NATA 2018 AGM & CONFERENCE

Similar documents
ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

IMPLEMENTATION OF ADS-B BY NAV CANADA

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

AERONAUTICAL INFORMATION CIRCULAR 33/17

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

APAC PBN UPDATE Slide 1 of xx

AERONAUTICAL INFORMATION CIRCULAR 11/16

(RN R A N V A V & & RN R P N

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

Learning Objectives. By the end of this presentation you should understand:

Performance Based Navigation (PBN) Implementation Plan. The Gambia

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

NEW FPL Transition Phase & Implementation Stages

Open Questions & Collecting Lessons Learned

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

TABLE OF CONTENTS 1.0 INTRODUCTION...

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

Flight Procedure Design and Cartography

PBN IMPLEMENTATION IN INDONESIA

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

ADS-B Implementation Update 2011 CNS/ATM Conference

FLIGHT STANDARDS SERVICE LESSON PLAN

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

Overview of Worldwide Data Link Equipage Mandates

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Título ponencia: Introduction to the PBN concept

North Atlantic Initiatives

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

Performance Based Navigation Implementation of Procedures

34 th Airline/ATS Safety Forum

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

PBN Airspace Concept. ATS requirements

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

PBN and airspace concept

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

Pilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

ICAO Changes to the Present Flight Plan Form. Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ

Bits to Blocks Aviation System Block Upgrades (ASBU)

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

SERVICE DEVELOPMENT ROADMAP

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

TWELFTH AIR NAVIGATION CONFERENCE

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

French DSNA approach to CNS rationalization & evolution

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

IAC 2011 Cape Town, October th

PBN Implementation Plan - Fiji Version 1 19 January 2010

NOVEMBER 2014 UPDATE NAT ATS SURVELLANCE AIRSPACE PHASE 2 OF THE NORTH ATLANTIC REGIONAL DATA LINK MANDATE

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

ICAO Air Navigation Panels/Study Groups Work Programme

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

European Aviation Safety Agency

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

PBN Implementation Plan Tonga

UK Performance-based Navigation (PBN) Implementation Status

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Russian Federation ATM modernization program

Draft PBN Implementation Plan Papua New Guinea

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Implementation of PBN in Armenian airspace

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

DRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:

Performance Based Navigation Operational End-State 2023

Approach Specifications

Contents. Subpart A General 91.1 Purpose... 7

NAV CANADA Policy Delivery of Air Navigation Services. Version 2.0

INTERNATIONAL OCEANIC AIRSPACE NOTICES

Transitioning to ICAO Flight Plan why, when, what, how

Space Based ADS-B. Transforming the Way you See the Sky February, 2015

Performance-based Navigation (PBN) Operations Plan VERSION 1.1

IFR SEPARATION WITHOUT RADAR

Terms of Reference - Review LOC/DME at CYGV, CYRJ, CYHR TERMS OF REFERENCE

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

Transcription:

NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace

TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization Plan Performance Based Navigation (PBN) Working Group Level of Service Projects Instrument Flight Procedures in the North ADS-B Canadian ADS-B Out Performance Requirement Mandate Aireon Space-Based ADS-B Aviation Weather Services Operations and Aeronautical Information Air Traffic Services Update Electronic Publications (Future of Paper Charts) Aviation Weather Services 2

NAV CANADA CORPORATE UPDATE Traffic Growth 3

NAV CANADA CORPORATE UPDATE Collaboration With Customers and Stakeholders Imperative to our business Goal to balance efficiency, GHG emissions, and noise Customer Survey Program Results remain positive We ll be reaching out to mid-size domestic carriers this year 4

NAV CANADA CORPORATE UPDATE Corporate Social Responsibility Report Service Charge Invoicing Feedback Survey Survey URL: http://bit.ly/2fm9llt 5

NAVAID MODERNIZATION PLAN The ANS is in transition The Aeronautical Study Implementation 6

NAVAID MODERNIZATION PLAN Ground-based NAVAIDs and non-gnss surveillance Current Proposed 7

PBN WORKING GROUP Major Activities Cold temperature correction / compensation issues Analysis of DME coverage to support RNAV 1 Arranging trial of RNP 2 routes Improving STAR educational text in TC AIM Concept of Operations for GBAS Landing System (GLS) for low visibility operations Operations Plan Edition # 2 published June 2017 Available on website 8

PBN WORKING GROUP Good news from Transport Canada TCCA released a new Flight Test Guide for Aeroplane Instrument Rating Groups 1, 2 & 3: Candidates for the test will now have to demonstrate one RNP APCH procedure [charted in Canada as an RNAV(GNSS) approach] 9

