Manson Construction Co.

Similar documents
OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

GALVESTON DISTRICT Dredging Schedules

2012 Texas Water Conservation Association Meeting

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

USACE GALVESTON DISTRICT PROJECT UPDATE

State of the Waterway 2017

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

MARCH 2014 HYDROGRAPHIC REPORT

Bigger, Deeper, Wider

1301 Wigmore St. Jacksonville, Fl 32206

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

Delivering the Goods: Ports in the South

The History & Management of the Atlantic Intracoastal Waterway in Florida

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015

Panama Canal Stakeholder Working Group Meeting

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

the foss seattle shipyard helping you succeed in a competitive market

Port of Los Angeles IAPH Green Port Survey

Waterway Access and the Atlantic Intracoastal Waterway in Florida

TOTAL DOMESTIC TRADE RANK TOTAL FOREIGN TRADE

TGS CEDAR PORT INDUSTRIAL PARK

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

Port of Pensacola - WHSE 9 & 10 52,500-92,500 SF WHSE +/-

Baltimore Harbor & Channels, Maryland and Virginia

U.S. Army Corps of Engineers Wilmington District

Port of San Diego Overview and Updates. September 2017

An overview of the US import terminal situation. Ad Ligthart

Port of Pensacola WHSE 8 83,000 SF WHSE +/-

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

ACS/2013/TRADE Customs Working Group.INFO.001 IMPACT OF THE WELCOME

US and Seattle perspective on shore power for cruise ships

Port Everglades Master/Vision Plan Update

The Potential Impacts of the Panama Canal Expansion on Texas Ports Final report PRC 17-78

TENTATIVE SCHEDULE

ACEC/MW and ACEC/MD. Maryland Port Administration. Steve Johnson. June 6, 2017

State of the Waterway 2017

- NEUTRAL. Savannah ORGIA PETER SALAMON MASTER OF URBAN DESIGN THESIS SAVANNAH COLLEGE OF ART AND DESIGN MAY 2015

Zoom Out Zoom In I D E A S I N T O R E A L I T Y

Photo list of facilities built under the projects of CJSC "HT Morstroy" Design Institute in

Figure 7. Dragline at Cape Coral, Figure 8. Cape Coral oblique aerial photograph, 1959.

Redesigning The Waterfront

TEXAS PORTS Value to the Nation

748 Ramirez Avenue Phone: Florida 32159

Riverine Sand Mining/Scofield Island Restoration (BA-40)

ANNUAL AUDIT REPORT OCTOBER 1, 2017 SEPTEMBER 30, 2018 PHILIPS PUBLISHING GROUP. Seattle, WA (206) (206) FAX

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT

Port Everglades Overview

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

Engineering With Nature Geographic Project Mapping Tool (EWN ProMap)

The Americas. Port of the Americas. Rhonda M. Castillo Gammill, Esq., P.E. Executive Director, Port of the Americas Authority

ASL Marine Holdings Ltd.

SAND TIGER SHARK (SoC)

MOBILE DISTRICT 2018 DREDGING PROGRAM

DREDGED MATERIAL DISPOSAL HISTORY AVOCA ISLAND LAKE

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

Dredging in Figures 2008 This review of the global dredging market focuses on the situation in 2008 and was published in October 2009.

BENEFICIAL USE OF DREDGED MATERIAL PILOT PROGRAM

Texas Port Profiles Updated March 2017

The Panama Canal Expansion: Myths and Realities for the North American Economy

Oil and Gas Capabilities

Shore Power at Port of Seattle. A viable solution to curb emissions at berth

PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3)


Panama Canal Outlook. Jorge L. Quijano Administrator/CEO Panama Canal Authority

Terminal Symposium February Houston Traffic

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

NOTHING CHANGES & YET EVERYTHING IS COMPLETELY DIFFERENT

Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing

PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT

Paso Robles Parking Action Plan 1

Communicating the Importance of Seaports. Bringin It Home. Presented to AAPA Annual Convention Galveston, TX October 27, 2009

FY 2018 Port Security Grant Program

Fun By Home Port Ship Miami, Florida Dates Ship Fort Lauderdale, Florida Dates

Port Everglades Receives Federal Authorization to Deepen and Widen Channels

The Galveston Seawall

Curriculum. Update: 2017

World-Class. World-Wide.

EFFECTIVE MESSAGE DEVELOPMENT BRAND AWARENESS. Andria Muniz-Amador Director, Public Affairs and Marketing

Strategic Advantages. Steve Boecking Vice President Hillwood August 26, 2011

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. The single biggest investment ever undertaken in Dover

CLIA 2006 Forecast. Terry Dale, President & CEO. San Diego February 8, 2006

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018

Opportunities in Non-Container Trade and the Expanding Cruise Industry

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM

Managed Lanes. What s New for Colorado. Parsons Brinckerhoff, 2013.

