COCESNA S FLIGHT PLAN STATISTICS. Flight Plan

Similar documents
POST-IMPLEMENTATION MONITORING OF THE NEW ICAO MODEL FLIGHT PLAN FORMAT. (Presented by Cuba)

AIC 01/ Aug 2012

OVERVIEW OF THE AMENDMENT - ICAO EUR FPL2012 Workshop

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

What is safety oversight?

FLIGHT PLAN FILING PROCEDURES IN THE SAM REGION

ICAO Changes to the Present Flight Plan Form. Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ

AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA)

NEW FPL Transition Phase & Implementation Stages

#9 #10 Cuál es la fecha packet 2018.notebook. November 27, 2018

AVIATION SECURITY (AVSEC) AND FACILITATION (FAL) TRAINING AND ASSISTANCE ACTIVITIES IN THE NAM/CAR REGIONS. (Presented by the Secretariat)

Aviation Security (AVSEC) and Facilitation (FAL) 7.3 Other Aviation Security and Facilitation Matters

APPENDIX C AIDC REGIONAL PLAN AND OF THE AIDC POINTS OF CONTACT (POC) Table A: General Information

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat)

AMDT 1 TO ICAO DOC 4444

3rd FPL Monitoring Group Teleconference (October 24, 2014 at 15 UTC) Reference: 1. Minute of 2nd FPL Monitoring Group Teleconference (July 29, 2014)

PBN and airspace concept

Curriculum for AIM Training Module 2: ARO Officer

ASSEMBLY 39TH SESSION

Fieldwork Dates AmericasBarometer

S E L F B R I E F I N G U S E R M A N U A L

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

P/01REV. Accountability and Performance Report of the ICAO NACC Regional Office to Member States. Nassau, Bahamas, May 2016

Proposal for the updating of the FASID ATM Evolution Tables

Flight Operations Inspector Manual

Integrated Sustainability Assessment and Reporting Algarve (Portugal) 22nd October 2007

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Air Traffic Management

Development of the Global AIM Strategy (AIM Projects)

ACI NA Air Cargo Conference

MIDAD Project IDS Vision

2.2 Air Navigation Deficiencies ICAO CAR/SAM AIR NAVIGATION DEFICIENCIES DATABASE SIP. (Presented by the Secretariat) SUMMARY

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Entry of Flight Identity

ICAO flight plan form completion guide

The number of passengers using public transport increases by 2.4% in November, as compared with the same month of 2017

Central American Agency for Aviation Safety

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

ASBU Block 0 Implementation and Regional ANPs

EUROCONTROL Specification for the Initial Flight Plan

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

ACAC. Air Traffic Flow Management & IFPS. Where we are?

DRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:

The EUROCONTROL CNS dashboard - User Manual -

Flying Adventures in Paradise Mexico, Central America & Caribbean Nations Regional Overview

Components of Tourism Supply

TWELFTH AIR NAVIGATION CONFERENCE

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

RMT.0464 ATS Requirements The NPA

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE

PBN and Flight Planning

Presentation. Feasibility of the Establishment of a Single Airspace within the Caribbean

Review of the measures adopted during December January 2014 period for mitigation of errors (recommended actions)

NAM/CAR/SAM Regions Air Traffic Services Inter-facility Data Communication (AIDC) Implementation Meeting Lima, Peru, April 2018

Reporte Mensual de carga.

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

TWELFTH AIR NAVIGATION CONFERENCE

AERONAUTICAL INFORMATION CIRCULAR 33/17

Learning Objectives. By the end of this presentation you should understand:

This Advisory Circular provides guidance to facilitate compliance with the requirements for a Flight Radiotelephone Operator rating.

International Civil Aviation Organization. ICAO Updates. 13 th COSCAP-NA Steering Committee Meeting

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Topic / Sub-topic L Content Ref. Material. ICAO Doc Recognise the need for

Overall co-ordination of 2012 testing activities will be achieved via the ICAO secretariat of the INFPL STG.

Analysis of flight plan availability in the SAM Region ANALYSIS OF FLIGHT PLAN AVAILABILITY. (Presented by the Secretariat) SUMMARY

ASSEMBLY 35TH SESSION

Presentation Title: Aerodromes Licensing Requirements

Implementation of ICAO Flight Plan 2012

Flightplan form completion guide.

