The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009

Similar documents
LFV Data link AIS activities

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

Avitech GmbH AIXM Capabilities & Experiences

MIDAD Project IDS Vision

Aeronautical METeorology in Europe

Leverage and demonstrate one of AIXM s main benefits: Make AIS Dynamic Data Understandable and Usable for Computer-driven Applications!

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

AMXM Airport Mapping picking-up SWIM

AIXM/WXXM CONFERENCE 2010

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

Aeronautical Information Management

Experience with Digital NOTAM

OVERVIEW OF THE FAA ADS-B LINK DECISION

QMS for AIS/MAP Service Implementation Workshop

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

Information Management towards SWIM

AIS-AIM Study Group Working Status

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

Airport AIM as a Service Presented at World ATM Congress 2016

Simulator Architecture for Training Needs of Modern Aircraft. Philippe Perey Technology Director & A350 Program Director

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

The Importance of AIM and the Operational Concept

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

AIXM Coding guidelines for the ICAO data sets

AIS/AIM System in South Africa (ATNS)

AIXM Annual Conference 2008 Day 2 March 19 th (morning) Migration TO and FROM AIXM from other AMDB Formats. Alan Poole/Dejan Damjanovic

30 SEP - 02 OCT, 2014

AN INTRODUCTION TO PANS-AERODROMES (Doc 9981)

Global Information Management. Status Report: AIXM

TWELFTH AIR NAVIGATION CONFERENCE

Delivering Digital Services. SWIM - Looking beyond the horizon

Surveillance and Broadcast Services

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP

Implementation of PBN in Armenian airspace

European ATM Development The Big Idea

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

Aeronautical Information Services Update on Aeronautical Information Exchange Model (AIXM)

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT

Sharing UAE experience in. AIM implementation

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

Runway Condition Assessment: putting data together for enhanced Safety

Curriculum for AIM Training Module 2: ARO Officer

Airspace User Forum 2012

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Technical Resources - Automation European AIS Database (EAD)

S 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK

SESAR DEPLOYMENT MANAGER WORKSHOP AIRPORT SAFETY. Airbus initiatives on airport safety nets PIERRE NIERADKA AIRBUS 20 FEB 2018

Introduction to Amendment 40 to Annex 15

Managing Aeronautical Data

IWXXM and WXXM Update. By: Aaron Braeckel Date: 22 September 2016

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

VALUE PROPOSITION FOR TRAINING AND SIMULATION A White Paper on Electronic Terrain & Obstacle collection

EGOA Enhanced General Aviation Operations by ADS-B

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance.

EUROCAE ED-250: ROAAS MOPS

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

Simone Gabriele. Digital NOTAM The Digital Age for Air Navigation

Lufthansa Systems AIM from a navigation data house perspective

Unmanned Aircraft System (UAS): regulatory framework and challenges. NAM/CAR/SAM Civil - Military Cooperation Havana, Cuba, April 2015

[EFFECTIVE DATE: 23 AUG 2012]

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink

STAIRWAY IDS ATC SIMULATION ENVIRONMENT - SWIM COMPATIBLE SYSTEM

Integrated SWIM. Federal Aviation Administration Presented to: Interregional APAC/EUR/MID Workshop>

CEM: KPIs used for the joint work between Traffic control, Airports and Airline companies

Federal GIS Conference February 10 11, 2014 Washington DC. ArcGIS for Aviation. David Wickliffe

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Next Generation Airspace Developments: Key Operational Trends and Enablers

Status of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU)

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

U.S. Domestic CPDLC-DCL Users Guide. DATA COMMUNICATIONS INTEGRATED SERVICES (DCIS) Harris Corporation

Spectral Efficient COMmunications for future Aeronautical Services. Jan Erik Håkegård ICT

The VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

EMMA2 Introduction. EMMA2 Demonstration Day Malpensa, Michael Roeder. Internet:

TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems

Data Origination, Management and WGS 84. ICAO PBN Seminar Data Origination & Management and WGS 84

