Air Traffic Control National Control Authority Liability Insurance Questionnaire Applicant: HungaroControl Hungarian Air Navigation Services

Similar documents
Air Traffic Control National Control Authority Liability Insurance Questionnaire Applicant: HungaroControl Hungarian Air Navigation Services

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

5.7 Other Air Navigation Matters THE BAHAMAS FLIGHT INFORMATION REGION (FIR) (Presented by Bahamas EXECUTIVE SUMMARY

Guidelines for NOTAM Workflow and Allocation of Responsibilities

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

AIP PORTUGAL ENR NOV-2007

AIRSPACE INFRINGEMENTS

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

PBN IMPLEMENTATION IN INDONESIA

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Excerpts from ICAO PBCS Manual

AIRCRAFT INCIDENT REPORT

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

Air Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES

Curriculum for AIM Training Module 2: ARO Officer

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

Air Traffic & Navigation Services

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DFS Aviation Services GmbH. A brand of experience

ENR-5 FLIGHT PLANNING

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Civil Approach Procedural Controller Military Terminal Radar Controller

What is B-RNAV? 1. 1 Adaptado de [ ]

French DSNA approach to CNS rationalization & evolution

AIR NAVIGATION SERVICE PROVIDERS

Cooperative Development of Operational Safety & Continuing Airworthiness Programme. 25th COSCAP SA STEERING COMMITTEE MEETING

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

HungaroControl. More than an Air Navigation Service Provider

Flight Inspection Services

North America Limited International Procedures Initial Detailed Syllabus

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

European Aviation Safety Agency

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2

FIJI AERONAUTICAL INFORMATION CIRCULAR Civil Aviation Authority of Fiji Private Bag (NAP0354), Nadi Airport Republic of Fiji

Airspace Infringement Survey 2007

The Effects of the Introduction of Free Route (HUFRA) in the Hungarian Airspace

LETTER OF AGREEMENT. Between. and RELATING TO

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

PPLAOG28 Maintain flight control operations and operating conditions

Performance Based Navigation Operational End-State 2023

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

AUDIT SUMMARY REPORT OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

REPUBLIC OF KAZAKHSTAN

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

THE BAHAMAS FLIGHT INFORMATION REGION (FIR) (Presented by Bahamas) SUMMARY

Airspace Management Operations Manual

Contents. Subpart A General 91.1 Purpose... 7

AERODROME OPERATING MINIMA

5.1 Approach Hazards Awareness - General

AERONAUTICAL INFORMATION CIRCULAR 33/17

Learning Objectives. By the end of this presentation you should understand:

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM

Electronic Terrain and Obstacle Data

ICAO Annex 14 Standards and Aerodrome Certification

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

1. RESPONSIBLE SERVICES 2. MAINTENANCE OF CHARTS 3. PURCHASE ARRANGEMENTS 4. AERONAUTICAL CHART SERIES AVAILABLE GEN APR 2015 AIP HUNGARY

Aeronautical Radio Licensing Policy Manual

2.2 ANSP Certification, Designation & Cross-Border ANS Provision

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

Organization and Services. AIXM 5 Public Design Review February 7-8, 2006 Washington DC

Cranfield Safety Management and Investigation Course

DHMI GENERAL DIRECTORATE OF STATE AIRPORTS AUTHORITY. Suat YILDIRIM ATC Expert

OPERATIONS MANUAL TABLE OF CONTENTS CHAPTER 7: SEARCH AND RESCUE FACILITIES IN THE AREA OVER WHICH THE AIRPLANE IS TO BE FLOWN

IFR SEPARATION USING RADAR

Appendix A REQUEST FOR AUTHORIZATION FORM

AIRSPACE INFRINGEMENTS BACKGROUND STATISTICS

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

OVERVIEW OF THE FAA ADS-B LINK DECISION

AUDIT SUMMARY REPORT OF THE CIVIL AVIATION ADMINISTRATION DENMARK

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE

Overview of Worldwide Data Link Equipage Mandates

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

THE AREA CONTROL CENTRE (CTR) POSITION

ATC automation: facts and steps ahead

Kenya Civil Aviation Authority Air Navigation Services ICAO Seminar/Workshop on Air Traffic Services System Capacity 8-10 June 2016 Nairobi

Bits to Blocks Aviation System Block Upgrades (ASBU)

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

Official Journal of the European Union L 186/27

Annex III to ED Decision 2017/023/R. AMC and GM to Part-CAT Issue 2, Amendment 13

