Tourism Zone KIGAMBONI NEW CITY MASTER PLAN, TANZANIA. LH Consortium 11

Similar documents
INFRASTRUCTURE DEVELOPMENT IN TANZANIA

Where are the poor: Region and District Poverty Estimates for Tanzania, 2012

FLY WITH US TO THE LAND OF KILIMANJARO, ZANZIBAR & THE SERENGETI

AN OVERVIEW OF TOURISM DEVELOPMENT IN THE SOUTHERN CIRCUIT

Estimating Utility Consistent Poverty Lines: With Illustrations from Mozambique and Tanzania. Channing Arndt University of Copenhagen

TABORA REGION MUNICIPAL DIRECTORS OFFICE TEL: /6088 P. O. BOX 174

VOCATIONAL EDUCATION AND TRAINING AUTHORITY PROCEDURESS FOR JOINING VOCATIONAL TRAINING CENTRES FOR TRAINING

POPULATION DISTRIBUTION AND DENSITY IN TANZANIA: EXPERIENCES FROM 2002 POPULATION AND HOUSING CENSUS

Market Brief on Tanzania

Market Brief on Tanzania

NATIONAL REPORT OF THE UNITED REPUBLIC OF TANZANIA ON SEA LEVEL STATUS

3rd International Forum on sustainable Tourism 20th to 22nd October 2008 Bamako - Mali

US France. Germany Japan. Switzerland. Canada Spain. Belgium. Hong Kong. Netherlands. Russia China. Italy. Sweden. Australia. Denmark. Austria.

Sanctuary Saadani River Lodge, Saadani National Park

Tanzania s Transport Hub: What Prospects for Regional Integration and Investment? 22 NOVEMBER 2016, JOHANNESBURG, CHELSEA MARKOWITZ

NATIONAL REPORT OF TANZANIA ON SEA LEVEL ACTIVITIES AND OBSERVING NETWORK

TANZANIA ATOMIC ENERGY COMMISSION LIST OF CENTRES UNDER CLOSURE AS AT 12TH OCTOBER 2018 ARUSHA

Dar es Salaam Real Estate Investment Opportunity, & Cytonn Weekly #11/2018

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Indian Ocean, Africa--east Coast, Kenya--Tanzania, Dar Es Salaam To Mombasa Harbor (SuDoc D 5.356:61200/992) By U.S.

Nacala Business Campus

2015 CRS ICT4D CONFERENCE INTRODUCING THE BANDWIDTH AGGREGATION BUYING PROGRAM

BUSINESS OPPORTUNITIES IN TANZANIA

Contents. East Africa Highlights 5. Destination East Africa 13. Getting Started 14. Itineraries 19. History 25. Culture 31. Environment 52.

Ministry of Natural Resources and Tourism Tourism Division. The 2009 Tourism Statistical Bulletin

East Africa Overland Tour (Vic Falls-Nairobi): Itinerary

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE TANZANIA RURAL AND URBAN ROADS AGENCY (TARURA) Ref. No. AB.21/288/01 E /32 22/03/2018

Magnetic Heart of Queensland

Trade Facilitation Conference on New Trends in Trade Facilitation. June 16, Dominique Njinkeu

National MAB Report. 1 Efforts towards implementation of Madrid Action Plan

Framework for Progressive Destination Competitiveness

Outline. Merging GNSS Kinematic Tracks - using the TanDEM-X mission in Africa. R.M.S. Fernandes Jorge Santos Detlev Kosmann.

