Centro de Promoção de Investimentos (Investment Promotion Centre) BOOK OF OPPORTUNITIES Joint Venture with Mozambican Companies

Similar documents

Business and Investment Opportunities in the Industrial Sector

South-South Learning Exchange Visit, Mozambique IT/ITES Experiences and Challenges

Investment Climate and Business Opportunities for Japan

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

EDM RURAL ELECTRIFICATION PLAN

Nacala Business Campus

Japan International Cooperation Agency

Table of Contents. CMA CGM Mozambique Profile

Cost of PEC-Zonal Activities in Mozambique Analysis of contract costs from 2008 up to 2011 Júlia Zita, Arjen Naafs

REPUBLIC OF MOZAMBIQUE SOFALA PROVINCE

Child-centred Disaster Risk and Vulnerability Assessment. Mozambique

ENERGY INVESTMENT OPPORTUNITIES PRESENTATION. By Remmy Makumbe, Director, Infrastructure and Services

Sampling methodology Mozambique

Agriculture Projects Project Title Sponsor Project Summary Estimated Investment Cost 1. Western Cashew Industries Limited

MOZAMBIQUE UPDATE ON DEMINING COMPLETION

PART IV ECONOMIC FEASIBILITY STUDY

Investment Opportunities

Strategic Location DJIBOUTI

SAPP DEMAND AND SUPPLY SITUATION

Investment Opportunities in ZAMBIA

Background Beira Development Corridor Limpopo Development Corridor Walvis Bay Corridor One Stop Border Posts

The main audience for this study

MOZAMBIQUE mvam Bulletin #8: March 2017

IMPERIAL LOGISTICS AFRICA DISTRIBUTORSHIPS

Market Brief on Mozambique

Walvis Bay and its role as a logistics hub for the SADC region. Christian Faure Executive: Marketing and Strategic Business Development

123% .1589$ 100% 7.5% 7.5% 100% 7.5% %12 458=5 100% OGE k FMI MOZAMBIQUE OVERVIEW OGE 458=5 100% = % 100% % 25648

MEGA MPUMALANGA ECONOMIC GROWTH AGENCY

Educational inequality in Mozambique

For personal use only

Why Namibia. Abundant Resources. Striking Opportunities. Competitive Economy. Top Quality Exports. Gateway to SADC

Pumped Storage Schemes & imported hydroelectricity

Mozambique Political Process Bulletin

MOZAMBIQUE mvam Bulletin #6: January 2017

Procurement Plan National PPFD

Realistic Assessment of SADC Energy Demand and Supply Up to By Prof M Elmissiry ENERGY SECTOR NEPAD, Midrand South Africa

LATEST LOGISTICS AND FORWARDING NEWS

Natural Gas in Developing Countries: Investment Needs and Opportunities for International Cooperation

18,669 children targeted for treatment of malnutrition

BUSINESS OPPORTUNITIES IN TANZANIA

INFRASTRUCTURE DEVELOPMENT IN TANZANIA

MOZAMBIQUE'S AGRICULTURAL ECONOMY IN BRIEF

Master Plan of Costa Rica Atlantic Coast Limon - Moin. November, 2008 Costa Rica

Southern African - German Chamber of Commerce and Industry. Business Delegation to Mozambique. 27 to 30 August, 2012

MOZAMBIQUE mvam Bulletin #5: December 2016

SADC PPP Network PPPs in SADC

SADC Enabling Infrastructure Initiative. Infrastructure Support for Deepening Regional Integration and Poverty Reduction in the SADC Region

REPORT ON IMPLEMENTATION OF THE VIENNA PROGRAMME OF ACTION MARCH 2019

Updated on November 28, 2016

MOZAMBIQUE TRADE AND TRANSPORT FACILITATION AUDIT

Capability Statement Connecting global markets

TransCentury AGM Presentation 29 May 2014 INVESTING IN AFRICA

Catchment and Lake Research

On the Road. Lonely Planet 4

POLICY QUESTIONS FOR TRAVEL FACILITATION FOR ENHANCING MOBILITY IN THE OIC MEMBER COUNTRIES. February 5th, 2015, Ankara

Zambia by Numbers. Foreign Exchange Reserves $1.892 Billion (Dec.2013) Public Debt as a % of GDP 36% (2013)

