NORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018

Similar documents
A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section

Fairfax County Transportation Advisory Commission (TAC)

A New Era of Transportation Solutions

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

Transportation TRANSPORTATION PROJECTS

Performance Measure Summary

Transportation Supporting Dulles Airport

Transform66 Transportation Management Plan: Transit & TDM Strategies

Our Panelists SPEAKERS MODERATOR

Basic Project Information

CONTACT: Michelle T. Holland

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

VIRGINIA DEPARTMENT OF TRANSPORTATION COMMONWEALTH TRANSPORTATION BOARD PUBLIC HEARING TRANSFORM 66 OUTSIDE THE BELTWAY CONCESSION PAYMENT PROJECTS

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

Dulles Corridor Improvements. Drive to Ride

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT

Fuller Road/Fuller Heights Road Improvements

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

Public Information Meetings. October 5, 6, 7, and 15, 2015

Fuller/Fuller Heights Road Improvements

McLean Citizens Association Transportation Committee Project Briefing

Arlington County Board Meeting Project Briefing. October 20, 2015

Report to the Dulles Corridor Advisory Committee

AGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

Dulles Toll Road Rate Setting Process

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

AGENCY NAME TRANSPORTATION

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M

I-66 Inside the Beltway Feasibility Study

Understanding Your I-66 Trip

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION

SECTION 106 ACTIVITIES ANNUAL REPORT

Transform66: Inside the Beltway

The Dulles Loop. Route 606. Route 28. Route 50

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

Design Public Hearing

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

WAGS Tournament Field Directions (October 8-10, 2016)

The following items were handed out at the January 4, 2018 NVTC Meeting.

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

SECTION 106 ACTIVITIES ANNUAL REPORT

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004

Fairfax County Parkway Widening Fairfax County

3 ASSESSMENT OF THE CORRIDOR

Metropolitan Washington Airports Authority (MWAA)

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Road Construction Ahead January-April 2015 NORTHWEST REGION

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

November 21, 2012 Barbara Kelleher, (954)

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TRANSPORTATION. Reston Market Profile

395 Express Lanes Project Update

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Culpeper District. Albemarle County Monthly Report. September 2012

Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews

SAY NO TO TRI COUNTY PARKWAY AKA: BI COUNTY PKWY / OUTER BELTWAY / NORTH SOUTH CORRIDOR / BATTLEFIELD BYPASS

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Transportation Management Program Office Newsletter J A N U A R Y

Silver Line Rail Project Update

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

Important Lane Closures, April 3 9, 2011

Hampton Roads Express Lane Network

I-95/395 HOV/Bus/HOT Lanes Project Overview

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Culpeper District. Albemarle County Monthly Report December 2011

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

Report to the Strategic Development Committee

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Appendix 1: Phase I Strategies

BG Peter D. Hidalgo (Retired) Internment at Arlington National Cemetery, Virginia

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

FDOT Treasure Coast Traffic Report through

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

To: Mary Beth Avedesian B.F. Saul Company

Route 29 Solutions Projects

Most people notice when ODOT builds something

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Capital Beltway HOT Lanes Project

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

City of Manassas Park

Transcription:

NORTHERN VIRGINIA OPPORTUNITIES Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018

VDOT s Responsibilities: Plan Design and Construct Operate and Maintain The Commonwealth s transportation facilities.

Northern Virginia District Fairfax, Loudoun, Prince William, Arlington Support cities and towns 2.4 million residents 760 employees Almost 14,000 lane miles More than 500 miles of regional bike facilities

Northern Virginia District 1,400+ traffic signals 2,200 bridges and large culverts (10% of state) 250,000 signs 24 park-and-ride lots with 12,000 spaces 13,000 ancillary structures More than 100 miles of soundwalls

Maintenance and Operations Paving, patching, guardrail, drainage, bridge and other repairs Respond to emergencies: infrastructure damage, homeland security, flooding Snow removal Work 24/7 with police and fire to clear incidents, reopen lanes as quickly as possible Manage olling/66 Express Inside the Beltway HOV, shoulder lanes, message signs, 511 and traffic information

Design and Construction Administer or review/accept all design/work on state roads (developer, localities, utilities, etc.) Traditional design-bid-build, design-build, Megaprojects As of April, administering 36 projects under construction worth $548 million in NOVA $4+ billion Megaprojects program including: 66 Express Lanes Beltway to Haymarket construction 395 Express Lanes construction 495 Express Lanes Northern Extension environmental, preliminary design

Planning and Funding Partnership among localities, state, private partners, regional planning organizations VDOT s Construction Program Funding Secretary, Commissioner and CTB prioritize and allocate through VTRANS, SMART SCALE via the Six-Year Improvement Program. SMART SCALE - We assist localities/sponsors with applications and administer evaluation process. State of Good Repair - bridges and pavement Special programs - revenue-sharing, federal, etc.

