PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG (ARAH SUNGAI BULOH DAN ARAH JINJANG) 26 SEPTEMBER 2018 1. LANJUTAN PENUTUPAN SEMENTARA LORONG SEPANJANG JALAN KEPONG (ARAH JINJANG) Tarikh 27 September 2018 01 Oktober 2018 Masa 9:30 pagi 4:30 petang Jangka Masa Tujuan 5 hari Untuk kerja-kerja ujian cerucuk jenis Statnamic Load Test dan sebarang kerja yang berkaitan bagi pembinaan Laluan MRT SSP Untuk makluman, penutupan sementara lorong sepanjang Jalan Kepong (Arah Jinjang) akan dilanjutkan dari 27 September 2018 sehingga 01 Oktober 2018, bermula jam 9:30 pagi 4:30 petang sahaja. Penutupan ini melibatkan lorong paling kiri dan lorong kiri sejauh 300 meter bermula dari persimpangan lampu isyarat Jalan West Road hingga ke Petronas Jinjang (Arah Jinjang). Semasa penutupan, pemandu dari Jalan Kepong menuju ke arah Jinjang akan dilencongkan untuk menggunakan dua (2) lorong yang sedia ada. Sewaktu ujian cerucuk dilaksanakan, pemandu dikehendaki mematuhi pengawal trafik bagi arahan Berhenti dan Bergerak. Sila patuhi arahan papan tanda lalu lintas dan pengawal trafik sepanjang masa. Untuk maklumat lanjut, sila rujuk peta di bawah. 1. CONTINUATION OF TEMPORARY LANE CLOSURES ALONG JALAN KEPONG (JINJANG- BOUND) Date 27 September 2018 01 October 2018 Time 9:30am 4:30pm Duration Reason 5 days To facilitate Statnamic Load Test and any other works for construction of MRT SSP Line There will be continuation of temporary lane closures along Jalan Kepong (Jinjang-bound) starting 27 September 2018 01 October 2018, from 9:30 am until 4:30 pm only. During this closure, the left-most lane and left lane will be closed for a stretch of 300 metres starting from the traffic light junction of Jalan West Road until Petronas Jinjang (Jinjangbound). Motorists from Jalan Kepong heading to Jinjang will be diverted to use the remaining two (2) lanes. During the test period, motorists are advised to adhere to safety signage and flagmen for Stop and Go at all time. For more info, please refer to the appended map. Page 1 of 6
MAP 1: CONTINUATION OF TEMPORARY LANE CLOSURES ALONG JALAN KEPONG (JINJANG-BOUND) Page 2 of 6
2. LANJUTAN PENUTUPAN LORONG SEPANJANG JALAN KEPONG (ARAH SUNGAI BULOH DAN ARAH JINJANG) Tarikh 28 September 2018 28 Disember 2018 Masa 11:00 malam 6:00 pagi Jangka Masa Tujuan 3 bulan Untuk kerja-kerja pengesanan dan pengalihan utiliti, pelebaran jalan dan sebarang kerja yang berkaitan bagi pembinaan Laluan MRT SSP Untuk makluman, penutupan lorong secara berkala sepanjang Jalan Kepong (Arah Sungai Buloh dan Arah Jinjang) akan dilanjutkan dari 28 September 2018 sehingga 28 Disember 2018, bermula jam 11:00 malam - 6:00 pagi, setiap hari. Pelan pengurusan trafik adalah seperti berikut: Penutupan A: Penutupan ini adalah sejauh 200 meter bermula dari Jalan Besar Kepong hingga ke susur masuk ke Jalan Metro Perdana Barat (Arah Jinjang) Penutupan B: Penutupan ini adalah sejauh 300 meter bermula dari susur keluar ke Jalan Metro Prima Barat menuju ke Jinjang (Arah Jinjang) Penutupan C: Penutupan sebahagian lorong sepanjang Jalan Besar Kepong (Arah Sungai Buloh) sejauh 100 meter bermula dari persimpangan Jalan Ambong Kiri hingga ke persimpangan Jalan Ambong. Penutupan D: Penutupan sebahagian lorong sepanjang Jalan Besar Kepong (Arah Sungai Buloh) sejauh 100 meter bermula di hadapan Hong Leong Bank hingga ke persimpangan dan masuk ke Jalan Ambong Kiri. Semasa penutupan jalan-jalan berikut, tiga (3) lorong akan dikekalkan bagi Penutupan A dan Penutupan B. Manakala dua (2) lorong akan dikekalkan bagi Penutupan C dan D untuk pemandu... 2. CONTINUATION OF LANE CLOSURES ALONG JALAN KEPONG (SUNGAI BULOH - BOUND AND JINJANG - BOUND) Date 28 September 2018 28 December 2018 Time 11:00 pm 6:00 am Duration Reason 3 months To facilitate utilities detection and relocation, road widening and any other works for construction of MRT SSP Line There will be continuation of lane closures along Jalan Kepong (Sungai Buloh-bound and Jinjang-bound) starting from 28 September 2018 until 28 December 2018, 11:00 pm to 6:00 am daily, intermittently. The traffic management plan involves the following closures: Closure A: Partial lane closure for a stretch of 200 metres starting from Jalan Besar kepong until the slip road entering Jalan Metro Perdana Barat (Jinjang-bound). Page 3 of 6
