HYDRAULIC STUDY OF THE NERETVA RIVER (FROM MOSTAR TO THE BORDER WITH THE REPUBLIC OF CROATIA)

Similar documents
FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT

Development of a MIKE11 Model of the Danube, Tisa and Sava Rivers in Serbia

"Transboundary coordination according to the FD Directive in the shared river basins of Greece

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study

MANAGING FRESHWATER INFLOWS TO ESTUARIES

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Enhancing hydrological data management and exchange procedures

12th Sava PEG FP Meeting REPORT 1 Zagreb, Croatia October 20-21, 2009

Croatia completes inventory of wetlands

Hydrological study for the operation of Aposelemis reservoir Extended abstract

Update on FLOODS in Nigeria

MEASURING ACCESSIBILITY TO PASSENGER FLIGHTS IN EUROPE: TOWARDS HARMONISED INDICATORS AT THE REGIONAL LEVEL. Regional Focus.

WP4.4 Cordevole MCA alternatives description

INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS

Datum Issues in the Red River of the North Basin ----

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

Zoran Đuroković, B. Sc. (Civ.Eng.) Davor Haničar, B. Sc. (Civ.Eng.) Ladislav Grđan, B. Sc. (Civ.Eng.) Silvio Brezak, B. Sc. (Civ.Eng.

ANALYSIS OF INADEAUTE WATER QUALITY OD THE RESERVOIR VONARJE/SUTLA LAKE AND POSSIBILITY OF RESTORATION AND UTILIZATION

Runway Length Analysis Prescott Municipal Airport

Procedures of obtaining the exploitation permit for the utilization of geothermal energy

THE IMPACTS OF CLIMATE CHANGE ON SKI RESORTS AND TOURIST TRAFFIC. M. Tepfenhart, W. Mauser and F. Siebel

Federal GIS Conference February 10 11, 2014 Washington DC. ArcGIS for Aviation. David Wickliffe

PHY 133 Lab 6 - Conservation of Momentum

A Multi-Agent Microsimulation Model of Toronto Pearson International Airport

Water resources cycle in karst (feasibility studies and engineering design; case studies)

ICPDR FP-EG project overview

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Analyzing Risk at the FAA Flight Systems Laboratory

Recommended Performance Measures

AIS DATA ANALYSIS FOR REALISTIC SHIP TRAFFIC SIMULATION MODEL

Lessons Learned from the Floods this May

Simulation of disturbances and modelling of expected train passenger delays

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

EU CBS IN ADRIA REGION

Digital twin for life predictions in civil aerospace

Implementation of WFD in Serbia and Montenegro

Northeast Stoney Trail In Calgary, Alberta

Waukegan & Calumet Rivers. All Hands Meeting

Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion

Natural Factors Affecting the Level of Osoyoos Lake

The search results explanations of hydrological data

Simulation Analysis on Navigation Indexes of Wanzhou Yangtze River Highway Bridge after the Anti-Collision Device Construction by Ship Model Test

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module

MAPs sector in Bosnia and Herzegovina

Jasna Plavsic. WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN Zagreb, 6 March 2014

Hydrology Input for West Souris River IWMP

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

Danube River Basin District

Investigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study of Sarawak River Basin Malaysia

Introduction. Background MEMORANDUM

WWF Living Neretva project Phase III

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

Extraordinary summer flood in a karst area: case study in Croatia

SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH

Flight Dynamics Analysis of a Medium Range Box Wing Aircraft

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

Blocking Sea Intrusion in Brackish Karstic Springs

APPENDIX D MSP Airfield Simulation Analysis

National and Regional Activities, Needs and Expectations

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING

Developing an Aircraft Weight Database for AEDT

NATIONAL REPORT of CROATIA

Hydrological data collected for Trebizat river

Budi Hadi Narendra Harris Herman Siringoringo Chairil Anwar Siregar. Research and Development Center for Forest

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV

112 SYSTEM IN BOSNIA AND HERZEGOVINA

AIRLINES MAINTENANCE COST ANALYSIS USING SYSTEM DYNAMICS MODELING

The Role of Glaciers in the Hydrologic Regime of the Nepal Himalaya. Donald Alford Richard Armstrong NSIDC Adina Racoviteanu NSIDC

