POSEIDON MED II Fleet of vessels Port infrastructure

Similar documents
sailing on the LNG era POSEIDON MED ll

SSLNG PORTS INFRASTRUCTURE

Pino MUSOLINO President, North Adriatic Sea Port Authority Developing and upgrading of the East-Mediterranean Motorways of the Sea (Italy-Greece MoS

WӒRTSILӒ SHIP DESIGN COMPANY INTRODUCTION. Andrew Loh. Presentation name / Author. Day Month Year

Greek. Islands Pass. Discover the Greek islands with just one Pass!

16 th Annual Report on the Greek Ferry Market The Sector under lethargy waiting for prospects

CRUISE TRAFFIC AND PERSPECTIVES IN THE ADRIATIC AND IONIAN MACRO REGION

LNG the future fuel in ferry and cruise ship ports?!

GENERAL TERMS & CONDITIONS COMMERCIAL POLICY

Case examples: CEF -fundings for Innovations

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

Port Feeder Barge: Floating Infrastructure for African Ports. 2 nd German-African Infrastructure Forum. Prof. Dr.-Ing.

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

Small Scale to large Market Strategies & Technologies towards the Mediterranean Area. The future of LNG fuelled shipping. Bartlomiej Z.

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

Time for clear cut measures

c/s Salamis Filoxenia Summarized Cruise Program Summer 2017

Gas as marine fuels operational aspects

TARIFF OF HARBOUR DUES

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

21/01/2014. LNG fueling a mindset change. The future is here in the Baltics! Baltic Sea Shipping Onboard Viking Grace

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

SHIP POWER YOUR SHORTER ROUTE TO BIGGER PROFITS. JAAKKO ESKOLA Group Vice President, Ship Power

Wärtsilä Corporation. Interim Report January-September 2006 Ole Johansson, President & CEO. 31 October Wärtsilä

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

EMERGENCY TOWING CAPABILITIES IN LITHUANIA. Igor Kuzmenko Lietuvos maritime academy

ENGINEERING AND TECHNICAL CHALLENGES IN LNG CONVERSIONS. 1 Wärtsilä

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

Zaliv Ship Design LLC

Shanghai Green Port Construction. Shanghai Municipal Transportation Commission

Introduction to BPO and Green InfraPort Project. Bogdan Ołdakowski, Secretary General, Baltic Ports Organization

Rights of passengers travelling by sea and inland waterway Regulation (EU) 1177/2010

WÄRTSILÄ CORPORATION RESULT PRESENTATION January 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

Port dues and charges Free port of Ventspils

Progressing towards profitable growth

BK Maritime. Making plans is working together. Provides a safe work environment. Qualify your fleet for a Green Passport and gain entry to all ports

EUROPEAN FORUM ON CLEAN ENERGY FOR ISLANDS 9-11 JULY 2018 CULTURAL CENTER FORMER URSULINE SCHOOL, NAXOS, CHORA AGENDA

Your Global Emergency Response Partner

Aegean Marine Petroleum Network Inc. Fourth Quarter 2008 Earnings Call Presentation February

WÄRTSILÄ CORPORATION RESULT PRESENTATION January 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

Anek-Superfast Ferries BARI DEPARTURES 2018

TECHNOLOGY COMPLIANCE FOR SUSTAINABLE SHIPPING

CURRICULUM VITAE TONY GRAINGER Marine Engineer

Associated Turkish Shipyards

Alternative fuels LNG a short or a medium term solution?

