Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Similar documents
4 Transport projects underway in Western Sydney

5 Rail demand in Western Sydney

Why the. Building for growth. West Metro. is vital

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

3 The growth of Western Sydney

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Industry briefing NOVEMBER 2017

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Comments on the High Speed Rail Phase-2 Report

SYDNEY S SECOND AIRPORT

Sydney Metro West A new railway for Western Sydney

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

SEARs strategic context and project need

What is Rail Futures?

TRANSPORT FOR A CONNECTED CITY


NSW Budget Highlights

Infrastructure Priority List. Infrastructure Priority List Printed as at 28 April

Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

7.0 Bus and light rail in Sydney

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Reimagining Central Station Precinct

Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system.

The Coalition s Policy

Improve Sydney Public Transport (ISPUT) Improve Sydney and Rural Railways (IMSARR) EXPANSION AND UPGRADE OF THE SYDNEY METROPOLITAN AND

JUNE 2007 UPDATE REPORT SYDNEY METROPOLITAN STRATEGY

PCAL Case Study Retail Areas: Rouse Hill Town Centre

Delivering better bus services for regional centres in Southern Tasmania

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel

Public Transport for Perth in 2031

SYDNEY S GROWTH ENGINES: DRIVING SYDNEY S ROAD NETWORK NEEDS

Sharing the Way with Sustainable Transport Options

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Draft Greater Sydney Region Plan

Shaping the Future of the Railway

Sydney CBD - Partnering with the coach industry for solutions

Dr Tim Brooker. Associate- Transport Planning; EMGA Mitchell McLennan Pty Ltd, Sydney. Abstract

New South Wales: state economy and State Budget,

New South Wales: State Economy and State Budget,

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Shaping Sydney Strategies and Action Plan

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

IN FOCUS NSW. Developing Western Sydney

New free City connector bus service

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

FARE S FAIR. A Restructuring of Sydney Transport s Fare System A PROPOSAL BY THE RAIL, TRAM AND BUS UNION

The Coalition s Policy to Build Melbourne s East West Link

Executive summary. Project description. Project name. Project address. Apartment mix. Deposit required. Estimated construction commencement date

The Asian evolution of high speed rail

THE. McKell Institute. McKell THE. Two Birds, One Stone. Harnessing Community Assets to Improve Transport Connectivity in New South Wales.

AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH

Politics, Finance and Transport: Megaprojects in Australia. Scott Elaurant and Jennie Louise Infrastructure Symposium, Brisbane 2015

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Australian Ideal College

CBD bus network. a new. begins Sunday 4 October 2015

BRT in Developed Countries The Brisbane Experience

Value of CityRail to the Community of New South Wales

Industry briefing April 2018

IN SUMMARY. Sydney is growing; but the South is not included. A strategic hub?

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

CBD Rail Link Business Case

Northern Beaches Transport Action Plan

OUTLOOK EAST LEPPINGTON

Delivering a stronger economy

County of Cumberland Plan Sydney Region Outline Plan

MARKET OUTLOOK. 01 Walkability & Accessibility 02 Infrastructure & Employment 03 Demographics 04 Residential Analysis 06 Rental Analysis

Value of CityRail to the NSW community. economic & financial analysis unit market development and research product development

Auckland Port and the Unitary Plan Dr Douglas Fairgray

Department for Transport

The Hon Paul Fletcher MP. Minister for Urban Infrastructure and Cities. CEDA 2018 State of the Nation. Tuesday 26 June 2018

PEOPLE FOCUSED PUBLIC TRANSPORT

Connecting Western Sydney. Submission to the Australian Government Western Sydney Rail Needs Scoping Study

MELBOURNE METRO RAIL PROJECT SOUTH YARRA STATION OPTIONS ASSESSMENT

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

State of Australia s Fast Growing Outer Suburbs The economic and demographic transition of the Fast Growing Outer Suburbs

Project overview SEPTEMBER 2015

10 Ideas for the NSW Budget to Kick-start Jobs in Western Sydney

The North West Growth Precinct

The State of Transport in Macquarie Park

Sydney Metro West A new railway for Western Sydney. Project overview, March 2018

NORTH WEST GROWTH CENTRE

Bus Corridor Service Options

BUSINESS PARK. 8 Parkview Drive, Sydney Olympic Park FOR LEASE

Central city railway capacity making better use of existing infrastructure

ILLAWARRASHOALHAVEN ECONOMIC OUTLOOK

WORKING PAPER ITLS-WP The North West Rail Link: Winners and losers in the locality of the north west area.

Project Overview June 2014

Investor Report. Connecting the best of both worlds

WESTERN SYDNEY PARKLANDS PLAN 2020 CORPORATE

Infrastructure Risks: Megaprojects in Australia. Scott Elaurant and Jennie Louise Project Management Institute, Adelaide 2015

South Australia Property Report January 2014

Directions. for a Greater Sydney

SYDENHAM TO BANKSTOWN ENVIRONMENTAL IMPACT STATEMENT OVERVIEW

The Rail Network in Wales

MELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016

Transcription:

