CDA WORKSHOP April 18-19, 2006 Georgia Institute of Technology Atlanta, Georgia. Proposed Agenda

Similar documents
Continuous Descent? And RNAV Arrivals

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology

Flight Trials of CDA with Time-Based Metering at Atlanta International Airport

Overview of On-Going and Future R&D. 20 January 06 Ray Miraflor, NASA Ames Research Center

Continuous Descent Arrivals (CDA) Workshop #2

CDA Continuous Descent Approach

RNP AR and Air Traffic Management

Air Navigation Bureau ICAO Headquarters, Montreal

AIR/GROUND SIMULATION OF TRAJECTORY-ORIENTED OPERATIONS WITH LIMITED DELEGATION

Tailored Arrivals (TA)

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Overview of NextGen Institute Project

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Preliminary Altitude and Fuel Analysis for KATL CDA. By Gaurav Nagle Jim Brooks Dr. John-Paul Clarke

SFO Tailored Arrivals Environmental Analysis

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures

KSFO RNAV TO GLS DEMONSTRATION

Keywords: Advanced Continuous Descent Approach, CDA, CORADA, RTA, Arrival Management

Aircraft Systems and 4D Trajectory Management

Boeing Air Traffic Management Overview and Status

FAA GBAS Program Update January 29, 2010

Analyzing Risk at the FAA Flight Systems Laboratory

Required Navigation Performance (RNP) in the United States

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms

European Joint Industry CDA Action Plan

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

FLIGHT OPERATIONS PANEL

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Takeoff/Climb Analysis to Support AEDT APM Development Project 45

FLIGHT OPERATIONS PANEL (FLTOPSP)

Development, design, and flight test evaluation of a continuous descent approach procedure for nighttime operation at Louisville International Airport

AREA NAVIGATION RNAV- MANAGEMENT

Environmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures

Making the World A better place to live SFO

TWELFTH AIR NAVIGATION CONFERENCE

Quiet Climb. 26 AERO First-Quarter 2003 January

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

Los Angeles Noise Mitigation. Captain Dan L. Delane FedEx Express Fleet Check Airman 13 November 2013

Optimization of Airspace and Procedures in the Metroplex

Decisions on which type of approach to use vary with each airline, and sometimes even for each flight. aero quarterly qtr_02 10

Heathrow s Blueprint for noise reduction. Ten practical steps to cut noise in 2016/17

Atlanta NextGen PBN Activities

MANUAL FOR CONTINUOUS DESCENT OPERATIONS V4-4 1 APRIL 2009

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Next Generation Airspace Developments: Key Operational Trends and Enablers

Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently.

Christchurch PBN Flight Paths Trial. Interim Report

Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management

AERONAUTICAL INFORMATION CIRCULAR 18/18

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Appendix A. Meeting Coordination. Appendix A

Challenges in Complex Procedure Design Validation

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

MODELING AND MANAGING SEPARATION FOR CONTINUOUS DESCENT ARRIVALS

MetroAir Virtual Airlines

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Commercial Aviation Safety Team

Airplane Navigation Capabilities

Partnership for AiR Transportation Noise and Emissions Reduction. MIT Lincoln Laboratory

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA

30 th Digital Avionics Systems Conference (DASC)

Wake Turbulence Research Modeling

RNAV Departures and STAR Operations Joint Safety Analysis and Implementation Team

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS)

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP)

Airlines are responsible for MagVar updates, which can be performed during scheduled maintenance.

Case study London Heathrow & London Heathrow-Amsterdam

En Route Merging and Spacing Preparation

FLIGHT OPERATIONS PANEL

Naples Airport Authority Board of Commissioners and Noise Compatibility Committee Special Meeting on Central/South Florida Metroplex

Have Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017

FAA NextGENProgram & NEAR Laboratory. Massood Towhidnejad, PhD Director of NEAR lab

THE NATIONAL ACADEMIES PRESS

9 th USA / Europe Air Traffic Management R&D Seminar June 14 June 17, 2011 Berlin, Germany

