ENAV experience on LPV implementation

Similar documents
ICAO framework for LPV

The support of an European ANSP

PBN Implementation inside Italian Airspace Status update Summer 2013

Open Questions & Collecting Lessons Learned

Patrizio Vanni (Project Coordinator)

Status of PBN implementation in France

DSNA NAVIGATION STRATEGY

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation

Título ponencia: Introduction to the PBN concept

Learning Objectives. By the end of this presentation you should understand:

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

PBN Implementation inside Italian Airspace

TWELFTH AIR NAVIGATION CONFERENCE

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Air Navigation Bureau ICAO Headquarters, Montreal

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

RNP AR APCH Approvals: An Operator s Perspective

PBN Implementation Plan Italy. Version 1

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

European Aviation Safety Agency

Approach Specifications

PBN and Procedure Design training

Performance Based Navigation Implementation of Procedures

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013

Russian Federation ATM modernization program

UK Implementation of PBN

EUROCONTROL approach to the execution of the PBN IR Mandate

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

ASSEMBLY 39TH SESSION

EASA RNP (AR) Workshop The Landscape Working Together

PBN and airspace concept

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Guidance for the preparation of EGNOS National Market Analysis

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

SBAS Frequently Asked Questions

Work Programme of ICAO Panels and Study Groups

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING

NEW FPL Transition Phase & Implementation Stages

Implementation of PBN in Armenian airspace

(RN R A N V A V & & RN R P N

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

GNSS/EGNOS services and applications in civil aviation

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

French DSNA approach to CNS rationalization & evolution

EANPG PROGRAMME COORDINATING GROUP (COG) PERFORMANCE BASED NAVIGATION IMPLEMENTATION TASK FORCE (PBN TF)

Guidelines for ANSP/Airports and Aircraft Operators for LPV implementation

ICAO Air Navigation Panels/Study Groups Work Programme

APAC PBN UPDATE Slide 1 of xx

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Development of the Safety Case for LPV at Monastir

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

PBN/TF/7 DRAFT Appendix D to the Report D-1

LPV implementation to non-instrument runways

FLIGHT OPERATIONS PANEL

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

SBAS-ASECNA Programme Status

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

V3 INTEROP. Abstract. Document information

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

Global ATM System ~Interoperability and Harmonization ~

EGNOS History, Status and Plans

APV IMPLEMENTATION PLAN

Flight Operations Inspector Manual

MEDUSA & NANSC, Egypt

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

PBN Operational Approval Continental En Route Navigation Specifications

PBN Implementation in the UK

FLIGHT OPERATIONS PANEL (FLTOPSP)

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Implementation challenges for Flight Procedures

TABLE OF CONTENTS 1.0 INTRODUCTION...

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

ATC automation: facts and steps ahead

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

SBAS as a solution for safe approaches in New Zealand and Australia

CNS/ATM Systems Interoperability and Harmonization

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

Challenges in Complex Procedure Design Validation

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

Transcription:

ENAV experience on LPV implementation Patrizio Vanni GNSS and SES expert International Strategies Office enav.it Tunisi, 23-10-2013

Main topics Company profile ENAV role in MEDUSA ENAV role in GNSS GNSS monitoring 2

Company profile Founded in 1981 Joint-Stock Company, 100% owned by Italian Ministry of Economy and Financial Planning 3

ENAV numbers Flights handled in one year: 1.6 million flights Peak of flights managed in one day: 6,064 Control Towers (TWRs): 39 Area Control Centers (ACCs): 4 Total sq km of airspace for which ENAV is responsible: 751,728 Employees (ENAV, Techno Sky, SICTA): 4,186 Hours of training delivered in 2012 (ENAV, Techno Sky, SICTA) : 195,100 4

