Kvaerner s yard at Stord. 19 March 2018 Steinar Røgenes, EVP EPCI

Similar documents
Capital Markets Day 10 January 2013

Growth and strategic development. 3 January 2019

Nordic Energy Summit, Oslo Jan Arve Haugan, President & CEO

Aker companies investor day, London Jan Arve Haugan, President & CEO Eiliv Gjesdal, CFO

Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO

Capital Markets Day 10 January 2013

Contents CONCRETE SUBSTRUCTURES ONSHORE FACILITIES STEEL JACKET SUBSTRUCTURES STRUCTURES

INTSOK 12 th Annual Russian-Norwegian Oil & Gas Conference

Summary. Kvaerner s Investigation Report. Fatal accident at Stord, Norway 7 March / 5

December Prosafe orders harsh environment semisubmersible

2nd quarter 2005: Status and outlook

Overview of Industrial Holding BLRT Grupp

LEPN license map Producing fields

Capital Markets Day 10 January 2013

Aker ASA and Aker Drilling ASA

MARITIME. Protect Your Assets. Lay-up seminar MOU - CEFOR. Dec. 2016, Oslo, Ungraded SAFER, SMARTER, GREENER

MA-D6 Field Development Slideshow

4th quarter results February 2012

FREEHOLD / LEASEHOLD OPPORTUNITY STRATEGIC QUAY SIDE LOCATION MALTHOUSE LANE, GORLESTON, GREAT YARMOUTH NR31 0GY CONTACT US. Site area - 4.

3rd Quarter 2004: Status and outlook

OCIMF Report Template OVID OVPQ

Capabilities for the Job

Wintershall K10-B Decommissioning Case Study. Sven Vandamme, Scaldis Salvage & Marine Contractors

WORLD LARGEST VISITS SINGAPORE

WORLDWIDE BUSINESS WITH SEFİNE SHIPYARD NEW BUILDING SHIP REPAIR CONVERSION MEGA STEEL CONSTRUCTION

Offshore Construction Vessels

Attitude is everything since 1841

Worldwide Shipyards Vard

Marine Consultants & Specialist Brokers. We are exclusively authorized to offer : WORK BARGE MAJOR

1H 2003 Results Announcement. August 1, 2003 SUMMARY

1st quarter 2005: Status and outlook

2005 Eni Field Trip - Libya

In this presentation you will find about: Who we are Our Activities & Services Some of our Customers Our Certificates Contact us

Mooring with HMPE rope. Jorn Boesten Segment Manager Offshore for DSM Dyneema FPSO Forum Monaco March

Annual General Meeting

ALBERT LOH consultants. m a r i n e s p e c i a l i s t

4 Rights and duties in connection with the conduct of petroleum activities

2Q 2008 INTERIM REPORT Unaudited

WELCOME TO DAMEN SONG CAM

Aker Kværner ASA 4th quarter and preliminary annual results 2007

SHIPBUILDING INDUSTRY

Ship Launching in Small Shipyards

Erhama bin Jaber Al Jalahma Shipyard

ECOLOCK LIFETIME CORROSION PROTECTION FOR OFFSHORE UNITS

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES

2Q 2013 presentation Oslo, 11 July 2013

Maritime Rules Part 40G: Design, construction and equipment novel ships

WELCOME TO DAMEN SONG CAM

Oil and Gas Capabilities

ENGINEERING AND TECHNICAL CHALLENGES IN LNG CONVERSIONS. 1 Wärtsilä

Oil and Gas Capabilities

Republic of Turkey - Ministry of Economy,

YMA TRAINING CATALOG 2017

ARCTIC PASSION 2018 Torkild Skjong - VARD Conceptual Design Department VARD`s ENTRY INTO EXPEDITION CRUISE DESIGN

bbe MOLDAENKE GmbH Ballast Water Workshop 2014

SIGNIFICANT EVENTS. 3 rd. 15 th. 8 th. 16 th. 9 th. 19 th. 12 th. 22 nd. Delivery of Safe Boreas, a harshenvironment

HUDSON LEADER. Classification society: American Bureau of Shipping. Recognized Organization: American Bureau of Shipping

WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

Orkun OZEK. Board Treasurer

Floating Docks. Our unique capability is your solution

Capable Accommodation work Barge with helideck. Large Work Deck with 400t deck crane. Accommodation for 165 pax. Mynx. Accommodation Work Barge

THE STYLE OF OUR COMPANY IS BASED ON SAFETY, RELIABILITY AND QUALITY

400 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge

CAMO. Continuing Airworthiness Management & Maintenance Management Service

MONTROSE PORT AUTHORITY

Oil and Gas Capabilities

EX USS SHADWELL Disposal Wreck in Place

Jack-Up Barge THE CLIMBING DUTCHMAN THE INDEPENDENT MAGAZINE FOR PROFESSIONALS IN THE ONSHORE AND OFFSHORE OIL AND GAS INDUSTRY volume 2 ISSUE 4

Notice To Mariner No. 147 PORT OF FUJAIRAH & VHFL TERMINAL BERTH CONSTRUCTION & DESIGN CRITERIA

PERMA SKIRT AGAINST SEA LICE!

