FINAL PROJECT COMPLETION REPORT

Similar documents
UNESCO Project Sheet Strengthening the Tropical Rainforest Heritage of Sumatra through Eco-tourism

Community-based tourism at Gunung Gede Pangrango National Park, Indonesia

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA)

TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN

Proposal to the African Elephant Fund

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

A Master Plan is one of the most important documents that can be prepared by an Airport.

The Caribbean Sub Regional Civil Society Forum will encompass three central objectives:

DRAFT Appendix A Appendix B. Planning Process & Public Participation

Agenda Item 6: Aviation Security and Facilitation

ASSEMBLY 39TH SESSION

WWF Riau s camera trap survey in progress

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

U.S. Support to the Coral Triangle Initiative Monthly Program Update November 2012

A Proposed Framework for the Development of Joint Cooperation On Nature Conservation and Sustainable Tourism At World Heritage Natural sites.

International Civil Aviation Organization. Fourth Meeting of the Asia/Pacific Regional Search and Rescue Task Force (APSAR/TF/4)

FACILITATION PANEL (FALP)

55 TH CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

Sub-regional Meeting on the Caribbean Action Plan for World Heritage November Havana, Cuba DRAFT CONCEPT PAPER

Committee. Presentation Outline

REPUBLIC OF GUYANA STATEMENT. on Behalf of the CARIBBEAN COMMUNITY (CARICOM) H.E. Mr. George Talbot, Permanent Representative

Worksheet: Resolving Trail Use(r) Conflict March 27, 2010

Special nature reserve and ornithological reserve Scope of implementation (local, Local national)

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

ACTION: Notice of a new task assignment for the Aviation Rulemaking Advisory Committee

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

University of Connecticut Division of Student Affairs Unit Review. What is Unit Review? Purpose. Guiding Principles of Unit Review

PAPUA NEW GUINEA PROGRESS REPORT

RUNWAY SAFETY GO-TEAM METHODOLOGY

TOWN OF PORT HEDLAND INNOVATE RECONCILIATION ACTION PLAN

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana

COUNTRY REPORT-2016/2017 THE INDONESIAN MAB PROGRAMME NATIONAL COMMITTEE: Management and Development of Biosphere Reserves in Indonesia

QUÉBEC DECLARATION ON ECOTOURISM World Ecotourism Summit Québec City, Canada, 2002

MPA MANAGEMENT CAPACITY. MPA Management Capacity Building Training TRAINING. Module 10: SUSTAINABLE TOURISM

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

Community-based tourism at Gunung Halimun National Park

AIRPORT EMERGENCY CONTINGENCY PLAN TEMPLATE V 3.3 April 27, 2012

Wiratno and Suyatno Sukandar DG of Forest Protection and Nature Conservation Ministry of Forestry - GOVERNMENT OF INDONESIA

The results of the National Tourism Development Strategy Assessments

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and

THE CARICOM REGIONAL IMPLEMENTATION PLAN

INTERNATIONAL/REGIONAL COOPERATION TO OIL SPILL RESPONSE IN THE STRAITS OF MALACCA : AN OVERVIEW BY ROSNANI IBARAHIM 1

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

Local Development Scheme

IATA Fuel Efficiency Program

MEMORANDUM FOR THE HONG KONG COMMITTEE FOR PACIFIC ECONOMIC COOPERATION (HKCPEC)

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Terms of Reference: Introduction

INDONESIA TOURISM INVESTMENT INVITATION

A vision for a healthier, more prosperous and secure future for all coastal communities. Can Gio Biosphere Reserve 2010 IUCN Vietnam MERD

Flight Operations Briefing Notes

State of Conservation of the Heritage Site. City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY

PELICAN ISLAND COMMUNITY PARTNERSHIP SCHOOL. Bylaws

Airports and UAS: Managing UAS Operations in the Airport Vicinity

Barents Euro Arctic Council 11 th Session Rovaniemi, Finland November 2007

VIETNAM. Initiative 1 Community-Based Poverty Reduction Tourism Program. Community-Based Poverty Reduction Tourism Program

Environmental Assessment Las Vegas Area Airspace Optimization Project

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

Areas Beyond National Jurisdiction and CTI CFF Seascape Concept Hendra Yusran Siry

VIII MEETING OF NATIONAL COORDINATORS. Pilot Project Program Border Crossings Summary and Conclusions. Jorge H. Kogan

Protected Areas & Ecotourism

Harnessing Uganda s tourism potential to foster economic growth and structural transformation

Capabilities for the Future - TSA Strategy

11 January Dear Public Consultations Team of the White Paper Task Force,

GLOBAL LEADERS IN BUILDING EFFECTIVE MARINE PROTECTED AREAS

Maloti Drakensberg Transfrontier Conservation and Development Area

Urgent Surveys for Evacuation and Measures from Unexpected Large Tsunami

INFORMATION PACKAGE Youth Access Clinician

TERMS OF REFERENCE WHITSUNDAY ROC LIMITED. Adopted 17 th October These Terms of Reference are underpinned by the Constitution of the

Talofa! Malo e lelei. Kia Orana. Hal o. Ia Orana. Maur i. Bula!

