INFRASTRUCTURE ENGINEERING

Similar documents
Public Informational Meeting

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

INVESTMENT PROJECTS AND OPPORTUNITIES IN MONTENEGRO

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro

Italo - Nuovo Trasporto Viaggiatori

Company Profile. Montaldo Engineering headquarter in Genova, Italy Phone: Mail:

Italo - Nuovo Trasporto Viaggiatori

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013

Photo Index. p p p p p p p p p p p p. 154

Projects overview 2018

The Coalition s Policy

5.7 Local road upgrades

SHIP RECYCLING. Your guide to compliance. Move Forward with Confidence

TORONTO TRANSIT COMMISSION REPORT NO.

UNVEILING AND OPENING TO TRAFFIC OF THE THIRD GUADARRAMA TUNNEL ON THE AP-6 MOTORWAY

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

Accessible Tourism. Marino Finozzi. Regional Minister for Tourism Veneto Region

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

STONES CORNER SUBURBPROFILE. Situated three kilometres from the Brisbane CBD, Stones Corner is located within one of Brisbane s key growth areas.

Building Connections to SUPPORT LIFE S JOURNEYS

Canada and Alberta announce 33 new infrastructure projects

Worldwide Experience of SALINI GROUP in working with Multilateral Development Banks - special focus on EBRD countries of operations

Major Projects Overview

1.2 Corridor History and Current Characteristics

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

waterview connection Completing the Western Ring Route the Waterview Connection

From: OECD Tourism Trends and Policies Access the complete publication at: Italy

Roads Australia Industry Presentation 12 March 2015

ITA AITES WORLD TUNNEL CONGRESS 2009

TORONTO TRANSIT COMMISSION REPORT NO.

ARTWEI ARTWEI ARTWEI

4 Transport projects underway in Western Sydney

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

Non-binding Survey of Interest. In the use of part of the Imperial Spa in Karlovy Vary and the Peat Pavilion

Key figures Observation and analysis of transalpine freight traffic flows. European Commission DG MOVE

For personal use only

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

THIS IS THE KEY LINK OF THE MEDITERRANEAN CORE NETWORK CORRIDOR (TEN-T NETWORK), WHICH WILL BE COMPLETED BY telt-sas.com 2

Planning Approval Consistency Assessment Form

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018

COMMITTEE OF THE WHOLE MEETING AGENDA

Christchurch and Waimakariri

How, when, what & why to access Structural Funds in Romania

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

Jim O Sullivan Chief Executive

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

History of Vauxhall Bridge

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

TERMINAL DEVELOPMENT PLAN

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

Transportation Supporting Dulles Airport

visits4u Case Studies: Historical Centre of Athens Athens, Greece

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Technical Explanation Introduction

IAT Annual Conference 'Driving Forward

ITINERA. Company Profile

PROJECT OF THE FIXED LINK THROUGH THE STRAIT OF GIBRALTAR NOVEMBER 2007

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

MEASURING ACCESSIBILITY TO PASSENGER FLIGHTS IN EUROPE: TOWARDS HARMONISED INDICATORS AT THE REGIONAL LEVEL. Regional Focus.

Stage 2 Parklands at Windaroo Territory & Wilkie Streets off Beaudesert-Beenleigh Road, Bannockburn, Queensland

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

TORONTO TRANSIT COMMISSION REPORT NO.

Key figures Observation and analysis of transalpine freight traffic flows. European Commission DG MOVE

Why the. Building for growth. West Metro. is vital

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Good morning, ladies and gentlemen. Joaquín Ayuso. Chief Executive Officer

Small hive beetle in Italy"

The development of air traffic in Sicily

M4 M5 Link Tunnels Community guide to the M4-M5 Link Modification Report September 2018

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

PAGONI CONSTRUCTION COMPANY

HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

Transport Infrastructure Construction and RMI Market Report - UK Analysis

Double Celebration for Shatin to Central Link Topping Out and New Names Announced for Two Stations in Kowloon City

Hungarian Public Road Nonprofit PLC

Board of the Centre Geneva, October 2007

Tunnelling Featured Projects

Topic on A Technical and Project Review of the 10 Airport Core Projects and their Influence on Current Developments

Behind the scenes of Queensland s top priority infrastructure project. Michael Glover Chief Financial Officer

CHAPTER 4: ALTERNATIVES

Belgrade lies at the point where the Sava River meets the Danube. It is surrounded on three sides by riverways. Hence its appellation as the Gateway

Major Schemes and the wider Strategic Network

Appendix L Technical Memorandum Aesthetics

Les Chemins de Fer du Sud de la France, Ligne de Central Var. History of the Line to 1925

MANTOVANI GROUP BUILDING THE FUTURE. March 2015

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

1. TU2 tunnel at Edessa Florina trunk road 2. Cut & cover (25x250m) Thessaloniki 3. Edessa bypass Cut & cover tunnel 4. Trunk tunnel road at

MODAIR. Measure and development of intermodality at AIRport

AMATA VN Public Company Limited

TfL Planning. 1. Question 1

Transcription:

INFRASTRUCTURE ENGINEERING

SIPAL INFRASTRUCTURES

CONCEPTUAL DESIGN > FINAL DESIGN > DETAILED DESIGN STRUCTURAL ANALYSIS Pre-project/preliminary studies on Highway and Railway infrastructures PSC Bridges design Steel girder Bridges design Tunnels and False Tunnels design Tunnel Electrical and Ventilation systems design Data network system design Maritime Structures design Linear and non linear static analysis Non linear staged construction analysis Buckling analysis Moving load analysis Modal analysis Response spectrum seismic analysis Time history analysis

