Great Lakes Navigation System Buffalo District

Similar documents
Buffalo District Navigation Program Overview

Great Lakes Navigation System Buffalo District

Great Lakes Navigation System Buffalo District

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Great Lakes Navigation Program Update

Great Lakes Dredged Material Management

Great Lakes Navigation System Dredging Update

Great Lakes Navigation System Dreding Update

Norfolk District North Atlantic Division

Great Lakes Navigation System

Harbor Maintenance Operations and Funding: Opportunities and Challenges for the Great Lakes Region

Great Lakes Navigation Update

Pump Stations...more than just pumps

Great Lakes Navigation Stakeholder Meeting

Norfolk District North Atlantic Division

Great Lakes Navigation Stakeholder Meeting

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

U.S. Army Corps of Engineers Wilmington District

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

Great Lakes Navigation System Dredging Update

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin

Great Lakes Waterways Conference

Cleveland Harbor Dredged Material Management

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

Presented to: City of Petaluma City Council

Inner Harbor Navigation Canal Lock. Victor A. Landry III Operations Manager, GIWW New Orleans District U.S. Army Corps of Engineers

Port of Kalama, New Approach to Maintenance Dredging

Great Lakes Navigation System

Great Lakes Navigation

USACE GALVESTON DISTRICT PROJECT UPDATE

Great Lakes Navigation System

Coastal Structures Risk Communication. Army Corps of Engineers. US Army Corps of Engineers BUILDING STRONG

Great Lakes Navigation System

MOBILE DISTRICT 2018 DREDGING PROGRAM

January 2018 Air Traffic Activity Summary

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

Baltimore Harbor & Channels, Maryland and Virginia

2011 Great Lakes Waterways Conference

1. USACE Response to Sandy Ports 2. NAVFAC Response to Sandy - Base 3. USSOUTHCOM/NAVFAC Response in HaiC Port Au Prince Port

Split Rock 100th anniversary. Superior Point Light. Eagle Harbor Lighthouse. Marquette Harbor Lightouse. Grand Island Lighthouse(before)

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

7/21/2014. New Jersey Waterway Debris Removal from Superstorm Sandy: Unprecedented! Superstorm Sandy. Superstorm Sandy.

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

The Corps of Engineers Dredges on the West Coast

GALVESTON DISTRICT Dredging Schedules

Aid to Local Ports FY19 Requests

REMARKS: All depths are in reference to Mean Low Water (MLW). Channel Length is in nautical miles.

The Knowledge Bank at The Ohio State University. Ohio Mining Journal. Car Unloaders

Water Resources Update after NCGA Long Session

Operations and Maintenance Funding Allocation via Navigation Systems Optimization

The Galveston Seawall

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

Discontiguous Features Southern Adirondack Feeder Reservoirs

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012

TOTAL DOMESTIC TRADE RANK TOTAL FOREIGN TRADE

MARCH 2014 HYDROGRAPHIC REPORT

North Cruise Berth Projects PortMiami

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

THE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG

Leptis Magna. 9 LEPTIS MAGNA s NORTH COAST

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

2012 Texas Water Conservation Association Meeting

STATUS OF THE COALITION. Chuck May, Chair Pro Tem

THE LEVEES OF DALLAS COUNTY

Physical Oceanographic Real-Time System (PORTS ) Funding Model

PELEE ISLAND PROPERTIES AVAILABLE THROUGH THE SAME ENTITIES NOW FOR SALE

Chapter VIII: Agencies and Organizations

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

Coastal Management: Treasure Island - Long Key Nourishment

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge

U.S. Coast Guard - American Waterways Operators Annual Safety Report

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Ohio Freight Conference Great Lakes Commercial Navigation

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

TENTATIVE SCHEDULE

Cat Island Chain Background & Access Guide

Meet Hoty Builders. Hoty Builders, LLC. Company Organization

Outer Banks Bridges Update:

Riverine Sand Mining/Scofield Island Restoration (BA-40)

Virgin Islands Port Authority Hurricane. Recovery Update. March 2018

Capital Program Delivery

Port Everglades Master/Vision Plan Update

EX USS SHADWELL Disposal Wreck in Place

Research and Statistics Department FOR RELEASE 8:50 A.M. Friday, February 23, 2018

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

Water Levels and Maintaining Access to the Great Lakes and Connecting Channels

www: vermilionparishpolicejury.com

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

Transcription:

