ CORPORATION HALF YEAR FINANCIAL REPORT JANUARY-JUNE July 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

The area involved 19th annual report

The area involved 20th annual report

The area involved 17th annual report

Greater Gabbard Wind Farm. Image courtesy of:

Cormorant and Guillemot WEST PENTIRE CRANTOCK CORNWALL

OFFSHORE WIND ENERGY. Dr. Rajesh Katyal Director General Additional Charge Group Head Wind Resource Assessment & Offshore

Nimbus Park. Units from 80,000 to 230,000 sq.ft. on 16 acres Leasehold or Freehold Build to Suit Opportunity M18 DHL BMW. North P227.

WÄRTSILÄ CORPORATION RESULT PRESENTATION JANUARY Björn Rosengren, President & CEO. Wärtsilä

FREEHOLD / LEASEHOLD OPPORTUNITY STRATEGIC QUAY SIDE LOCATION MALTHOUSE LANE, GORLESTON, GREAT YARMOUTH NR31 0GY CONTACT US. Site area - 4.

HULL. Enterprise Zone incentives. BUILD TO SUIT OPPORTUNITIES 183 hectares (453 acres) Road/rail/sea connectivity. Manufacturing/ distribution use

Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions

WÄRTSILÄ CORPORATION

LMI News. Representing one of the largest investments in Hull's history, manufacturing giant opened its wind turbine plant last month.

WELL LET DEPARTMENT STORE INVESTMENT HOUSE OF FRASER FRESHNEY PLACE SHOPPING CENTRE 19/21 VICTORIA STREET, GRIMSBY DN31 1DW

Advantage One. Modern Freehold Industrial Warehouse Investment Opportunity ENTER. Third Avenue, Bletchley Milton Keynes, MK1 1DR

RETAIL OPPORTUNITY. A new retail destination. Riverside Building Riverside Way, Nottingham NG2 1DP

Exercise Grey Seal Initial Lessons

North York Moors National Park Authority. Director of Planning s Recommendation

SITE VISITS REPORT ISLE OF WIGHT 13 TH & 15 TH May 2014

WÄRTSILÄ CORPORATION

Policy PL Date Issued February 10, 2014

DRIVING PROFITABLE GROWTH. BJÖRN ROSENGREN President & CEO

The UK s leading ports operator

2012 RESULT PRESENTATION

Business Development Prospectus.

to responsible management

Europarc Grimsby DN37 9TS

SWIBER AND RAWABI LAUNCHES 500MT DERRICK PIPE-LAY BARGE AZIZ

WHAT MAKES A SUCCESSFUL BUSINESS COMMUNITY?

WÄRTSILÄ CORPORATION

SLATEFORD HOUSE Lanark Road, Edinburgh, EH14 1TL. Development Opportunity with Residential / Commercial / Leisure Potential

WÄRTSILÄ CORPORATIONO O

WÄRTSILÄ CORPORATION

Executive Summary. Ideally suited for a company requiring an impressive corporate headquarters

INTERIM REPORT JANUARY-JUNE 2012 BJÖRN ROSENGREN, PRESIDENT & CEO 18 JULY 2012

Policy Research Corporation

Development Site Opportunity. East Street Shopping Centre, Southampton, SO14 3HX. For Sale (Long Leasehold) gva.co.uk/8771

DELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014

References. water.eu

THORP ARCH TRADING ESTATE WETHERBY LS23 7FW

Handelsbanken Nordic Large Cap Seminar

WELCOME SE16 PRINT WORKS MEET THE TEAM AND SITE TOUR

1 Wärtsilä 17 June 2007 WÄRTSILÄ CORPORATION THIS IS WÄRTSILÄ

CITY CENTRE OFFICES FRIAR HOUSE

Coomb House, 7 St. John s Road, Isleworth, London, TW7 6NH

TRITON KNOLL OFFSHORE WIND FARM

INTERIM REPORT JANUARY-JUNE 2013

ADVANCED MANUFACTURING

INVESTMENT SUMMARY. Freehold property situated on an island site within Bishop s Stortford s prime retailing pitch.

TOTAL COST OF OWNERSHIP OF MARINE PROPULSION ENGINES

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. Spring 2016

WÄRTSILÄ CORPORATION

WÄRTSILÄ CORPORATION RESULT PRESENTATION January 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

For Sale Retail Investment Portfolio. Aberdeen, Galashiels & Hawick

Economic Impact of Tourism. Norfolk

Cooper Jack Marina TURKS & CAICOS ISLANDS PREMIERE AUCTION MAY 21 AT 5PM ET ULTRA LUXURY THE CARIBBEAN BASIN MULTI-COUNTRY/MULTI-PROPERTY AUCTION

The Economic Impact of BT Group plc in the UK

SHEFFIELD 11/15 FARGATE & 18/36 CHAPEL WALK PRIME RETAIL PARADE WITH ASSET MANAGEMENT OPPORTUNITIES. Sat Nav Ref: S1 2HD

GLASINFRYN FARM Bangor, Gwynedd

For Sale or To Let. 3 separate sites located within close proximity in East Cowes on the Isle of Wight.

an attractive traditional seaside hotel overlooking Morecambe Bay towards the peaks of the Lake District National Park

