Shadow Impact Assessment & 2323 Lake Shore Boulevard West. Etobicoke, Ontario

Similar documents
Spadina Avenue Built Form Study Preliminary Report

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING Produced for information by the City of Markham

Director, Community Planning, Toronto and East York District

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham

Fabulous Residential Development Site on the Peninsula

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

FORT YORK PEDESTRIAN & CYCLE BRIDGE

Submitted to: NYX CAPITAL CORP. 1131a Leslie Street, Suite 201 Toronto, Ontario M3C 3L8 Attention: Mr. Tim Jessop Development Manager

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

KING CONDOMINIUM RESIDENCES (REZONING)

September 13, Presented by: Jeremy Parsons PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT

Director, Community Planning, Toronto and East York District

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

Dufferin Jog Elimination Project

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

This submission strongly objects to the following aspects of the proposed development:

Nov. 29, 2007 PL Ontario Municipal Board Commission des affaires municipales de l Ontario. Judith Sellens and Claire Sellens

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

The Royal Atlantis. Hotel + Residences. Dubai, UAE

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

Disposition of Spadina Expressway Properties - Memorandum of Understanding with Infrastructure Ontario

I508. Devonport Peninsula Precinct

Update Report - Etobicoke Creek and South Mimico Creek Trails

Concept Curtin Precinct Map and Code

STARA PLANINA REVISION OF APPLE PLATEAU BASE AREA DEVELOPMENT

Mixed use conversion and redevelopment opportunity

STAFF REPORT TO COUNCIL

Southwest Sector. Site 6 Site 7 Site 9a/b Site B Site C Site D

2175 Lake Shore Boulevard West Official Plan and Zoning Amendment, and Removal of the Holding Provision Applications Final Report

This report recommends two new TTC transit services in southwest Toronto.

Construction Staging Area Blue Jays Way (357 King Street West)

Approve, subject to conditions, and with a County Board review in one (1) year. (June 2003)

DECISION/DIRECTION NOTE

MARSHALL Subdivision. Township of Springwater, County of Simcoe. Traffic Brief for: Ontario Inc. Type of Document: Final Report

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/

Appendix L Technical Memorandum Aesthetics

Lake Erie Commerce Center Traffic Analysis

BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16

Klarman Hall & G2 Pavilion

Welcome WINSTON GROUP. Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green.

Welcome to our exhibition

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

GUIDELINES RAILWAY LANDS WEST AND CENTRAL LOCATION URBAN DESIGN GUIDELINES

Number Four Capital Quarter is a new eight storey landmark. office development in the heart of Cardiff City Centre s

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Director, Community Planning, Toronto and East York District

ESPLANADE CENTRE. 260 West Esplanade and 255 West 1 st Street North Vancouver, British Columbia

TORONTO TRANSIT COMMISSION REPORT NO.

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

THE FORMER BRADBURY HALL, CHATSWORTH ROAD, CHESTERFIELD. GROUP LEADER, DEVELOPMENT MANAGEMENT

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

The Brant Park. 430 ADELAIDE STREET WEST Retail for Lease

PROCEEDING COMMENCED UNDER subsection 22(7) of the Planning Act, R.S.O. 1990, c. P.13, as amended

Toronto and East York Community Council. Director, Toronto Building, Toronto and East York District

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

Appendix B Connecting Track Options Evaluation Criteria

Pre-application submission for Committee: Phase 4 development at West Hendon

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

Live Life Healthy 2 C HAMPAGNE D R IVE, TOR ONTO, ON. M3J 0K 2

The Palm Tower/Mall - Architecture. Prabhanjan Kambadur, Director MENA, RSP Architects, Planners & Engineers (MENA)

Nelson Mandela Community School, Colville Road, Sparkbrook, Birmingham, B12 8EH. Erection of single storey detached learning pod building

LAND AT STRATHAVEN GOLF CLUB

I507 Devonport Naval Base Precinct

Runway Length Analysis Prescott Municipal Airport

Town: Sharon Place (neighborhood or village): Sharon. ame of Area: Present Use: Date (month / year): July 2008

Sustainable Brisbane Walking Tour

Pioneer Events Center

5.17 STRANDFONTEIN (permanent population: + 110) (IDP )

Toronto and East York Community Council

- Gerald D. Hines Founder and Chairman, Hines

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

Hotel and Hospitality Services. Capita Real Estate

STANTEC TOWER. FOR LEASE Avenue NW Edmonton, AB

Construction Staging Area 197 Redpath Avenue

Southwest LRT Alignment Video Narration

The perfect location for every event: Messe Basel

Clydebank Healthcentre. Design Delivery Group Session Six- 19/04/2016

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

2004 SOUTH DAKOTA MOTEL AND CAMPGROUND OCCUPANCY REPORT and INTERNATIONAL VISITOR SURVEY

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

Inclusion on the City of Toronto's Heritage Register Midtown in Focus Phase 1: Main Street Properties