State of South Africa s Maritime Industry Transport Portfolio Committee. 08 May 2012 Commander Tsietsi Mokhele Chief Executive Officer

The Southern African Power Pool. Meeting growing power demands through Southern African regional integration

Mozambique Food Security Outlook April to September 2009

HISTORY EARLY INHABITANTS

Resource Sector Mozambique

Endless investment opportunities in public infrastructure and services Carlos Herrera Investors Servicing Director

nacala business campus --- the platform of opportunity ---

CONTENTS Executive Summary... iii 1. Introduction Major Destinations for Zambia s Exports Major Source Countries for Zambia s

China s Engagement in the Construction Industry of Southern Africa: the case of Mozambique

TRANSPORTATION: Airports and Aviation Services

SOUTHERN AFRICA TROPICAL CYCLONE IDAI

Australia. Geography

LATEST LOGISTICS AND FORWARDING NEWS

SOUTHERN AFRICA TROPICAL CYCLONE IDAI

Evaluating local and regional supplier inputs to mega-infrastructure projects: lessons from the Moatize railway, Mozambique.

This bedroom can sleep a single person or two people sharing a bed,

Tanzania s Transport Hub: What Prospects for Regional Integration and Investment? 22 NOVEMBER 2016, JOHANNESBURG, CHELSEA MARKOWITZ

Southern African Development Community (SADC) Grain Trade What does the data say?

ALAN GOLDING ANALYTIKA HOLDINGS (PTY) LTD. Exploration Management, BOTSWANA

Trade Blocs, Development Hotspots and Changing Trade Patterns. Breakbulk Africa, 18 th February 2015

MAPUTO PORT DEVELOPMENT COMPANY

PROMOTING INNOVATION AND TRADE IN HORTICULTURE 25-27th NOVEMBER 2015, KIGALI,RWANDA

Outlıne of the Presentatıon

East African Power Industry Convention 2007, Addis Ababa, ETHIOPIA

Capability Statement. Connecting global markets

Aswan Investment Opportunities

WELCOME TO THE REPUBLIC OF BASHKORTOSTAN

REPUBLIC OF MOZAMBIQUE

A Case Study: Shared Connectivity Between Schools in Inhambane

MOZAMBIQUE News reports & clippings 344 Poverty survey supplement - 31 October 2016 Editor: Joseph Hanlon (

Estimating Utility Consistent Poverty Lines: With Illustrations from Mozambique and Tanzania. Channing Arndt University of Copenhagen

ZAMBIA Land of OPPORTUNITIES & PROFITS. Zambia Development Agency

1.0 Introduction Zambia s Major Trading Partners Zambia s Major Export Markets... 4

Number 1 Gross Regional Product per capita in Queensland

Instituto Nacional de Desminagem

CONTENTS Executive Summary... iii 1. Introduction Major Destinations for Zambia s Exports Major Source Countries for Zambia s

MOZAMBIQUE. Drought Humanitarian Situation Report

DOING BUSINESS in LUSOPHONE AFRICA

Appeal coverage: 116.4%; Click here to go to the attached Contributions list, or refer to Federation s website.

SOUTHERN AFRICA TROPICAL CYCLONE IDAI

Zambia s Investment Opportunities

Provincial Review 2016: Limpopo

Central America. Market Opportunities for U.S. Exporters. Costa Rica, El Salvador, Guatemala, Honduras, Belize, Nicaragua

Transcription:

Centro de Promoção de Investimentos ( Promotion Centre) BOOK OF OPPORTUNITIES Joint Venture with Mozambican Companies January 2015