ICAO EIGHTH SYMPOSIUM AND EXHIBITION ON MRTDs, BIOMETRICS AND SECURITY STANDARDS. (Montreal, 10 to 12 October 2012)

DEPARTMENT OF HOMELAND SECURITY. U.S. Customs and Border Protection. Extension of the Air Cargo Advance Screening (ACAS) Pilot Program

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

JOB DESCRIPTION FBO Manager

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

NATIONAL ASSOCIATION OF UNCLAIMED PROPERTY ADMINISTRATORS (NAUPA) NETWORK STRATEGIC PLAN ( )

INDONESIA TOURISM INVESTMENT INVITATION

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

2 THE MASTER PLAN 23

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS

TOR FOR THE DEVELOPMENT OF A ECOTOURISM BUSINESS PLAN FOR FAYOUM

Export Strategies for Tourism

Revalidation: initial consultation

Ecotourism as a tool for Switching Community from Destructive to Non-destructive Activities

Introduction to Scenario-Based Training

ANNUAL BUSINESS PLAN

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

STOCKTON POLICE DEPARTMENT GENERAL ORDER UNMANNED AIRCRAFT SYSTEM SUBJECT. DATE: November 14, 2017 NO: V-6

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

APEC Travel Facilitation Initiative - Progress Report

Performance Review Body 18

Tourism and Wetlands

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

National Park Service Wilderness Action Plan

Twelve Apostles Marine National Park Australia

The Corporation of the City of Kawartha Lakes Council Report

Transcription:

FINAL PROJECT COMPLETION REPORT I. BASIC DATA Organization Name: Wildaid Project Title: Assessment and Strategy for Protecting Wildlife and Timber Resources in the Gunung Leuser Ecosystem II. OPENING REMARKS Provide any opening remarks that may assist in the review of this report. In early 2003, WildAid received a grant from the Critical Ecosystem Partnership Fund (CEPF) to develop an assessment and strategy for protecting wildlife and timber resources in the Leuser Ecosystem in northern Sumatra, Indonesia. The project was originally to be a joint effort between WildAid and Conservation International (CI). CI withdrew from the project in September 2003 and WildAid received permission from CEPF to continue independently. In addition to conducting considerable background research, members of the WildAid assessment team (Project Leader Steven Galster, Mark Bowman, John Boyd and John Gavitt) made several trips to Sumatra and other areas where illegal trade in wildlife and timber from the Leuser Ecosystem takes place. From April 21-26, 2004, three assessment team members carried out a reconnaissance effort in North Sumatra. Its main purpose was to explore options, such as the possibility of establishing a multi-agency Task Force for combating illegal activity in the Leuser Ecosystem. As the Leuser International Foundation (LIF) is the sole non-governmental body authorized to manage the Leuser Ecosystem, WildAid worked to include its staff in all phases of the assessment. A final group discussion with the Leuser Management Unit (LMU), the body responsible for implementation of decisions of the LIF, resulted in the development of a potential structure for the Task Force. Visits were also made by team members to local wildlife markets in Medan, the port of Balawan, and to the Ecosystem boundary. From June 8-25, 2004, three team members carried out the first phase of the assessment in North Sumatra, Aceh and Jakarta. The trip entailed meetings with the LMU (Medan, Banda Aceh); LBH Human Rights NGO (Medan); the Agency for Conservation of Nature and Natural Resources (BKSDA) (Medan and Banda Aceh); Forest Department (Medan); Undercover and Criminal Investigation Unit (Medan, Banda Aceh); Customs Department (Balawan Port); Courts (Medan); Australian Consulate (Medan); US Consulate (Medan); and US Embassy (Jakarta). An aerial survey of the Leuser Ecosystem was conducted with the Indonesia Navy to assess the area, terrain and illegal activities occurring in and around the Leuser Ecosystem. Finally, a three-man WildAid assessment team traveled to Indonesia in November 2004 to interview LIF staff on the results of a workshop on protection of the Leuser Ecosystem. The WildAid team closed final gaps in background information and discussed preliminary recommendations with the relevant NGOs and law enforcement agencies. The team also traveled to Malaysia to discuss illegal wildlife trade in Sumatra with TRAFFIC officials. 1