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

Implementation challenges for Flight Procedures

Evidence Based Training from a Regulator s Perspective

Introduction to Amendment 40 to Annex 15

21 States 19 Territories 26 Civil Aviation Authorities (CAAs) 44 Flight Information Regions (FIRs) 29 FIRs in NAM 15 FIRs in CAR.

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

ICAO ATC FPL 2012 Amendment

PBN Implementation CAR/NAM Regions

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

2012 Performance Framework AFI

ICAO LOC-I SYMPOSIUM STALL & UPRT IMPLEMENTATION. Itash Samani Global Head of FSTD Regulations, Regulatory Affairs June 2015 Nairobi Kenya

2018 Annex Amendments

AIR TRAFFIC SERVICES (ATS) INTERFACILITY DATA COMMUNICATION (AIDC)

International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

Atennea Air. The most comprehensive ERP software for operating & financial management of your airline

ICAO No Country Left Behind (NCLB) Campaign: NACC Regional Assistance Strategy

ICAO GANP Requirements and Evolution

GDS/CRS Booking Policy for Air India Ltd

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

Approach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Economic Benefits of Air Transport in El Salvador

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

ADS-B. Installation Challenges. July 13, Federal Aviation Administration. James Marks ADS-B Focus Team Lead FAA Flight Standards Service

Transcription:

COCESNA S FLIGHT PLAN STATISTICS Flight Plan

FLIGHT PLAN IN CENTRAL AMERICA In different parts of the world the problem in the flight plans is a wellknown issue, Central America is not the exception, the problems did not arise after the changes of the format in the year 2012. COCESNA so that the change was not so shocking in Central America enabled each of the member countries. Converters were installed in those systems that could not be updated in a different way. Examples of changes to the flight plan format were installed in each of the AIS offices in the region. Even so, the flight plan errors continued.

COCESNA S effort to flight plan issues in Central America Since 2016 COCESNA developed an application called Flight Plan Validator the main objective was to filter each flight plan coming to CENAMER Control, it was a measure implemented by COCESNA to mitigate flight plan issues, for statistics purposes and to increase safety. FLIGHT PLAN VALIDATOR DIAGRAM

FLIGHT PLAN VALIDATOR PHASES PHASE 1 The flight plan validator will have a three month trial period in which the application will be verified and if necessary the period will be increased. Users questions will be answered during this period. The database will be updated with the types of aircraft that are rejected due lack of information. ADVANCE PHASE 1: 90%

FLIGHT PLAN VALIDATOR PHASES PHASE 2 The route of flight will be checked according to ICAO specifications.. Users questions will be answered during this period. This phase will have a three month trial period and if necessary it will be increased. ADVANCE PHASE 2: 0%

COCESNA S effort to flight plan issues in Central America COCESNA developed a course specially designed for AIS personnel and flight dispatchers. In order to reinforce the basic knowledge of AIS officers in Central America, the course was approved by ICAO personnel, using the TRAIN AIR PLUS methodology. Staff have been trained in almost all Central American countries has also been supported in resolving specific flight plan situations in each country.

ANALYSIS Most of the problems that arise are related to deficiencies and noncompliance with the standards and recommended practices in the PANS ATM Doc. 4444, mainly by the operators, as well as by AIS/ATS units that amend or modify the plans already sent by the operators. COCESNA found that the problem lies in the basic knowledge that must have the AIS officer, flight dispatchers and air traffic controllers. The person delivering the physical flight plan is not always aware of the ICAO standard used to fill each part of the flight plan The airline doesn t have a copy of the AIS flight plan this results in lack of knowledge of the flight plan issued to all control centers, this results in no complain to the flight plan originator. In cases the flight plan on board the aircraft is in part different from the one transmitted by the AIS office, this can result in an air traffic incident.