Closure B: Partial lane closure for a stretch of 300 metres starting from the slip road exiting Jalan Metro Prima Barat heading towards Jinjang (Jinjang-bound). Closure C: Partial lane closure along Jalan Besar Kepong (Sungai Buloh-bound) for a stretch of 100 metres starting from the junction of Jalan Ambong Kiri until the junction of Jalan Ambong. Closure D: Partial lane closure along Jalan Besar Kepong (Sungai Buloh-bound) for a stretch of 100 metres starting in front of Hong Leong Bank entering Jalan Ambong Kiri. At any one time, there will be three (3) lanes made available during Closure A and B and two (2) lanes available during Closure C and D for motorists. MAP 2: CONTINUATION OF LANE CLOSURES ALONG JALAN KEPONG (SUNGAI BULOH - BOUND AND JINJANG - BOUND) Page 4 of 6
3. LANJUTAN PENUTUPAN LORONG SEPANJANG JALAN KEPONG (ARAH SUNGAI BULOH DAN ARAH JINJANG) LAMAN RIMBUNAN Tarikh 28 September 2018 28 Disember 2018 Masa 10:00 malam 6:00 pagi Jangka Masa Tujuan 3 bulan Untuk kerja-kerja pengesanan dan pengalihan utiliti, pembinaan stesen dan sebarang kerja yang berkaitan bagi pembinaan Laluan MRT SSP Untuk makluman, penutupan lorong secara berkala di sepanjang Jalan Kepong (Arah Jinjang dan Arah Sungai Buloh) di Laman Rimbunan akan dilanjutkan dari 28 September 2018 hingga 28 Disember 2018, bermula jam 10:00 malam 6:00 pagi. Pelan pengurusan trafik adalah seperti berikut : Penutupan A: Penutupan lorong kiri dan tengah di Jalan Kepong (Arah Jinjang) sejauh 600 meter bermula dari persimpangan keluar Laman Rimbunan hingga ke susur masuk persimpangan lampu isyarat Laman Rimbunan menuju Taman Fadason. Penutupan B: Penutupan lorong kiri Jalan Kepong (Arah Sungai Buloh) sejauh 180 meter bermula dari depan Hong Leong Bank hingga ke persimpangan Jalan Ambong Kiri. Penutupan akan dilaksanakan secara berkala dan dalam satu-satu masa, pemandu boleh menggunakan satu (1) lorong sedia ada untuk Penutupan A dan dua (2) lorong sedia ada bagi Penutupan B. Sila patuhi arahan papan tanda serta pengawal lalu lintas sepanjang masa. Untuk maklumat lanjut, sila rujuk peta di bawah.. 3. CONTINUATION OF LANE CLOSURES ALONG JALAN KEPONG (SUNGAI BULOH-BOUND AND JINJANG-BOUND) LAMAN RIMBUNAN Date 28 September 2018 28 December 2018 Time 10:00 pm 6:00 am Duration Reason 3 months To facilitate utilities detection and relocation, station construction and any other works for construction of MRT SSP Line There will be continuation of lane closures along Jalan Kepong (Sungai Buloh-bound and Jinjang-bound) nearby Laman Rimbunan, starting from 28 September 2018 until 28 December 2018, 10:00 pm 6:00 am daily, intermittently. The traffic management plan involves the following closures: Closure A: Left and middle lane closure along Jalan Kepong (Jinjang-bound) for a stretch of 600 metres starting from the Laman Rimbunan exit until the slip road traffic light junction of Laman Rimbunan heading towards Taman Fadason. Closure B: Left lane closure along Jalan Kepong (Sungai Buloh-bound) for a stretch of 180 metres starting from in front of Hong Leong Bank until Jalan Ambong Kiri. Page 5 of 6
These closures will be conducted daily, intermittently. During these closures, motorists are advised to use the remaining one (1) lane for Closure A and two (2) lanes for Closure B. Motorists are advised to adhere to safety signage and flagmen at all time. For more info, please refer to the appended map. MAP 3: CONTINUATION OF LANE CLOSURES ALONG JALAN KEPONG (SUNGAI BULOH- BOUND AND JINJANG-BOUND) LAMAN RIMBUNAN For media enquiries, please contact: Zaini Ghazali Tel: +6012 328 1821 zainighazali@azrb.com Leanne Ann Susau Tel: +603 7493 3832 leanne@mgjv-kvmrt.com.my Page 6 of 6