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

01 INTRODUCTION. Student Learning Hub University of Bristol, Beacon House. Proposals for Beacon House. Have your say

Memorandum / Letter of Intent

SUBJECT: Downtown Mobility Hub draft New Precinct Plan and Policy Framework

Green Fields Leppington

LEASING OPPORTUNITIES

Transcription:

Shadow Impact Assessment 2313 & 2323 Lake Shore Boulevard West Etobicoke, Ontario REPORT: GWE12-099-SHADOWS-2014 Prepared For: Peter Swinton, B.Arch., MCIP, RPP PMG Planning Consultants 227 Bridgeland Avenue Toronto, Ontario M6A 1Y7 Prepared By: Justin Ferraro, B.Eng., Project Manager Vincent Ferraro, M.Eng., P.Eng., Principal November 13, 2014 127 Walgreen Road, Ottawa, Ontario K0A 1L0 T (613) 836-0934 F (613) 836-8183 www.gradientwind.com

1. INTRODUCTION Gradient Wind Engineering Inc. (GWE) was retained by PMG Planning Consultants, on behalf of Osgoode Properties Ltd., to undertake a a shadow impact study, and a qualitative pedestrian wind assessment, for rezoning approval of a planned residential development located at 2313 and 2323 Lake Shore Boulevard West in Etobicoke, Ontario. This report summarizes the methodology, results and recommendations related to the shadow impact study, with the wind assessment presented in a separate report. The study is based on architectural drawings provided by Richmond Architects Ltd. in October of 2014, surrounding street layouts and trhee-dimensional building massing information, and recent site imagery. 2. TERMS OF REFERENCE The focus of this shadow impact assessment is a proposed twenty-five (25) storey residential development located at 2313 and 2323 Lake Shore Boulevard West in Etobicoke, Ontario. The development is situated on the west bank of Lake Ontario and Humber River Bay, and immediately east of two (2) existing ten (10) storey apartment buildings with the same civic addresses. Additionally, the Humber Bay Park East Trail, which continues as the Martin Goodman Trail at the Humber River crossing, borders the proposed site to the east. Lake Shore Boulevard West is located approximately 115 meters (m) to the west. The development comprises a twenty (20) storey rectangular building rising above a nearly rectangular five (5) storey podium having its long axis aligned parallel with Lake Shore Boulevard West. The residential building rises to a maximum height of 84.6 m above grade to the top of the mechanical penthouse. The ground floor is served by two (2) main residential entrance vestibules, one on each of the east and west façades, a central lobby and elevator core, and individual suites covering the north and south façades. Access to three (3) levels of below-grade parking is provided at the southwest corner of the development, with a dedicated loading area at the northwest corner. The podium roof on the 6 th floor provides a large landscaped terrace, parts of which are intended for occupant use. In addition, a raised pedestrian walkway and stair extends from the west façade on the 3 rd floor to a large landscaped area at grade located between the two existing 10-storey apartment buildings on the west side. Figure 1 illustrates an overall context plan including surrounding buildings. PMG Planning Consultants Osgoode Properties Ltd. Richmond Architects Ltd. 2313 & 2323 Lake Shore Boulevard West, Etobicoke: Shadow Impact Assessment Page 1