1. Agriculture/Agri-business/Forestry ( Project) 1.1. Farming and Livestock Project 1.2. Rice Production Project 1.3. Bean Commercialization Project (Expansion) 1.4. Project for Processing and Export of Agricultural Commodities 1.5 Project of Tomato Processing 1.6. Livestock Agro-processing Project 1.7. Milling Project 1.8. Cashew Nut Processing Project 1.9. Cassava Processing Project 1.10. Pineapple Processing Project 1.11. Agro-processing in Greenhouse and Aviaries 1.12 Forest Management Project Cabo Delgado - Flamingo Investimentos, Lda Muidumbe 1.13 Litapata Forest Exploration Project Cabo Delgado - Muidumbe 1.14 Tomato Production and Processing Industry Sofala - Nhamatanda (Province - District) Cooperation Maputo -Moamba Morrumbene Niassa Maputo City / Equipment Maputo - Magude Maputo - Magude Gaza - Bilene Massinga Inhambane -Inharrime Sofala - Muxungue Morrumbene 500 000 Objective: Potato production Market: National Supporting infrastructure: 50 ha (10 ha reserved for potato production) *Feasibility study completed 130 367 Objective: Rice and butter beans production Market: National *Feasibility study completed 1 380 000 Objective: Packaging and commercialization of beans purchased in local communities. Market: National and international *Feasibility study completed 5 000 000 Objective: Production, processing and marketing of vegetable Market: National and international 350 000 Objective: Tomato Processing. 450 000 Objective: Beef and Goat meat Processing 4 545 455 Objective: Bran production 2 845 454 Objective: Cashew nut processing 152 000 Objective: Cassava processing for brewers and bakery industries 4 030 090 Objective: Pineapple processing 1 000 000 Objective: Production of fruits, vegetables and poultry Market: Start with national market Supporting infrastructure: Area of 15 ha. *Feasibility study completed N.A. Objective: Forest management for exploitation under 25- year concession Support infrastructure: Area of 20 000 ha and forest industry Financial N.A Objective: Development of activities relating to felling and timber processing Supporting infrastructure: Area of 20 ha Equipement 8 000 000 000 Objective: Tomato production and processing Market: Domestic, regional and international Supporting Infrastructure: Beira Corridor (EN6, Port in 70 km, power, etc.)

2. Construction/Real Estate ( Project) 2.1. CENONE CONSTRUÇÕES, S.A (Modernization and Expansion) 2.2. Real Estate Project 2.3. Plató Pemba Real Estate Project 2.4. Housing Construction Project in Marrabo Village 2.5. Housing Construction Project in Nicoadala and Zalala 2.6. Integrated Project for construction of residential buildings and social infrastructure 2.7. Integrated Project for Construction of residential buildings and social infrastructure 2.8. Integrated Project for Construction of residential buildings and social infrastructure 2.9. Integrated Project for Construction of residential buildings and social infrastructure 2.10. Integrated Project for Construction of residential buildings and social infrastructure 2.11. Construction of 2 Warehouses 3. Infrastructure/Energy ( Project) 3.1. Construction of Moatize Dry Port -Tete (Province - District) Cooperation Maputo City Maputo - Boane Cabo Delgado - Pemba City Quelimane -Quelimane City Zambezia - Nicoadala, Zalala Gaza - Xai-Xai City Mampula - Nampula City Nampula - Nacala City (Utopia) Tete Tete City Gaza - Macias Cabo Delgado Metuge, Balama Equipment (Province - District) Cooperation Tete - Moatize 500 000 Objective: Engineering and public works, geotechnical (soil survey and drilling), electrical, telecommunications, ventilation and air conditioning and hydraulic works, and paintings. Market: National N.A Objective: Construction of housing Supporting infrastructure: Area of 1 ha N.A Objective: Construction of tourist, commercial, residential and social infra. Supporting infrastructure: Area of 150 ha 150 000 000 Objective: Construction of housing - T2 (2-bedrooms) (500) and T3 (3-bedroom) (1500), social infrastructure, roads, facilities for water supply, sanitation and power supply, and others. 50 000 000 Objective: Construction of housing - T2 and T3 (500 units), social infrastructure, roads, facilities for water supply, sanitation, power supply, etc. 40 000 000 Objective: Construction of housing - T2 and T3 (300 units) social infrastructure, roads, facilities for water supply, sanitation, power supply, etc. 150 000 000 Objective: Construction of housing - T2 (500 units) and T3 (1500 units), social infrastructure, roads, facilities for water supply, sanitation, power supply, etc. 150 000 000 Objective: Construction of housing - T2 and T3 (2000 units), social infrastructure, roads, facilities for water supply, sanitation, power supply, etc. 150 000 000 Objective: Construction of housing - T2 (500 units) and T3 (1500 units), social infrastructure, roads, facilities for water supply, sanitation, power supply, etc. 28 000 000 Objective: Construction of housing - T2 (500 units) and T3 (1500 units), social infrastructure, roads, facilities for water supply, sanitation, power supply, etc. 400 000 Objective: Construction of warehouses for 1) gas and oil equipment logistics (200 000 each) and 2) mining and agricultural products logistics. Market: Domestic, regional and international Supporting infrastructures: 6.24x10.00 in a 50x50 area 7 000 000 Objective: Construction of the port infrastructure for the storage, transport and distribution of goods and services within the country and Southern Africa region through the Sena line.