Field Report Snow and Ice Processes AGF212

How to develop resilient infrastructure (Global SDG9)

Towards practical Guidance for Sustainable Sediment Management using the Sava River as a showcase

East European Trio 6N/7D

PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA

MONITORING OF LAKE NASSER USING REMOTE SENSING AND GIS TECHNIQUES

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

Approximate Network Delays Model

Long term morphological analysis and simulations

STX France. STX France uses Siemens PLM solutions to enhance passenger comfort by predicting external aerodynamics

Advances for Pipelines

SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL

Authentic Measurements as a Basis for Cadastral GIS

Active Geodetic Network of Serbia

Observing Subtleties: Traditional Knowledge and Optimal Water Management of Lake St. Martin

AN ANALISIS OF CITIES ENDANGERMENT OF FLOODS ON THE EXAMPLE OF NOVI SAD

Airport Simulation Technology in Airport Planning, Design and Operating Management

HEATHROW COMMUNITY NOISE FORUM

Overview of Highway 37 Project. Novato Rotary November 4, 2016

Labrador - Island Transmission Link Target Rare Plant Survey Locations

! Figure 1. Proposed Cargo Ramp at the end of Taxiway Echo.! Assignment 7: Airport Capacity and Geometric Design. Problem 1

GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013

Sea Level Stations Operation in Nicaragua

Overview of Boeing Planning Tools Alex Heiter

GEOSPATIAL ANALYSIS OF GLACIAL HAZARDS PRONE AREAS OF SHIGAR AND SHAYOK BASINS OF PAKISTAN. By Syed Naseem Abbas Gilany

PERFORMANCE MEASURE INFORMATION SHEET #16

THE MUNICIPALITY of PROZOR-RAMA

Transcription:

HYDRAULIC STUDY OF THE NERETVA RIVER (FROM MOSTAR TO THE BORDER WITH THE REPUBLIC OF CROATIA) B.Sc. Draženka Kvesić, civ. eng. PRONING DHI d.o.o., Račkog 3, Zagreb Croatia. Email: drazenka@proning-dhi.hr. Contact author. M.Sc. Božidar Deduš, civ. eng. PRONING DHI d.o.o., Račkog 3, Zagreb Croatia. Email: deda@proning-dhi.hr Key words: MIKE 11, steady mode, unsteady mode, calibration, MIKE GIS, flooding mapping ABSTRACT The main purpose of the study about the Neretva river project is the creation of a mathematical model, which will be used for analyzing possibilities of establishing a flood forecast system as well as simulation and presentation of flood waves by using mapping technology. The basis of this system represents the mathematical model MIKE 11, which is used for the creation of the Neretva river model from the hydroelectric power plant HE Mostar until the border with the Republic of Croatia (i.e. up to the water reservoir (VS) Metković), an area of app. 50 km. The model includes 5 tributaries. For the purpose of this project, both geodetic and hydrometric surveys have been conducted as well as detailed hydrological analysis, which are used for conducting hydraulic simulations. Available time series data came from 14 water monitoring stations, for the period from 1995 to 2006. Hydraulic simulations were made with MIKE 11, which has a possibility of simulating 1-dimensional flow. Flow simulations of steady and unsteady mode were made. A mathematical model calibration was done for both types of flows, followed by verification, and afterwards simulation of selected water waves. A flow simulation was done in steady mode for the case of the bank protection which is located in the area from VS Počitelj until VS Gabela. It was also done in the case of being without a bank protection on the river Neretva. An analysis of the flow regime transformation was made in order to evaluate the anthropogenic influence from gravel exploitation. A flooding map was created by using MIKE 11 GIS based on the obtained steady mode flow simulation results, topographic data and digital maps. Flood zone mapping creates an important step towards better understanding of flood problems in urban areas, as well as in areas of special interest.