Second Quarter 2016 Presentation

The Charleston Style Awning Charleston Style Awning Frame must be installed on the wall as there is no connecting part between AA and TB

N. S. Savannah History and Decommissioning Status

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM

56m Multipurpose Vessel / Icebreaker Listing ID:

SHIP RECYCLING. Your guide to compliance. Move Forward with Confidence

Poly Shelters. Instruction Manual. Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC. Note: Photo may be of a different but similar model

AZ MARINE OFFSHORE SERVICES PTE LTD. Safety Rules & Regulations for Compliance by the Ship s Crew

TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB

Bilfinger The international engineering and services group. April 7, 2016

CORROSION PREVENTION. Leaders in Corrosion Prevention and Sealing Technology.

FLEET STATUS REPORT. Seadrill Limited. Drilling depth (feet) Location Current contract Client Start Expire Dayrate US$ D a.

BK Maritime. Making plans is working together. Provides a safe work environment. Qualify your fleet for a Green Passport and gain entry to all ports

Minara Resources Limitedit Sydney February Peter Johnston

Associated Turkish Shipyards

14ft Deluxe Universal Frame Pad Installation Instructions

Captain Will Whatley RRS Sir David Attenborough A new ship for the British Antarctic Survey

Economic and Social Council

The 3 platforms are called Tchatamba-A (MOPU), Tchatamba South and the Tchatamba West and the FSO is called MADIELA and is owned by MODEC.

Citigroup Investor Conference October 2010

More mobility for the world. Services for the Airbus A320. Family business NEW

AMATA VN Public Company Limited

Life cycle Solutions partner for the entire life cycle of industrial assets

Scotland Oil & Gas Gas.

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

TSAKOS INDUSTRIAS NAVALES S.A.

Safety instructions and warnings Package contents and parts Tool requirements Product features... 5

Parques Reunidos Expands to Australia with the Acquisition of Wet n Wild Sydney July 2018

Succeeding with Entry into Service MRO Europe: Engineering & Maintenance

Transcription:

Kvaerner s yard at Stord 19 March 2018 Steinar Røgenes, EVP EPCI

Kvaerner at Stord Core business Module and platform assembly Onshore plant installation Installation and hook-up Platform demolition and recycling 1600 employees 750 office 850 non office 2

Established in 1919 as a herring oil factory 3

A leading ship yard in the 1970s 4

Oil and gas focused from 1975 GULLFAKS A (1986) OSEBERG A (1988) STATFJORD A (1977) GULLFAKS C (1989) 5

The Stord Yard 6

The Stord Yard Yard numbers Fabrication area Assembly area Service area Office buildings Total yard area 50 000 m2 90 000 m2 50 000 m2 10 000 m2 200 000 m2 7

Improved productivity with new crane Old crane: Lifting capacity: 350 T Total height: 74 m Total width: 125 m New crane: Lifting capacity: 1050 T Total height: 115 m Total width: 153 m 8

Increased crane coverage and new deep sea quay More flexible yard tailor made for floating facilities 9

Deep sea quay 10

Quay numbers 266m quay west 17 000m2 production area west 100m extension of gantry crane 122m distance between pier and new quay -16m water depth 15t/m2 area loads 11

Johan Castberg with Storen crane and quay expansion 12

51 new apprentices in 2017 29 nye lærlinger på Stord 22 nye lærlinger i Verdal 13

Aasta Hansteen completion project 19 Mars 2018 Hans Bruntveit, Project Director

Aasta Hansteen field development Aasta Hansteen spar FPSO Luva Snefrid Sør Haklang Polarled Gas export 15

Aasta Hansteen SPAR FPSO Topside Dry weight: 24 500 tonnes Conventional gas processing plant Substructure Total length: 200 m Spar deck freeboard: 21 m Hard tank diameter: 50 m Displacement: 146 000 tonnes Condensate storage: 25 000 Sm 3 16