Great Lakes Navigation System Buffalo District Josh Feldmann U.S. Army Corps of Engineers Chief, Operations Branch 9 FEB 2016 US Army Corps of Engineers BUILDING STRONG

Key FY16/17 Buffalo District O&M Activities 2.35M CY of dredging Dredged material management Structure repair with government plant at Cleveland, Toledo, and Conneaut in 2016; Cleveland, Ashtabula, and Buffalo (CDF maintenance) in 2017 Structure Repair by contract at Cleveland, Lorain, Fairport, and Port Clinton Harbors using Sandy Supplemental funds CDF maintenance at Buffalo Harbor BUILDING STRONG

Dredging Projects 2016 Toledo Sandusky Huron Cleveland Conneaut Erie Rochester Oswego 2017 Toledo Sandusky Cleveland Ashtabula Buffalo Fairport 3 BUILDING STRONG

Project highlights Cleveland East Breakwater: On-going repair of 4,400 linear feet of the Cleveland Harbor East Breakwater Dolosse structures damaged by Hurricane Sandy. Buffalo CDF #4: on-going repair of the lakeside stone dike to ensure continued performance and structural integrity of a structure subject to extreme wave action BUILDING STRONG

USACE-Buffalo District Storyboard Who: SAF, Inc. What: Buffalo CDF 4 Dike Repair Contract No. W912P4-14-D-0009 0001 When: SEP 2015 NOV 2016 Where: Buffalo Confined Disposal Facility #4, Buffalo, NY. Why: Improve the structural integrity of the lakeside stone dike by repurposing existing armor stone downslope, adding additional grouted and non-grouted stone underlayers, casting concrete blocks at the crest, and placing new armor stone on the lakeside crest. Looking toward shore, showing old armor removed and underlayer installed. Further out you can see that the underlayer has been grouted. Looking down dike wall, showing finished concrete blocks and new blocks being poured. Finished reach with new armor stone placed on lakeside of the crest. At the end of the 2015 construction season the repair will be 33% completed.

USACE-Buffalo District Storyboard The ribbon cutting ceremony for the $18.9 million detached breakwater repair at Oswego, NY was held on the 25 th of November to highlight the project s successful completion. The breakwater received extensive damage from the oversized waves and extreme angle hitting the structure from Hurricane Sandy in 2012, thus requiring this critical structure s repair. Nine hundred and seventy three 16-Ton dolosse and unusually large armor stone (up to 20-Ton) were used for the 1,050 linear foot repair. Armor stone material was railed from the Jamesville Quarry, NY and the Rock of Ages Quarry, VT. The contractor, Durocher Marine Division / Kokosing Construction Company, worked vigilantly to repair the exposed and submerged breakwater using a combination of armor stones and dolosse. All together they placed 973 dolosse, 51,863 tons of armor stone, 40,316 tons of underlayer stone, and 13,068 tons of bedding stone, and completing the project 12 months ahead of schedule. The ceremony was attended by U.S. Congressman John Katko, U.S. Senator Charles Schumer representative, City of Oswego Mayor Thomas W. Gillen, Port of Oswego Chairman Terrence Hammill. Ribbon Cutting Ceremony Finished Project with Dolosse at Western End Finished Project with View of Eastern End

USACE-Buffalo District Storyboard Barcelona Harbor, NY Cellular sheet pile failure was caused by storms of 29 OCT 02 NOV. Complete loss of internal fill down to water line left the concrete cap suspended only by edge friction. LRB staff mobilized on 04 NOV, assessed the structure condition, and closed the structure to public access due to danger of collapse. A request for emergency repair funds is being prepared. Breach in sheet pile cell Interior of cell

USACE-Buffalo District Storyboard Barcelona Harbor, NY Cellular sheet pile failure worsened during the storm of 12 13 NOV. LRB staff made a site visit on 16 NOV to document the additional damage and consult with local stakeholders. Complete loss of the lake side sheet pile and the concrete cap occurred. The harbor side sheet pile was severely damaged and the cell effectively no longer exists. Sheet pile has separated from the landward adjacent cell and it appears that there is a void of approximately 3 depth below the concrete cap of that cell. Another storm with winds of up to 50 mph is predicted for 18 NOV. An additional site survey will be conducted to determine if the damage from this storm effects the adjacent cells. Complete Breach of Lake Side of Structure Previously damaged cell is now completely missing Severe damage to Harbor Side Sheet Pile Separated sheet pile and missing fill at adjacent cell