Israel. Contacts. Flight Information. Country Specific Travel Information. Aeronautical Information Publication (AIP) ISO Country Code - IL

AIR LAW AND ATC PROCEDURES

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Form SR FCL 1105 (JAR FCL 02) Issue 8 (Jan 2009) Page 1 of 6

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

SESAR Solutions. Display Options

HungaroControl Csaba GERGELY

Russian Federation ATM modernization program

MetroAir Virtual Airlines

Transcription:

Air Traffic Control National Control Authority Liability Insurance Questionnaire Applicant: HungaroControl Hungarian Air Navigation Services Private Limited Company The following questionnaire should be filled in as comprehensively as possible. Failure to do so might discourage insurers. If there is any information which you believe to be of a material nature you should declare it or you could risk denial of a claim. 1) Responsibilities a) Please provide full details of all activities undertaken, including all associated services provided such as the provision of aeronautical information, NOTAMs, certification and licensing. b) How many Air Traffic Control Centres are there? Give location(s), title (s) and overall map(s) if possible. c) What is the area of responsibility of each Centre? At what point do responsibilities pass to other authorities or airports? Is there any overlap of responsibility into neighbouring (foreign) territory? d) Please advise the airports for which air traffic control services are provided (if any). Please provide details of responsibilities at each airport (e.g. overflying, approach control, take-off and landing etc.) e) Is the airspace divided into upper airspace and lower airspace for control purposes? f) What flight level is the dividing line between upper airspace and lower airspace? Provision of Air Traffic Services, (Air Traffic Control and Flight Information Service), Aeronautical Information Services (AIP, NOTAMs), CNS services, and MET service at Budapest Liszt Ferenc International Airport There is only 1, Budapest Air Traffic Control Centre (ATCC) Integrating Budapest ACC, Budapest APP and FIC Budapest ACC is responsible for provision of ATS within Budapest FIR controlled areas as described in the 2. Supplement to the ministerial order 26/2007 (III.1) issued by GKM-HM-KvVM. Budapest approach is responsible for provision of ATS within Budapest TMA. Budapest FIC is responsible for provision of FIS within Budapest FIR uncontrolled areas except Traffic Information Zones (TIZs) as described in the 2. Supplement to the ministerial order 26/2007 (III.1) issued by GKM-HM-KvVM. HungaroControl provides ATC at Budapest Liszt Ferenc International Airport 24/7. Yes. FL285 1

g) How many sectors are provided for the control of upper airspace and lower airspace? h) Are you responsible for Military ATC? How is the interaction of military and civil Air Traffic Control achieved through the Control Centres? i) Do you have any contractual agreements with third parties which either reduce or increase exposure to your insurers? j) What are the opening and closing times of the airport in your country each day / night? 2 sectors for lower ACC and 8 sectors for upper ACC + 4 sectors for APP En-route GAT Military flights controlled from Budapest ATCC. Military Approach and Tower units are located at the military airports and coordination is done via telephone. No Budapest Liszt Ferenc International Airport: This airport is open 24/7, but according to the regulation scheduled flight should not be planned to operate between 00.00-05.00 local time. 2) Staff a) How many staff are normally on duty? 25 air traffic controller, 5 flight information officers, and 5 assistants b) How many staff are on duty at: Busy periods? Quiet periods? c) What is the total number of Control Officers employed? d) How often are controllers subjected to medical checks? e) At what interval do they have to re-qualify? Every year. f) What are their qualifications? Please provide details of training procedures including: Busy periods: 30 air traffic controller, 6 flight information officers, and 6 assistants Quiet periods: 20 air traffic controller, 4 flight information officers, and 4 assistants. 172 air traffic control officers+28 flight information officers Once per every two years under age of 40, and annually over age of 40. -per ICAO standard -English language qualified -Basic training is in accordance with the EUROCONTROL Common Core Content requirements., then 6-12 month on-the job training i) Where does training take place and how long does it last? The training of air traffic controllers take place at HungaroControl premises and the course has 3 modules. The Basic and rating training last 4-5 months and performed by Entry Point Central which is a joint venture of 2

