MESSE BASEL NEW EXIBITION BUILDING

Similar documents
The perfect location for every event: Messe Basel

Too big to go elsewhere?

Environmental. Messe Basel and Messe Zürich

First published December 2006 Copyright China Trend Building Press Limited

Connecting Global Competence. The future of building for China

First-half result 2015 MCH Group

MCH Group Global Live Marketing. Sustainability Report 2016

[PR] Re-invigorating the Event Industry INTERTENT /2015. Press release "Re-invigorating the event industry"

STATEMENT OF SIGNIFICANCE

AMS MU800 Mullion Drained Curtain Walling

COLOGNE, INTERNATIONAL TRADE FAIR FOR AMENITY AREAS, SPORTS AND POOL FACILITIES.

GENERATE LEADS, CLOSE DEALS & MEET NEW CLIENTS IN NORTH AFRICA

QUALITY COLORS. Case Study Justice Center, Bochum, Germany COLORED CONCRETE WORKS. An initiative of LANXESS

karlsruhe trade fair centre

A LOOK BACK AT A SUCCESSFUL FAIR. GET NORD 2014.

Congress Center Basel: Knowledge and Innovation

Frankfurt am Main NEW: Monday Friday. New sequence of days!

Messe Essen s new East Fair Building inaugurated at North Rhine- Westphalia

Frankfurt am Main. The world s leading trade fair for lighting and building services technology. Inspiring tomorrow.

INVITATION TO PRE-QUALIFICATION FOR PARALLEL PROJECTS. +One

FRAMELESS GLASS SLIDING FOLDING SYSTEM Sliding Folding System SPECIALISED SLIDING SYSTEMS

Elegance 52 & Elegance 72 Curtain Walling

Sustainable Brisbane Walking Tour

Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava

LET THE LIGHT FLOOD IN ORANGERIES AND EXTENSIONS

continuous louvre WALLS

WIPO ADMINISTRATION BUILDING GENEVA, SWITZERLAND, 2011

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

RamirentClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED

Stephan Kurzawski Senior Vice President Messe Frankfurt Exhibition GmbH Colombo, 6 September 2018

MANOMAV SHOWCASE PROJECTS PORTFOLIO

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

Welcome To arrive is to be welcomed

Basel has a new number the Volkshaus

AMBIENCE IMPROVEMENT PROJECT O.R TAMBO INTERNATIONAL AIRPORT CONCEPT DESIGN

INTER GASTRA February 2014

General information from A to Z

JCT 42 A1(M) SHERBURN IN ELMET SELBY LEEDS

10,000 sq ft of refreshingly contemporary office space To Let or For Sale. garden place. let your business grow

sunprotection privacy DESIGNING. SUNLIGHT Wingline Roofing and shading for terraces and outdoor dining areas

23 25 February India Exposition Mart Ltd. (IEML) Greater Noida, Delhi/NCR

EXPO REAL October europa mitte. europa mitte. europe s heart. europe s heart JOINT STAND EXPO REAL 2016

BOUSTEAD PROJECTS JV AWARDED ICONIC RAZER GROUP S SOUTHEAST ASIA HQ DEVELOPMENT

continuous louvre WAlls

# TRENDSOFBEAUTY APRIL 2016 MESSE GRAZ HALL A, GROUND FLOOR. years.

Lakeview Residence Villas, Bürgenstock Hotels & Resort Lake Lucerne, Obbürgen

DB RREEF Trust (ASX: DRT) Space at Bligh Street Development Update

Organizing an event that your attendees rave about long after the team-building selfies

Architect designed office space from 2,500 sq ft FOR SALE // TO LET SPACE TO INSPIRE // SPACE TO GROW

TENDABOX BX3000. Cassette awning with folding arms BX3000. Description. Options:

into your home Bringing the great outdoors Create the perfect Visofold door styled to complement your home

Friends Meeting House, Hitchin. 1 Paynes Park, Hitchin, Hertfordshire, SG5 1EH. National Grid Reference: TL Statement of Significance

LET STELLAR DOORS GRACE THE ENTRANCE TO YOUR HOME

PARTNERING FOR SUCCESS

WAREHOUSE/INDUSTRIAL UNIT TO LET. Worldwide Heathrow Regional M4, M25, M3 Local A40, West London

Model Max. Surface m 2 Min. Width mm Max. Width mm Min. Height mm Max. Height mm Solar Guard , ,000

SHOPPING MALL HOTEL & CONVENTION CENTRE

20 23 February Berlin ExpoCenter City. Innovation Learning Efficiency. Where the industry meets

COLD ROOM DOORS. catalog

BALCONIES. protect against falling ( Bauteile, die gegen Absturz sichern ) must be observed.