It should be noted that assessment team members have been hampered in their access to important areas and contacts due to the continuing unrest in Aceh and other security concerns. In addition, the political situation in Indonesia and several delays outside of WildAid s control caused problems with timely completion of the assessment. Budgetary and time constraints prevented WildAid from hosting a stakeholder workshop and conducting a series of meetings with recently appointed political figures. WildAid believes it would be more appropriate to complete these activities when funding is available to implement the proposed strategy contained in this document. However, as noted above, assessment team members did meet with LIF staff members to obtain as much information as possible about the workshop that was held recently with government officials on protection of the Ecosystem. The most important goal for this project is that of implementation of a protection strategy for the Leuser Ecosystem. WildAid will be grateful for any assistance that the CEPF can provide to set the stage for achieving this goal. The recent tsunami off the coast of Sumatra, resulting in terrible devastation and human losses there and in other countries in the Region, will undoubtedly delay steps for implementation of a strategy to protect the Leuser Ecosystem. However, the re-building of Aceh province alone will require extensive use of timber and other local resources. Therefore, the need for management and protection of the Leuser Ecosystem is even greater now than in December 2004, when the assessment was completed. III. ACHIEVEMENT OF PROJECT PURPOSE Project Purpose: Trained, equipped and financially supported actors are effectively protecting the Leuser Ecosystem and this strategy is replicated in other areas in Sumatra. Planned vs. Actual Performance Indicator Purpose-level: 1.1 Protection strategy implemented and in place in at least one other core area of Sumatra within 2 years after completion of the project. 1.2 An effective team of park rangers and other actors, as specified in the strategy, are implementing at least 75% of the articulated elements of the strategy (implementation of priority elements begun by the end of 2004).*The term "Park Rangers" or "Rangers" refers to any enforcement officers involved in protection efforts within the Leuser Ecosystem. 1.3 Initial elements, as defined in the strategy, are fully funded by the end of 2004 amount to be determined by the strategy. Actual at Completion Purpose-level targets have been delayed. These targets were not the responsibility of WildAid under this Project. WildAid's responsibility was limited to providing an assessment that contains a strategy for implementation that is achievable with additional funding. Describe the success of the project in terms of achieving its intended impact objective and performance indicators. 2

WildAid has successfully completed a threats- and needs- assessment of the Leuser Ecosystem. In its report, WildAid included a 5-year strategy for strengthening the protection of the Ecosystem, focusing on three main areas: First and foremost, the strategy calls for development of a Leuser Protection Task Force at the national level to combat significant environmental crime within the Ecosystem for a three-year period. The Task Force would contain several sections that would provide specialized logistical support during all phases of this law enforcement effort, ranging from intelligence-gathering to prosecution. There would also be a section on public affairs to help ensure public understanding of, and support for Task Force activities. Under the proposal, WildAid would offer on-site technical support in establishing Task Force policy and procedures, coordinating specialized law enforcement training and monitoring law enforcement activities. The LIF would be responsible for all areas of Task Force administration. Second, WildAid recommends the creation of a Leuser Protection Committee System to more effectively utilize existing law enforcement agencies responsible for Ecosystem protection at the National, Provincial, and District levels. These Committees would identify significant threats to resources within their particular areas and recommend to enforcement agencies ways to address such threats. The Committees would also be a valuable source of information to the Task Force, which would be available to respond in cases of significant resource destruction and where local officials are unable or unwilling to take action. Third, WildAid recommends a Malacca Straits Working Group on Environmental Crime to address international smuggling of timber and wildlife from the Ecosystem and other areas in the region. The Malacca Straits region - encompassing Indonesia (Aceh, North Sumatra), Singapore and the west coasts of Malaysia and Thailand - is a hub for illegal trade. The Working Group would enable Customs officers and other key enforcement personnel to meet on a regular basis, share intelligence and take enforcement action within their respective agencies to address illegal trade. Although WildAid has included an action plan and budget for implementation each of these three initiatives, it should be emphasized that these are concepts only. Further consultation with all stakeholders concerned should precede any formal discussions for funding any of these initiatives. Were there any unexpected impacts (positive or negative)? Assessment team members have been hampered in their access to important areas and contacts due to the continuing unrest in Aceh and other security concerns. In addition, the political situation in Indonesia and several delays outside of WildAid s control caused problems with timely completion of the assessment. IV. PROJECT OUTPUTS Planned vs. Actual Performance Indicator Actual at Completion Output 1: Pre-Assessment information gathering completed (April 30, 2003). Information from CI was requested until it withdrew from the project in October 2003. 1.1 WildAid requests background information on the WildAid received information from CI Indonesia until 3