ii) What arrangements exist for refresher training? iii) To what international standard does your training extend? HungaroControl and Entry Point North. Unit training, which comprises radar and tower simulator training 6 months On the job training 6-12 months. Refresher trainings and simulations take place annually. Training is according to the EUROCONTROL standards. g) Describe your incident reporting system? Reporting system is in accordance with EUROCONTROL ESSAR 2 requirements. HungaroControl operates an Integrated Safety and Quality Management System. The Air Traffic Safety division is responsible for internal investigation of the incidents. h) Please describe your rules relating to watch times for individual controllers? 3) Technical Systems / Equipment a) State type of radar in use indicating whether this is primary or secondary surveillance radar. b) Does the radar provide full coverage for the whole of the area? c) Who is responsible for maintenance of navigation aids/landing aids (VORs, NDBs, ILS etc)? d) Are computers used for Air Traffic Control functions? If so, state type and how long in use. e) Is full overlapping provided for VHF Omnidirectional Range Stations currently installed on your airway network? Maximum 90 minutes in one row, than a minimum 30 minutes brake. 2 En-route radar stations, type Raytheon System Limited UK Condor MSSR EMS* for Secondary and Raytheon Canada ASR23SS for Primary surveillance. 2 TAR radar stations, type ATCR-33K (Alenia) and ATCR 33S-DPC (SELEX) for Primary, 2 SIR-S* (SELEX) for Secondary surveillance. * these En-route and TAR radars are enhanced MODE-S capable radars. Full coverage of Hungarian Airspace granted as far as primary and secondary radar coverage is concerned, above 4000 feet. HungaroControl maintains en-route VORs, DMEs and NDBs. Airport operators are responsible for ILS maintenance. HP PC computers are used in the whole MATIAS D1 System. No f) Are standby VOR s provided? Yes g) Is standby power available at the VOR site? Yes 3

h) What direct user to user telephone service is provided between Air Traffic Control Centres and airports within the defined areas? And do you have any such direct telephone links with neighbouring (foreign) ATC operators? i) Do you have systems which enable you to identify and control aircraft / vehicles on the ground at airports? Please describe to what extent these systems reduce the risk of runway incursion especially in poor visibility? j) Do the Air Traffic Control Centres have standby power supplies and battery operated emergency lighting? Direct lines of MFC type with all neighbouring centres as well as with major domestic airports/airfields. Advanced Surface Movement Guidance and Control System (ASMGCS) is installed at Budapest-Control tower. Addition to that Stop Bar Crossing Monitoring and alerting system helps to controllers to identify aircrafts penetrating the CAT II. holding position. Yes. 4

4) Statistical Data a) Estimate the number of annual (for the last year) aircraft movements i.e. takeoffs/landings and overflights under your control including a split (if possible) between wide body jets, narrow body jets and smaller general aviation aircraft. If you control military aircraft, please estimate approximate split between military and civil movements. Over flights: 2015 643 362 2016 671 037 2017 708 112 2018: +4%* Take offs : 2015 45 763 2016 47 730 2017 51 065 2018: +8%* Landings: 2015 45 763 2016 47 500 2017 51 065 2018: +8%* *as it is expected on February 2018. b) If responsible for overflying what number of aircraft are controlled annually what are largest aircraft controlled. c) Estimated receipts for flight charges for last 3 years. d) Please demonstrate the trend in your AIRPROX reports. e) Do you have ISO certification? If so to which level? When does it expire? Civil (%): 99% Military (%): 1% The percentage between wide body and narrow body aircraft using Budapest Liszt Ferenc International Airport is 4% wide body and 96% narrow body. See above for overflights. Largest aircraft A380 2015: HUF 35 294 216 219 2016: HUF 35 818 295 922 2017: HUF 37 771 776 446 2018: HUF 36 672 159 491* (*as it is expected on February 2018) In 2016 (situation at the end of September) - there was no A category AIRPROX, - there were 3 category B AIRPROX with the direct contribution of HungaroControl ATS staff. The Air Traffic Services and AIS divisions of HungaroControl got ISO certification in 2003 by 5

f) Do you have any contractual agreements with third parties which either reduce or increase exposure to your insurers? 5) Security: Please describe the levels of security protection you have in place for DNV. It is annually reconfirmed. No. CCTV is used at HungaroControl buildings. In addition to that a) Control Towers Control tower is located within SRA of Ferihegy airport, and armed guard at the SRA entrance. b) Other control centres Armed guard at the entrance of the control centre. c) Outlying equipment Armed guard at the en-route radar stations d) Offices Armed guard at the entrance of the office building 6) Existing Liability Insurance: Do you currently purchase ATC liability insurance (Y/N)? If yes: a) What is the period insured? From 01.04.2017, 00.00 hours to 31.03.2018, 24.00 hours b) What limit do you purchase? USD 1,200,000,000 any one accident/occurrence unlimited in all during the policy period. d) What claims have been notified to insurers during the last 5 years? Please give details: Yes. No accident occurred on air traffic control s fault 6