PanAust Quarterly Report for the three months to 31 March 2018

Similar documents
PanAust Quarterly Report for the three months to 31 March 2017

PanAust Quarterly Report for the three months to 31 December 2018

PanAust Quarterly Report for the three months to 31 December 2016

Inca de Oro Copper-Gold Project and Carmen deposit sale process

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

Tax Contribution Report 2017

MARCH 2018 QUARTERLY ACTIVITIES REPORT

JUNE 2017 QUARTERLY ACTIVITIES REPORT

December 2017 Quarterly Report

For personal use only

For personal use only

For personal use only

For personal use only

For personal use only

AUSIMM - Technical Meeting & AGM

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

December 2018 Quarterly Production Report

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Lorena Gold Project Malachite AGM 29 November 2017

For personal use only

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

Cadia East PC2 recorded its highest quarterly ore production, and PC1 recommenced ore production

For personal use only

Australian Mines increases Marymia ground holding

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

On The Road To Silver Mining In Mexico

On The Road To Silver & Gold Mining In Mexico

Lihir record milling throughput rate of 14.5mtpa (annualised) delivering record quarterly gold production

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

Australian Securities Exchange Notice

FOR THE THREE MONTHS ENDED 31 MARCH 2012

Australian Resource Reviews Gold 2016

Quarterly Activity Report Period ending 31st March 2016

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019

For personal use only

OZ Minerals Limited. Half-Year Report 30 June 2008

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.

For personal use only

Matilda Zircon Limited (ASX: MZI) (formerly Olympia Resources Ltd) Quarterly Activities Report for Period Ended. 30 June 2009

For personal use only

Candelaria and Ojos del Salado Chile

NEWCREST LOOKING TO THE FUTURE

Kinross Production Continues on Plan

For personal use only

QUARTERLY ACTIVITIES REPORT 31 OCTOBER 2018

For personal use only

Investor Presentation July 2013

BMO CAPITAL MARKETS GLOBAL METALS & MINING CONFERENCE PRESENTATION 25 FEB 2008

Market Release 11 March 2019

Quarterly Activities Report For The Period Ending 30 June 2018

ENVIRONMENT ACTION PLAN

Quarterly Activities Report Period Ended 31 March 2018

Ramelius Resources Limited ASX:RMS

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited)

Updated Quarterly Activities Report

For personal use only

Haoma Mining NL A.B.N

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

1st Quarter Report 2018 HIGHLIGHTS

ASX Appendix 4D Half-Year Financial Report

Gold production of 548koz, up 5% on the September 2017 quarter, down 14% from the June 2018 quarter

Cathay Pacific Airways Limited Abridged Financial Statements

First Thunderbox gold now anticipated in June Quarter 2016

A modern mining company

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

For personal use only

Group AISC margin of $515/oz, higher by $74/oz compared to the September 2018 quarter

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project

Quarterly Report for the Period Ending 30 September 2014

QUARTERLY ACTIVITIES REPORT 31 JULY 2017

MOUNT GIBSON IRON LIMITED QUARTERLY REPORT FOR THE PERIOD ENDED 30 SEPTEMBER October 2017

Corporate Presentation March 2015

QUARTERLY ACTIVITIES REPORT

31 MARCH 2018 QUARTERLY REPORT

Morgan Stanley Asia Pacific Summit November Ian Smith MD & CEO

Gold Mining an Industry in Transition. Melbourne Mining Club 7 June Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1

Cathay Pacific Airways Limited Abridged Financial Statements

Newcrest Mining Limited

OZ MINERALS CITI S 4 TH AUSTRALIAN INVESTMENT CONFERENCE OCTOBER

For personal use only

OZ MINERALS US ROADSHOW

For personal use only

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

Quarterly Activities Report For the period ended 31 December 2017

For personal use only

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

On The Road To Silver Mining In Mexico

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

BHP Billiton Global Indigenous Peoples Strategy

Media Release QANTAS RESULTS FOR THE HALF YEAR ENDED 31 DECEMBER 2004 HIGHLIGHTS. Fully franked interim dividend of 10 cents per share

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

Lihir Operations. 14 th PNG Mining and Petroleum Investment Conference. 5 December 2016

(ABN ) Rex Minerals Limited and its controlled entities. 31 December 2009 Interim financial report

Frequently Asked Questions

For personal use only

Quarterly Activities Report For The Period Ending 31 March 2018

Transcription:

PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 7 3117 2000 F: +61 7 3846 4899 E: info@panaust.com.au W: www.panaust.com.au 30 April 2018 PanAust Quarterly Report for the three months to 31 March 2018 Highlights Very strong 12-month rolling safety metrics recorded - Total recordable injury frequency rate (TRIFR) 1.01 - Lost time injury frequency rate (LTIFR) 0.07 Solid quarterly production and cost outcomes achieved - The Phu Kham Copper-Gold Operation produced 19,459 tonnes (t) of copper in concentrate at a C1 i cost of US$1.42/lb after precious metal credits from 15,958 ounces (oz) of gold and 124,037oz silver. An all-in sustaining cost ii (AISC) of US$1.88/lb copper was realised. - The Ban Houayxai Gold-Silver Operation recorded production of 21,965oz of gold and 136,836oz of silver at a C1 cost of US$892/oz after silver credits. An AISC of US$1,201/oz gold was achieved, which included capital expenditure in relation to planned construction works at the Tailings Storage Facility. - The Ban Houayxai process plant achieved a new quarterly throughput record of 1.31Mt, including a new monthly throughput record of over 481,000t in March. TSF stewardship - Major construction programs for the Phu Kham and Ban Houayxai Tailings Storage Facilities (TSF) and associated infrastructure advanced during the quarter and are nearing completion. - Annual Tailings Independent Review Panel site visits and comprehensive dam safety reviews were completed during the quarter. Sustainability driving business excellence - On 9 February, 164 employees graduated from the Company s Supervisory Skills Training Program. A ceremony celebrating their completion of the Program was held at the Crowne Plaza in Vientiane, Laos. - On 7 March 2018, earlier than ever before, PanAust published its 2017 Business Review and Sustainability Report. - On 3 April, PanAust s sustained focus on safety performance was recognised at the ASEAN Occupational Safety and Health Network (OSHNET) Conference in Siem Reap, Cambodia where its Lao-registered Company, Phu Bia Mining, won the Excellence Award.

Business overview Building on the Company s 2017 safety, production and cost outcomes, PanAust recorded solid performances across all business metrics during the March 2018 quarter. Operating as a private company for approaching three years now, PanAust continues to maintain its discipline of transparent, regular and open communication with its stakeholders. This commitment was amply demonstrated during the quarter with the publication of the Company s 2017 Business Review and Sustainability Report. The 2017 Business Review and Sustainability Report is the twelfth instalment of our annual consolidated reporting on sustainability issues and third as a private company. Highlighting PanAust s commitment to excellence in timely communications, the 2017 Report was published two and a half months earlier than in previous years, Dr Hess said. On 3 April, PanAust received the Excellence Award at the 19th Annual ASEAN Occupational Safety and Health Network in Siem Reap, Cambodia. We were very pleased to receive the Award for our excellence in occupational safety and health management and will remain focused on our safety performance. We are confident that our program of deep dive safety audits, incident and near-miss investigations, and safety awareness programs will continue to deliver strong safety outcomes, Dr Hess added. While the Company s operating assets in Laos continue to support the business through strong production outcomes, PanAust s priority focus in 2018 will be to actively identify growth opportunities that will sustain the business in the long-term. Operations overview Phu Kham Copper-Gold Operation, Laos (PanAust 90 per cent) Production of copper in concentrate at the Phu Kham Copper-Gold Operation totalled 19,459t during the quarter. A C1 cost of US$1.42/lb copper was realised. Table 1 Phu Kham Copper-Gold Operation Production summary (100% equity basis) Units Copper in concentrate t 19,459 Gold in concentrate oz 15,958 Silver in concentrate oz 124,037 C1 cost after precious metal credits US$/lb Cu 1.42 AISC US$/lb Cu 1.88 Further details of the production and cost performances are contained in Tables 3 and 4 of this report Page 2 of 9

Phu Kham production performance A total of 14 million tonnes (Mt) of expit material was mined during the quarter which included 4.8Mt of ore. Copper, gold and silver head grades averaged 0.51 per cent, 0.21 grams/t (g/t) and 2.01g/t respectively. An overall copper recovery rate of more than 80 per cent was realised. Quarterly pay-metal in concentrate sales totalled 20,106t of copper, 16,510oz of gold and 150,901oz of silver. Ban Houayxai Gold-Silver Operation, Laos (PanAust 90 per cent) The Ban Houayxai Gold-Silver Operation poured 21,965oz of gold and 136,836oz of silver in doré during the March 2018 quarter. A C1 cost of US$892/oz gold was realised. Table 2 Ban Houayxai Gold-Silver Operation Production summary (100% equity basis) Units Gold poured oz 21,965 Silver poured oz 136,836 C1 cost after precious metal credits US$/oz 892 AISC US$/oz 1,201 Further details of the production and cost performances are contained in Tables 3 and 5 of this report Ban Houayxai production performance Total material mined at Ban Houayxai during the quarter totalled 3.8Mt with 1.4Mt of ore processed. The process plant achieved a new quarterly mill throughput record of 1.3Mt. The previous record was achieved in the March 2017 quarter. Gold and silver head grades averaged 0.67g/t and 6.59g/t respectively. A gold recovery percentage of over 76 was achieved. Payable gold and silver in doré sold during the quarter totalled 21,471oz and 134,331oz respectively. Pre-development and exploration projects overview Frieda River Copper-Gold Project, PNG (PanAust 80 per cent) In Papua New Guinea, PanAust holds an 80 per cent interest in the Frieda River Copper-Gold Project. PanAust continues to liaise with PNG authorities on the Frieda River Project following lodgement of a Special Mining Lease (SML) application and Environmental Impact Statement (EIS) with the Mineral Resources Authority (MRA) of PNG and the Conservation and Environment Protection Authority (CEPA) of PNG, respectively in 2016. Page 3 of 9