Los Angeles Basin Terminal Airspace Redesign

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1

QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS

Development of Flight Inefficiency Metrics for Environmental Performance Assessment of ATM

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

GOLD. Advanced Data Link Operations

Think the solution, experience the change

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

DCA Airport Noise. MWAA WG Dec 15, 2016

Transcription:

CDA WORKSHOP April 18-19, 2006 Georgia Institute of Technology Atlanta, Georgia Tuesday April 18 th Proposed Agenda 8:00 9:00 Review of January 18-19 CDA Workshop Carl Burlesson would like: (1) list (from airlines) of ~ 10 airports where there is interest in practically applying CDAs (by end of this workshop); (2) short list of what to do to implement CDAs (simplified procedure); (3) feedback to improve TARGETS process; and (4) consensus on required data sets UPS working CDAs at Sacramento Mather; looking at expanding Louisville activities, including the incorporation of ADSB so that aircraft can co-space (or RTA??) off each other Recent TARGETS update process different than previously (newer version forces lower altitude at some waypoints UPS has found that about 3 degrees is the highest they can go to accurately manage deceleration MITRE working CDA trajectories for TARGETS Louisville Summary up to 6 db noise reduction; as much as 30 % reduction NOx, as well as other pollutants Northwest not comfortable instructing crews to stabilize at such an early point Potential for added capacity constraints if runway used for both arrivals and departures? If there s a need for a departure push, arriving aircraft at top of descent can be slotted to leave slots for departures LAX proposal includes use of CDAs when demand is up to 90% of operational capacity Ongoing European initiatives: Manchester, Heathrow, Ucherest (?) and 9:00 9:20 Welcome and Introduction Steve Vale - FEDEX Thore Delta T Walton UPS Continental Boeing Air Traffic Management Miller Boeing Flight Deck Walton FAA Flight Standards (AFS540?) Jet Blue (((very positive on potential use of CDAs))) Jet Blue Pilot Walter White FAA S. Cal Mngr for Procedures (ATC experience in CA) Steffan CSSI??? Aerospace (research on FMS) Wayne Bartlett FAA (rep on IPT Ops Panel) Frank Alexander Northwest Airlines Don Porter FAA R&P RNAV Lead Dave Williams NASA Langley

Everet Palmer NASA Ames Jesse - Boeing Noise Engineering (heavily involved in Amsterdam Schipol CDAs) Pierre NASA Airspace Management Cavadini EuroControl vanboven Airbus Kim/Roof Volpe Clarke/Brooks/Garaff? GTech Liu FAA AEE Jesse Gaines FAA Mngr of 9:20 9:50 Agenda Review / Meeting Format 9:50 10:20 CDA Workshop Goals / Objectives Development of minimum thrust descent within appropriate constraints Forum for open exchange between all stakeholders 10:20 11:00 Discussion - S. Liu Presentation FAA Operational Evolution Plan (OEP) Definition: Thrust at/near idle from a high altitude until stabilization point prior to touchdown with no level flight segments Is it appropriate for the Environmental group at FAA to lead this enormous operational effort? Need to ensure that CDA implementation doesn t trip and EIS due to different lateral paths 11:00 11:15 Break 11:15 11:45 Preliminary Results Schipol CDA Trial (Boeing) Boeing and LVNL (Dutch ATC) AAT: Advanced Arrival Techniques 2 airlines: MD11 / 737 / A320 192 CDA flights (others tried but could not) Daytime / nighttime baseline procedures (differing level flight segment altitudes) Results: time about a wash; ~40 to 90 lbm fuel savings (one aircraft type MD11 savings greater) INM 6 noise results: 1 to 6 db using FDR data input CDA Demo Results: present individual flight data (noise vs. track distance)? 11:45 12:15 Discussion 12:15 1:15 Lunch 1:15 1:40 CDA Development Dual Runway IAH (Continental/Boeing) [Kwo-On Tong] (Design concept only) With 3 parallel runways, implement CDA procedures only at 2 so that aircraft not capable of flying CDAs continue uninterrupted