1. INTRODUCTION The river Neretva and its tributaries is the largest and most significant river in this water area that lies in the area of responsibility of JP for Vodno područje slivova Jadranskog mora ( Catchments areas of the Adriatic Sea ), which ordered this project. It is also one of the larger rivers in Bosnia and Herzegovina. The river Neretva is 225 km long and runs with its longest part through BH (203 km), and only 22 km through Croatia before inflowing into the Adriatic Sea. It rises underneath the Jabuka mountain in BH. Together with its tributaries, it represents an individual environmental unit and a unique ecological system in this part of world. It rises in the mountainous part of Herzegovina and has features of a mountain river throughout its major part. Because of these features, several hydroelectric power plants have been built: Jablanica, Grabovica, Salakovac and Mostar. Tributaries to the Neretva river are as follows: Ljuta, Rama, Drežanka, Radobolja, Jasenica, Buna, Bregava, Trebižat and Krupa. On its way to the Adriatic Sea, the Neretva river runs through several cities which are considered as BH s most beautiful cities, such as: Konjic, Jablanica, Mostar, Čapljina, Počitelj and the Croatian cities Metković and Opuzen. It is famous for its emerald- green colour, clean and entirely drinkable water in its upper flow. The Neretva river flows into the Adriatic Sea in the vicinity of Opuzen within the Neretva delta. Figure 1 Orthophoto of the Neretva river at the examined section

The respective section of this hydraulic study is 50 km long and starts at its upstream part at the hydroelectric power plant HE Mostar and runs to the border with the Republic of Croatia, i.e. up to Metković, where the downstream water monitoring station is located. This project consists of three parts: hydrological analyses, hydraulic calculation and mapping of flooding zones. According to the project assignment, the hydraulic study should be done in the 1-D model program, i.e. in this case with MIKE 11. 2. HYDROLOGICAL ANALYSES The basic task of the hydrological analyses is creating historical and current flow curves for the existing automatic hydrological stations at the catchments area of the Neretva river- from Mostar to Gabela, defining water balances (spatial and time distribution of the flow in the catchments) for the selected years based on created flow curves; and calculation of probabilities on high water occurrences (flows and water level) of various recurrent periods for the respective hydrological stations. Table 1 Synoptic survey of calculated hydrological parameters which are presented in this elaborate No. VS Flow Flow curve Probability of occurrence HW Water balance 1980. ; 2005/2006. 1 Mostar Noretva Yes Yes Yes 2 Baćevići Noretva Yes Yes Yes 3 Žitomislići Noretva Yes Yes Yes 4 Gabela Noretva Yes Yes Yes 5 Dom Jasenica No Yes No 6 Buna Buna Yes Yes Yes 7 Stolac-Do Bregava No Yes Yes 8 Studenci Trebižat No Yes Yes 9 Stubica Trebižat Yes No No 10 Humac Trebižat Yes Yes No 11 Studenci Studenčica Yes Yes No

Figure 2 Cartographic survey of the respective catchments of the Neretva river with appurtenant hydrological stations The possibility of having large waters of various recurrent periods, which is later on used as input data for stationary hydraulic simulations, is displayed in the following diagram:

Figure 3 HE Mostar Radobolja VS Mostar, Neretva Qmax. 1/20 = 1814 m 3 /s Qmax. 1/100 = 2216 m 3 /s Qmax. 1/500 = 2610 m 3 /s Jasenica VS Baćevići, Neretva Qmax. 1/20 = 1909 m 3 /s Qmax. 1/100 = 2318 m 3 /s Qmax. 1/500 = 2720 m 3 /s Profile 1, Neretva Qmax. 1/20 = 1929 m 3 /s Qmax. 1/100 = 2330 m 3 /s Qmax. 1/500 = 2740 m 3 /s Buna VS Žitomislići, Neretva Qmax. 1/20 = 2046 m 3 /s Qmax. 1/100 = 2433 m 3 /s Qmax. 1/500 = 2900 m 3 /s Bregava Trebižat VS Gabela, Neretva Qmax. 1/20 = 2208 m 3 /s Qmax. 1/100 = 2600 m 3 /s Qmax. 1/500 = 3150 m 3 /s Profile 2, Neretva Qmax. 1/20 = 2096 m 3 /s Qmax. 1/100 = 2490 m 3 /s Qmax. 1/500 = 2980 m 3 /s Krupa VS Dračevo? Border of RH

