Anglia Winter Key Route Strategy (KRS) 2017/18

Similar documents
LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

Penalty Fares Scheme. Comments by Transport Focus. Abellio East Anglia Ltd. 16 October Abellio East Anglia Operating Route October 2016

c2c s timetable consultation Passenger Focus report

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

GTR 2018 timetable proposals

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

Pritlewell Station - Mobile Catering Opportunity

Connecting local communities

National Rail Passenger Survey: User Guidance Report

HS11/HS12 Mk2 Route Loadings

Michèle Dix Managing Director 17 January 2018

Making rail accessible: helping older and disabled customers

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Elizabeth line Services

Making rail accessible: Helping older and disabled customers. October 2018

NETWORK RAIL Anglia Route AR 9

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

ASLEF s Response to the East Anglia Rail Franchise Consultation

Bus Passenger News April 2016

Bus Passenger News September/October 2016

National Rail Passenger Survey Main Report Spring 2018

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38)

Putting Havering on the map

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX

GTR December 2015 timetable consultation

National Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36)

National Rail Passenger Survey East Midlands Trains TOC Report Spring 2016 (Wave 34)

National Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37)

Summary of questions and discussion

Railfuture East Anglia Autumn 2018 Public Meeting

National Rail Passenger Survey Autumn 2015 Main Report

45,000 SQ FT HEADQUARTERS BUILDING AVAILABLE TO PRE-LET

45,000 sq ft headquarters building available to pre-let

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

Stakeholder News. // 4m service. Welcome from MD, Jamie Burles. improvements. Issue 11 September 2015

YOUR SPACE COLCHESTER

Archived News & Gen Week commencing 18/03/12

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

98 Manor Way, Beckenham, Kent BR3 3LR

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017

The case for a local rail station. At Great Blakenham, Suffolk.

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Making rail accessible. Helping older and disabled passengers

Crossrail transforming travel across London - Infrarail

SCIENTIFIC RESEARCH AND DEVELOPMENT

The Brighton mainline Route Utilisation Strategy. Making it work for passengers. A paper by London TravelWatch and Passenger Focus

Central Section Conditional Outputs Statement

Network Rail 2014 Customer Survey Report

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Chapter 4 Route Window NE3 Manor Park station. Transport for London

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements.

Crossrail: Socio-Economic Technical Report

campaigning by the Railway Development Society Limited

Improving stations: improving passenger satisfaction. October 2016

Current Contents of Website, and Version History V5.17

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

News & Gen Report for week commencing 4 th July 2010

BUILD TO SUIT INDUSTRIAL / LOGISTICS DEVELOPMENT

THE IMPACT OF STANSTED EXPANSION UPON SURFACE ACCESS NETWORKS

Cross-London Inter-Regional Connections

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

National Rail Performance Report - Quarter /16 (January-March 2016)

Cycle Tendring. Great Bicycle rides around the Clacton and Great Bentley area

railse no. 111 March 2011

London TravelWatch Response to the West Coast Main Line Route Utilisation Strategy Draft for Consultation

Discussion Paper. Peterborough. Corby. Kettering. Northampton. Cambridge. Bedford Sandy. Milton Keynes. Bletchley. Hitchin. Stevenage.

Our new Great Western Franchise. Tarka Rail Association AGM June 2015

RAILFUTURE LONDON AND SOUTH EAST BRANCH

Crossrail / Elizabeth Line An Update

GETTING AROUND LONDON THE RENAISCANCE OF LONDON ORBITAL RAIL SERVICES A 21ST CENTURY SURPRISE?

May 2019 Timetable. Highlights and Response to Feedback

RAILFUTURE. campaigning by the Railway Development Society. A I R P O R T L I N K S

London Stansted Noise Complaints Analysis Report 2014

commercial office retail WITHAM ESSEX CM8 1FR

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE

The New Northern Franchise

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

Initial Road Link Capacity Assessment Land East of Elsenham, Essex The Fairfield Partnership. 31 st July 2006

IPSWICH MEANS BUSINESS

Highland Mainline Journey Time Improvements Phase 2

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Surface Access. Position Statement on behalf of Stop Stansted Expansion

NEW ENTERPRISE ZONE DEVELOPMENT SUFFOLK PARK BURY ST EDMUNDS IP32 7QB. HIGH QUALITY BUSINESS SPACE DESIGNED FOR YOU FROM 2,000 to 75,000 sq ft

London Stansted Noise Complaints Analysis Report 2015

January EASTERN SECTION prospectus for growth

Railfuture East Anglia Seamless Public Transport in East Anglia How well integrated are trains and buses?