The overall approval and permitting process for the SML application and other permits and approvals is now being coordinated by a government appointed State Negotiating Team, chaired by the Department of Mineral Policy and Geohazards Management. PanAust is investigating opportunities to increase the value of the Project and access alternative development pathways to decrease capital expenditure and reduce the overall Project risk profile. Study work has identified a preferred pathway for value enhancement. Engineering, cost estimation and implementation planning for the selected scenario was undertaken during the quarter. High-level discussions regarding the Project between Government of PNG leaders and officials and PanAust executives were held in Port Moresby during the quarter. The meetings confirmed the Government of PNG s continuing commitment to the Project as a national priority. Escalation of a local labour dispute led to the temporary suspension of site-based activities in late-march. The Company is working with relevant stakeholders to resolve the situation. Work continues at other locations in PNG and in Brisbane to advance the Project, including updating the Project s Feasibility Study and Environmental Impact Assessment that supports the nation-building Sepik Development Project. PanAust welcomed the outcome of interim arbitration proceedings with its joint venture partner in the Frieda River Project, Highlands Pacific (Highlands). The Arbitrator found in favour of PanAust, agreeing that Highlands had an obligation to contribute to the costs of the Project from the date of lodgement of the application for a Special Mining Lease which occurred on 23 June 2016. It is PanAust s position that Highlands has an obligation to either contribute to the costs of the Frieda River Project or to dilute its interest. Myanmar Exploration Licences, Myanmar (PanAust 80 per cent) In Myanmar, PanAust holds an 80 per cent interest in Wuntho Resources Company Limited (WRCL) and has established a joint venture with Myanmar Energy Resources Group International Company Limited (MERG), a Myanmar-based company which holds the remaining 20 per cent of WRCL. The joint venture holds three Exploration Licences within a 213 square-kilometre contract area in the Sagaing Region of northern Myanmar. The Exploration Licences comprise three tenement blocks: Hel Chain, Pin Hin Hka and Nam Awl. WRCL has applied for additional Exploration Licences in the same Region. Also in Myanmar, PanAust has a farm-in agreement with Metro Mining Limited (an Australian ASX-listed company) for the Mahar San Exploration Project. During the quarter, a program of geochemical sampling and mapping of prospective areas within the WCRL Exploration Licences continued. Diamond drilling resumed at the Mahar San Project, results of which are expected to be available in late April/early May. Inca de Oro Copper-Gold Project, Chile (PanAust 66 per cent) PanAust completed a feasibility study on the Inca de Oro Copper-Gold Project in 2014. No material site activities are currently being undertaken or are planned. In January 2018, PanAust announced it was commencing a process for the sale of the Inca de Oro Project and nearby Carmen deposit. Page 4 of 9

Sustainability PanAust is committed to ensuring its presence positively impacts host communities and countries in which it operates. The Company achieves this by meeting the demand for resources in a socially responsible way, ensuring the supporting traditional rights and values, and respecting cultural heritage. Public reporting of sustainability performance On 7 March, PanAust released its 2017 Business Review and Sustainability Report for the year ending 2017. The Report was independently assured and prepared in accordance with the Global Reporting Initiative (GRI) G4 Sustainability Reporting Guidelines, including the Mining and Metals Supplement. The Report is PanAust s twelfth instalment of its annual consolidated reporting on the Company s sustainability performance. It provides a balanced and comprehensive overview of PanAust s 2017 performance in six core business elements: governance, economic, social, environmental, and health and safety performance, and employees. The Report is accessible via the Annual Reports page on the Company s website. Above: PanAust s 2017 Business Review and Sustainability Report Commitment to fostering a local workforce in Laos On 9 February, the most recent graduates of the Company s Supervisory Skills Training Program were recognised at a ceremony held at the Crowne Plaza Hotel in Vientiane, Laos. Now in its eighth year, the Program offers to highpotential employees in Laos, training that will facilitate success in frontline leadership roles. An essential element to leadership development in the Company, the program comprises 10 modules that develop employees skills with regard to human relations in the workplace. The Program supports PanAust s commitment to localisation. In 2017, 91 per cent the Company s workforce in Laos was comprised of Lao-national employees. This benchmark was set in 2016 and is expected to increase to 93 per cent in 2018. Localisation represents a positive and enduring legacy of PanAust s contribution to Laos. Above: Supervisory Skills Training Program graduates celebrate their successful completion of the Program at a ceremony at the Crowne Plaza Hotel in Vientiane, 9 February Page 5 of 9