Optimizing trajectories over the 4DWeatherCube

Runway Incursion Preventive measures at aircraft level

AIM AUTOMATION. Raul Martinez, RO/AIM International Civil Aviation Organization North American, Central American and Caribbean Office

PENS Symposium How to join PENS

Meteorological Service for International Air Navigation

AIXM 5 NAVAID Use Case. AIXM 5 Public Design Review February 7-8, 2006 Washington DC

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

Aircraft Systems and 4D Trajectory Management

Management System for Flight Information

ADQ Regulators Working Group

SWIM. Demonstrations and products. Giovanna Ono Koroishi

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg

Work Programme of ICAO Panels and Study Groups

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

Digital NOTAM Preliminary Business Case

LATVIAN AIP DATA SET

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars

Air Traffic Management and Space Transportation System Wide Information Management and Integration into European Airspace

Transcription:

The D-AIM Project and Trials Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009

D-AIM Background Cooperation between LFV (Swedish Airports and Air Navigation Services) and EUROCONTROL Focus on automation of aeronautical information, made available for ALL users, ground based as well as airborne. Project running 2007-2009 Close connection to RTCA/EUROCAE work on AIS/MET Data Link 2

Digital Aeronautical Information Management Moving away from a paper based information environment to a digital information environment 3

Digital Aeronautical Information Management Data Integrator AOC ATC Airport Operator Pilot Scope of trials 4

Flight Information Service Broadcast (FIS-B) Previously performed work - mainly text based information Above: Example of text based presentation of Met Report 5 Left: Cockpit Display screenshot of ATIS information

Digital Aeronautical Information Management Focus on graphical presentation of temporary aeronautical information Intitial airborne use cases: Taxiway or Runway Closure (Digital NOTAM) Temporary Segregated Area (TSA) Status Digital Meteorological Information, geo-spatially displayed Picture from Digital NOTAM simulation performed by Technical University of Darmstadt in 2006 Aircraft passing activated Temporary Segregated Area (TSA), from D-AIM test flight, autumn 2008 6 Aircraft landing on RWY 09/27 at Norrköping Airport, EFB showing RWY 11/29 Closure, from D-AIM test flight, autumn 2008

Aerodrome Mapping Database (AMDB) Part of Norrköping AMDB With orthophoto (for digitising/verification) 7

Aerodrome Mapping Database (AMDB) Input material for Stockholm-Arlanda AMDB (Orthophoto + CAD files) 8

Snapshots from ESMS, ESSA and ESSP AMDB Malmö Airport - ESMS Stockholm-Arlanda Airport - ESSA Norrköping Airport - ESSP 9

Digital Aeronautical Information Management Following AIM principles based on service orientation as adopted by SESAR and using open global standards such as (list not exhaustive): ISO, Open Geospatial Consortium (ISO19100, GML, WFS) EUROCONTROL, FAA (AIXM, AMDB, WXXM) ICAO (Annex 3, 10 &15, Doc 9816) RTCA/EUROCAE (ED-99A, ED-108A, ED-119) AIXM Annex 15 Annex 3 Sources AIXM AMDB WFS D-AIM server AIXM AMDB Annex 10 Doc 9816 ED-108A WFS FIS-B server Annex 10 Doc 9816 ED-108A Data Link Ground Station(s) Other users (ATC, AOC, Airport) Aircraft AIXM AMDB Annex 10 Doc 9816 ED-108A WFS 10 AMDB AIXM ED-99A AMDB ED-119 WFS

EVOLUTION rather than Revolution Adapting already existing systems where possible to get payback on investments already made Overlap between introduction of new AIM services and use of traditional AIS/MET services to facilitate for early adopters as well as other more conservative users LFV before D-AIM Source formats: AIXM 3.3 and traditional weather formats User output: Voice Paper pdf 11 Current D-AIM trials Source formats: AIXM 3.3/4.5 and traditional weather formats, both with added geo-spatiality and temporality User output: Data Link Web services (Voice, Paper, pdf) Goal Source formats: AIXM 5 and WXXM User output: Data Link Web services (Voice, Paper, pdf)