Renewable energy activities and new jobs in ports. Athanasios Vatistas EcoWindWater Ltd. GREECE

Textile and Apparel Importer Trade and Transportation Conference

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Dredging in Fowey Chapter 3 Post departure of the Lantic Bay

Development of New Markets for the Maritime Cluster

Marine Exchange of Alaska Port of Juneau Navigation Study

Restoration History Of Anitra Thorhaug, Phd.

Maritime Administration. U.S.-Flag Shipping Options During Emergencies

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006

Transcription:

Manson Construction Co. Since 1905 Frederick Paup, Chairman of the Board & Executive Vice President

About Manson Established in 1905, Manson began as a small, family-owned Puget Sound marine pile driving business. Today, Manson thrives as an employee-owned company with a national presence offering a wide range of skills and services. Headquarters remain in Seattle, though we have expanded to include permanent facilities in Northern and Southern California, Louisiana, and Florida. One foot in the water!

History Manson began in 1905 with a single floating pile driver Early jobs included timber docks that served Puget Sound s Mosquito Fleet of steam passenger boats

Manson Core Values Safety: Creating an Incident and Injury Free culture through training, communication, work planning, hazard recognition, and accountability People: Treating our coworkers, clients, and business partners with respect and honesty Ethics: Practicing the highest standards of conduct at work and in our daily lives Quality: Committing to doing the job right Leadership: Leading with respect, professionalism, integrity, fairness, and accountability Stewardship: Conducting our work in an environmentally responsible and sustainable manner

Locations

Equipment Fleet Manson s Heavy Marine Equipment Fleet 30 Derrick and Spud Barges (Up to 1,000 Ton Capacity) 31 Flat Barges 21 ABS and Dump Barges 4 Hydraulic Cutter Suction Dredges 4 Trailing Suction Hopper Dredges 32 Tug and Assist Boats

Capabilities Marine Construction Bridges Wharves and piers Flood protection Rock Placement Dredging Mechanical, cutter suction and hopper Maintenance, upland disposal, beach nourishment Offshore Pipeline, outfall Subsea cable Oil and gas platforms

Bridges Example Projects: WSDOT, Design-build Evergreen Floating Bridge and Landings, (2011-2015) $586 million WSDOT, Manette Bridge Replacement (2010-2012) $44 million MnDOT, St. Anthony Falls I- 35W Bridge, (2007-2008) $233 million Caltrans, San Francisco Oakland Bay Bridge (2002-2008) $1.04 billion

Wharves, Docks, Piers Example Projects: Port of Long Beach, Wharf Backlands Redevelopment, Phase 1 at Piers D, E, & F (2011-2013) $123 million Port of Long Beach, Wharf Backlands Redevelopment Phase 2 at Pier E (2011-2013) $55 million Port of Tacoma, WUT Berth Extension (2010-2011) $24 million Port of Los Angeles, TraPac Berths 145-147 (2008-2011) $102 million

Storm Protection Example Projects: Bayou Bienvenue Pile Foundation, Sill and Monolith, New Orleans, LA, (2010-2011) $21 million Bush Canal Receiving Structure and Floodwall, LA, (2010-2011) $12.5 million GIWW Bypass Gate Abutment Inner Harbor Navigation Canal, New Orleans, LA (2009-2010) $28 million Lake Cataouatche Levee Construction (2007-2008) $17 million, Avondale, LA MRGO Emergency Levee Construction, New Orleans, LA (2005-2007) $21 million

Offshore Structures Example Projects: IGBS Prototype Installation, ExxonMobil, Gulf of Mexico East Cameron Block Platform Installation, Maritech Resources, Gulf of Mexico VR 252 I Tri-pod Installation, Castex Offshore, Inc., Gulf of Mexico EI 315 C Tri-pod Installation, Tana Exploration, Gulf of Mexico

Pipelines and Outfalls Example Projects: Transbay Cable Project (2009-2010) $12 million, San Francisco Bay, CA Calleguas Municipal Water District, Hueneme Outfall Replacement, (2009-2010) $15 million City of Austin, Texas, Water Treatment Plant No. 4, (2011-2012) $61 million City of Mercer Island, WA, Sewer Lake Line and Pump off No. 4 Replacement (2009-2011) $15 million