FAA 711065P min. vertical (1,000 feet) or min. radar (3 miles) separation between aircraft on parallel runways 1:40 2:10 Discussion 2:10 2:30 Example Successful RNAV STAR Development (FAA/RNAV) ATO Perspective 7100.9d Standard Terminal Arrival (STAR) Should be from high altitude down to terminal Descend Via - pilot-discretion lateral/vertical navigation (ATC responsible for obstacle clearance ATL CDA benefits analysis (from MITRE) ARTS arrival data 2:30 3:00 Discussion 3:00 3:15 Break 3:15 3:40 Experience Gained SDF/LAX (SDF/SCT) [Walter White / J.P. Clarke] All carriers at LAX have different flight ops manual Choice of confidence interval on runway end spacing determines monte carlo spacing 30 miles out United / America West significant up-front work (simulators) 2/23/2006 initial implementation 3/2/2006 full implementation => no flow control needed ¼ of LAX arrival traffic subject to these operations continuous angle profile below nominal 3 degree (but loosely parallel) beyond about 25 miles Decision points at ~ 60 and 70 miles from runway end Steps: (1) leave lateral profile; (2) build wind model; (3) use TASAT to determine aircraft-specific crossing altitude at waypoints; and (4) determine best transition altitude Fast-time simulator includes B73/74/75/76 and A319 actual performance Aircraft weight class-specific separations being developed 3:40 4:00 Discussion 4:00 4:30 Identifying Opportunities for Near-Term Implementation (Georgia Tech) [Todd Waller, Using ASPM - Delta] Delta s airports of interest: Atlanta, Philadelphia, Newark, Jacksonville, Daytona Beach???: Buffalo 4:30 5:00 Discussion 5:00 Adjourn - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Wednesday April 19 th

9:00 9:30 FMS VNAV Capabilities (Sam Miller, Boeing) FMS VNAV boxes contain thousands of performance lookup tables for aircraft/engine combination VNAV & LNAV different yet integrally related VNAV Path constructed from lowest point (on approach) backwards ECON descent least effort to get from here to there Older FMS don t handle multiple angle approach patterns (i.e. stepped 2 to 2.5 to 3 degrees) Is it possible to generate a table of characteristics defining different FMS capabilities/algorithms only a handful of truly unique (high-level) boxes, but many, many subtle variations Tweaking of VNAV restrictions to optimize flight path and capacity may result in significantly different distances out for top of descent by aircraft type Anti-icing necessitates higher idle thrust on approach 9:30 10:00 Discussion 10:00 10:45 Open Discussion / Air Carrier Coordination [Jim,UPS] Sacramento Mather Example ( published approach, not a special ) Basically extends out published ILS information further in distance/altitude 3-degree approach from 15,000 feet (about 60 miles out) Extension of ILS to 22L Louisville Preferred landing to the North 10:45 11:00 Break 11:00 11:20 Data Requirements Pre & Post CDA [Brooks] Near term: Per FAA Administrator: wants 5 airports doing CDA demos by end of 2006 Need to document environmental benefits Carriers will need to have documented $$ savings in advance of procuring required FMS/other electronics FOQA / ACARS / FDR / radar data Pre/post fuel flow / emissions calculations Support structure needed across carriers to do items above and document benefits to Washington Data Requirements Pre & Post CDA [Brooks] 11:20 11:45 Discussion 11:45 1:00 Lunch 1:00 2:00 Group Specific / Breakout or Discussion 2:00 2:20 RNAV Departure

2:20 2:40 Discussion 2:40 3:00 Break 3:00 4:00 Wrap-up Next meeting: some time in last 2 weeks of July Topics for next time: More air carrier support needed for future CDA workshops Need for Airbus performance expert More specifics on design philosophies for FMS designs Smiths Honeywell Comparison of FMS algorithms Influence of Cost Index Specific example of the development of a single CDA procedure Interaction of arrivals and departures Presentation of controller s perspective (workload / running traffic) Other airline specific cases/experiences Invite MITRE? Distinction between current capabilities and longer term NGATS capabilities Will B787 / A380 blow current procedures out of the water? 4:00 Adjourn CDAA CDA Anonymous support group