Business update H land acquisitions and deliveries visibility

Similar documents
Q3 FY18 Business Highlights

Parques Reunidos Expands to Australia with the Acquisition of Wet n Wild Sydney July 2018

Half Year F1 Results. November 4, 2015

Wizz Air aims to increase market share with F17 capacity growth of 20% Q3 passenger growth of 20%, Load Factor of 88% (+2.3ppt)

Operating lease of 50 new MC aircraft. Annual General Meeting of Shareholders Moscow 25 June 2018

Quarterly Interim Management Statement. Three Months to June 30, 2015

MATERIAL FACT. In Madrid, on 11 December Parques Reunidos Servicios Centrales, S. A.

Parques Reunidos Corporate Presentation March 2016

Half Year F1 Results. November 4, 2015

THE AIRBUS PURCHASE AGREEMENT

Flybe Group plc New Walker Hangar Exeter International Airport Clyst Honiton Exeter EX5 2BA Company No: November 2018

March 4, Investor Conference

Brexit: impact on the Spanish residential market

Q1 FY 13 IMS Analyst & Investor presentation. 3 months to 31 December 2012

The Qantas Group A Strong, Sustainable Future Alan Joyce, CEO Qantas Airways. Macquarie Australia Conference 4 May 2012

IRT Americas Trade. September 1, 2017

Quarter 3 Interim management Statement

Quarter Interim Management Statement. 28 July 2010

CIVITAS EB-5 CAPITAL

THIS LETTER IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION.

information memorandum Business and Technology Precinct Westlink Green Darra

Q3 FY 15 Analyst & Investor presentation. 3 months to 30 June 2015

INTERIM RESULTS. 31 December 2018

Forward-Looking Statements Statements in this presentation that are not historical facts are "forward-looking" statements and "safe harbor

Qantas Group - Positioned for Growth and Sustainable Returns

DISCLOSEABLE TRANSACTION IN RELATION TO ACQUISITION OF AIRCRAFT

Chris Walton Finance Director. Raymond James Growth Airline Conference New York 27 th January 2005

Q2 FY2011 Results Presentation

1H 13 Results. July 25th, H 13 Results.

MAJOR TRANSACTION PURCHASE OF AIRCRAFT AND RELATED TRANSACTIONS

Indaba February 2007

Win-win-win: LANXESS sells stake in Rubber Good for LANXESS, good for ARLANXEO, good for Saudi Aramco

GATWICK AIRPORT LIMITED

H RESULTS BOLOGNA, SEPTEMBER 4 TH 2017

Talaat Moustafa Group Holding 1Q08 Results Earnings Release

E BOUGHTON ROAD

A copy of this letter is available on the Company s website at

Passenger growth of 17%, Load Factor higher at 91% Margin expansion (EBITDAR 41.9%, Net Profit 25.1%)

Q3 FY 14 IMS Analyst & Investor presentation. 3 months to 30 June 2014

q Analyst & investor presentation Thursday 20 th July 2017

Melco International Development Limited (Incorporated in Hong Kong with limited liability) Website : (Stock Code : 200)

CIMB Plantation Day 2012

EB-5 INTRODUCTION & REGIONAL CENTER CREDENTIALS Berkeley Regional Center Fund LLC (USCIS ID: )

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

TBU Q ANALYST & INVESTOR PRESENTATION

CapitaMalls Asia Limited Asia s Leading Mall Developer, Owner and Manager Singapore China Malaysia Japan India

CATHAY PACIFIC AIRWAYS LIMITED (Incorporated in Hong Kong with limited liability) (Stock Code: 293) Announcement

Slots. The benefits of strategic slot management. Richard Matthews Slot strategy & scheduling manager. 8 th March 2013

Melco International Development Limited (Incorporated in Hong Kong with limited liability) Website : (Stock Code : 200)

CATHAY PACIFIC AIRWAYS LIMITED (Incorporated in Hong Kong with limited liability) (Stock Code: 293)