! "#$ #%& Challenge the future. Delft University of Technology

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Jamaica Investment Forum 2018 th. Montego Bay

CUSTOMER SEGMENTS IN SHIP POWER TIMO KOPONEN VP FINANCE&CONTROL, SHIP POWER

Interconnections of Greek islands The Regulatory Approach

LNG as a fuel. The past, the present and the future developments MARITIME. Alexandros Chiotopoulos 20 April Ungraded

Comfort on Board. Move Forward with Confidence

Operator / Line Ship / Voyage Departure Frequency / Destination Agency

WORLDWIDE BUSINESS WITH SEFİNE SHIPYARD

Balkan Flexipass 2008

Greece connecting Asia through her ports Regional developments

buy Balkan Flexipass!!

the Port of Gothenburg

1 Wärtsilä 17 June 2007 WÄRTSILÄ CORPORATION THIS IS WÄRTSILÄ

WORLDWIDE BUSINESS WITH SEFİNE SHIPYARD NEW BUILDING SHIP REPAIR CONVERSION MEGA STEEL CONSTRUCTION

Trieste. 11 port in Europe. for total tonnage for rail traffic. port in Italy. port in Italy. oil port in the. for total tonnage.

WATERBORNE TRANSIT. April 21, 2010

TAKING THE PLUNGE IS SHIPPING READY FOR THE 2020 GLOBAL SULPHUR CAP? CREDIT RISK FUEL QUALITY TRAINING LNG INSIDE:

WÄRTSILÄ CORPORATION RESULT PRESENTATION JANUARY Björn Rosengren, President & CEO. Wärtsilä

THE M/S MEGASTAR BUNKERING EXPERIENCE. Tallinn

ARCTIC PASSION 2018 Torkild Skjong - VARD Conceptual Design Department VARD`s ENTRY INTO EXPEDITION CRUISE DESIGN


Location. waterfront property. Peninsula. ! Short ferry ferry ride ride (30 (30 minute passenger ferry, ferry, minute vehicle) from from Seattle

What do local businesses expect from the cruise industry. The experience of the AIC Forum. Olympia, 23 th May 2015

Forum of Adriatic and Ionian Chambers of Commerce

Reducing emissions through innovative tug design

Value creation from R&D

World-Class. World-Wide.

ECONOMIC CONSEQUENCES OF PIRACY AND ARMED ROBBERY ON SHIPPING

Crossroads of the Adriatic: Corfu

Proceedings of the 12 th International Conference on the Stability of Ships and Ocean Vehicles, 2015, Glasgow, Scotland 1

Port Everglades Master/Vision Plan Update

c/s Salamis Filoxenia Summarized Cruise Program Summer 2018

WÄRTSILÄ CORPORATION

go-ferry.com Anek-Superfast Ferries VENICE DEPARTURES 2019

Problem 07 Hub and Spoke

Lecture 11. Container Ships

The contribution of passenger shipping to the Greek economy

SEAJET2 11/04/ /04/2014 FRIDAY 11/04

SMILEGOV Islands fostering multi-level governance for sustainable energy planning

Piracy Report PIRACY REPORT FEBRUARY Piracy and Acts of Armed Robbery of Ships

Wärtsilä Italia S.p.A. Confindustria Venezia Giulia - Trieste, 28 th February 2018

The world merchant fleet in 2014 Statistics from Equasis

Republic of Turkey - Ministry of Economy,

30 th. anniversary MALTA-SICILY EXPRESS FERRIES

Status and way forward for LNG as a maritime fuel

DIMITRIOS NIKOLAOS SPANOS Curriculum vitae

WÄRTSILÄ CORPORATION

DET NORSKE VERITAS TM

Port Tariffs Version #8 Valid from 1 August 2017 until 30 June 2018

HRADF: Putting Greek economy into long-term perspective

In this presentation you will find about: Who we are Our Activities & Services Some of our Customers Our Certificates Contact us

logy=a+blogx ( R 2 = 0.942, σ= ) 50% 75% a b Y=α X β 50% 75% α β

Transcription:

POSEIDON MED II Fleet of vessels Port infrastructure Ioannis BAKAS HELENGI Engineering Technical Manager Project Manager for POSEIDON MED II LNG fuelling the future of the Eastern Mediterranean Limassol, Cyprus, 16th September 2016

Poseidon Med II - Content Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness

Poseidon Med II Activity 14 Scope of work: To prepare the basic and/or detailed technical designs of the 10 candidate vessels that is required to convert into LNG-fuelled ships, as well as to study the required Port and Shipyard infrastructures, including the design of Bunker Vessels Activity 14 Leader: NAP Engineering Other beneficiaries participating: HL, EPE, Shipping Companies Technical Coordination: DESFA Duration of Activity: 01/06/2015 -> 31/12/2020

Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness

Poseidon Med II LNG Retrofit Designs 10 candidate vessels selected: 1 from ARCHIPELAGO LNG 5 from POSEIDON MED 4 new selections Confirmation of selection in progress Final list of fleet of vessels to be approved by end of this year Design process: Basic design for 5 vessels Detailed design for 5 vessels

Poseidon Med II LNG Retrofit Designs Basic Design: New General Arrangements including LNG Bunker Stations Update of Safety Drawings including Fire & Life Safety, Evacuation LNG Process Diagrams, P&I, Ventilation Routes Control & Electrical Systems Weight impact, new Stability Calculations Basic Financial Analysis of Retrofit Detailed Design: Content of Basic Design to be further analysed HAZID Report, Hazard Areas analysis LNG System Detailed Process Diagrams and Calculations Structural Analysis of affected decks Single line diagrams of all new ancillary systems onboard Financial Analysis of Retrofit

Poseidon Med II LNG Retrofit Designs TERA JET (Owner: Seajets) High Speed Ferry Monohull type Year of Built: 1999 Regular service: Aegean Sea Route under evaluation: Piraeus Paros Naxos - Santorini Linked to: Port of PIRAEUS Input from: ARCHIPELAGO Deliverable: Basic design Current progress: Starting in October 2016

Poseidon Med II LNG Retrofit Designs SUPERFAST I (Owner: Attica Group) Linked to: Port of PATRAS Input from: POSEIDON MED Deliverable: Detailed design Ro-Pax Ferry Current progress: Retrofit design Year of Built: 2008 in progress Regular service: Ionian & South Adriatic Sea Route under evaluation: Patras Igoumenitsa Bari

Poseidon Med II LNG Retrofit Designs FESTOS PALACE (Owner: Minoan Lines) Linked to: Port of PIRAEUS Input from: POSEIDON MED Deliverable: Detailed design Current progress: Retrofit design Cruise Ferry Year of Built: 2001 Regular service: Aegean & Cretan Sea Route under evaluation: Piraeus Heraklion in progress

Poseidon Med II LNG Retrofit Designs ARIADNE (Owner: Hellenic SeaWays) Linked to: Port of PIRAEUS Input from: POSEIDON MED Deliverable: Basic design Current progress: To start Car & Passenger Ferry Year of Built: 1996, extended retrofit in 2007 Regular service: Aegean Sea Regular route: Piraeus Chios Lesvos and vv by March 2017

Poseidon Med II LNG Retrofit Designs HIGHSPEED 6 (Owner: Hellenic SeaWays) Linked to: Port of PIRAEUS Input from: POSEIDON MED Deliverable: Detailed design High Speed Catamaran Ferry Year of Built: 2000 Regular service: Aegean Sea Route under evaluation: Piraeus Ios Santorini Current progress: To start by January 2017

Poseidon Med II LNG Retrofit Designs NEPTUNE GALENE (Owner: Neptune Lines) Linked to: Port of PIRAEUS Input from: POSEIDON MED Deliverable: Detailed design Current progress: Starting in Pure Car & Truck Carrier December 2016 Year of Built: 2014 Regular service: Mediterranean & Black Sea Route under evaluation: Koper-Piraeus-Gebze, Piraeus as refueling port

Poseidon Med II LNG Retrofit Designs CRUISE OLYMPIA (Owner: Minoan Lines) OR HELLENIC SPIRIT (Owner: ANEK LINES) Built in 2010 Built in 2001 Adriatic route Linked to: Port of PATRAS Input from: New Vessel Deliverable: Basic Design Current progress: under evaluation Linked to: Port of PATRAS Input from: New Vessel Deliverable: Basic Design Current progress: under evaluation Adriatic route