ENAV background in GNSS 1996: first participation to international GNSS programmes 1997: First SBAS flight trials on Ciampino airport 1998: signature of bilateral agreement with ESA for the partecipation on the EGNOS programme September 2010: Italian PBN TF constitution April 2011: AIC A1/2011 Introduction of P-RNAV in the terminal airspace of Italy November 2011: First draft for National RNP APCH Safety Case May 2012: EWA signature with ESSP June 2012: National PBN Implementation Plan approved by National Regulator September 2012: National RNP Approaches Safety Case approval by NSA November 2012: AIC A17/2012 Introduction of RNP APCH in Italy December 2012: first LPV publication for Linate Airport 5

ENAV participation in international frameworks EGPC MRD CCB Sol Expert Group PB-NAV EGNOS V3 ANSP Expert Panel BoD OMM PBN TF NSP NSG 6

ENAV role in MEDUSA ENAV will be responsible of performing the flight trials on Monastir airport using a Piaggio P-180 Avanti II equipped with a Rockwell Collins GPS-4000S receiver and a LPV capable Flight Management System (FMS). ENAV is giving also technical support to MEDUSA Members on RNP APCH implementation: Sharing experience and lessons learnt on RNP APCH implementation Studying international framework (ICAO) Identifying convergence areas for Single European Sky regulations Understanding States local scenarios and constraints Defining requirements for GNSS monitoring and recording and possible solutions 7

Implementation Validation & Implementation planning Airspace design Project planning Main supporting tasks PBN implementation process ICAO Doc9613 PBN Manual ICAO EUR Doc025 EUR RNP APCH Guidance Material 1 Operational requirement 2 PBN Implementation team 3 Project objectives and scope 4 Reference scenario 5 Safety and Performance criteria 6 CNS/ATM Assumptions 7 Route design 8 Initial Procedure Design 9 Airspace Volumes Confirm Navigation Specifications 10 11 12 13 14 15 Validate airspace concept Finalize procedure design Instrument flight procedure + Flight Inspection ATC system integration consideration Awareness and training material 16 Implementation 8 17 Post-implementation review 8

Italian LPV implementation plan The plan is in line with the ICAO Assembly Resolution A37/11 Short term 2012-2014 LPV procedures for major airports Radar monitoring mitigation Medium term 2014-2016 LPV for airports with site critical issues Long term 2016-2020 Cost/benefit analysis to assess where is possible to dismiss conventional navaids Future steps 1. Consider impacts of new PBN IR 2. Perform feasibility studies of LPV implementation on small airports without radar monitoring service 3. Review National safety case in order to update some mitigations 4. Consider EGNOS evolutions 5. Update National PBN plan 9

Approach phase Consultation with operators in progress by means of periodical ENAV Customer Care meeting. RNP APCH procedures initially implemented with LNAV and LPV minima (7 procedures). Airports already involved: Fiumicino, Ciampino, Milano Linate, Venezia; Further 8 runway ends expected before next summer Milano Linate, Milano Malpensa, Firenze, Bologna, Bergamo. Implementation, expected during next year, on two runway ends at the moment served only by circling approach (Genova and Verona). LPV helicopter approach procedures developed and validated for Milano Linate and Bergamo airports in the framework of ACCEPTA Project. GNSS monitoring: Activities in progress in order to deploy a national GNSS strategy and to overcome some of the Safety Requirements needed for the implementation of RNP APCH procedures. 10

Training Plan Training modules for Procedure designers in the framework of continuous training activities Training modules on PBN familiarization and P-RNAV procedures, including operational aspects, for ATCOs operating in radar CTR Training module on GNSS approach procedure for ATCOs planned accordingly to implementation schedule Operational training modules on PBN and related procedure management for ATCOs instructors operating at ENAV Academy Training modules on PBN familiarization for all people involved in operational activities. 11