Why does Sydney need a new fast Metro to the West? (as shown in 10,000 Friends of Greater Sydney Stage 1 Rail Plan) The Stage 1 Rail Plan was developed to support an integrated transport plan that would increase and sustain the efficiency of Sydney s rail system until the middle of this century. The Plan was designed to satisfy a number of key objectives. 1. Give passengers the service they want fast and frequent. 2. Deliver a genuine public transport alternative to the private car. a turn up and go service with no timetables. 3. Cut emissions per passenger kilometre by 50% by 2031. 4. Work within existing constrained State budget. 5. Ensure minimum impact on the day-to-day rail operations during construction and implementation 6. Facilitate Clearways program and upgrade of signalling system. 7. Provide additional all day capacity for freight services with new tracks to north and south of Sydney 8. Achieve maximum standing time for passengers of 25 minutes. A fast Metro to the west is a vital component of this Plan The Proposed Fast Metro - CBD-Parramatta A modern single-deck train carrying up to 1200 passengers, 550 seated with up to 650 standing (at maximum 4p/m 2 ) running underground CBD to Parramatta with a single stop at Olympic Park station. The train would surface beyond Parramatta to provide a limited stop service to Penrith and all stations Blacktown to Richmond. At the City end the train would connect to existing unused platforms 26 and 27 at Central and to the proposed new station at Town Hall east of the existing. Further extension to the north would await determination of a route across the Harbour either by tunnel or by recapturing lanes 7 and 8 on the Sydney Harbour Bridge. Because of their 140 kph speed between stations, 1.2 m/s 2 acceleration and deceleration, and number of doors enabling quick boarding and alighting at stations, these trains can run faster and twice as frequently as the present double deckers. 1

They provide enhanced comfort delivering 1100 seats in the same time a double-decker with 890 seats can do so. They can complete the journey in half the travel time or better. Estimated travel time CBD to Parramatta is 12 minutes. It would grow regional areas This fast train service between Sydney s two major centres would provide a significant alternative to car travel taking pressure of the existing road links between the centres. By improving accessibility it would encourage development of Parramatta as Sydney s second CBD. It would enhance the attractiveness of the Olympic Park precinct as a residential and commercial area thereby exploiting the Government s already significant investment in this area. It would have minimum impact on rail operations during construction. It would facilitate and enhance the impact of Clearways projects and signalling upgrades. Existing Clearways and Signalling upgrade projects will make a significant demand on scarce resources, such as skilled staff and track possessions, for a number of years. The current complex metropolitan network is a handicap to the implementation of modern system-wide technologies such as Digital Train Radio and Automatic Train Protection. The Fast Metro will facilitate the disaggregation of the network into a number of smaller, mainly self-contained systems. It would meet the increasing travel demand for train services to the growing Western Sydney. Main West services to Town Hall will be at capacity during the weekday peak by 2013. The maximum number of double deck trains per hour that can operate reliably on the network is 20 trains per hour (tph) per track. Modernising the train control system could increase this capacity by 2 to 4 tph enough to accommodate up to 8 years growth. Single-deck trains, as proposed by the Stage 1 plan, would increase frequency up to 40 tph per track a 100% increase in train services and a doubling of passenger capacity. But more is required to serve future needs of Western Sydney. The fast Metro would increase capacity to Parramatta and the west by 100% but also permit the following improvements to be implemented with existing rolling stock at no extra cost: Main North services increased from 4 to 8 trains per hour 100% increase. Inner West local services increased from 4 to 10 trains per hour 150% increase. Liverpool services increased to 12 trains per hour 50% to 100% increase. Bankstown line services increased from 8 to 10 trains per hour 25% increase. 2

It would provide an effective fast link to CBD through interchange at Parramatta with proposed high speed rail service to major outer regional centres on Central Coast, Newcastle and Wollongong and in due course to Canberra, Melbourne and Brisbane. It would provide effective increased services to other rail corridors at minimal cost. It would provide an alternative to the City Relief line and western line proposal with greater benefit to the network enabling funds allocated to that proposal to be diverted to this one. Investigation of stopping patterns for an intercity service compared to an all stations service have shown that it would carry a far greater number of passengers; It would contribute significantly to growth of Parramatta compared to an all stations service It would be significantly less costly than the current proposals due to the easier route and lesser stations enabling implementation far sooner. Business Case Cost - $4-6 billion Patronage increase in Western Corridor by 25 million passengers per annum and on other routes by 10 million passengers per annum. Revenue from premium of 50c per journey across all CityRail fares (all passengers benefit) = 35 million extra passengers x average fare of $2 + total patronage x 50 cents = $245 million per annum. Viable project for Federal and/or PPP funding. Outcomes The Fast Metro would: Stimulate growth of Parramatta as Sydney s second CBD by radically improving its accessibility. Support Parramatta as the preferred interchange for an East Coast high-speed train service. Provide a very fast, very frequent service between Western Sydney, Olympic Park (exploiting Government s significant investment in this area) and the CBD. 3

Enable substantial improvement in frequency and/or journey times for passengers from Liverpool and surrounds, the Northern suburbs, the Upper North Shore, the Inner West and the Bankstown line. Enable a planned program of overdue and safety-related technology upgrades to the whole network. Require no acquisition of private dwellings in the Inner West With changes to Sector 1 and rolling stock proposed in the Stage 1 Rail Plan it will: o deliver sufficient capacity to the rail network to 2050. o provide a basic plan upon which rail extensions can be logically made and supported, such as the North West Rail Line, a possible Epping-Parramatta line as well as possible additions to Bondi Beach, Northern Beaches and an Inner West-Parramatta extension. 4

10,000 Friends of Greater Sydney RAIL PLAN STAGE 1 5