ANALYSIS DESIGN > ANALYSIS > SITE SUPERVISION

ANALYSIS DESIGN > ANALYSIS > SITE SUPERVISION

SITE SUPERVISION Technical support to adapt the project to the erection requirements Detailed Analysis to define times and methods of constructions Design of site facilities Design of provisional structures Technical support for materials selection and procurement Design of bridge launching site facilities

ANALYSIS SUPPORTING FINAL TESTS Analysis to define load conditions for the final tests Site assistance during the final tests Preparation of reports for final tests execution Interpretation and reporting of final tests results

CAD CAE TOOLS CAD STATIONS Autodesk Autocad Autodesk Autocad MAP 3D ROADWAY DESIGN Autodesk Civil 3D Prost Civil Design FEM STATIONS Midas CIVIL (FEM for Bridges and structures in general) Midas GTS (3d geotechnical models for tunnels) Plaxis 3D foundation (3d geotechnical models for foundations) Plaxis 3D tunnels (3d geotechnical models for tunnels) Phase (2d) Paratie Plus (embedded walls analysis)

DESIGN & SITE SUPERVISION DESIGN > ANALYSIS > SITE SUPERVISION

DESIGN & SITE SUPERVISION PEDEMONTANA VENETA EXPRESSWAY COMMISSIONED BY: Veneto Region OBJECT: Final and Detail Design, Construction and Management VALUE OF WORKS: 2,130 ML YEARS: 2009 - in progress

DESIGN & SITE SUPERVISION PEDEMONTANA VENETA EXPRESSWAY The Pedemontana Veneta pay-toll expressway is part of the European Corridor No. 5 project. The Pedemontana Veneta project is intended to reconfigure and re-organize the entire road system of the reference territory, raising all-round levels of quality and safety according to mobility and local development requirements and promoting substantial modifications to mobility profiles throughout North East Italy.

DESIGN & SITE SUPERVISION PEDEMONTANA VENETA EXPRESSWAY

DESIGN & SITE SUPERVISION SALERNO - REGGIO CALABRIA MOTORWAY - MEGA LOT 2 COMMISSIONED BY: Anas S.p.A OBJECT: Detail Design and Construction VALUE OF WORKS: 817 ML YEARS: 2008 - in progress

DESIGN & SITE SUPERVISION SALERNO - REGGIO CALABRIA MOTORWAY - MEGA LOT 2 Mega Lot 2 involves the section of the Salerno/Reggio Calabria motorway from km 108+000 to km 139+000, including the Lauria North interchange. The works on the section, for a total of 31 km, include planimetric optimisation of the section and broadening of the carriageway, construction of the emergency lane and complete modernisation and upgrade to type 1/a of CNR/80 regulations.

DESIGN & SITE SUPERVISION SALERNO - REGGIO CALABRIA MOTORWAY - MEGA LOT 2

DESIGN & SITE SUPERVISION PALERMO TRAMWAY SYSTEM COMMISSIONED BY: Municipality of Palermo - Amat OBJECT: Detail Design and Construction VALUE OF WORKS: 192 ML YEARS: 2008 - in progress

DESIGN & SITE SUPERVISION PALERMO TRAMWAY SYSTEM The Tramway System of Palermo, currently one of the most important under construction in Italy, is intended to link the West and South suburbs of the city with the centre. The main engineering structures include the new bimodal arch bridge on the Oreto River, the Einstein Bridge and three pedestrian overpasses on Viale della Regione Siciliana.

DESIGN & SITE SUPERVISION PALERMO TRAMWAY SYSTEM

DESIGN & SITE SUPERVISION PALERMO HUB COMMISSIONED BY: RFI - Italferr OBJECT: Detail Design and Construction VALUE OF WORKS: 596 ML YEARS: 2005 - in progress

DESIGN & SITE SUPERVISION PALERMO HUB The Palermo Hub project envisages electrified double-track connection of the City of Palermo with the Punta Raisi Falcone e Borsellino international civil airport, to be constructed mainly alongside existing electrified single-track sections, laying the track partially on the surface and partly underground and also upgrading and installing line and station technological systems.

DESIGN & SITE SUPERVISION PALERMO HUB The track comprises: 19.5 km of railway embankments/cuttings; 0.5 km of viaducts/bridges/ underpasses/overpasses; 6 natural tunnels with a total length of 3.2 km; 18 artificial tunnels with a total length of 5.2 km; around 2.8 km of stations/stops in tunnel or open air.

DESIGN & SITE SUPERVISION VARIANT SS24 DEL MONGINEVRO IN THE CESANA CLAVIERE SECTION COMMISSIONED BY: ANAS S.p.A. OBJECT: Detail Design and Construction VALUE OF WORKS: 133 ML YEARS: 2005 - in progress

DESIGN & SITE SUPERVISION VARIANT SS24 DEL MONGINEVRO IN THE CESANA CLAVIERE SECTION The works carried out by ANAS for the Torino 2006 Winter Olympic Games included upgrading of State Road No. 24 del Monginevro in the section between Cesana Torinese and the Italian-French border.

DESIGN & SITE SUPERVISION VARIANT SS24 DEL MONGINEVRO IN THE CESANA CLAVIERE SECTION Asbestos-bearing rock was encountered during excavation of the Cesana tunnel at the end of 2006. The Technical Variant Expert s Report drawn up at the time introduced construction of the first underground repository for special waste and adoption of a suite of experimental technologies necessary to complete the works while, at the same time, safeguarding the health of workers and residential receptors bordering on the areas of the site.

FINAL TEST DESIGN > ANALYSIS > SITE SUPERVISION

FINAL TEST DESIGN > ANALYSIS > SITE SUPERVISION