3. HYDRAULIC CALCULATIONS and ANALYSIS OF RESULTS 3.1. MATHEMATICAL MODEL Measurements from different water monitoring stations have been available for this project in such a way that boundary conditions of the mathematical model have been determined at their locations. As the time measure data is not the same for each station, several mathematical models have been created for which hydraulic simulations have been conducted later on. Therefore, we gained geometric models for the following sections: HE Mostar VS Gabela, HE Mostar VS Dračevo, HE Mostar VS Metković, VS Žitomislići - VS Dračevo. The mathematical model also included tributaries of the river Neretva as follows: Radobolja, Jasenica, Buna, Bregava, Trebižat and Krupa. For the area of Počitelj up to the border with the Republic of Croatia where the river bed changes due to anthropogenic influence, it is necessary to repeat the recording of the Neretva river bed quiet often because of gravel exploitation. Hence, we have cross section profiles from 1984, 1997, 2002-2005. At this section, the cross section profiles are recorded with high density (in ca. 200 locations, about every 75m), in comparison with the section upstream of Počitelj towards Mostar (ca. 80 locations, about every 450 m). It is necessary to define three models which will differ in their year of recoding at the flow analysis due to anthropogenic influence. The first model is a model that consists of cross section from 1984, the second one is of cross section from 1997 and the third one of cross section from 2003-2005, including cross section from 1997. This all refers to the part from Počitelj to the border with Croatia. Upstream of Počitelj, the cross sections of all three models are the same, which were recorded after 1998. In this way, the three models differ from each other: Model 1984 Model 1997 Model 2003/05

The following figure displays the changes of one cross section profile throughout the year: Figure 4 cross sections at chainage 32+487 1984. 1997. 2005. 3.2. BOUNDARY CONDITIONS The typical upstream boundary condition of the mathematical model of river flows is the hydrogram Q(t) on the specific water wave at non-chainage flow, i.e. constant inflow for chainage flow. The upstream boundary conditions are defined at all entries into the mathematical model, which means at the upper model boundary of the Neretva river, and at the upper boundaries of all Neretva river tributaries at the examined section. The downstream boundary condition as the water level diagram h(t), where the water level in the function of time, is usually used as a suitable boundary condition. On the other hand, the unambiguous value Q(h) is the downstream boundary condition which is required for chainage flow. Furthermore, during the flow simulation, the condition h(t) will generally speaking not always be available, except when it is about reservoirs or tides conditions. The tides of the Adriatic Sea have a rather small amplitude. This difference rarely rises over 40 cm in the southern part. However, the tide may rise to a significant height in narrow channels and bays during strong north winds. This phenomenon is characteristic for large and deep bays of the southern Adriatic Sea. The sea phases consist of a mixed type and their amplitudes are quiet irregular. The Q(h) condition is therefore used as the downstream boundary condition for chainage flow, while h(t) is used as the downstream border condition for non-chainage flow.

3.3. CALIBRATION AND VERIFICATION OF THE MATHEMATICAL MODEL OF THE NERETVA RIVER The calibration of the unsteady flow consists of adjusting model features in such a way to gain coincidences between measured and simulated time dependant hydrograms. The water level diagram is in this case particularly emphasized due to the fact that flows are never precise or accurate and are rarely recorded for the entire flooding period. In the same time, the water level in the function of time is mostly accurate at the majority of locations along the river flow. The measured unsteady flows might be used for additional verification at the calibration. By having available the measurement data from the water monitoring stations at the Neretva river and its tributaries from HE Mostar to VS Metković, seven historical events from 1995-2005 have been selected as well as one extracted historical event for which a model verification has been conducted. They are as follows: Table 2 events for which the calibration of the model has been conducted Simulation Upstream Downstream Simulation Simulation duration Section boundary boundary start end (days) condition condition 12.12.1995. 22.4.1996. 130 Žitomislići- Q(t) H(t) Dračevo VS Žito. VS Dračevo 15.12.1999. 20.12.1999. 5 HE Mostar Q(t) H(t) Gabela VS Mostar VS Gabela 9.10.2002. 16.10.2002 7 Žitomislići- Q(t) H(t) Dračevo VS Žito. VS Dračevo 21.3.2004. 6.4.2004. 15 HE Mostar Q(t) H(t) Gabela VS Mostar VS Gabela 10.4.2004. 11.5.2004. 31 HE Mostar Q(t) H(t) Gabela VS Mostar VS Gabela 27.3.2005. 10.5.2005 44 HE Mostar Q(t) H(t) 25.12.2005. 11.1.2006. 17 Dračevo HE Mostar Dračevo VS Mostar Q(t) VS Mostar VS Dračevo H(t) VS Dračevo Table 3 event for which the verification of the model has been conducted Simulation Upstream Simulation Simulation duration Section boundary start end (days) condition 30.11.2004. 7.12.2004. 7 HE Mostar- Metković Q(t) VS Mostar Downstream boundary condition H(t) VS Metković