The world is your wallpaper - extend your living room to the outside

INDUSTRIAL FOR SALE Newmarket, Suffolk

markilux safe timeless beautiful markilux collection Specification markilux 1700 markilux 1700 stretch markilux markilux 1710 stretch markilux

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

CBO-750 ASSEMBLY INSTRUCTIONS

ADELAIDE OVAL REDEVELOPMENT

Plan your road to success

Pioneer Events Center

Hilton Rotterdam Hotel, the Netherlands

Subject(s): Century II (aka Auditorium, Cultural Center, Civic Center, Civic Cultural Center)

Nature-based Camp Undergoes Facilities Makeover Sustainable design strategies are aimed at complementing camp s mission

Frameless All Glass Wall Systems (no stiles but with rails)

SECTIONAL OVERHEAD DOORS

Concept architectureworld 2017

MORRISTOWN REIMAGINED OUNT KEMBLE

Ferrari World Abu Dhabi

MEETINGS MADE EASY BASEL. HOTELS DESIGNED TO SAY YES! radissonblu.com/meetings

EMPOWERING THE ENTIRE BUSINESS. RAISE YOUR PROFILE. Cologne,

A SPACE TO SHAPE IDEAS

URBANTEC BRASIL RIO DE JANEIRO, SEPT , 2017 SMART SOLUTIONS FOR BETTER CITIES. Brazil s top conference for sustainable urban development

First published December 2006 Copyright China Trend Building Press Limited

Phoenix Sky Harbor transit guideway bridge

Press release. MEDICAL FAIR INDIA 2017 closes with a huge boom in visitors. New programme highlights were well received

PARTNERING FOR SUCCESS

Post Show Report. 5,775 construction professionals over 3 days 8,295 4,396 4,987 5,775 SHOW AT A GLANCE.

Hong Kong Convention and Exhibition Centre FAST FACTS

Heritage Character Area Zoning - Edmonton s Approach to Preserving(?) Community Character

COMMERCIAL LAND/BUILDING

All in in Oklahoma WinStar World Casino attracts gambling fans with a woven media facade

The art of creative living

Artist s impression of Capri by Fraser, Ginza / Tokyo

Villars, Chalet La Perle ski in, ski out

berlin Bild: Deutsches Historisches Museum

THE FORMER GIRLS' HIGH SCHOOL IN MOSTAR A D A P T I V E R E - U S E P R O P O S A L F O R

BRANDING UNLIMITED SPONSORSHIP

venues Bespoke and multipurpose facilities for the exhibition and event markets

T E C H N I C A L B R O C H U R E

CONFERENCE CENTER NORD WITH HALL C6. Connecting Global Competence

29 SEPT 1 OCT 2016 MESSE KASSEL / GERMANY

Welcome to the Pacific Spas family!

Transcription:

12013E MESSE BASEL NEW EXIBITION BUILDING Basel - BS Owner MCH Messe Schweiz (Basel) AG Messeplatz 1 4058 Basel General contractor HRS Real Estate AG Hochbergerstrasse 60c 4057 Basel Architect/General planner Herzog & de Meuron Basel Ltd. Rheinschanze 6 4056 Basel Structural engineer Ribi und Blum AG Konsumhof 3 8590 Romanshorn Gruner AG Gellertstrasse 55 4052 Basel MEP engineering Electrical engineer: Herzog Kull Group Zürich AG Rütistrasse 22 8952 Schlieren HVAC engineer: Lippuner Energie- and Metallbautechnik AG Werdenstrasse 84+86 9472 Grabs Sanitation engineer: Huustechnik Rechberger AG Leutschenbachstrasse 45 8050 Zurich Geotechnical engineering: Pfirter, Nyfeler + Partner AG Gartenstrasse 15 4132 Muttenz Construction physicist: Zimmermann + Leuthe GmbH Birkengasse 2 4583 Aetigkofen Facade engineer: Feroplan Engineering AG Uetlibergstrasse 132 8045 Zurich LOCATION / HISTORY Basel is considered the most important exhibition site in Switzerland, and one of the most significant in Europe. The largest watch and jewellery show in the world, BASELWORLD, and ART BASEL, an internationally renowned trade fair for contemporary art, provide Messe Basel with global publicity. In Switzerland, Basel is known for holding muba, Swissbau and the gastronomy trade fair, Igeho. Parts of the Autumn Fair, the largest and oldest amusement fair in Switzerland, also take place at Messe Basel. The exhibition grounds are located in the centre of the city, are very easy to reach with both public and private transport, and offer an exhibition area of 141,000 m 2, of which 83,000 m 2 are suitable for multi-storey stand constructions. Eventually BASELWORLD in particular required more space and more modern infrastructure. So in 2005, the MCH Group, to which Messe Basel belongs, began planning new and larger exhibition halls. With a clear Yes vote three years later, the voters of the canton of Basel- Stadt agreed to a new exhibition centre. In 2008, HRS Real Estate AG was tasked with optimising the project and in autumn 2009, they were awarded general contractor status. Landscape architect Vogt Landschaftsarchitekten AG Stampfenbachstrasse 57 8006 Zurich Surveyor Gruner AG Gellertstrasse 55 4052 Basel Location of the building Messeplatz Basel 4058 Basel Planning 2009 Execution 2010-2013