GNSS Monitoring 12

Documentation Annex 10 Aeronautical Telecommunications Annex 11 Air Traffic Services Annex 4 Aeronautical charts Annex 14 Aerodromes Annex 15 Aeronautical Information Services SARPs NOTAM SIS performance Doc 4444 Air Traffic Management Doc 9992 PBN Airspace design manual Doc 9849 GNSS Manual Doc 9613 PBN Manual Doc 8168 PANS-OPS Doc 9905 RNP AR APCH Doc 8071 Manual on testing of radio navigation aids PANS ATM PBN implementation processes GNSS context Implementation guidance Obstacle clearance GNSS testing ATC phraseology Specifications Procedure design FPL 13

The 5Ws for GNSS monitoring WHY? Annex 10 recommends that a State monitor and record relevant GNSS data to support accident/incident investigations and confirm performances. WHAT? GNSS core systems parameters SBAS WHEN? Periodically Not real time WHERE? Representative locations in the service area WHO? States Delegated State or Entity 14

Monitoring and recording process Input IGS sites EDAS EDCN Dedicated stations Recording Retention policies Recording for accidents/incidents investigation support GNSS performance confirmation Elaboration Pegasus Dedicated tools Reporting Periodicity Information 15

1. Input Analysis of sites and infrastructures available on the market: IGS network EDCN EDAS Definition of a policy for the identification of represantive sites Ionospheric errors DoP Other parameters 16

2. Recording Parameters to be recorded: Observed satellite C/N0 Observed raw pseudo-range code and carrier phase Navigation messages Receiver status For SBAS also: Observed GEO C/N0 Observed GEO raw pseudo-range code and carrier phase SBAS data messages Definition of appropriate retention policies Security rules (authentication, data integrity, etc) 17

3. Elaboration GNSS performance (total system concept SIS + airborne capability + aircraft capability to fly the trajectory) in relation to the type of approach (Annex 10) Accuracy Integrity Continuity Availability Computation by dedicated tools (e.g. Pegasus developed by Eurocontrol) Need to have adequate documentation Compliance of algorithms against MOPS specifications Discussions going on the need to monitor also GPS SPS performance 18

4. Reporting Sample of 24hrs data elaboration Trimestral reporting Share of reports For EGNOS: Public monthly reports made by ESSP Site ROMA (Roma EGNOS RIMS Channel A) Date 06/07/2013 Location Lat (deg): 41,804 Lon (deg): 12,584 Alt (m): 172,904 GPS Standalone Receiver THALES AVIONICS Software Pegasus 4.7.4 Solution: with RAIM (no SBAS) Data set Duration Start Stop Expected Total Valid Valid (%) 1 Hz 24h 00:00 23:59 86400 86399 86034 99,58% Results Operation: NPA (HAL: 556 m ; VAL: N/A) Accuracy (m) Measured Scaled Required HNSE(95%) 3,35 211,22 220,00 VNSE(95%) 3,88 - N/A Availability (%) samples 86034 Minimum required 99 % to 99,999% Availability 100% Continuity Events 0 Minimum required 1-1x10^-4 /h to 1-1x10^-8 /h Continuity 1/h (100%) Integrity Events (HPE > HAL) 0 Minimum required 1-1x10^-7 /h Integrity 1/h (100%) MI (PL > PE) Total 0 Horizontal 0 Vertical - Protection level statistics (RAIM Un-weighted PL) HPL (m) VPL (m) 99% 95% 50% mean std deviation 73,63 19,67 10,35 12,18 9,85 - - - - - Position error statistics HPE (m) VPE (m) 99% 95% 50% mean std deviation 4,22 3,35 1,30 1,58 1,04 5,10 3,88 1,56 1,70 1,21 19

Conclusions Need to develop an harmonized approach for GNSS performance assessment under ICAO framework (core constellation vs. GNSS) New constellations (Galileo, Beidou, etc), SBAS evolutions (EGNOS V3) and new services (double frequency) constitutes an attractive challenge for aviation community GNSS data recording and monitoring can be also used to support: RFI mitigation activities Real time ATC (developing dedicated interfaces) But: Differences between performance at ground level and on board aircraft 20

21