PanAust Way Ahead in safety On 3 April, PanAust s outstanding safety performance was recognised at the 19th Annual ASEAN Occupational Safety and Health Network (OSHNET) Conference in Siem Reap, Cambodia where it s Lao-registered Company, Phu Bia Mining won the Excellence Award. The ASEAN OSHNET Awards recognise companies based in ASEAN countries for excellence in occupational safety and health management. The Award is the first time the Company has been formally recognised for its safety outcomes. It affirms that PanAust s safety performance is at an international level, is best-practice, and demonstrates the success of the Company s targeted safety programs that focus on hot spots and lead indicators. It also shows the maturing PanAust s positive and proactive safety culture; a culture that was cultivated not simply to achieve minimum compliance, but as a reflection of its Values. Above: Phu Bia Mining representatives receive the ASEAN OSHNET Excellence Award at the 19th Annual ASEAN OSHNET Conference in Siem Reap, Cambodia Page 6 of 9

PanAust Group production and sales statistics for the March 2018 quarter Table 3 Phu Kham Copper-Gold Operation Units Total material mined t 14,024,708 Copper-gold ore mined t 4,824,654 Process plant available time % 95.4% Process plant operating time % 95.1% Ore milled t 4,709,074 Copper head grade % 0.51 Gold head grade g/t 0.21 Silver head grade g/t 2.01 Concentrate produced dmt 82,964 Copper in concentrate t 19,459 Gold in concentrate oz 15,958 Silver in concentrate oz 124,037 Copper recovery % 80.77 Concentrate sales dmt 86,247 Payable copper in concentrate sold t 20,106 Payable gold in concentrate sold oz 16,510 Payable silver in concentrate sold oz 150,901 Ban Houayxai Gold-Silver Operation Total material mined t 3,820,853 Gold-silver ore mined t 1,436,342 Process plant available time % 97.7% Process plant operating time % 97.6% Ore milled t 1,310,488 Gold head grade g/t 0.67 Silver head grade g/t 6.59 Gold in doré oz 21,965 Silver in doré oz 136,836 Gold recovery % 76.16 Payable gold in doré sold oz 21,471 Payable silver in doré sold oz 134,331 Cumulative data may incorporate post reporting period adjustments to prior periods Page 7 of 9

Table 4 Phu Kham Copper-gold Operation production costs US$/lb copper Mining cost 0.73 Deferred mining and inventory adjustments capitalised -0.02 Processing cost 0.65 General and administration (site support) 0.16 Total on-site operating costs 1.51 Transport handling and marketing 0.21 Concentrate treatment and refining 0.24 Total off-site operating costs 1.96 Deduct precious metal credits -0.54 Total direct operating costs (C1 cost) 1.42 Royalty 0.19 Sustaining capital (includes TSF) 0.15 Rehabilitation and closure 0.00 Corporate support and shared services costs 0.11 Lease principal and interest charges 0.00 Deferred mining and inventory adjustment capitalised 0.02 All-in sustaining costs 1.88 Notes: costs are based on payable copper in concentrate produced; may include minor computational discrepancies due to rounding Table 5 Ban Houayxai Gold-Silver Operation production costs US$/oz gold Mining cost 456 Deferred mining and inventory adjustments capitalised -7 Processing cost 430 General and administration (site support) 113 Total on-site operating costs 991 Total off-site operating costs (freight, refining) 6 Deduct silver credit -105 Total direct operating costs (C1 cost) 892 Royalty 88 Sustaining capital (includes TSF) 162 Rehabilitation and closure 2 Corporate support and shared services costs 50 Lease principal and interest charges 0 Deferred mining and inventory adjustment capitalised 7 All-in sustaining costs 1,201 Notes: costs are based on payable copper in concentrate produced; may include minor computational discrepancies due to rounding Page 8 of 9

For further information contact: Ms Kate Horan T +61 7 3117 2089 E kate.horan@panaust.com.au i Brook Hunt convention for the reporting of direct costs comprising: mine site, product transportation and freight, treatment and refining charges and marketing costs; based on payable metal content after by-product credits ii AISC reported are the C1 cost plus royalties, allocated corporate support charges, shared services costs, sustaining capital; lease principal and interest charges; and deferred mining and inventory adjustments capitalised Page 9 of 9