LOCATION AND COMMENTS LINES AND FEATURES MILEAGE GRID. REF. UP DOWN GREATER U/BRIDGE A107 UPPER CLAPTON LONDON ROAD

356,500 people commuted to jobs in the City of London. 40 per cent from inner London, 29 per cent from outer London, 31 per cent from outside London

First Thameslink trains arrive on Great Northern

London Stansted Airport Noise Complaints Analysis Report 2016

Update on the Thameslink programme

Freedom of Information request Re: paragraph 3.19 and Figure 11 of the NAO s July 2005 report on Maintaining and improving Britain s railway stations

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB

Transcription:

Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions in which even with point heaters on point work would still be overwhelmed this could be due to forecasted heavy snowfall within a short period of time or the cumulating effect after multiple days of snowfall. It is possible that the KRS could be implemented on some lines of route but not others due to the geographical spread of the route. This will be communicated out as necessary before implementation of the KRS. *When KRS is implemented the route availability will be from 0600 to 2200 in line with staffing availability of Snow men. Respective SPOC s and deputies for Anglia Route KRS: TOC SPOC Deputy Greater Anglia Gold On-call C2C GTR Gold On Call ARL Control Shift Manager TFL Rail Greater Anglia Once units are marshalled for the day s service, there are no planned split/attach moves within the plan. This does lead to additional ECS moves to and from depots, but makes the overall plan more robust. Longer distance services have longer turn rounds at destinations. All trains have been given extra running time and dwell time at stations, to allow for the conditions. Classes 317 and 321, limited to 60mph, and as such times have been adjusted to reflect this. West Anglia: Sub lines only, platforms 1-7, at Bethnal Green, services towards Seven Sisters Sub line to Hackney Downs, all other services via the Fast Lines Mainline: Main lines only to Shenfield and platform 8-14 The below is a summary of service for each of the three areas, on a route by route basis.

North Area: Norwich to Cambridge Saturday service, longer turnarounds at Norwich. Ipswich to Cambridge Saturday service with slightly longer journey times and longer turnarounds at Cambridge. Ipswich to Peterborough Saturday service with minor re-timings. Norwich to Lowestoft Saturday service with minor-retimings. All other Routes All other North area routes are not included in the plan, due to Network Rail not guaranteeing the point work being available en route. Services to be run as appropriate under control arrangements, based on available resources. South East Area: London to Southend Victoria 2 TPH all day increasing to 4 TPH in the peaks. All trains 12 coaches Wickford to Southminster 1 Shuttle Train in service 90min frequency if points at Wickford and Fambridge allow. London to Colchester / Ipswich 2 TPH calling all stations, all trains 12 coaches. 1 TPH London Colchester. Class 321s. 1 TPH London Ipswich. Class 360s. Additional peak services will operate to/from Colchester to London. London to Norwich 1 TPH all day plus 3 extra services in the peaks. Witham to Braintree 1 TPH, 60min frequency with Witham connections with mainline services. Colchester to Clacton 1 TPH shuttle service, all stations except Colchester Town. All trains 8 coaches Additional peak services will operate to/from Clacton to London (12 coaches). Thorpe LS to Walton on the Naze 1 TPH 60min frequency connecting at Thorpe LS with Clacton services. If local conditions allow (i.e. points at Thorpe le Soken and Kirby Cross. Manningtree to Harwich Town 1 TPH 60min frequency connecting at Manningtree with mainline services if local conditions allow (i.e. points at Manningtree and Harwich International).

West Area: London to Bishop s Stortford 1 TPH calling Tottenham Hale, then all stations from Ponders End to Bishop s Stortford with 1 TPH calling Northumberland Park. No service to Stratford from West Anglia. All trains 8 coaches. London to Stansted Airport 2 TPH calling Tottenham Hale, Harlow Town and Bishop s Stortford with 1 TPH calling Stansted Montfichet. All class 379 and 8 coaches. London to Cambridge 2 TPH, Saturday timetable with revised timings and stopping patterns. All class 379 and 8 coaches. Broxbourne to Hertford East 1 TPH 60min frequency using one train connecting at Broxbourne with mainline services. If local conditions allow (i.e. points at Broxbourne, Broxbourne Junction, Ware and Hertford East). These trains are shown as Q paths in the bid, and will have crew allocated to them. Control to liven up trains in systems if able to operate. Cambridge to King s Lynn GTR will operate an hourly shuttle from Cambridge to King s Lynn. No GA services. TFL Rail London to Shenfield (Metro) Services to run every 10 mins, but run fast from Ilford to Stratford in the peak direction during the peaks. Supplementary Gidea Park / Chadwell Heath services may be introduced to serve Manor Park, Forest Gate and Maryland. All TfL Rail services between Liverpool Street and Shenfield will have an additional 5 minute journey time during snow level 2 & 3. London to Brentwood Saturday timetable, 10 minute frequency, with VSTP enhancements. All trains 8 coaches. Potential for additional services during peak hours. All TfL Rail services between Liverpool Street and Brentwood will have an additional 5 minute journey time during snow level 2 & 3. Arriva Rail London Romford to Upminster Point work to get unit on branch not covered by Network Rail staff, significant risk to disruption of mainline services if points fail when accessing branch. However, a service may run on Romford - Upminster if there is already a