Other Project Funding Partners Projects and multimodal efforts are often funded through a combination of state funds, formula federal funds along with: NVTA Localities Public-Private Partnerships (P3) Toll Revenue Programs (66 Inside the Beltway, 395 Express Lanes, etc.) Federal grants (TIGER, FLAP, TAP, etc.) Other (Tax Districts, Proffers, etc.)

Partnership in Administering Projects Upcoming Contractor and Business Opportunities VDOT-Administered Projects Megaprojects Transform 66 Outside the Beltway Opportunities via FAM/EMP and VDOT; Concession fee projects I-395 Northern Express Lanes Extension Opportunities via Lane Construction I-495 Northern Express Lanes Extension Study Locally Administered Projects More VDOT Opportunities

Your Resources for VDOT-Administered Projects Find all of the info you need: virginiadot.org/business and eva.virginia.gov How to bid How to find business opportunities Register with eva for free to get started How to become SWAM-certified For assistance, contact: Leslie Martin, leslie.martin@vdot.virginia.gov 703-259-1775

VDOT s Construction Performance Metrics on Dashboard On-time On-budget Quality and safety Environmental performance

VDOT s Construction Performance In FY2017: Statewide, all construction 92% on-time In northern Virginia, 98% on-time and 60% ahead of schedule Incentive and disincentive programs On-Time 98% On-Budget 93% Quality and Safety 94% Environmental Performance 99%

VDOT-ADMINISTERED VDOT-Administered Projects Coming >$5 million or significant to be advertised within two years Loudoun County: Belmont Ridge Road improvements at Dulles Greenway $7.5 million Dec. 2019 Route 7/Battlefield Parkway interchange (Leesburg) $58 million June 2018 George Washington Boulevard overpass at Route 7 $28 million April 2019 In Prince William County: Williamson Boulevard and Stonehouse signal $12 million June 2020 In Arlington County: North Glebe Road over Pimmit Run $7 million April 2020

VDOT-ADMINISTERED VDOT-Administered Projects Coming >$5 million or significant to be advertised within two years In Fairfax County: East Spring Street Widening $11.5 million August 2020 Fairfax County Parkway/Popes Head Road interchange $64 million December 2019 Centreville Road bridge over Bull Run $5 million November 2019 Rolling Road/Old Keene Mill Road improvements $4 million December 2019 Wilson Boulevard over Route 50 bridge rehab $2.5 million November 2018 In the City of Alexandria: King Street bridge over I-395 major bridge rehab $13.4 million June 2020

LOCALLY ADMINISTERED Locally-Administered Projects Coming >$5 million or significant to be advertised within two years Fairfax County Scotts Run Trail $4 million June 2018 Chain Bridge Road pedestrian and drainage improvements $4.6 million September 2018 Springfield commuter parking garage $64 million December 2019 City of Alexandria Eisenhower Avenue widening $8.8 million May 2019 Town of Leesburg Sycolin Road widening to four lanes $15 million December 2018 Town of Falls Church S. Washington Street multimodal improvements $4.8 million March 2019

LOCALLY ADMINISTERED Locally-Administered Projects Coming >$5 million or significant to be advertised within two years City of Manassas: Route 28 widening $13.6 million May 2019 Town of Dumfries Route 1/Main Street improvements $4 million June 2019 Loudoun County Waxpool Road improvements $6.6 million October 2019

PRIVATELY ADMINISTERED Transform 66 Outside the Beltway $2.3 billion construction, 22.5 miles Two new express lanes along regular lanes each direction will look similar to existing I-495 lanes Express Mobility Partners (EMP) Equity Investors Cintra Global LTD, Meridiam Infrastructure North American Fund II Design-Build Contractors Ferrovial Agroman US Corp and Allan Myers VA, Inc. (FAM Construction) DBE Goal percentage: 15% SWaM Goal: 27% 24 trainees required Flexible barrier with buffer, median for potential future transit(with auxiliary lanes, if needed)

