POSEIDON MED II Fleet of vessels Port infrastructure Ioannis BAKAS HELENGI Engineering Technical Manager Project Manager for POSEIDON MED II LNG fuelling the future of the Eastern Mediterranean Limassol, Cyprus, 16th September 2016
Poseidon Med II - Content Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness
Poseidon Med II Activity 14 Scope of work: To prepare the basic and/or detailed technical designs of the 10 candidate vessels that is required to convert into LNG-fuelled ships, as well as to study the required Port and Shipyard infrastructures, including the design of Bunker Vessels Activity 14 Leader: NAP Engineering Other beneficiaries participating: HL, EPE, Shipping Companies Technical Coordination: DESFA Duration of Activity: 01/06/2015 -> 31/12/2020
Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness
Poseidon Med II LNG Retrofit Designs 10 candidate vessels selected: 1 from ARCHIPELAGO LNG 5 from POSEIDON MED 4 new selections Confirmation of selection in progress Final list of fleet of vessels to be approved by end of this year Design process: Basic design for 5 vessels Detailed design for 5 vessels
Poseidon Med II LNG Retrofit Designs Basic Design: New General Arrangements including LNG Bunker Stations Update of Safety Drawings including Fire & Life Safety, Evacuation LNG Process Diagrams, P&I, Ventilation Routes Control & Electrical Systems Weight impact, new Stability Calculations Basic Financial Analysis of Retrofit Detailed Design: Content of Basic Design to be further analysed HAZID Report, Hazard Areas analysis LNG System Detailed Process Diagrams and Calculations Structural Analysis of affected decks Single line diagrams of all new ancillary systems onboard Financial Analysis of Retrofit
Poseidon Med II LNG Retrofit Designs TERA JET (Owner: Seajets) High Speed Ferry Monohull type Year of Built: 1999 Regular service: Aegean Sea Route under evaluation: Piraeus Paros Naxos - Santorini Linked to: Port of PIRAEUS Input from: ARCHIPELAGO Deliverable: Basic design Current progress: Starting in October 2016
Poseidon Med II LNG Retrofit Designs SUPERFAST I (Owner: Attica Group) Linked to: Port of PATRAS Input from: POSEIDON MED Deliverable: Detailed design Ro-Pax Ferry Current progress: Retrofit design Year of Built: 2008 in progress Regular service: Ionian & South Adriatic Sea Route under evaluation: Patras Igoumenitsa Bari
Poseidon Med II LNG Retrofit Designs FESTOS PALACE (Owner: Minoan Lines) Linked to: Port of PIRAEUS Input from: POSEIDON MED Deliverable: Detailed design Current progress: Retrofit design Cruise Ferry Year of Built: 2001 Regular service: Aegean & Cretan Sea Route under evaluation: Piraeus Heraklion in progress
Poseidon Med II LNG Retrofit Designs ARIADNE (Owner: Hellenic SeaWays) Linked to: Port of PIRAEUS Input from: POSEIDON MED Deliverable: Basic design Current progress: To start Car & Passenger Ferry Year of Built: 1996, extended retrofit in 2007 Regular service: Aegean Sea Regular route: Piraeus Chios Lesvos and vv by March 2017
Poseidon Med II LNG Retrofit Designs HIGHSPEED 6 (Owner: Hellenic SeaWays) Linked to: Port of PIRAEUS Input from: POSEIDON MED Deliverable: Detailed design High Speed Catamaran Ferry Year of Built: 2000 Regular service: Aegean Sea Route under evaluation: Piraeus Ios Santorini Current progress: To start by January 2017
Poseidon Med II LNG Retrofit Designs NEPTUNE GALENE (Owner: Neptune Lines) Linked to: Port of PIRAEUS Input from: POSEIDON MED Deliverable: Detailed design Current progress: Starting in Pure Car & Truck Carrier December 2016 Year of Built: 2014 Regular service: Mediterranean & Black Sea Route under evaluation: Koper-Piraeus-Gebze, Piraeus as refueling port