Illustration:Statoil 17

Kvaerner s Aasta Hansteen contracts Scope: Mooring Upending Ballasting Installation of predefined equipment Make ready for mating Scope: Fabrication of modules Inshore hook-up Offshore hook-up Commissioning assistance Completion 18

Upending of SPAR substructure Photo: Espen 19 Rønnevik Kvaerner and 2018 Roar 19.03.18 Lindefjeld/Statoil

Towed to and anchored at Digernessundet Photo: Statoil

Submergence test Executed in Q3 2017 Submergence test down to 6 metres draft Test to verify that SPAR was ready for mating 21

Mating of topside and hull Photo: Espen Rønnevik Kvaerner and 2018 Olaf Nagelhus/Statoil 19.03.18

Inshore hook-up scope 23

Current project status for Kvaerner Platform at Digernessundet, where inshore phase is being completed Progress according to plan HSSE: Zero lost time incidents Sail-away from Stord early April Offshore hook-up to start summer 2018 24

Decommissioning 19 March 2018 Eirill Hatlevik, Vice President Decommissioning

Historical Decommissioning projects ESSO Odin Maureen Alpha Brent Flare Frigg 27

Kvaerner s Disposal site - Stord Deconstruction area with controlled drainage and deep water access. The acquisition of GMC Decom has provided access to machinery, more decom resources, and extended decom area and quay. 28

Capacities Tonnage at site: 60 000 tonnes Permit to receive relevant hazardous materials and safely dispose these through approved disposal routes Concrete area pads: 40 000m 3, total processing area 80 000m 3 incl. new areas. Deepwater quaysides with waterdepth - 26m and 32.5m Access to cranes with high lifting capacity and inhouse multi-wheelers 29

Miller Client - Saipem UK (BP) Topside: 28 700 tonnes Substructure: 12 000 tonnes First modules received in 2017, remaining 37 000 tonnes to be delivered this summer by Saipem Scope: dismantle and recycle modules 30

Varg A Client Saipem UK (Repsol) Topsides weight: 900 tonnes Scope: deconstruction and recycling of topsides and mono-tower Mono-tower weight: 3 200 tonnes including concrete 31

Nyhamna Subsea compression plant Removal and disposal of test plant at Nyhamna. Accommodate inspections. Approximate weight 2 200 tonnes. Duration August 2017 to autumn 2018. 32

Valhall QP topside & bridge Call off on frame agreement with Allseas for Aker BP decom work Scope: recycling of the topside and bridge Work to be completed by spring 2020 Topside & bridge weight: 3 527 tonnes 33

Kvaerner Decommissioning work scope Studies Preparation Plugging and abandonment of wells Offshore removal and transport Onshore deconstruction and disposal Overall planning of decommissioning Removal and disposal studies Mapping of hazardous materials Shutdown & cleaning of process systems Hook-down to prepare for removal Mapping and removal/ sealing of hazardous materials Blue text: Kvaerner with relevant competence Green text: Kvaerner already established/starting up Preparation and removal of jackets, topside and subsea structures Marine operations not requiring HLV Inshore deconstruction and load-in Make safe Remove hazardous materials and equipment for sale Deconstruction & segregation of materials Disposal Reuse and recycling maximised using best practical environmental option principle 34

Johan Sverdrup ULQ topside Elly Bjerknes, EVP Process Solutions 19 March 2018

36

Execution Locations 37

ULQ parts Antenna tower Heli deck LQ upper part Crane LQ 3 rd, 4 th and 5 th Leirvik AS Lay down platform LQ 1 st and 2 nd Utility K2JV Poland 38

Progress First cut 31.03.16 First section into the assembly hall 21.10.16 Deliveries from Poland Equipment installed Last steel section installed 12.09.2017 Load out and jacking November 2017 22 DAYS Accommodation modules installed January 2018 Heli deck & heli-hangar March 2018 39

Remaining main work First half of 2018: Installation of accommodation modules Start loop testing Heli-deck & heli-hangar installed Second half of 2018: Final weighing of topside Mechanical completion Completion and testing Q1 2019: Ready for sail-away and delivery 40

Illustration of ULQ sail-away For illustration only/kvaerner 41

Sverdrup riser platform hook-up EPC EPC Contract value: NOK 450 million Kvaerner works in an integrated team with Aker Solutions Scope: Planning, management and hook-up of the seven platform modules Offshore hook-up and completion work to start early May Living Quarters (LQ) Process (P1) Drilling (DP) Riser (RP) 42