9M 2018 RESULTS BOLOGNA, NOVEMBER 15 TH 2018

CATHAY PACIFIC AIRWAYS LIMITED (Incorporated in Hong Kong with limited liability) (Stock Code: 293)

CATHAY PACIFIC AIRWAYS LIMITED. Major Transaction Purchase of 30 Airbus A Aircraft

CATHAY PACIFIC AIRWAYS LIMITED. Major Transaction Purchase of 15 Airbus A Aircraft

CATHAY PACIFIC AIRWAYS LIMITED. Major Transaction Purchase of 10 Boeing ER Aircraft

CATHAY PACIFIC AIRWAYS LIMITED. Discloseable Transaction Purchase of 6 Airbus A Aircraft

CONNECTED TRANSACTION LOAN FACILITY TO KHOR AMBADO FREE ZONE COMPANY FZCO

2005 Q3 investor update. 25 August 2005

28 MARCH 2019 AIR NEW ZEALAND 2019 INTERIM RESULT

Qantas Airways Limited

9M 13 Results. October 31, M 13 Results.

AIRCRAFT SALES & ACQUISITIONS

Qantas Airways Limited Alan Joyce, CEO Qantas Airways. Macquarie Australia Conference 3 May 2013

HATTEN LAND LIMITED. Shaping the Future, Melaka and Beyond. FY2017 Results. Corporate Presentation 17 August 2017

Meeting the Management 2017 Structurally improving the financial profile. Michael Pontzen, CFO

LOS ANGELES INTERNATIONAL AIRPORT

Australian Site Tour Ravensthorpe Nickel Operation. Isak Buitendag General Manager

Tiger Airways Holdings Limited FY11 Results

Centurion Corporation Limited

H RESULTS BOLOGNA, SEPTEMBER 3 RD 2018

Passengers from Danish airports by arrivals at Spanish airports

Hock Lian Seng Holdings Limited

Launch of IPO of Aéroports de Paris

PRIVATE AIRCRAFT Ownership, Fractional, Jet Card or Charter?

Results Presentation 1H FY18

Revenue Recognition Implementation Issue 2.11 NOTICE

Corporate Presentation 2012/13 Interim Results

OTOC Limited (ASX:OTC) Investor Update Annual General Meeting 2012

Analyst and Investor Conference Call Q Ulrik Svensson, CFO and Member of the Executive Board

BHP Billiton: A Strategy of Diversification

FY 2018 RESULTS BOLOGNA, MARCH 15 TH 2019

2006 Interim Results. 03 May 2006

Saudi Aramco and LANXESS to form a global synthetic rubber powerhouse. Matthias Zachert, CEO Michael Pontzen, CFO

Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development

NORMAN DAY HSE TRAINER ADVISOR NEW STARTERS TRAVEL FROM PERTH TO GINBATA / MINE VILLAGE 25/02/2017

2014 IMS PRESENTATION

Air China Limited. Cathay Pacific Airways Limited

Transpacific Trade Our New Product as of April March 14, 2018

HATTEN LAND LIMITED. Shaping the Future, Melaka and Beyond. Corporate Presentation 12 October 2017

FY 13 Results. February 26, FY 13 Results.

HISPANIA FORMALIZES THE FIRST PHASE OF THE AGREEMENT WITH BARCELÓ AND ACQUIRES 80.5% OF BAY, WHICH HOLDS ASSETS WITH A VALUE OF 215 MILLION

Investor Update: Delta Marketing & Codeshare Agreement

GREENLAND HONG KONG HOLDINGS LIMITED

ANGLIAN WATER GREEN BOND

Saudi Aramco and LANXESS to form a global synthetic rubber powerhouse

1. THE COMPANY. In a short period of time, TOUCH COMPLEMENTS has strengthened the brand in the market, and right now has 30 units in Spain. p. 2 p.