PBN WORKING GROUP Performance-Based Aviation Action Team (CPAAT) Membership includes TC, DND, NAV CANADA, and stakeholder representatives Proposal of interest to NATA under consideration for submission: In northern Canada, amend the minimum 100 NM between destination and alternate aerodromes when GNSS is planned at both 10

LEVEL OF SERVICE PROJECTS Cartwright CWO Arctic Radio Communication Service ADIZ Boundary Change 11

LEVEL OF SERVICE PROJECTS ADIZ Boundary Change Changes are taking places on May 24, 2018 Notice of Change and AIC 2/18 on NAV CANADA Website Existing Boundary: Red New boundary: Green 12

NORTHERN INSTRUMENT APPROACHES AIM S Internal Mandate AIM s capacity will flex to demand by September 2019 13

GNSS PROGRAM STATUS (LNAV) 14

GNSS PROGRAM STATUS (LPV) 15

ADS-B OUT MANDATE Requirement for a mandate? Scope The Aeronautical Study Implementation 16

ADS-B OUT MANDATE Aeronautical study process Terms of reference The Terms of Reference encompasses all classes of Canadian airspace proposing a phased approach: Class A, B and FL600 and Above (Class E). Class C, Class D Control Zones and Class E Control Zones. All other controlled airspace. The Aeronautical Study through consultation is drafting recommendations on implementation Final review has been completed and the report is being drafted 17

ADS-B OUT MANDATE Equipage (performance) requirements GNSS Define the positioning requirement to achieve the target surveillance levels for mandated airspace. Transponder version Define based on consultation and assessment of versions that meet the target performance for the service to be offered. Current operations accommodate the use of all three versions of ADS-B Out transponders. Required message set must be defined as well as the transponder version. Antenna placement Performance requirement to meet the service provision may result in antenna diversity. May not be a requirement in all airspace classifications, type of flight (IFR or VFR), or service provided (surveillance separation, traffic advisory, search and rescue). 18

AIREON SPACE-BASED ADS-B 19

CANADIAN DOMESTIC AIRSPACE Northern CDA Space-Based Expanded Coverage ~110 Thousand Flights/Year Central CDA ~550 Thousand Flights/Year Southern CDA ~2.3 Million Flights/Year 20

AIREON SPACE-BASED ADS-B Edmonton FIR Day 1 Readiness (Fall 2018) Where VHF DCPC is available, 5 NM ATS surveillance separation NAV CANADA Day 1 of ASEPS trial EG Fall 2018 Advanced Surveillance Enabled Procedural Separation

AIREON SPACE-BASED ADS-B Gander Domestic FIR Day 1 Readiness (Fall 2018) Where VHF DCPC is available, 5 NM ATS surveillance separation SB ADS-B future application

AIREON SPACE-BASED ADS-B Gander Oceanic FIR (March 2019) Approved Longitudinal and Lateral procedural minima using ATS surveillance. Controller/Pilot Data Link Communication (CPDLC) is the method of communication that supports the application of these minima. Variable Mach Tactical application based on current traffic availability +/-.02 Mach Organized Track System (OTS) to be all ½ degree separation

AVIATION WEATHER SERVICES Weather Cameras Updated guidelines Phase II: 127 total sites 2018: Aklavik, Trout Lake, Gamètì, Paulatuk, Gjoa Haven, Braeburn Phase III planned for 2019 Includes 16 sites identified by NATA Laser Ceilometers Project nearing end with ten northern sites remaining Six sites in NT and NU scheduled for 2018 Yukon and Quebec already complete 24

AVIATION WEATHER SERVICES Precipitation Sensors Measured rate of fall More accurate data No manual data collection Data is recorded Installations starting soon 22 northern sites planned for 2018 25

AIR TRAFFIC SERVICES UPDATE SATvoice Deployed at Edmonton ACC in January 2018 Initiation of ground-to-air communication by controller Air-to-ground capability planned for later this year 26

ELECTRONIC PUBLICATIONS Background Customers are not satisfied with size and format of aeronautical printed products Paper printing is a risk to reliability and a limiting factor in the timeliness of information Paper publications limit ability to transition from a 56-day to 28- day publication cycle 27

ELECTRONIC PUBLICATIONS Approach being considered Continue print of large-format charts Enroute and VNC/VTA Discontinue printing (PDF still available): Canada Air Pilot (CAP) Canada Flight Supplement (CFS) Water Aerodrome Supplement (WAS) Restricted Canada Air Pilot (RCAP) CD AIP CD epub CD (under consideration) Continue to be available through apps (Jeppesen, ForeFlight, etc.) 28

ELECTRONIC PUBLICATIONS Next steps Defining concept Internal Hazard Identification and Risk Assessment Consultations with stakeholders starting in August 2018 No change expected to products before 2020 29

THANK YOU