FLIGHT PLAN STATISTICS 2017 Costa Rica El Salvador Honduras Guatemala MESES Sent Rejected Sent Rejected Sent Rejected Sent Rejected Enero. 1591 188 2340 301 2483 209 2355 416 Febrero 1368 60 2143 129 2212 201 1883 231 Marzo 1591 33 2388 24 2580 98 2116 113 Abril 1381 42 2217 33 2436 156 2065 264 Mayo 1132 26 2366 29 2323 142 2022 191 Junio 1092 11 2362 29 2283 132 2001 135 Julio 1188 28 2461 29 2814 103 2087 139 Agosto 1039 26 2444 18 2665 86 2080 125 Septiembre 848 6 2297 30 2366 71 1902 67 Octubre 681 12 1808 18 1731 72 1538 51 11911 432 22826 640 23893 1270 20049 1732

FLIGHT PLAN STATISTICS. 2017 Nicaragua Belize Panamá MESES Sent Rejected Sent Rejected Sent Rejected Enero 1024 169 663 92 4960 250 Febrero 993 126 543 28 3937 189 Marzo 1118 29 598 4 4180 265 Abril 1057 67 577 7 4231 548 Mayo 1059 65 478 6 4290 510 Junio 1046 44 535 2 4251 497 Julio 1167 42 543 4 4462 495 Agosto 1026 26 477 4 3899 390 Septiembre 875 23 320 0 5420 488 Octubre 723 8 299 8 3962 146 10088 599 5033 155 43592 3778

200 188 FLIGHT PLAN STATISTICS Costa Rica -Rejected. 180 160 140 120 100 80 60 40 60 33 42 26 28 26 20 11 6 12 0

FLIGHT PLAN STATISTICS El Salvador - Rejected. 350 300 301 250 200 150 129 100 50 24 33 29 29 29 18 30 18 0 Enero Febrero Marzo Abril Mayo Junio Julio Agosto Septiembre Octubre

FLIGHT PLAN STATISTICS Honduras - Rejected 250. 209 200 201 156 150 142 132 100 98 103 86 71 72 50 0

. 100 90 80 92 FLIGHT PLAN STATISTICS Belize - Rejected 70 60 50 40 30 28 20 10 0 7 8 6 4 4 4 2 0 Enero Febrero Marzo Abril Mayo Junio Julio Agosto Septiembre Octubre

FLIGHT PLAN STATISTICS Panamá - Rejected. 600 500 548 510 497 495 488 400 390 300 250 265 200 189 146 100 0

450 416 FLIGHT PLAN STATISTICS Guatemala - Rejected. 400 350 300 264 250 231 200 191 150 113 135 139 125 100 50 67 51 0

FLIGHT PLAN STATISTICS El Salvador Common errors. WRONG NUMBER OF FIELDS DUPLICATE FPL STORED 76 207 AIRCRAFT TYPE NOT FOUND IN DATABASE 67 NON RVSM STATUS 49 INCONSISTENT ITEM 10 AND 18 R WITH NO PBN/ 36 FILL REG/ IN FIELD 18 ONLY IF DIFFERENT FROM THE AIRCRAFT INCONSISTENT PBN/ VALUE INVALID SURV EQUIP INCONSISTENT ITEM 10 AND 18 PBN/ INVALID COMNAV EQUIP 24 23 20 17 17 0 50 100 150 200 250

FLIGHT PLAN STATISTICS Guatemala Common errors. DUPLICATE FPL STORED INCONSISTENT ITEM 10 AND 18 PBN/ 326 452 INVALID FIELD 18 SYNTAX 291 NON RVSM STATUS 217 AIRCRAFT TYPE NOT FOUND IN DATABASE 104 WRONG NUMBER OF FIELDS INVALID SEL/ REPEATED LETTERS FILL REG/ IN FIELD 18 ONLY IF DIFFERENT FROM THE AIRCRAFT IDENTIFICATION IN ITEM 7. DOC 4444 INCONSISTENT PBN/ VALUE INVALID EET/ SYNTAX 34 33 30 28 28 0 50 100 150 200 250 300 350 400 450 500

FLIGHT PLAN STATISTICS Belize Common errors. AIRCRAFT TYPE NOT FOUND IN DATABASE INVALID SEL/ ELEMENT 8 123 NON RVSM STATUS INCONSISTENT ITEM 10 AND 18 PBN/ NO ORIGINATOR FOUND IN ORGN/ INVALID SEL/ REPEATED LETTERS WRONG NUMBER OF FIELDS INCONSISTENT ITEM 10 AND 18 Z WITH NO DAT/ OR COM/ OR NAV/ INCONSISTENT ITEM 10 AND 18 R WITH NO PBN/ INVALID ELEMENT ON STS/ 6 5 4 3 2 2 1 1 0 20 40 60 80 100 120 140