Leuser Ecosystem from CI Indonesia. Please refer to logframe or performance tracker for subject list. This list removed due to Excel limitations. 1.2 WildAid receives response(s) to its request for background information from CI Indonesia. After April 30, 2003 WildAid is kept current by CI Indonesia of events that may affect the reconnaissance mission and assessment. 1.3 As responses are received from CI Indonesia, project leader distributes response(s) from CI to members of the assessment team. 1.4 CI Indonesia and WildAid meet to develop project strategy. Please refer to logframe or performance tracker for discussion areas list. This list removed due to Excel limitations. Output 2: Reconnaissance mission(s) completed (October 30, 2003). 2.1 WildAid, using the background information provided earlier and the objectives agreed upon between WildAid and CI, completes its plans for reconnaissance mission(s). 2.2 Prior to on-site travel, WildAid receives a letter of introduction from CI Indonesia/CEPF, with terms of reference for the WildAid reconnaissance and assessment teams. 2.3 Reconnaissance mission takes place October 15-30, 2003. Please refer to logframe or performance tracker for list of possible objectives. This list removed due to Excel limitations. Output 3: On-site assessment carried out (November 1 December 5, 2003) 3.1 Upon arrival, reconnaissance team briefs WildAid assessment team. its withdrawal from the project in October 2003. Receiving permission from CEPF to move forward independently, WildAid continued to develop seek information through other sources. WildAid met with two CI Indonesia representatives in Bangkok in July 2003. In addition to providing information useful to the project, CI worked with WildAid in developing an assessment strategy. WildAid requested an extension to the project due to several earlier delays in project implementation outside WildAid s control, including the unstable political situation in Indonesia. On June 23, 2004, CEPF approved a time extension for the project from February 28, 2004 to December 31, 2004. Reconnaissance missions by WildAid took place from March 31 - April 3, 2004 and from April 21-26, 2004. WildAid completed its plans for reconnaissance missions in March 2004. A letter from CI/CEPF was no longer applicable due to CI s withdrawal from the project. During a pre-reconnaissance visit to Sumatra from March 31 - April 3, 2004, WildAid obtained important information about the political situation in Aceh and efforts by LMU to build capacity of the Leuser International Foundation (LIF) and local NGO s. WilldAid also learned about structure of the LMU, and the draft management plan for the Leuser Ecosystem and the business plan for the LIF. From April 21-26, 2004, WildAid carried out a reconnaissance in the Leuser Management Unit in Medan, North Sumatra Province, Indonesia. The main purpose behind the trip was determine stakeholder support for establishing a multi-agency Task Force to combat illegal activity in the Ecosystem, including a final group discussion with the LMU about the potential structure a proposed Task Force. From June 8-25, 2004 WildAid carried out the first phase of the assessment in North Sumatra, Aceh and Jakarta. The second phase of the assessment took place from November 5-12, 2004 in North Sumatra Province and Malaysia. With one exception, members of the reconnaissance team were also members of the assessment team. As reconnaissance and assessment took place during different time periods, the one member of the November assessment team who had not participated in reconnaissance missions was briefed verbally or via e- mail by reconnaissance team members prior to assessment activities. 4