Poseidon Med II LNG Retrofit Designs PANVISION (Owner: Arista) July 2017 Bulk Carrier Year of Built: 2011 Regular service: MED, ARA Route under evaluation: Mediterranean, North Europe Linked to: Port of PIRAEUS Input from: New Vessel Deliverable: Basic design Current progress: To start by

Poseidon Med II LNG Retrofit Designs AMMOCHOSTOS (VTS) Linked to: Port of LIMASSOL Input from: New Vessel Deliverable: Detailed design Current progress: To start by December 2016 Utility/ Escort tug Year of Built: 2014 Regular service: EMED East Mediterranean Route under evaluation: Limassol Port & territorial waters

Poseidon Med II LNG Retrofit Designs OPEN TYPE CAR FERRY, LOCAL SERVICE Open type car ferry, indicative photograph Year of Built: 2014-2015 Regular service: EMED East Mediterranean Route under evaluation: Rio Antirrio, refueling in Patras Linked to: Port of PATRAS Input from: New Vessel Deliverable: Basic design Current progress: Under evaluation

Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness

Poseidon Med II LNG Ready New Buildings Tasks: Conceptual and detailed design of 2 different vessels: Concept design of conventional LNG fuelled vessel Detailed design for an innovative Ro/Pax ferry Deliverable: Report on LNG as fuel on new building designs (conceptual and detail) Progress: Started beginning of September 2016

Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness

Poseidon Med II LNG Bunker / Feeder vessels Tasks Study the basic design of a newly built bunkering vessel Study the detailed design of a feeder type LNG tanker Study the basic design of a special retrofit for the conversion of an existing open-type car ferry to an LNG Bunkering vessel Deliverable: LNG bunkering vessels designs, including retrofit of existing vessel to bunker barge Progress: Design started in July 2016 and is in progress

Poseidon Med II LNG Bunker / Feeder vessels AMALTHEIA - 2 MAIN PARTICULARS Length overall: appr. 91m Breadth moulded: appr. 15m Normal speed: appr. 12.50 kn Cargo capacity: between 1000 2000m³ depending on configuration

Poseidon Med II LNG Bunker / Feeder vessels AMALTHEIA - 7 MAIN PARTICULARS Length overall: appr. 110m Breadth moulded: appr. 19m Normal speed: appr. 12 kn Cargo capacity: 7000m³

Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness

Poseidon Med II HAZID Port Workshops LNG BUNKERING SITE EVALUATION - HAZID PORT WORKSHOPS UNDERWAY: IGOUMENITSA Done PATRAS Done HERAKLION Done LIMASSOL Done PIRAEUS 20 22 September 2016

Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness

Poseidon Med II Electromechanical Equipment Tasks: Provide a detailed Mechanical and Electrical LNG Equipment Design for handling LNG cargoes at Ports equipment (like LNG loading arms, pumps, control valves, safety installations and control elements will be calculated and analysed) Ports under consideration: Piraeus, Patras, Igoumenitsa, Limassol, Heraklion Deliverable: Report on the Infrastructure of the 5 ports Progress: in process

Poseidon Med II Part 1 Vessel Installations 1. LNG Retrofit Designs 2. LNG Ready New Buildings 3. LNG Bunker / Feeder Vessels Part 2 Port Infrastructure 1. HAZID 2. Electromechanical Equipment Part 3 Shipyard Preparedness

Poseidon Med II Shipyard Preparedness Tasks: Identify critical factors: Gap Analysis/Diagnosis Assessment/ Performance evaluation Explore standards and manufacturing processes Perform a consultation process with local shipyards Deliverable: Full report with detailed roadmap presenting how local shipyards could really be prepared Progress: To begin late September 2016

THANK YOU FOR YOUR ATTENTION! Ioannis BAKAS HELENGI Engineering Technical Manager Project Manager for POSEIDON MED II