23-3-2004 25-3-2004 27-3-2004 29-3-2004 31-3-2004 2-4-2004 4-4-2004 6-4-2004 The following figure displays only one result of the calibration of unsteady flow, for one location, i.e. VS Bačevići: Figure 5 measured simulated [meter] 36.8 HE Mostar - Gabela 21.3.2004. - 6.4.2004. Water Level NERETVA-MO-HR 58790.00 36.6 External TS 1 nivo-bacevici 36.4 36.2 36.0 35.8 Water level 35.6 35.4 [m^3/s] HE Mostar - Gabela 21.3.2004. - 6.4.2004. Discharge NERETVA-MO-HR 59275.15 1300.0 1200.0 1100.0 1000.0 Discharge External TS 1 protok-bacevici 35.2 35.0 34.8 34.6 34.4 34.2 34.0 900.0 800.0 700.0 600.0 33.8 33.6 500.0 33.4 33.2 33.0 32.8 32.6 32.4 32.2 32.0 400.0 300.0 200.0 100.0 31.8 23-3-2004 25-3-2004 27-3-2004 29-3-2004 31-3-2004 2-4-2004 4-4-2004 6-4-2004 Manning s numbers M have been used in the mathematical model of the Neretva river, which values are marked at the schematic display as shown in figure 6. Figure 6

vs sutina vs mostar radobolja 37267 36439 36511 36571 35735 35788 36074 36116 36184 35048 35195 34887 34964 35840 35983 35906 35306 35427 34789 34218 34712 34397 34564 34632 34481 34286 34096 34149 34007 33947 32487 32764 32832 32922 32557 32616 32688 32370 31084 31117 31278 31543 31695 31470 31585 31763 31863 32003 30732 30325 30571 30651 30819 30974 30906 31191 31363 30402 30485 30242 29830 29931 30057 30145 28684 28482 28041 28154 28279 28379 28587 28784 28883 29028 29133 29367 29475 29566 29681 29759 27841 27940 27061 27151 27249 27338 27544 27734 27433 27637 26382 25926 25540 25423 25620 25715 25812 25983 26101 26183 26297 26476 26578 26664 26766 26863 26957 25354 25323 41677 35510 35677 35660 35573 33864 33564 33657 33495 32070 32190 32273 he mostar 44398 45137 45638 46174 46801 47333 48185 48985 43517 38118 38946 39425 40172 33184 33286 33333 33434 56554 57309 58148 58790 55561 53409 54020 54688 49964 50869 51608 51745 42977 bregava trebizat 52355 vs zitomislici vs gabela 61252 61783 62527 59760 60141 vs capljina 72271 72554 71852 71240 71073 70377 69245 69593 68290 68660 67851 66680 67046 6613166228 66526 66722 66896 67521 63457 jasenica buna 66032 65663 65027 65322 65057 65067 63775 64058 64404 64691 vs bacevici 3.4. HYDRAULIC CALCULATION FOR STEADY FLOW, FOR FLOW OF RANK 1/20, 1/100 AND 1/500 YEAR Steady flow has been conducted for two different scenarios: in cases with embankments (which is the real case) and without embankments. Simulations have been conducted for water waves of the recurrent period 20, 100 and 500 years, which are defined by the Hydrologic analyses of the Neretva river. Figure 7 Schematic display of the determined boundary conditions for RP=100 g. Figure 8 Longitudinal section of the Neretva river with marked maximum water level for RP=100 years [meter] 14-7-2004 00:00:00 90.0 85.0 80.0 75.0 70.0 65.0 60.0 55.0 50.0 45.0 40.0 35.0 30.0 25.0 3626736349 3374233806 33009 33100 20.0 15.0 10.0 5.0 0.0-5.0-10.0-15.0 NERETVA-MO-HR NERETVA-MO-HR 65027-55561 NERETVA-MO-HR 53409-30145 0.0 5000.0 10000.0 15000.0 20000.0 25000.0 30000.0 35000.0 40000.0 45000.0 [m]

