METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Similar documents
Extending TRACKS. Design and engineering effort nears completion. Animation shows how light rail will operate in Hopkins

Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

COMPLETE TRANSPORTATION GUIDE TO SUPER BOWL LII IN THE BOLD NORTH

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

2018 Service Implementation Plan Executive Summary

DEMOGRAPHICS AND EXISTING SERVICE

Meeting Summary. 1 June 5, 2017 CAC Meeting Summary

Hampton Roads Express Lane Network

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Why we re here: For educational purposes only

Measure R Program Update

BaltimoreLink Implementation Status Report

108 miles/1,427 Average ADT miles/613 Average ADT miles/1,851 Average ADT

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

Update on Palm Beach MPO Funded Projects

METRO Green Line ridership has already exceeded expectations in its first month.

25 th Avenue Grade Separation. September 13, 2017

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Welcome. Green Line in Your Community

Terrace Regional Transit System CITY OF TERRACE COMMITTEE OF THE WHOLE SEPTEMBER 13, 2017

2009 Regional Solicitation Selected Projects*

#1. Why is the City doing this project?

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

25 th Avenue Grade Separation. December 13, 2017

Huntington Metro Station Joint Development

Broward Boulevard Transit Corridor Workshop. February 5, :00 AM 12:30 PM FDOT District IV Auditorium

AGENCY NAME TRANSPORTATION

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250

Sound Transit Operations August 2015 Service Performance Report. Ridership

Seattle Center Director s Report

Annual Transit Ridership Monitoring Report Fiscal Year

Project Deliverable 4.1.3d Individual City Report - City of La Verne

I-95/395 HOV/Bus/HOT Lanes Project Overview

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Silver Line Operating Plan

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017

TORONTO TRANSIT COMMISSION REPORT NO.

Sound Transit Operations December 2014 Service Performance Report. Ridership

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

Metrobus Service Evaluations

Intercity Transit Short / Long Range Plan Short-Term Recommendations Transit Authority Meeting

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program

Capital Metropolitan Transportation Authority. Monthly Performance Report

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Ozaukee County Transit Development Plan

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

The 15-day comment period will run from Thursday, April 4, 2019 to 4pm on Wednesday April 18, 2019.

Service Change Plan Cowichan Valley Regional Transit System July 2018 Expansion. Prepared by

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

SRTA Year End Fixed Route Ridership Analysis: FY 2018

1.2 Corridor History and Current Characteristics

Att. A, AI 46, 11/9/17

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

2017/ Q1 Performance Measures Report

CITY COUNCIL AGENDA MEMORANDUM

PERFORMANCE REPORT DECEMBER Performance Management Office

MEETING MINUTES District 1 Trail Planning Meeting 1

Date: 11/6/15. Total Passengers

Regional Planning for Tri-Rail Coastal Link

FIXED ROUTE DASHBOARD JULY 2018

A Line (Snelling) Bus Rapid Transit. February 24, 2014 Technical Advisory Committee Meeting #5

Red Rock Corridor Commission Agenda 4:30 p.m. Thursday, March 24, 2016

Call for Public Hearing August 2019 Service Changes

Southwest LRT Alignment Video Narration

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

This report recommends two new TTC transit services in southwest Toronto.

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Greater Portland Transit District

PERFORMANCE REPORT DECEMBER 2017

Call for Public Hearing August 2019 Service Changes

Title VI Service Equity Analysis

GREENBELT-BWI THURGOOD MARSHALL AIRPORT EXPRESS LINE ROUTE B30

November 9, Society of American Military Engineers

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Report to the Dulles Corridor Advisory Committee

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet

RACINE COUNTY PUBLIC TRANSIT PLAN:

DRAFT Service Implementation Plan

// Atlanta Streetcar System Plan

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

TORONTO TRANSIT COMMISSION REPORT NO.