Citigroup Investor Conference October 2010

Time Watch Investments Limited

Investor Meeting Presentation. 4 June 2014

Inca de Oro Copper-Gold Project and Carmen deposit sale process

Transcription:

Hacienda del Rosario. Seville. Business update H1 2018 land acquisitions and 2018-2020 deliveries visibility July 2018 1 2018 CORPORATE PRESENTATION

Disclaimer This document has been prepared by Aedas Homes, S.A. (the Company ) and comprises slides for a presentation to the market of the investment activity and a business update of the Company and its subsidiaries (the Group ) during the six month-period ended on 30 th of June 2018. For the purposes of this disclaimer, Presentation means this document, its contents or any part of it. This Presentation may not be copied, distributed, reproduced or passed on, directly or indirectly, in whole or in part, or disclosed by any recipient to any other person, for any purpose other than the above. The information contained in this Presentation does not purport to be comprehensive or to include all information that may be required to fully analyze the issues referred to therein. Accordingly, no representation or warranty, express or implied, is made as to the truth, accuracy or completeness of the information in this Presentation. None of the Company, any of its subsidiaries, or any of their respective directors, officers or employees accepts any responsibility or liability whatsoever for any loss howsoever arising from any use of this Presentation or otherwise arising in connection therewith. The information and opinions contained in this Presentation are provided as at the date of the Presentation and are subject to verification, correction, completion and change without notice. In giving this Presentation, no obligation to amend, correct or update this Presentation or to provide the recipient with access to any additional information that may arise in connection with it is undertaken. This Presentation may include forward-looking statements relating to, among others, the Company s financial position, operating results, strategy, plans, targets or goals. Forward-looking statements are subject to risks, uncertainties and factors beyond the Company s control that may result in actual results materially differing from prospective results or the results implied in the forward-looking statements. No undue reliance should be placed in such forward-looking statements. This Presentation does not constitute or form part of, and should not be construed as, any offer to sell or issue or invitation to purchase or subscribe for, or any solicitation of any offer to purchase or subscribe for, any securities of the Company in any jurisdiction, nor shall it or any part of it nor the fact of its distribution form the basis of, or be relied on in connection with, any contract or investment decision. Any purchase of or subscription for securities of the Company should be based solely on each investor s own analysis of all public information, the assessment of risk involved and its own determination of the suitability of any such investment. No reliance should be placed and no decision should be based on this Presentation. 2 2

Land acquisitions in H1 2018 Acquisition in H1 2018 / Total figures 100% Fully permitted land acquired in H1 2018 % Units 1,905 1 Units 182% 2018 Investment Target already overachieved 96.6 Mn Total land investment cost Ready to Build Fully Permitted Land 35% 65% Avg. Cost per unit 43k 81.1Mn 8k 15.5Mn 51k 96.6Mn Acquisition Avg. Cost per unit Expected Avg. Capex per unit to reach Ready to Build Investment Avg. Cost per Unit 1. Third party appraisal approach to estimate number of units may vary from company approach. Estimated number of units may vary in time due to differences between maximum land buildability and final product definition. Buildable surface remains constant 3 3

Land Acquisitions in H1 2018 - Map 16 bilateral deals sealed up to 1,905 housing units and 96.6 Mn that met our strict investment criteria Capacity of AEDAS s team to identify, negotiate and close off-market accretive opportunities H1 2018 Acquisitions Map % units H1 2018 Acquisitions Breakdown by Regional Offices Valencia Investment Avg. Cost per Unit Valladolid 55.5k Investment Avg. Cost per Unit Units acquired 55.9k 126 Units acquired 179 9% % Units Investment Avg. Cost per Unit Units acquired Madrid 69.1k 709 37% 7% 3 Andalucía 47% 1,905 Units Centre 47% Investment Avg. Cost per Unit Units acquired Seville 36.8k 372 20% 27% Investment Avg. Cost per Unit Granada 50.7k East & Mallorca 6% Units acquired 519 4 4