SEA for oil and gas development in Southern Africa is it effective? Bryony Walmsley Southern African Institute for Environmental Assessment

Spadina Avenue Built Form Study Preliminary Report

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Honourable Dr. Mary Michael Nagu, MP Minister of State, (Investment and Empowerment)

SCHEDULE B CLASSIFICATION OF USES OF LAND AND BUILDINGS

Region 2: Tourism Partnership of Niagara. Visitor Statistics Visitor Spending Statistics Hotel Statistics Tourism Related Establishments

The United Republic of Tanzania Ministry of Natural Resources and Tourism TOURISM DIVISION The 2013 Tourism Statistical Bulletin

KRABI TOWN MUNICIPALITY PROJECT FOR PROMOTING SUSTAINABILITY IN FUTURE CITY OF THAILAND

Embassy of the United Republic of Tanzania

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

Possibilities and limits to measure sustainability in tourism

VICTORIA QUAY COMMERCIAL PRECINCT PLAN

4 th Africa Regional Meeting of the Collaborative Arrangement for the Prevention and Management of Public Health Events in Civil in Civil Aviation

MANDALIKA DEVELOPMENT PROJECT DEDICATED INVESTMENT OPPORTUNITIES

Zambia by Numbers. Foreign Exchange Reserves $1.892 Billion (Dec.2013) Public Debt as a % of GDP 36% (2013)

KENYA S NEWEST COMMUNITY.

5 DAY SAFARI SELOUS & ZANZIBAR

Draft Planning Controls Planning Scheme Amendment GC81

from boat parking lots to icons Marina Development Update Marina Development Update from boat parking lots to icons Presentation by Ed Modzelewski

Africa's Top Wildlife Countries: Botswana, Kenya, Namibia, Rwanda, South Africa, Tanzania, Uganda, Zambia & Zimbabwe By Mark W.

KURASINI AREA REDEVELOPMENT PLAN DAR ES SALAAM, TANZANIA

Current and Forecast Demand

A connected community.

Stuart Thain. Elizabeth Leader Cameron Simonsen

GeoQuest Study for the next Quiz Day:

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

Manila, November Consultative Group Meeting. Slum Upgrading. Farouk Tebbal, Andrea Merrick

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA

Investment Opportunities DMIC UP Region

ECOTOURISM AND BIODIVERSITY CONSERVATION

GOLD COAST AUSTRALIA

Welcome to AVI AFRIQUE 2017

Africa Infrastructure Diagnostic Study PORT SECTOR

SOUTH INTERCHANGE AREA

PCAL Case Study Retail Areas: Rouse Hill Town Centre

WHITE MAIZE: The markets below represent the major producer and consumer markets in countries where white maize is heavily consumed as the staple.

Sustainable Rural Tourism

SUB-SAHARAN AFRICA (2): POPULATION AND SETTLEMENT GEOGRAPHY

Special Economic Zone (SEZ) Cape Kelayang

THE HEART OF A VIBRANT COMMUNITY

MEETING OF SADC MINISTERS RESPONSIBLE FOR TRANSPORT & METEOROLOGY

One Commodity Map. 7. What is a commodity? 8. Explain what a one-commodity country is.

TANZANIA COMPANY PROFILE A 5 STAR PROPOSITION

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

East African Power Industry Convention 2007, Addis Ababa, ETHIOPIA

Partnership for Quality Infrastructure: Investment for Asia s Future (21 May 2015)

WHAT DOES IT TAKE TO BUILD THE MOST SOCIAL CITY IN AFRICA?

Catchment and Lake Research

Basic Idea Regarding the Selection of Cruise Ship Liners. to have a Partnership with the Naha Port Authority on a

Silvia Giulietti ETIS Conference Brussels An EEA reporting mechanism on tourism and environment and ETIS

Djibouti Code of Conduct* Info Sharing & Maritime Situational Awareness

Dar es Salaam City Report

State of Center City Charlotte

International Center for Research on Women (ICRW) Request for Proposal: Travel and Tour Agent for East Africa Trip 2017

FIRST QUARTER SALARY RELEASES FOR THE YEAR 2015/16

THE SUMMIT RENO LAKE TAHOE

Tourism Satellite Accounts : The Demand Perspective

Abstract. 1 Introduction

INFORMATION NOTE Dar es Salaam United Republic of Tanzania June 2011

EAST AFRICA Price Bulletin November 2017

Transport Impact Assessment

If searching for the ebook Namibia Touring Map in pdf format, in that case you come on to right website. We present the complete edition of this book