3.2. Construction of Mutarara Dry Port - Tete 3.3. Construction of Matutuine Dry Port - Maputo 3.4. Designing and Construction of Moatize Industrial Park -Tete 3.5. Construction of Mocuba Dry Port 3.6. Construction of Pemba Intercontinental Hub 3.7. Pavua Dam Project 3.8. Corumana Dam Project Complementary works phase II (Expansion) Tete - Mutarara Maputo - Matutuine Tete - Moatize Zambézia - Mocuba Cabo Delgado -Pemba Sofala - Pungué River Maputo - Moamba Market: domestic and international, a region with coal mining industry Supporting infrastructure: the Sena railway line, tarred roads system linking Zimbabwe, Zambia, Malawi and Congo Republic, energy supply from the Cahora Bassa Power Supply Plant (HCB), and water infrastructure 2 000 000 Objective: Construction of the port infrastructure for the storage, transport and distribution of goods and services to Malawi through the Sena line. Market: National and international, near Malawi. Supporting infrastructure: Sena railway line, secondary roads connecting the country and Malawi, and electricity from HCB. 500 000 000 Objective: Construction of a multipurpose terminal for general cargo; fuel terminals (for strategic reserves); terminal for petrochemicals products and passenger terminal and Marina. Market: National and international - close to South Africa, Botswana and Zimbabwe Markets Supporting infrastructure: South railway system, consisting of three railway lines connecting the port of Maputo, Swaziland, South Africa and Zimbabwe. 12 500 000 Objective: Delimitation, fencing and establishment of basic infrastructure for small and medium-sized enterprises to set up different types of industries, trade and support services to mining companies located in Tete province. Market: National and international - a region with coal mining industry and with multinationals. Supporting infrastructure: Tete International Airport, train and port system of Beira Corridor 5 000 000 Objective: Rehabilitation of Mocuba Dry Port Market: National and international - SADC region with high potential for agribusiness near northern capital Supporting infrastructure: Tarred roads connecting all provincial capitals 450 000 000 Objective: Construction of an Intercontinental airport and logistic infrastructure Market: National and international - a region with high tourist potential, flow of tourists and multinational oil companies. Supporting infrastructure: Paved roads integrated to the national road (N1), the Beira corridor, 600 000 000 Objective: Study and construction of a dam with the following dimensions: height - 84 m; Storage volume - 3,330 M m 3 ; Useful volume - 210 M m 3 and Mean Flow m 3 / s 85.9. The dam will have the potential to generate electricity of about 438 GWh / year. 25 000 000 Objective: Increase the level the reservoir from 111 to 117 M m 3, by placing gates on the flood spillway and construction of a dyke.