FLIGHT PLAN STATISTICS. DUPLICATE FPL STORED WRONG NUMBER OF FIELDS Panamá Common errors 1450 1655 INCONSISTENT ITEM 10 AND 18 Z WITH NO DAT/ OR COM/ OR NAV/ 206 INCONSISTENT ITEM 10 AND 18 PBN/ INCONSISTENT PBN/ VALUE INVALID DOF/ SYNTAX AIRCRAFT TYPE NOT FOUND IN DATABASE INCONSISTENT ITEM 10 AND 18 R WITH NO PBN/ INVALID EET/ SYNTAX INVALID SPEED OR LEVEL 97 75 54 50 50 32 16 0 200 400 600 800 1000 1200 1400 1600 1800

FLIGHT PLAN STATISTICS. AIRCRAFT TYPE NOT FOUND IN DATABASE Costa Rica - Errores más comunes INCONSISTENT ITEM 10 AND 18 PBN/ FILL REG/ IN FIELD 18 ONLY IF DIFFERENT FROM THE AIRCRAFT NON RVSM STATUS 29 INCONSISTENT ITEM 10 AND 18 Z WITH NO DAT/ OR COM/ OR NAV/ 25 INVALID COMNAV EQUIP 20 INCONSISTENT PBN/ VALUE 18 INVALID SEL/ ELEMENT 17 INCONSISTENT ITEM 10 AND 18 R WITH NO PBN/ 14 INVALID SEL/ SYNTAX 10 71 86 89 0 10 20 30 40 50 60 70 80 90 100

FLIGHT PLAN STATISTICS. WRONG NUMBER OF FIELDS Honduras - Errores más comunes DUPLICATE FPL STORED AIRCRAFT TYPE NOT FOUND IN DATABASE INCONSISTENT ITEM 10 AND 18 PBN/ INCONSISTENT ITEM 10 AND 18 Z WITH NO DAT/ OR COM/ OR NAV/ 116 INCONSISTENT PBN/ VALUE 90 NON RVSM STATUS 66 INVALID SEL/ ELEMENT 45 INCONSISTENT ITEM 10 AND 18 R WITH NO PBN/ 38 INVALID COMNAV EQUIP 33 146 165 195 301 0 50 100 150 200 250 300 350

FLIGHT PLAN STATISTICS. FILL REG/ IN FIELD 18 ONLY IF DIFFERENT FROM THE AIRCRAFT Nicaragua - Errores más comunes ALTN/ INFORMATION NOT FOUND FOR DUPLICATE FPL STORED INCONSISTENT ITEM 10 AND 18 PBN/ INVALID SEL/ SECOND PAIR OF LETTERS NOT IN ALPHABETICAL ORDER 45 PBN/ VALUE EXCEEDED 30 INCONSISTENT ITEM 10 AND 18 Z WITH NO DAT/ OR COM/ OR NAV/ 30 AIRCRAFT TYPE NOT FOUND IN DATABASE 27 INCONSISTENT PBN/ VALUE 24 NON RVSM STATUS 22 57 65 77 107 0 20 40 60 80 100

. COSTA RICA

. EL SALVADOR

. NICARAGUA

. BELICE

. PANAMA

. PANAMA

Expected results for implementation : Flight plans completely based on the regulations prescribed in Doc.4444. To provide the originator of the message with the immediate knowledge of an error in a flight plan. Allows to communicate with the specialists in charge to clarify the reason of the error and to take the action that corresponds. Air traffic controllers do not spend time on auxiliary work and focus their own activities. More efficcient AIDC coordinations.

COCESNA S EFFORT TO ELIMINATE FLIGHT PLAN ISSUES IN CENTRAL AMERICA : Flight plans completely based on the regulations prescribed in Doc.4444. Facilitate the message originator change the. Allows to communicate with the specialists in charge to clarify the reason of the error and to take the action that corresponds. Air traffic controllers do not waste time on auxiliary work and focus their own activities. More efficcient AIDC coordinatios.

CONCLUSION The implementation of this application brings major changes for Central America, allowing ATS operators and AIS dependencies to comply with ICAO regulations, preventing flight plan errors from negatively impacting the operation of automated systems as well air traffic control services.

THANK YOU!