Palmares Beach & Golf Resort

Wastewater Allocation Request

Connectivity. Sport & Leisure

CHAPTER 2 HOTEL INDUSTRY

January 22 nd, Ede Ijjasz-Vasquez Senior Director Social, Urban, Rural & Resilience The World Bank

TOURISM INVESTMENT OPPORTUNITIES IN RWANDA

Transcription:

Tourism Zone KIGAMBONI NEW CITY MASTER PLAN, TANZANIA 11

SITE ANALYSIS Locati ion and Area Present Facilities & Population 12

SITE ANALYSIS LOCATION AND AREA Site Location: Kigamboni, Dar Es Salaam, Tanzania The site is located close to DSM CBD and faces to the Indian Ocean Dar Es Salaam Kigamboni New City Site Area: 64,944,000 m2 CBD Site Rwanda Burundi Lake Victoria Kenya Kigoma Tabora Lake Tenganyi ka Rukwa Mbeya Manyara Tanga Singida Dodoma Dar Es Salaam Indian Ocean Lake Nyasa Ruvuma Mozambique 13

SITE ANALYSIS PRESENT FACILITIES & POPULATION Present situation of Kigamboni new city project area S/N Ward Population (persons) Mwalimu Nyerere Academy 1 Kigamboni 41,085 2 Mjimwema 18,006 3 Kibada 3,352 4 Vijibweni 19,165 5-1 Somangira 1,200 Total population 82,808 14

THE MASTER PLAN OF THE NEW CITY Vision Planning Concept Comprehensive Land Use Plan Transportation Network Plan Green Network Plan 15

VISION The future of Africa!! Transportation & Industrial hub connecting Africa to the Indian Ocean The source of national economic growth through global business, tourism resort, advanced education and high-quality residence ENTA PORT of Tanzania City of International Exchange City of Ocean Tour City of Convenience and Safety City of Education City of High-Technology Industry 16

PLANNING CONCEPT Overall Urban Structure Framework (2030) Tunnel Bridge Connection of Kigamboni New City Business Land Use Pattern Industrial Tourism Education Residential Open Space System 17

COMPREHENSIVE LAND USE PLAN (2030) Residential District Commercial / Business Industrial Tourism Education Institutional Utility Service Recreation The Other Section Area( m2 ) Per.(%) Total 64,944,000 100.0 Total 23,518,000 36.2 Detached House 16,723,000 25.7 Apartment 6,795,000 10.5 Total 3,664,000 5.5 Business 1,324,000 2.0 Convention Center 89,000 0.1 Central Commercial 731,000 1.1 Market 142,000 0.2 Commercial 523,000 0.8 Mixed Use 855,000 1.3 Total 4,987,000 7.7 General Industry 3,304,000 5.1 R&D Industry 468,000 0.7 Port 1,215,000 1.9 Total 5,375,000 8.3 Tourism Area 3,112,000 4.8 Resort Villa 1,346,000 2.1 Golf Course 917,000 1.4 Total 4,282,000 6.6 Primary School 545,000 0.9 Secondary School 489,000 0.8 Polytechnic 460,000 0.7 University College 2,788,000 4.3 Total 3,766,000 5.8 Military Area 1,546,000 2.4 Community Facility 448,000 0.7 Cultural Facility 576,000 0.9 Medical Center 84,000 0.1 Government Establishment 1,112,000 1.7 Total 646,000 1.0 Sewage Management 118,000 0.2 Waste Management 72,000 0.1 Power Supply 249,000 0.4 Distribution Reservoir 67,000 0.1 Substation 140,000 0.2 Total 11,312,000 17.3 Open Spaces 6,006,000 9.2 Park 2,146,000 3.3 Open Space (Ocean) 734,000 1.1 Sports Field 129,000 0.2 Play Field 335,000 0.5 Eco Park 1,962,000 3.0 Total 7,394,000 11.4 Transfer Center (Ferry) 105,000 0.2 Bus Terminal 42,000 0.1 Parking Lot 161,000 0.2 Road 7,086,000 10.9 Detached House Apartment Business Convention Center Central Commercial Market Commercial Mixed Use General Industry R&D Industry Port Sewage Management Waste Management Power Supply Distribution Reservoir Substation Transfer Center Tourism Area Resort Villa Golf Course Primary Schoo Secondary Sch Polytechnic University Col Military Area Community Fa Cultural Cente Government Establishment Open Space Park Open Space (O Sports Filed Play Field Eco Park Bus Terminal Parking Lot 18