3.9. Sussundenga Dam Project 3.10. Chimezi Dam Project 3.11. Montepuez Dam Project 3.12. Mandimba Dam Project 3.13. Pambarra Irrigation Project (Expansion) 3.14. Paunda Irrigation Project 3.15 Mphanda Nkuwa Hydroelectric Plant 3.16 Moatize Thermal Power Plant (Coal) 3.17 Benga Thermal Power Plant (Coal) Manica - Sussundenga Manica - Chimezi River Cabo Delgado - Montepuez (Montepuez River) Niassa - Mandimba District Vilankulos Mabote Tete - Chiúta Tete - Moatize Tete - Benga 350 000 000 Objective: Construction of concrete dam, a dome type with the following dimensions: maximum height - 45 m; Crest length - 99.60m and volume stored in NPA = 33 million m 3. The project aims to produce electricity for the promotion of industrial development in the region; increase the annual water availability for irrigation of 1500 ha and consumption in the urban center of Sussendenga 120 000 000 Objective: Construction of earth dam with side flood spillway and concrete bottom outlet. The infrastructure will have the following dimensions: maximum height - 25 m; storage capacity in NPA = 23 million m 3 ; basin area - 138 km 2 and length of the crest - 166 m. This project is intended for water storage for irrigation of areas of Chimezi-Zonué, water supply to the headquarters of Sussendenga district; a potential for power generation and regulation of flood flows. 125 000 000 Objective: Construction of earth dam with water intake. The dimensions of the dam will be - a maximum height - 27.3 m; storage capacity NPA = 2,003,220 m 3 and the crest length of 2 000 m. The dam is intended to store water for irrigation, water supply to the headquarters of Montepuez district and power generation. 150 000 000 Objective: Impounding reservoir for irrigation; water supply and power generation 5 000 000 Objective: Expansion of irrigation system to 400ha. Installation of a power line to the pumping equipment, consultation for the detailed design of the project Supporting infrastructure: Existence of a 20 ha of irrigation system operated by private farmers and smallholders *Financial study completed 20 000 000 Objective: Construction of the 1000 ha irrigation system. *Financial study completed 2 600 000 000 Objective: Construction of a hydroelectric dam with generating capacity of 2400MW. The project will be divided into two stages, the first stage with generating capacity of 1500MW. The project will be implemented within 61 km from the Cahora Bassa. *The environmental impact assessment completed *Financial Closure Underway 1 500 000 000 Objective: Construction of a thermal power (coal-fired) plant with generating capacity of 2400MW. *Feasibility study completed. 1 300 000 000 Objective: Construction of a thermal power (coal-fired) plant with generating capacity of 2000MW.

3.18. Alto Malema Hydroelectric Plant 3.19. Lúrio Hydroelectric Plant 3.20. Majawa and Berua Hydroelectric Plant 3.21. South - Central (CESUL) Transmission Line Project Backbone Zambézia - Gurúè Cabo Delgado Zambézia - Milange Tete Maputo *Feasibility study completed 124 000 000 Objective: The project comprises the construction of a hydroelectric dam with generating capacity of 60MW. *Feasibility study completed 400 000 000 Objective: The project comprises the construction of a hydroelectric dam at the mouth of the Lúrio River with the capacity to 120MW. *Feasibility study underway 120 000 000 Objective: The project comprises the construction of a hydroelectric dam with generating capacity of 25 MW (Maawa) and 41 MW (Berua). *Feasibility study underway 1 870 000 000 Objective: Construction of the backbone of the high voltage power system, 400 kv, with capacity of 2650 MW and a length of 1500 km, which will enable the transmission of electricity from central power plant of Mphanda Nkuwa, Moatize and Benga and HCB North to national Market. *Feasibility and environmental study completed 4. IT ( Project) 4.1. Information Technology (IT) Project - expansion of data base discover (Expansion) 4.2. MozGate Technology Project (Expansion) (Province - District) Cooperation Maputo City 2,000,000 Objective: Technological network expansion through installation of a new data base discover. Supporting infrastructure: Company installed a payment system, e-sistaf Maputo City / Equipment 50,000 Objective: Expand capacity by increasing equipment and technicians certified in domestic and industrial wiring area (networking cabling, sales of computer equipment and telecommunications, services provision and training). Market: National Supporting infrastructure: Equipment for network qualification and structured