CONCEPT Two aged building complexes were demolished and replaced by a new build measuring 220 metres in length, 90 metres in width and 32 metres in height. Large bored piles were inserted into the ground to provide the foundations of the load-bearing supports. The core buildings and basements are made of reinforced concrete, while the hall ceilings are steel/concrete composite structures. The basements were connected by a tunnel. The two upper floors now span part of the exhibition site. This has considerably enlarged exhibition space, providing the grounds with more flexibility and comfort. In the eight- to ten-metre-high halls, exhibitors can even erect multi-storey stands. The multi-functional event hall with 2,500 places, located south of the exhibition site, is also part of the new exhibition centre building and connects to the Congress Center Basel via a new skywalk. ARCHITECTURE The new building, which was designed by renowned Basel-based architecture office Herzog & de Meuron, combines functionality and aesthetics in an almost perfect way. The upper part of the building consists of two hall structures, positioned on top of each other and projecting outwards over the street to varying extents. The ground floor is predominantly glazed to achieve spatial transparency as well as the intended opening of the hall complex and a dynamisation of public life. The two hall floors are closed entities and are displaced against each other in such a way that they are perceived as separate units. Twisting the facade of the ground floor reinforced the architectural differentiation. The cladding of the top

Ground floor

Upper floor

storeys looks like a fabric woven from metal strips and is made from individually bolted aluminium elements, some of which have been positioned so that wave-like clusters allow views from the halls over the cityscape. The City Lounge is a central architectural element a covered public space with a tram stop. This not only marks the entrance to trade fairs and the event hall, it has also become a focal point of public life. In the middle of the City Lounge, fascinated visitors look through a circular opening that reaches through both top floors. This atrium a window to heaven, as the architects call it makes the new build an impressive visiting card. FEATURES The building of the new exhibition grounds in Basel is the largest construction project that HRS Real Estate AG has realised to date. Messe Basel placed high demands on the project management as the different requirements of an exhibition centre of such dimensions are enormous. The biggest challenge was the very tight schedule. In February 2013, the new halls had to be handed over. This is due to the announcement years before that BASELWORLD would be taking place in the new halls from April 2013. The building process had to be planned in such a way that the trade fairs and events could still be carried out without any particular restrictions. This demanded a high degree of flexibility from all involved. At peak times about 1,200 workers were on-site at the same time. The work was carried out in one and two-shift operations. Night shifts were also needed at times. To provide just a few numbers, 1,200 concrete elements, 46,000 m 2 of ceiling panels and 14,000 facade elements were installed for the new build. On average, 20 HGVs per hour were on the road for deliveries. For this reason, HRS Real Estate AG set up an interim warehouse and checkpoint for dispatching lorries at the Basel harbour.

There was virtually no space on the city-centre building site, which was surrounded by heavily trafficked roads and tram lines. For this reason, the general contractor decided on a vertical construction method and split the project into 22 stages. Using eleven stationary building cranes and an average of six mobile cranes, the construction followed a precisely defined sequence of assembly. During the building phase, one person was charged with continually updating the schedule and logistical plans. ENERGY CONCEPT / SUSTAINABILITY The new exhibition centre building has a highly thermal-insulating cladding and is connected to the district heating grid of the city of Basel. Thanks to these sustainability efforts, the Minergie certifying body of Basel-Stadt awarded the new build its own Minergie label, specially developed for this project. In addition, the target values of the SIA Standard 380/4 in terms of lighting and ventilation/air conditioning were met. The green roof is another example of the sustainable focus of the project.

Basement

PROJECT DATA Total costs: about CHF 430 million SIA volumes: 664,000 m 3 Gross floor space: 83,000 m 2 Lower storeys: 1 (1 mezzanine floor) Ground floor + upper floors: 3 (3 full storeys and 3 mezzanine floors) HVAC equipment rooms: 4 (on the roof) Exhibition space Ground floor: 6,500 m 2 1 st upper floor: 14,850 m 2 2 nd upper floor: 14,750 m 2 Architektur-Bau CRP Sàrl 1020 Renens - P. Guillemin October 2015 Vogt-Schild 8042 / RZ - Printed on FSC paper. Mixed Sources - Photos: A. Barakat