Marinas Example Projects: Alamitos Bay Marina, Long Beach, CA (2011-2012) Elliot Bay Marina (1990-1991) $18 million, Seattle, WA Carillon Point Marina (1988-1989) $2.3 million, Kirkland, WA Sun Road Marina (1986-1987) $2 million, San Diego, CA

Ferry Landings Example Projects: South San Francisco Ferry Terminal Gangway and Float, (2010-2011) $10 million South San Francisco Ferry Terminal Pier 9 Layover Floats (2010-2011) $2.3 million Orcas Island Ferry Terminal Dolphin Replacement (2008) $4.4 million, Orcas Island, WA Clinton Ferry Terminal Dock Expansion, (2002-2003) $12 million

Cruise Ship Terminals Example Projects: Port of Juneau Cruise Ship Berths, (2015-2017), $53 million, Juneau, AK Freeport Harbour Berths 4 & 9, (2008-2009), $12 million, Freeport, Grand Bahamas Berth IV Cruise Ship Terminal, (2007-2008), $10 million, Ketchikan, AK

Navigation Dredging Example Projects: Oakland Inner/Outer Harbor Maintenance dredging, CA (2010-2011) $12 million Jacksonville Port Authority Maintenance Dredging, FL (2009-2011) $ 15 million Galveston Harbor and Channels and Houston Ship Channel Maintenance Dredging, TX (2011-2012) $9 million Ventura Harbor Maintenance Dredging, CA (2009-2011) $7.4 million

Environmental Restoration Example Projects: Oakland Harbor Navigational Improvements/Hamilton Wetlands Restoration Project (2006-2010) $165 million contract, Oakland Harbor, CA Lake Mechant Land Bridge Restoration, LA (2008-2009) $32 million Sand Berm Construction, LA, (2010) $15 million

Environmental Remediation Example Projects: Thea Foss & Wheeler-Osgood Waterways Remediation, (2003-2005), $58M, Tacoma, WA Middle Harbor Waterway Remediation, (2003-2004), $8M, Tacoma, WA Port Hueneme Confined Aquatic Disposal Facility, (2008-2009), $12M, Ventura County

Beach Renourishment Example Projects: Gulf Shores Beach Renourishment, (2012-2013), Orange Beach, AL Port St. Joe Beach Construction (2008-2009) $21M Siesta Key, FL Beach Renourishment,(2006-2007) $9.3 M Fort Pierce Beach Fill, FL, (2007) $3.4 M Loch Arbour to Deal, NJ, (2015), $38 M

International Example Projects: Manzanillo, Mexico, 2012, LNG Channel Widening and Deepening, Boskalis & Dredging International Melones Island, Panama, 2011, Pile Driving, Intercoastal Marine Inc. Grand Bahamas, The Bahamas, 2008-2009, Cargo Berth Construction, Freeport Harbour Company Great Guana Cay, The Bahamas, 2007-2008, Entrance Channel Dredging, Passerine at Abaco Holdings, Ltd Sakhalin Island, Russia, 2006, Dredging and Marine Construction, Exxon Neftegas, Ltd

Derricks & Dredges

Derricks & Dredges Haakon Maximum Lifting Capacity 400 Tons Derrick 24 Maximum Lifting Capacity 400 Tons Valhalla Maximum Lifting Capacity 350 Tons Njord Maximum Lifting Capacity 200 Tons

Derricks & Dredges Hagar Maximum Lifting Capacity 135 Tons Vulcan Maximum Lifting Capacity 140 Tons Viking Maximum Lifting Capacity 150 Tons Valkryie Maximum Lifting Capacity 135 Tons

Derricks & Dredges Scandia Maximum Lifting Capacity 135 Tons Southman Maximum Lifting Capacity 100 Tons Andrew Maximum Lifting Capacity 80 Tons Einar Maximum Lifting Capacity 75 Tons

Derricks & Dredges Freya Maximum Lifting Capacity 67 Tons Derrick 8 Maximum Lifting Capacity 50 Tons Derrick 6 Maximum Lifting Capacity 50 Tons Derrick 3 Maximum Lifting Capacity 50 Tons

Derricks & Dredges Vasa Maximum Lifting Capacity 140 Tons Acadia Maximum lifting capacity 50 tons

Hopper Dredges Glenn Edwards 13,000 cubic yards Bayport 5,000 cubic yards

Hopper Dredges Newport 4,000 cubic yards Westport 1,800 cubic yards

Cutter Suction Dredges H.R. Morris 27 diameter Frank Bechtolt 18 diameter

Cutter Suction Dredges Leonard J 24 Bob Lofgren 26

Thank you! Gracias! Frederick Paup, Chairman of the Board & Executive Vice President www.mansonconstruction.com Inquiries: proposals@mansonconstruction.com