Time line from origination to use dynamic info NOTAM Origination at Flight Planning Center (FPC) European Aeronaut. Database (EAD) Local EAD Network Adapter (LENA) D-AIM server Flight Information Service Broadcast (FIS-B) server Cockpit Display (CDTI) or Electronic Flight Bag (EFB) NOTAM < 1 min < 1 min < 5 min < 2 min < 1 min Total: < 10 min MET Origination at Airport or MET office Swedish MET Institute (SMHI) & MET Office UK LFV MET System (TOR) D-AIM server Flight Information Service Broadcast (FIS-B) server Cockpit Display (CDTI) or Electronic Flight Bag (EFB) MET < 1 min < 2 min < 10 min < 2 min < 1 min Total: < 15 min 12

Time line from origination to use baseline info AIP/AIXM Update (ready 49 days before AIRAC pub.date) LFV AIP/AIXM System (Atalis) Commit (EAD) D-AIM Server ( 49 day wait updated at AIRAC pub.date) User WFS/WMS Client AIP < 1 min < 5 min < 1 min Total: < 7 min (and 49 days ) AMDB Update D-AIM server User WFS/WMS Client AMDB < 1 min < 1 min Total: < 2 min 13

Data link channel load Data link used: VDL Mode 4 (VHF link with 19200 bps) Update rate per service: 2 minutes Message size per service: Message type METAR & SIGMET RWY/TWY Closure NOTAM Temporary Segregated Area Message size in bits* Average: 452 bits Average: 504 bits Average: 152 bits Cost * Per message. The coordinates for the affected airport or area are available in the onboard data base and not being broadcast. 0 0 0 Cost: The Swedish VDL mode 4 network can encompass both free services from the Air Navigation Service Provider as well as other services from commercial providers. The services listed above are all examples of services that are/will be free of charge when operational. 14

(D-AIM AMDB) (D-AIM AMDB) (D-AIM AMDB) (D-AIM AMDB) (D-AIM AMDB) (D-AIM AMDB) D-AIM Infrastructure Ground station coverage 2006-2009 2006 May 2009: Malmö Stockholm-Arlanda (replacing old station) Umeå Norrköping Stockholm-Bromma Kiruna (replacing old station) Östersund Sundsvall Göteborg Visby Karlstad May 2009- Luleå Coverage at 3000 ft Coverage at 10000 ft 15 Coverage at 33000 ft

D-AIM Current Status Ground part of D-AIM trials infrastructure and connection to operational infrastructure in place in autumn 2008 First release of Cockpit display/ Electronic Flight Bag (EFB) software ground user application software in autumn 2008 First test flights autumn 2008 First demo and workshop Nov 2008 Stockholm-Arlanda Airport cooperation initiated Jan 2009 Jeppesen cooperation initiated Feb 2009 All six AMDBs available spring 2009 New release of EFB software May 2009 16 Screen dump from Beta version of EFB software showing Malmö Airport AMDB

D-AIM Upcoming Work D-AIM Demonstration and Workshop Stockholm-Arlanda Airport, June 5, 2009 Web site application summer 2009 Continued system verification and development Airport and Data Integrator use case during 2009 Continued validation during 2009 Final report late 2009 17

Way ahead after trials Implementation (for use cases considered mature, e.g. AMDB, subset of FIS-B applications) D-AIM phase II (still TBD) More validation (more users active in trials, e.g. ATC, Airlines) Extended scope (include more data formats, sources and/or applications, e.g. AIXM5, WXXM, terrain and obstacle data base, D-TAXI, etc) Potential part of SESAR Joint Undertaking work in WP8 and 14 18

Questions? For more information see www.d-aim.aero or contact roger.li@lfv.se. 19

Thank you! 20