PRIVATELY ADMINISTERED Transform 66 Outside the Beltway 12 interchanges 63 bridges and overpasses 3.1 million tons of asphalt 57 million pounds of steel 300+ pieces of heavy equipment 2.2 million linear feet of sound wall 2.3 million square feet of retaining wall 4,000 new park and ride spaces 18+ miles of new bike trail 1,000+ expected jobs needed to build

Transform 66 Outside the Beltway Business and contract opportunities Small trail projects administered by VDOT, to be complete by Dec. 2022 Via I-66 EMP FAM Construction Wide range of potential services including construction, materials, trucking, environmental, photography/videography and catering Special pre-qualifications may be required Interested businesses contact: DBEinfo@fam66.us and register at www.fauscorp.com Contact: Angela Roberson, Civil Rights, aroberson@ferrovial.us Nina Etheridge, DBE/Diversity and Workforce, netheridge@fam66.use

Transform 66 Concession Fee Projects Voted by Commonwealth Transportation Board Project Request Administered East Falls Church Metro Station bus bay expansion $4.8 million Arlington Widening Jermantown Road bridge over I-66 $11 million VDOT Route 50 and Waples Mill Road intersection improvements $2 million VDOT Monument Drive bridge pedestrian improvements $3.8 million VDOT Commuter parking structure at Government Center/Fairfax Corner $38.5 million Fairfax Lee Highway pedestrian improvements: Nutley Street to Vaden Drive $1.3 million VDOT Poplar Tree Road bridge construction to four lanes $6 million VDOT I-66 median widening (Lee Highway to Route 28) for WMATA Orange Line $40 million VDOT Route 29 improvements, Shirley Gate to Pickwick Road VDOT/Fairfax

Transform 66 Concession Fee Projects Voted by Commonwealth Transportation Board Project Request Administered Balls Ford Road improvements and interchange at Route 234 $168 million Prince William Balls Ford Road widening, Groveton to Sudley Road (234 Business) $67.4 million Prince William George Snyder Trail, Chain Bridge Road to Fairfax Boulevard at Draper Drive $13.6 million City of Fairfax Nutley Street trail, Marshall Road SW to Tapawingo Road SW $0.3 million Vienna Western bus maintenance/storage facility $11.1 million PRTC VRE (Broad Run Station, South Manassas third track, Manassas Station platform extension, Manassas Park parking/bridge, real-time traveler info) $128.5 million VRE

PRIVATELY ADMINISTERED I-395 Northern Express Lanes Extension $336 million design-build project led by Lane Construction under contract to Transurban, expanding eight miles north from Edsall Road DBE Goal percentage: 10% SWaM Goal: 19% On-the-job trainee goal: 14 individuals Upcoming contract opportunities: Storm drain work and video inspection Underdrain video inspection Storm drain lining Contact: Jason Tracy, Lane Construction jatracy@laneconstruct.com or 571-259-3151

495 Express Lanes Extension Study Three-mile northern extension of Express Lanes from Dulles Toll Road to vicinity of American Legion Bridge/Maryland line $6 million approved by CTB in April for environmental study; expected completion 2019 To be closely coordinated/compatible with Maryland plans Full scope to be refined in coming months Look for new opportunities following the study

VDOT-ADMINISTERED More Opportunities at VDOT Coming soon in maintenance and operations On-call pipe replacements and pipe lining TBD Signal communications support Fall/winter 2018 Sign installation maintenance services Spring 2019 Traffic signal control cabinets Fall 2019 Professional services CEI TBD Limited services traffic engineering design - term contract TBD

More Opportunities at VDOT Administrative Services Division (ASD) 200+ active contracts in northern Virginia totaling $223 million. Examples: Facilities Maintenance and Repair janitorial HVAC roof plumbing electric fence handyman septic generators stormwater hauling welding mechanics Trash/Debris Removal trash/landfill litter/debris recycling shredding urgent pickup Arboricultural Services wildflower beds facilities landscaping tree removal/trimming mowing

More Opportunities at VDOT Administrative Services Division (ASD) Maintenance sweeping traffic control graffiti/carcass removal bridge/tunnel washing snow potholes Maintenance Materials, Equipment, Repairs pipe bridge structures liquid mag chemical tanks spreader racks pressure washing towing hauling welding mechanics Traffic Operations Maintenance utility marking sign installation traffic signal controls, cabinets