Modules on their way to Norway from Korea Offshore hook-up and completion work will start early May Photo: Statoil 43

Njord A Upgrade Project Elly Bjerknes, EVP Process Solutions 19 March 2018 44

Illustration: Statoil 45

NJORD LISENCE PARTNERS 50% 20% 20% 7.5% 2.5% 46

Njord A delivered in September 1997 The platform was towed offshore only 28 months after cutting of the first steel plates. 47

23 August 2016: Back to Stord the same way it left 48

49

EPC contract signed 17 March 2017 Client Statoil Project Upgrading of the Njord A semi-submersible platform. Awarded Frame agreement awarded 1 April 2016, EPC awarded 17 March 2017 Contract value Around NOK 5.5 billion 50

Aker Solutions and Kvaerner in Verdal key suppliers 51

Njord: A unique project First NORSOK project First production platform on NCS to be upgraded Greenfield and brownfield in parallel Hectic dock phase Partly hot work Challenging HSSE 52

Three main phases PHASE 1: Yard stay, inspection, pre-epc PHASE 2: Dock phase: Increased buoyancy PHASE 3: Further decom and upgrade work 53

Three main phases PHASE 1: Yard stay, inspection, pre-epc PHASE 2: Dock phase: Increased buoyancy PHASE 3: Further decom and upgrade work 54

Main activities in the dock phase Removal scope Winches Helideck Cranes Compressors Lifeboats Riser guides Reinforcement of existing pontoons 55

4400 work permits 45 km welds (Repair rate 0,5%) 200 tons of steel (6349 items) 50.000 l of painting Dry dock numbers 3.500 tons of sand 60.000 m2 of painting 1.100 tons of scaffolding 1 ton of welding wire a week

Three main phases PHASE 1: Yard stay, inspection, pre-epc PHASE 2: Dock phase: Increased buoyancy PHASE 3: Further decom and upgrade work 57

Installation of blisters 58

Installation of colum top extension 59

Installation of four top deck boxes 60

Installation of winch houses 61

Large scope Shale shakers and flow divider Crane replacement Tote tanks Structural re-inforcement Exhaust system power generators Escape chute New helideck Winch house Deckbox extension Disposal cassion Chemical storage tank Blister Freshwater dumpline Deluge skid Produce water caisson Pontoons Trippel lifeboat station Fairleads Evacuation chute Winch house Deckbox extension Freshwater generator Utility room 62 HiPap Blister Fairleads Deckbox extension

Johan Castberg FPSO Elly Bjerknes, EVP Process Solutions 19 March 2018 64

The Johan Castberg field Location: 240 km north of the Snøhvit-field in the Barents Sea Partners: Statoil (Operator 50%) Eni (30%) and Petoro (20%) Water depth: 360-390 metres Production start: 2022 65

Johan Castberg contracts NOK 3.8 billion contract Module fabrication contract 10 modules + flare Total weight: 14 645 tonnes Almost 10 000 tonnes of fabrication at Kvaerner Integration contract Install prefabricated modules Hook-up of modules at a total topside of more than 18 000 tonnes 66

Johan Castberg FPSO Flare (Kvaerner/ subcontract AKSO) Modules (Kvaerner and subcontractors ) Turret (SBM) Helideck (Singapore) Hull (Singapore) LQ (Singapore) 67

Execution locations and scope Kvaerner s scope Fabrication of modules (Verdal and Stord) 68 Integration and hook-up (Stord) Testing and completion (Stord) Main subcontractors: Aker Solutions (Egersund and Sandnessjøen) Peak manning: around 2 000 employees and subcontractor personnel Stord Gas injection Recomp. area Separation area Egersund Prod.water/WI Chemicals Sandnessjøen Flare Future area Verdal Future/SW Filter Pipe rack 70% Norwegian content

Project phases 2018 to 2020 2019 to 2020 2020 to 2022 Module fabrication Interim phase Integration phase This is a placeholder text. This text can be replaced with your own text. Fabrication start in Q4 18 Almost 10 000 tonnes of modules to be fabricated at Kvaerner Assembly of stick built modules for Integration phase Hull arrival from Singapore Q3 2020 Installation of all modules and Hook-up and integration between modules and Hull Commissioning and testing 69

Johan Castberg with Storen crane and quay expansion

Topsides, floaters & onshore facilities Jackets Concrete solutions 71

Copyright and disclaimer Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Kvaerner and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Kværner ASA and Kværner ASA s (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as expects, believes, estimates or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Kvaerner s businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Kværner ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Kværner ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Kværner ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. 72