5. Manufacturing ( Project) 5.1. Meat Processing Project (Expansion/modernization) 5.2. Cement and Steel Factory Project 5.3. Cement Factory Project (Expansion/modernization) (Province - District) Cooperation Maputo Maputo - Boane Maputo - Matola N.A Objective: Expansion and modernization of its services of sausage, hams, hamburgers and polony. Supporting infrastructure: Building and equipment for production 2 070 000 Objective: Construction of a plant for cement production as well as the development of other complementary activities. 3 018 233 Objective: Creating an industry in production of cement for construction. 6. Tourism ( Project) 6.1. The Project for Construction of Tourist Complex Sea and Sun Lodge 6.2. The Project for Construction of Kafalume Tourist Complex (Province - District) Morrumbene Cooperation Management / / Equipment / Financial Maputo - Boane 1 st phase: Objective: Construction of SEA & SUN LODGE with more than 4 stars and 2 250 000 other facilities for tourism activities with 132-beds capacity. 2 nd phase: 750 000 750 000 Objective: Construction of a multinational tourist complex with 240-bed Supporting infrastructure: Area of 3.47 ha, power and drinking water supply *Architectural design/feasibility study completed, construction license obtained N.A Objective: Construction of tourist complex and development of other activities Supporting infrastructure: Area of 5 ha N.A Objective: Construction of bungalows Supporting infrastructure: Area of 10 ha 6.3. The Project for Construction of Tourism Complex Cabo Delgado - Muidumbe 6.4. The Project for Construction of Tourist Resorts Cabo Delgado -Palma (Pundanhar) 6.5. The Project for Construction of Tourism Complex Maputo - Ponta N.A Objective: Construction of tourist complex Mamole, Matutuine Supporting infrastructure: Area of 7 ha 6.6. Tourism Infrastructure Project Nampula - Nacala All types N.A Objective: Project compatible for industry, agriculture and tourism Velha Supporting infrastructure: Area of 20 ha 6.7. Tourism Infrastructure Project Nampula - Nacala All types N.A Objective: Project compatible for Industry, Agriculture and Tourism Velha Supporting infrastructure: Area of 10 ha 6.8. Construction of Tourist Complex Niassa Lichinga N.A. Objective: Construction of tourist complex Supporting infrastructure: Area of 500 ha 6.9. Orla Tourist Complex Maputo - Matutuine 500 000 Objective: Construction/development of tourist complex. Supporting infrastructure: Area of 150 ha

7. Mineral Resources ( Project) 7.1. The Project for Exploration of Coarse Sand for Construction 7.2. Quarry Project 7.3. Gold and Gems Exploration Project 7.4. Gold and Gems Exploration Project 7.5. Gold and Gems Exploration Project 7.6. Gold and Gems Exploration Project 7.7. Quarry Project (Province - District) Cooperation Maputo - Boane Maputo - Namaacha Manica - Macossa locality Manica - Macossa Manica - Macossa Manica - Macossa Cabo Delgado - Palma (Pundanhar) Cabo Delgado - Metuge (Miezi) 7.8. Quarry Project 7.9. Gold and Iron Exploration Project Namplua Monapo, Erati 7.10. Gold and Iron Exploration Project Manica 7.11 Limestone Exploration Project Inhambane 900 000 Objective: The Project for exploration of coarse sand for construction Market: National Supporting infrastructure: Area of 77 ha with license for mineral exploration *Feasibility study completed 800 000 Objective: Exploration of basalt rock (stone) and for construction. Market: National Supporting infrastructure: Area of 115 ha *Feasibility Study completed N.A Objective: Exploration of gold and gems Supporting infrastructure: Area of 406 ha N.A Objective: Exploration of gold and gems Supporting infrastructure: Area of 406 ha N.A Objective: Exploration of gold and gems Supporting infrastructure: Area of 514 ha N.A Objective: Exploration of gold and gems Supporting infrastructure: Area of 406 ha Financial N.A Objective: Extraction and processing of stone for construction Supporting infrastructure: Area of 67 ha N.A Objective: Extraction and processing of stones and sand for civil construction Supporting infrastructure: Area of 25 ha 1 500 000 Objective: Extraction of mineral resources Supporting infrastructure: Area of 25 ha 750 000 Objective: Extraction of mineral resources Supporting infrastructure: Area of 25 ha 500 000 Objective: Extraction of limestone Supporting infrastructure: Area of 25 ha

8. SME (Micro-projects) ( Project) 8.1. Fishery and Aqua-culture Project *Exchange rate applied to the investment value is 1USD = 33 Mt (Province - District) Morrumbene Cooperation 50 000 Objective: Fish and Shrimp Production. Supporting infrastructure: 5 tanks (fish ponds) 50x50 in size each, with a capacity of 4.2 ton/year. *Feasibility Study completed.

Rua da Imprensa, 332, R/c, PO Box 4635, Maputo, MOÇAMBIQUE Tel: +258 21 313310/75, Fax: +258 21 313325 Email: cpi@cpi.co.mz, sdn@cpi.co.mz Website: www.cpi.co.mz