unit on the branch when the KRS is implemented. London to Chingford Saturday timetable, 15 minute frequency. All trains 8 coaches. Chingfords to run on the fast lines London to Cheshunt No services. London to Enfield Town Saturday timetable, 15 minute frequency during peak hours and 30 minute service off peak. All trains 8 coaches. All service to run on the sub lines. North London Line / West London Line 3 TPH will be running in each direction between Clapham Jn and Stratford. There will be no service between Willesden Jn and Richmond. ARL is doing this in order to minimize the use of points at Willesden Jn. The Willesden-Clapham service is much busier (with fewer alternatives) than the Willesden Richmond service. Although NR Sussex have stated that they cannot man the WLL as part of their KRS, it has been indicated by Sussex and LNW Routes that routes at Latchmere and Mitre Bridge Junctions respectively will be secured in ARL s favour, using P17 at Clapham Jn. DC Line Not Anglia route but no service will run. Gospel Oak Barking Line 3 TPH all day. East London Line 3 TPH Highbury West Croydon 4 TPH Dalston Jn New Cross. No service to Crystal Palace. Points to note are that we will need Kensal Green Jn, Camden Rd West Jn, and Gospel Oak Jn available and be able to get units to/from East Ham to get ARL ECSs in the right place. Away from the Anglia Route ARL will need the New Lines to be fully accessible from Willesden Jn and be able to turn ECS moves at Queen s Park. - C2C There are two timetable options; Snow Plan and Snow Plan Lite The core service pattern will be: London Fenchurch Street to Shoeburyness via Laindon London Fenchurch Street to Pitsea via Rainham Upminster Grays via Ockendon Mainline:

Up Road: 4 TPH until 0935 then 2tph to 1405, then 4tph until 1905 then 2tph. Services will call at all stations via Laindon. Down Road: 4 TPH until 0930hrs, 2 TPH until 1430hrs, 4 TPH until 2030hrs then 2 TPH until end of service. Platform 2 at Laindon and Leigh on Sea are expected to be unavailable, as are Platforms 1 & 4 at Southend Central. Train Length: Services will operate in 8-car fixed formation with coupler bags fitted on each leading end. Rainham / Tilbury: Down Road: 2 TPH all day Fenchurch Street to Pitsea via the Down Tilbury Line, Platform 7 Barking, Platform 2 at Grays and Platform 3 at Pitsea. Up Road: 2 TPH all day to Fenchurch Street via the Up Tilbury Line Platform 1 at Grays, Platform 8 at Barking and the Up Main Line calling at all intermediate stations. Platform 4 at Pitsea is to be used until 0620 hours. Train Length: Services will operate in 8-car fixed formation with coupler bags on each leading end. Ockendon: Single Train Working. Service every 45 minutes starting from Upminster Platform 1A and Grays Platform 3. Services will use Platform 1 at Ockendon and the Reversible Line (3rd Line) at West Thurrock Junction to Platform 3 at Grays. Ockendon passing loop unavailable. Require access to single line to lock-in and extract the unit from the branch. The unit will run with coupler bags on each leading end. Train Length: Services will operate in 4-car formation owing to Platform 1A at Upminster being inadequate (7-cars). Govia Thameslink Railway Great Northern Severe Weather Timetable 2 TPH Kings Cross Cambridge (semi fast) 1 TPH Cambridge Kings Lynn 1 TPH Cambridge Royston Class 321 EMUs will be used. All Outer services timed as Class 317s. Graduated SRTs to avoid inflated time at the end of journey 60mph running assumed. Great Northern Resource Deficient Timetable 1 TPH Kings Cross Cambridge (semi fast). Cambridge Ely / Kings Lynn booked service over Fens. 1 TPH Cambridge Royston.

Cross Country Trains Run a normal hourly timetable. --------------------------------------------------------------------------------------------------------- EMT Run a normal hourly timetable. FOC Both corridors out of Felixstowe, crosscountry and London. North Walsham to Harwich.