Downtown Office Building for Sale Owner/user Opportunity - Reduced Price $2,700, E Street Santa Rosa CA

Presentation to the DRCOG Board August 16, 2017

Improving Directional Signage for TTC Services at Pearson Airport

First rail. August 2011

Business Item No

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

Implications of Construction Cost Escalation

Tri-Rail Coastal Link and Downtown Miami Link. Miami-Dade County Black Affairs Advisory Board February 3, 2016

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

Madison Metro Transit System

Regional Service Improvement Plan

Request to Improve Transit along the Dufferin Street Corridor

ROUTE EBA EAST BUSWAY ALL STOPS ROUTE EBS EAST BUSWAY SHORT

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

Transcription:

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Orange Line BRT Project What is the Orange Line project? 17-mile Highway BRT project $150 million capital project opening 2020/2021 Active project within FTA Small Starts grant program I-35W south is Minnesota s most heavily-traveled transportation corridor 210,000 cars, trucks, and buses per day on 35W 14,000 existing bus riders each weekday on 26 routes Over 26,000 rides by 2040 w/ BRT Who are Orange Line riders? Access to 30,000 suburban jobs Better serves all-day, evening, weekend markets Better serves non-downtown trips, especially to the 494 corridor 2

Funding & Budget Total capital cost: $150.7 million All non-federal project funds secured $12.1 M for Orange Line awarded by state 2017 special session bonding bill Received federal Letter of No Prejudice allowing local funds to be encumbered with MnDOT CTIB dissolution Hennepin and Dakota will fulfill remaining CTIB capital commitment $3.8M paid by Dakota $23.4M paid by Hennepin 50% of Orange Line operating costs will be split 86% Hennepin /14% Dakota 3

Small Starts Overall Project Rating Warrants high corridor ridership = automatic medium for mobility improvements, congestion relief, and cost-effectiveness, simplified environmental benefits approach Economic Development plans & policies performance & impact affordable housing Land Use quantitative & qualitative review of corridor land use Medium (Automatic through warrants) 66.64% Medium-High Medium-High High 50% Medium 50% High 50% Local Financial Commitment simplified evaluation due to low project cost Medium-High 4

CIG Report - Small Starts Summary 5

Station Naming Process Regional Transitway Guidelines, Chapter 9.5 Station Naming Reflect local geography Easy for the general public to recognize Distinct from the names of other stations to the extent feasible Succinct and the use of two names for one station should be avoided Timeline Dec. 2016 Jun. 2017 Mar. 14, 2017 May 23, 2017 Jun. 13, 2017 Jul. 10, 2017 Jul./Aug. 2017 Input from Orange Line Working Group & Technical Advisory Committee Burnsville City Council meeting Dakota County Regional Railroad Authority meeting Approval of station name recommendations from TAC Station naming information item at Transportation Committee Station naming business item at Transportation Committee 6

Recommended Station Names Marquette Ave & 3rd St Marquette Ave & 5th St Marquette Ave & 7th St Marquette Ave & 11th St 2nd Ave & 3rd St 2nd Ave & 5th St 2nd Ave & 7th St 2nd Ave & 11th St I-35W & Lake St I-35W & 46th St I-35W & 66th St Knox Ave & 76th St* (Knox Ave & International Blvd) Knox Ave & American Blvd I-35W & 98th St* Burnsville Heart of the City I-35W & Burnsville Pkwy *Adjacent park & rides will be renamed to reflect Orange Line station name 7

Orange Line Construction Phasing Three Orange Line construction contracts anticipated: 12 th Street Ramp and Lake Street MnDOT construction award in 2017, with completion in 2019 and 2021, respectively Construction Contracts Lake Street Project (MnDOT) BRT Stations (Metro Transit) Knox Avenue Transitway (Metro Transit) Additional construction packages (below) anticipate Federal Small Starts Grant award in early-to-mid 2018 Knox Ave underpass contract includes construction associated with I-494 Construction award in mid 2018 with completion in 2020 I-494 work during 2019 construction season Orange Line station package includes station improvements, systems, pylons Construction award in late 2018 with completion in 2020 Phased work, not all sites will be under construction at once Fare collection and signage ready to place at all locations in mid-2020 Local CIP projects and redevelopments will help inform phasing 8

Project Look Ahead Begin construction Execute MnDOT partnership agreement Finalize 35W phasing schedules with MnDOT and selected contractor Continue to seek $74.1M FTA Small Starts funding Update cost estimates and submit project information for FTA Annual report Project plan updates Monitor FY19 appropriations process and prepare for Small Starts Grant Agreement Seek full corridor construction in 2018 Complete design of 11 stations and Knox Avenue Transitway Initiate appraisals for right-of-way (ROW) needs Seek Council approval to acquire project ROW Finalize third party agreements Continue public outreach and communication 9 Existing conditions, I-35W at Lake Street Existing conditions, Lake Street under I-35W bridge

Christina Morrison christina.morrison@metrotransit.org 612-349-7690 Natalie Westberg natalie.westberg@metrotransit.org 612-349-7451 www.metrotransit.org/orangeline American Boulevard Station, Bloomington 10