Poseidon Med II LNG Retrofit Designs CRUISE OLYMPIA (Owner: Minoan Lines) OR HELLENIC SPIRIT (Owner: ANEK LINES) Built in 2010 Built in 2001 Adriatic route Linked to: Port of PATRAS Input from: New Vessel Deliverable: Basic Design Current progress: under evaluation Linked to: Port of PATRAS Input from: New Vessel Deliverable: Basic Design Current progress: under evaluation Adriatic route
Poseidon Med II LNG Retrofit Designs PANVISION (Owner: Arista) July 2017 Bulk Carrier Year of Built: 2011 Regular service: MED, ARA Route under evaluation: Mediterranean, North Europe Linked to: Port of PIRAEUS Input from: New Vessel Deliverable: Basic design Current progress: To start by
Poseidon Med II LNG Retrofit Designs AMMOCHOSTOS (VTS) Linked to: Port of LIMASSOL Input from: New Vessel Deliverable: Detailed design Current progress: To start by December 2016 Utility/ Escort tug Year of Built: 2014 Regular service: EMED East Mediterranean Route under evaluation: Limassol Port & territorial waters
Poseidon Med II LNG Retrofit Designs OPEN TYPE CAR FERRY, LOCAL SERVICE Open type car ferry, indicative photograph Year of Built: 2014-2015 Regular service: EMED East Mediterranean Route under evaluation: Rio Antirrio, refueling in Patras Linked to: Port of PATRAS Input from: New Vessel Deliverable: Basic design Current progress: Under evaluation
Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness
Poseidon Med II LNG Ready New Buildings Tasks: Conceptual and detailed design of 2 different vessels: Concept design of conventional LNG fuelled vessel Detailed design for an innovative Ro/Pax ferry Deliverable: Report on LNG as fuel on new building designs (conceptual and detail) Progress: Started beginning of September 2016
Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness
Poseidon Med II LNG Bunker / Feeder vessels Tasks Study the basic design of a newly built bunkering vessel Study the detailed design of a feeder type LNG tanker Study the basic design of a special retrofit for the conversion of an existing open-type car ferry to an LNG Bunkering vessel Deliverable: LNG bunkering vessels designs, including retrofit of existing vessel to bunker barge Progress: Design started in July 2016 and is in progress
Poseidon Med II LNG Bunker / Feeder vessels AMALTHEIA - 2 MAIN PARTICULARS Length overall: appr. 91m Breadth moulded: appr. 15m Normal speed: appr. 12.50 kn Cargo capacity: between 1000 2000m³ depending on configuration
Poseidon Med II LNG Bunker / Feeder vessels AMALTHEIA - 7 MAIN PARTICULARS Length overall: appr. 110m Breadth moulded: appr. 19m Normal speed: appr. 12 kn Cargo capacity: 7000m³
Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness
Poseidon Med II HAZID Port Workshops LNG BUNKERING SITE EVALUATION - HAZID PORT WORKSHOPS UNDERWAY: IGOUMENITSA Done PATRAS Done HERAKLION Done LIMASSOL Done PIRAEUS 20 22 September 2016
Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness
Poseidon Med II Electromechanical Equipment Tasks: Provide a detailed Mechanical and Electrical LNG Equipment Design for handling LNG cargoes at Ports equipment (like LNG loading arms, pumps, control valves, safety installations and control elements will be calculated and analysed) Ports under consideration: Piraeus, Patras, Igoumenitsa, Limassol, Heraklion Deliverable: Report on the Infrastructure of the 5 ports Progress: in process
Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness
Poseidon Med II Shipyard Preparedness Tasks: Identify critical factors: Gap Analysis/Diagnosis Assessment/ Performance evaluation Explore standards and manufacturing processes Perform a consultation process with local shipyards Deliverable: Full report with detailed roadmap presenting how local shipyards could really be prepared Progress: To begin late September 2016
THANK YOU FOR YOUR ATTENTION! Ioannis BAKAS HELENGI Engineering Technical Manager Project Manager for POSEIDON MED II