1. 3.2 WildAid and CI-Indonesia assessment teams carry out on-site assessment. (See logframe or performance tracker for full details. These details were removed due to Excel limitations.) 3.3 WildAid and CI-Indonesia conduct one-day workshop with key stakeholders. Output 4: Proposal for three-year strategy drafted, reviewed and finalized (February 28, 2004). 4.1 WildAid prepares a draft report of the threats and needs assessment and a three-year strategy for protection and sends it to CI Indonesia for comment (January 15, 2004). 4.2 CI Indonesia provides its comments on draft report and submits them to WildAid (January 25, 2004). 4.3 WildAid incorporates comments from CI Indonesia and sends second draft to CI Indonesia (February 5, 2003). 4.4 CI Indonesia submits final comments on joint report (February 15, 2003). 4.5 WildAid and CI Indonesia submit joint report to CEPF (February 28, 2004). From June 8-25, 2004 WildAid carried out the first phase of the assessment in North Sumatra, Aceh and Jakarta. The trip entailed meetings with LMU (Medan, Banda Aceh), LBH Human Rights NGO (Medan); BKSDA (Medan and Banda Aceh); Forest Department (Medan); Serse and Criminal Investigation Unit (Medan, Banda Aceh); Customs Department (Balawan Port); Courts (Medan); Australian Consulate (Medan); US Consulate (Medan); and US Embassy (Jakarta); An aerial survey of the Leuser Ecosystem was conducted with the Indonesia Navy to assess the area, terrain, and illegal activities occurring in and around the Leuser Ecosystem. From November 5-12, 2004 WildAid traveled to Medan and other areas in North Sumatra Province, closing gaps in the assessment by meeting with current and past LIF/LMU/LDP staff and officials from Forestry, Customs, and various agencies under the National Police. The team also traveled to Malaysia to discuss illegal wildlife trade in Sumatra with TRAFFIC officials. The workshop did not take place because WildAid was not funded for this initiative and the LIF had hosted a similar workshop with key stakeholders recently. WildAid distributed a draft report to the CEPF, LIF, TRAFFIC and CI on November 18, 2004, with a deadline of December 20, 2004 for response. WildAid received comments from other WildAid staff and the LIF. As a new President had just been elected in Indonesia, WildAid felt it was important to complete the assessment and to provide a final report as quickly as possible, so that efforts to obtain political and financial support for implementation of the project's proposed strategy could move forward in the early stages of the new Indonesian administration. This indicator was no longer applicable due to CI s withdrawal from the project. However, a draft report was sent to CI on November 18, 2004 with a request for comments by December 20, 2004. CI did not comment on the draft provided by WildAid. See 4.2 See 4.2 See 4.2. WildAid submitted its final report to the CEPF on December 20, 2004. Describe the success of the project in terms of delivering the intended outputs. In spite of several setbacks, WildAid was successful in independently completing its project responsibilities by presenting a threats- and needs- assessment of the Leuser Ecosystem and a proposed strategy to strengthen the protection of that Ecosystem. Were any outputs unrealized? If so, how has this affected the overall impact of the project? 5

The lack of an on-site partner reduced the level of stakeholder involvement in the assessment. The stakeholder meeting did not occur for the reasons stated in indicator 3.3 above. V. SAFEGUARD POLICY ASSESSMENTS Provide a summary of the implementation of any required action toward the environmental and social safeguard policies within the project. Not applicable. VI. LESSONS LEARNED FROM THE PROJECT Describe any lessons learned during the various phases of the project. Consider lessons both for future projects, as well as for CEPF s future performance. A "point person" or coordinator for each organization involved in a project partnership is absolutely essential to a project's success. Delays in project implementation inevitably result in even further delays due to work schedule conflicts. It may be better to implement a strategy through a manageable body that has a clear mandate from high levels of government than to try to foster change through existing government bureaucracy. Project Design Process: (aspects of the project design that contributed to its success/failure) The project design was valid in the following areas: 1) One organization with expertise in law enforcement partnering with an on-site organization with broad knowledge of the current situation in the area concerned. 2) A step-by-step process in obtaining information through extensive background research, followed by reconnaissance and assessment missions. 3) Submitting draft findings and recommendations for comment before submitting the final assessment. One aspect of the design that may have created unrealistic expectations was the Project Purpose (Trained, equipped and financially supported actors are effectively protecting the Leuser Ecosystem and this strategy is replicated in other areas in Sumatra). This might lead the reader to believe that the current project includes activities for implementation of the proposed strategy from the assessment. WildAid believes it would have been clearer to limit the Purpose to the assessment only, as activities surrounding strategy implementation were not covered by the budget. Project Execution: (aspects of the project execution that contributed to its success/failure) 6

The project was executed in professional manner, but not in as timely a manner as desired. Planned activities were delayed several times for reasons outside of WildAid s control. Adjustments to the Project took place on a regular basis, requiring significant flexibility on the part of everyone involved. Once reconnaissance missions took place, several months elapsed between activities by the assessment teams. This created problems in keeping up with current events in the area concerned and background information becoming dated. VII. ADDITIONAL COMMENTS AND RECOMMENDATIONS The recent tsunami off the coast of Sumatra, resulting in terrible devastation and human losses there and in other countries in the Region, will undoubtedly delay steps for implementation of a strategy to protect the Leuser Ecosystem. However, the re-building of Aceh province alone will require extensive use of timber and other local resources. Therefore, the need for management and protection of the Leuser Ecosystem is even greater now than in December 2004, when the assessment was completed. 7