DEVELOPMENT CONTROL GUIDELINE International Business Zone_ Development Scheme Commercial & Market Area Embassy Convention Government Establishment International School Business Embassy International School Cultural Facilities nvention Government Office Cultural facilities Central Commercial District mmercial Center Fish Market City Hall Police station 19

DEVELOPMENT CONTROL GUIDELINE Tourism Zone_ Development Scheme Tourism Zone Island Resort Golf Course Medical Tourism Facility Aquarium Commercial olf Course Cultural Facility Aquarium Eco Park Amusement Park Area ild Tour Culture Zone Eco Park Amusement Park Wild Tour Area 20

DEVELOPMENT CONTROL GUIDELINE Industrial Zone_ Development Scheme Bus Terminal Bus Terminal Community Center Industrial Zone Community Center Industry R&D Center Medical Center dustry University Medical Center &D Center University 21

DEVELOPMENT CONTROL GUIDELINE Residential Zone_ Development Scheme Central Park Detached House (Government Establishment) Apartment Complex Residence Zone Central Park Apartment vernment Establish Mixed Use Low-rise Apartment Detached House tached House Complex Prefabricated House Mixed Use Arcade Street 22

DEVELOPMENT CONTROL GUIDELINE Residential Zone_ Population & Housing Supply Plan Classification (Unit) Average scale ( m2, %) Site area ( m2 ) Component ratio (%) Public site ratio (%) Number of housing (houses) Population (persons) Component ratio (%) Remark Total 24,706,6000 100.0 83,400 500,000 100.0 Population density 77 person/ha Sub total 24,373,000 0 98.64 83,300 499,400 99.89 Total 100 16,723,0000 67.68 10,100 60,000 12.0 Detached house High density 800 50 8,361,5000 33.84 7,300 43,200 8.64 Medium density 1,600 30 5,016,9000 20.3 2,200 13,200 2.64 Low density 4,000 20 3,344,6000 13.54 600 3,600 0.72 30 Apartment 105 6,795,0000 27.5 68,000 408,200 81.65 5 th ~15 th floor, Floor Area Ratio 150% Mixed use 138 855,000 0 3.46 5,200 31,200 6.24 4 th floor, Floor Area Ratio for residence 120% Sub total 100 333,600 0 1.36 100 600 0.11 High density 800 - - - - - - Government Establishment 30 Medium density 1,600 50 166,8000 0.68 70 420 0.08 Low density 4,000 50 166,8000 0.68 30 180 0.03 23

TRANSPORTATION NETWORK PLAN Road Network Plan LEGEND Water Taxi Trunk Road Primary Distributor District Distributor Railway Undersea Tunnel 24

TRANSPORTATION NETWORK PLAN Bridge Section Plan Cable-Stayed Girder Bridge Type 18m Key Map Reclamation Section A End Point Reclamation section Start Point A 1,500m 400m (Slope Section) 700m (Deviation Range) 400m (Slope Section) Dar es Salaam 50m Kigamboni EL:10.0m EL:10.0m 10m Mean Sea Level 0.00 15m 10m Undersea Tunnel Vertical Section EL : - 35.0M) 800m 1,000m (Slope Section) (Tangent) 800m (Slope Section) 25