nivo vode (m.n.m) razina vode (m.n.m) Figure 9 Razine Water vode levels za stacionarno for steady flow tečenje without bez nasipa, enbankments, povratnih perioda recurrent 20, periods 100, 500 20, godina 100, 500 70 60 50 PP=20g. Hmax PP=100g. Hmax PP=500g. Hmax 40 30 20 10 0 25300 30300 35300 40300 45300 50300 55300 60300 65300 70300 stacionaža 3.5. ANALYSIS OF THE CHANGES IN THE FLOW REGIME IN ORDER TO EVALUATE THE ANTHROPOGENIC INFLUENCE DUE TO GRAVEL EXPLOITATION ALONG THE SECTION FROM THE BORDER TO ČAPLJINA Cross section profiles from three different time periods have been available for the analysis of the anthropogenic influence due to gravel exploitation. Based on gained results from the hydraulic simulations, it is visible that the border is at chainage 33 km where the tendency of changes in the water surface level shifts. With time, the river bed is becoming deeper downstream of that chainage, so that the maximum level of the water is at the lowest for model 2003/05, regardless of the water wave rank. Upstream of the 33 km at the Neretva river is the highest water level for model 2003/05, which chronologically speaking means that it has a tendency of rising. All this is only valid under the assumption that the riverbed is as measured in 1997, i.e. that the flow curve at VS Gabela and for the other models is as it was defined in the hydrological analysis. Figure 10 Antropogenic influence Antropogeni utjecaj na modelu HE Mostar - VS Gabela PP=100 god. 19 17 15 PP100 1984 PP100 1997 ITP100 2003/05 13 11 9 7 5 25000.00 27000.00 29000.00 31000.00 33000.00 35000.00 37000.00 39000.00 stacionaža

4. MAPPING FLOODS Within the project Hydraulic study of the Neretva river, one of the assignments was the cartographic layout of hydraulic simulation results which, combined with orthophoto maps and 3D Digital Elevation Model (DEM) in shapes as lines, contour lines and individual dots, give a survey on the events during floodings in different versions that represent the flows of the recurrent periods 20, 100 and 500 years. The digital map of the area which was used to determine the flooding area was created by using all available geodetic and GIS documents as follows: 1. Cross section profile of the Neretva river and its tributaries, gained by geodetic recording, from chainage km. 20+705 st. 73+500 in ACAD format, from where they were translated into table format which is suitable for using it in the MIKE11 Cross Section Editor. 2. Different geodetic records of the Neretva river bed where heavy gravel exploitation occurs (control records) in ACAD format 3. 3D Digital Elevation Model (DEM) that is defined by lines, contour lines and individual dots at the examined section up to above the level of the 500 year water by developing the digital orthophoto 4. colored DOF in the scale 1:5000 of the entire area 5. colored DOF in the scale 1:1000 of part of the area (from the RH border to beyond the city Čapljina). Geodetic profiles are used in cases when they exist (riverbed and surrounding, mostly up to the embankment, but not always. For parts where the geodetic profile is missing, data from the DEM follows up. In this way, a model has been created which is used in mapping. 70 maps (dimensions 90/60) have been created as the result of mapping flooding zones of certain recurrent periods and models with existing bank protections and without them, similar to this one: Figure 11