3. OBJECTIVES In accordance with the requirements of the Terms of Reference for Sun / Shadow Studies obtained from the City of Toronto 1, the principal objectives of this study are to simulate shadow patterns cast during specific dates and times in order to illustrate: (i) the net new roof and net new ground shadows formed by the proposed building, and (ii) the shadows cast on the proposed building by the surrounding massing and the study building itself. 4. METHODOLOGY 4.1 Background Shadow impact studies are performed to determine the extent of shadows cast by a proposed development onto the existing surroundings, as well as those cast by the existing surrounding buildings on the proposed development. The procedure requires knowledge of the proposed site massing, as well as detailed knowledge of the existing adjacent lands and buildings. The current approach used to conduct a shadow impact study is based on three-dimensional computer modelling and rendered images. Shadow patterns are determined for selected dates and times at a specific geographic location on the Earth s surface, which is defined by the latitude and longitude of the site. For the purposes of this study, a shadow-sensitive area may be defined as any facility or operation sensitive to the effects of shading and includes: (i) residential, recreational, and institutional uses (e.g., parks, schools, daycares, hospitals, etc.); (ii) restaurant patios; (iii) plant nurseries; and (iv) solar energy collectors, among others. These uses are considered important because sunlight is necessary for the function, physical comfort, energy efficiency or commercial viability of the space. The consequences of shadows cast by new uses of existing land may be beneficial, including cooling effects during warm weather, or adverse, such as the loss of natural light necessary for solar energy collection or personal enjoyment. In general, when shadow-sensitive areas are placed in shade by a proposed project for three or more consecutive hours, the shading may be considered to interfere with sun-dependant activities on that property. For the present site, shadow sensitive areas span from the south-southwest clockwise through to east-northeast. 1 Toronto Development Guide, Sun/Shadow Terms of Reference, July 2012 PMG Planning Consultants Osgoode Properties Ltd. Richmond Architects Ltd. 2313 & 2323 Lake Shore Boulevard West, Etobicoke: Shadow Impact Assessment Page 2

APPENDIX A SHADOW RENDERINGS 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 1

TABLE A1: SHADOW RENDERING DATES AND TIMES DATES TIME March 21 st June 21 st September 21 st December 21 st (Figure / Page #) (Figure / Page #) (Figure / Page #) (Figure / Page #) 9:18 AM A1 / A3 A10 / A7 A20 / A12 No Rendering 10:18 AM A2 / A3 A11 / A8 A21 / A13 A28 / A16 11:18 AM A3 / A4 A12 / A8 A22 / A13 A29 / A17 12:18 PM A4 / A4 A13 / A9 A23 / A14 A30 / A17 1:18 PM A5 / A5 A14 / A9 A24 / A14 A31 / A18 2:18 PM A6 / A5 A15 / A10 A25 / A15 A32 / A18 3:18 PM A7 / A6 A16 / A10 A26 / A15 A33 / A19 4:18 PM A8 / A6 A17 / A11 A27 / A16 A34 / A19 5:18 PM A9 / A7 A18 / A11 No Rendering No Rendering 6:18 PM No Rendering A19 / A12 No Rendering No Rendering 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 2

FIGURE A1: MARCH 21 ST, 9:18 AM FIGURE A2: MARCH 21 ST, 10:18 AM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 3

FIGURE A3: MARCH 21 ST, 11:18 AM FIGURE A4: MARCH 21 ST, 12:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 4

FIGURE A5: MARCH 21 ST, 1:18 PM FIGURE A6: MARCH 21 ST, 2:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 5

FIGURE A7: MARCH 21 ST, 3:18 PM FIGURE A8: MARCH 21 ST, 4:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 6

FIGURE A9: MARCH 21 ST, 5:18 PM FIGURE A10: JUNE 21 ST, 9:18 AM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 7

FIGURE A11: JUNE 21 ST, 10:18 AM FIGURE A12: JUNE 21 ST, 11:18 AM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 8

FIGURE A13: JUNE 21 ST, 12:18 PM FIGURE A14: JUNE 21 ST, 1:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 9

FIGURE A15: JUNE 21 ST, 2:18 PM FIGURE A16: JUNE 21 ST, 3:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 10

FIGURE A17: JUNE 21 ST, 4:18 PM FIGURE A18: JUNE 21 ST, 5:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 11

FIGURE A19: JUNE 21 ST, 6:18 PM FIGURE A20: SEPTEMBER 21 ST, 9:18 AM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 12

FIGURE A21: SEPTEMBER 21 ST, 10:18 PM FIGURE A22: SEPTEMBER 21 ST, 11:18 AM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 13

FIGURE A23: SEPTEMBER 21 ST, 12:18 PM FIGURE A24: SEPTEMBER 21 ST, 1:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 14

FIGURE A25: SEPTEMBER 21 ST, 2:18 PM FIGURE A26: SEPTEMBER 21 ST, 3:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 15

FIGURE A27: SEPTEMBER 21 ST, 4:18 PM FIGURE A28: DECEMBER 21 ST, 10:18 AM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 16

FIGURE A29: DECEMBER 21 ST, 11:18 AM FIGURE A30: SEPTEMBER 21 ST, 12:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 17

FIGURE A31: DECEMBER 21 ST, 1:18 PM FIGURE A32: DECEMBER 21 ST, 2:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 18

FIGURE A33: DECEMBER 21 ST, 3:18 PM FIGURE A34: DECEMBER 21 ST, 4:18 PM 2313 & 2323 Lake Shore Boulevard West, Mimico: Shadow Impact Assessment A 19