Perspectives on Partnerships and Opportunities in the North

TO LET MODERN WAREHOUSE UNITS WITH OFFICES & CAR PARKING IN ALTENS INDUSTRIAL ESTATE

ENERGY CENTRE, SKYPARK, EXETER, DEVON E.ON UK PLC

Prime Well Let Retail Parade. Inverness 41/47 High Street

Creating a High Quality Business District

- 0.4 ACRE DEVELOPMENT OPPORTUNITY NORTHGATE LOCKS, CANAL STREET, CHESTER, CH1 4EJ

FOR SALE 3-15 ROSE STREET STRATEGIC SERVICING/ LOADING BAY INVESTMENT EDINBURGH, EH2 2PR

Statement of Community Consultation

MLS # $202, Acres residential development site in Bay County, Florida

317a & 400 Hoe Street, Walthamstow, E17 9AA

Harbor Holdings - Seward

BLACKPOOL AIRPORT ENTERPRISE ZONE

WÄRTSILÄ CORPORATION RESULT PRESENTATION January 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

Tourism 201 CHAPTER 10

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Characterful period home with 3 acres and fine views. station house buchlyvie, stirling, fk8 3pd

Gain-Scheduled Control of Blade Loads in a Wind Turbine-Generator System by Individual Blade Pitch Manipulation

presented by DENISE ARANA General Manager, Direct Client Relationships Unit Facilitating Economic Growth and Development

MULTI-LET INDUSTRIAL INVESTMENT UNITS 55-65, NORWICH LIVESTOCK & COMMERCIAL CENTRE, HALL ROAD, NORWICH NR4 6EQ

Welcome to the Winners Zone!

Produced by: Destination Research Sergi Jarques, Director

Transcription:

L IN C S OFFSHORE WIND FARM www.dongenergy.co.uk

Welcome to Lincs Lincs Offshore Wind Farm has been fully operational since 2013. Situated off the east coast of England, the Project comprises 75 turbines with a combined total capacity of 270MW. DONG Energy UK is focused on offshore wind power, oil and gas exploration and commercial energy sales. We have invested over 5bn in the UK since 2004 and are the world leader in developing and building offshore wind. West of Duddon Sands Walney 1+2 Barrow Blackpool Burbo Bank Burbo Bank Extension Lincs Westermost Rough Race Bank Gun eet Sands 1+2 Gun eet Sands Demo London Array 1 Wind power in operation Wind project under construction Project Timeline 2004 Centrica Energy acquired the Crown Estate lease to develop an offshore wind farm at Lincs under Round 2 from RES January 2007 An application for consent was submitted to Government October 2008 Approval for consent was granted

Where is Lincs? Lincs Offshore Wind Farm is situated 8km off the east coast of the UK, near Skegness in Lincolnshire. It sits to the east side of the Round 1 Lynn and Inner Dowsing offshore wind farms. GRIMSBY N W E S Inner Dowsing Centrica Racebank DONG Energy Chapel St Leonards Skegness Lincs Centrica, DONG Energy and Siemens Lynn Centrica Boston BLAKENEY POINT October 2009 Final investment decision was made December 2009 DONG Energy and Siemens Project Ventures each acquired a 25% stake 2010 Onshore construction began 2011 Offshore construction began

Ownership The Project is owned 25% by DONG Energy, 25% by Siemens Project Ventures and 50% by Centrica. How big is it? The area covered is 35 km 2 This is equal to 5,000 Burgh Road Stadium pitches, home of Skegness A.F.C. 150m 3.6MW wind turbine 94m Grimsby Dock Tower 155m Humber Bridge concrete towers April 2012 Established connection to the grid August 2012 First power 2013 Inauguration

How much electricity does it produce? The Project has a capacity of This means that each year it provides enough power for over 270MW 190,000 homes. 1 What has been the impact on the local economy? During construction Lincs provided work for up to working onshore and offshore. 250 people 100 jobs Approximately have been created to maintain the Lincs Offshore Wind Farm, largely from the local area, and more staff are employed during the peak summer periods when wind conditions are low and optimal for maintenance works. 35 full time 69 The base is home to Centrica staff and Siemens service staff: the majority of whom are from the local area and trained locally. 19 apprentices who are based at the Grimsby In addition Siemens have operations base and serve the Lincs and the Lynn and Inner Dowsing offshore wind farms. How do we maintain the turbines? The Lincs Offshore Wind Farm is adjacent to Centrica s Lynn and Inner Dowsing offshore wind farms, and operations for the two farms are based out of the Grimsby operations base. Centrica operates the wind farm in partnership with Siemens Wind Power. Innovation what makes this Project special? The Project was one of the first wind farms in the UK to use the larger diameter rotor (120m) version of the Siemens 3.6MW turbine. Lincs Offshore Wind Farm was also the first wind farm to utilise a conical foundation and monopile connection to improve stability across the life of the Project. 1 We base this on a conservative assumed load factor of 34% (which is lower than our average for 2014) and a household consumption of 4MWh per year. Source: DECC, 2014, Energy consumption in the UK, Average electricity consumption per house in 2013 was 4192kWh. https://www.gov.uk/government/statistics/energy-consumption-in-the-uk

Mark West, Wind Turbine Installation Manager Working on such a large scale construction project brings its challenges, and we had to overcome both technical and commercial problems. For example, we had to deal with challenging sea bed conditions and bring in a second turbine installation vessel to keep the Project on track. However, it also brings a large amount of satisfaction. When the Project was finished, it was very satisfying to look out at Lincs Offshore Wind Farm from a crew transfer vessel or the beach, knowing that you played a significant role in providing new, clean energy for the UK. DONG Energy Power (UK) Ltd. 33 Grosvenor Place, London SW1X 7HY Tel: +44 (0) 207 811 5200 DONG Energy Power (UK) Ltd. 2015. All rights reserved. No parts of this publication may be reproduced by any means without prior written permission from DONG Energy Power (UK) Ltd. All graphics in this document are for illustrative purposes. Dates are based on available information and are subject to change. Cover image: Hunstanton Cliffs and seashore at sunset in Norfolk.