Deliveries visibility 2018-2020

2018 Expected Deliveries Total housing units 222 Completed 100% Sold 2 84% Project 1 Regional Office Municipality # Units Construction Status Occupational License Sold 2 Delivered Brisas del Arenal East & Mallorca Jávea 64 Completed Granted 48 19 Galera Sun Costa del Sol Estepona 32 3 Completed Granted 20 17 Hacienda del Mar II East & Mallorca Alicante 126 Completed Expected September 2018 119 0 Total 222 187 36 Galera Sun. Estepona. Brisas del Arenal. Jávea. Hacienda del Mar II. Alicante. (1) Projects may be moved backwards or forwards in terms of expected delivery dates for scheduling purposes (2) Sales = Reservations + Contracts + Deliveries (as of 30.06.2018) (3) Total of 48 units, 16 of which were delivered in 2017 6 6

2019 Expected Deliveries Total housing units 1,071 Under construction 100% Sold 2 68% Project 1 Regional Office Municipality # Housing Units Construction Progress Sold 2 Current expected deliveries Altos de la Reserva Boadilla del Monte 11 7 H2 Terraza Los Fresnos Boadilla del Monte 30 30 H1 Altos de Los Fresnos Boadilla del Monte 35 21 H2 Centre Escalonia Las Rozas 60 58 H2 Altos del Pilar 3 Madrid 60 50 H2 Ulloa I Alcorcón 54 51 H2 Tasman Sant Just Desvern 30 20 H1 Dampier Masnou 26 3 H2 Nou Eixample Mar Cataluña Vilanova i la Geltrú 88 87 H1 Humboldt Vilanova i la Geltrú 93 47 H2 Estronci 99 Hospitalet de Llobregat 55 53 H2 Vanian Green Village Estepona 72 31 H2 Costa del Sol Zagaleta 1 Benahavis 1 0 H1 Villas Arco Norte F1 Dos Hermanas 50 47 H1 Villas Arco Norte F2 Dos Hermanas 62 22 H2 Villas Arco Norte F3 Dos Hermanas 27 0 H2 Andalucía Ramón y Cajal Sevilla 54 18 H1 Jardines H. Rosario I Sevilla 79 66 H1 Jardines H. Rosario II Sevilla 63 29 H2 New Folies Andratx 41 21 H2 East & Mallorca Marina Real Denia 80 71 H2 Total 1,071 732 Varied since last disclosure (1) Projects may be moved backwards or forwards in terms of expected delivery dates for scheduling purposes (2) Sales = Reservations + Contracts + Deliveries (as of 30.06.2018) (3) This Project will be delivered over the period of two years, w/ total of 100 units: 60 in 2019 and 40 in 2020 7 7 0-25% 25-50% 50-75% 75-100%

2020 Expected Deliveries Total housing units 2,008 Under construction 11% Sold 2 26% License granted 16% License requested 80% License to be requested 4% Project 1 Regional Office Municipality # Units Construction License Status Sold 2 Zagaleta 2 Costa del Sol Benahavis 1 Granted Construction 0 Cabot Centre Madrid 28 Granted Construction 18 Carreres 10 East & Mallorca Valencia 59 Granted Construction 45 Doria 6 East & Mallorca Palma de Mallorca 40 Granted Construction 10 Altos del Pilar 3 Centre Madrid 40 Granted Construction 25 South Bay Costa del Sol Estepona 47 Granted Construction 35 Terraza Los Fresnos II Centre Boadilla del Monte 98 Granted Marketing 24 Mourelle East & Mallorca Calviá 20 Requested Marketing 0 Mesas Costa del Sol Estepona 30 Requested Marketing Pending 0 Bremond Son Moix East & Mallorca Palma de Mallorca 35 Requested Marketing 13 Tasman II Cataluña Sant Just Desvern 35 Requested Marketing 3 Orpí Cataluña Masnou 36 Requested Marketing 9 Piteas Centre Pozuelo de Alarcón 48 Requested Marketing 22 Forneri Cataluña Cambrils 48 Requested Marketing 1 Ulloa II Centre Alcorcón 54 Requested Marketing Pending 0 Fineo Centre San Sebastián de los Reyes 56 Requested Marketing 29 Eliza East & Mallorca Alicante 56 Requested Marketing Pending 0 Varied since last disclosure (1) Projects may be moved backwards or forwards in terms of expected delivery dates for scheduling purposes (2) Sales = Reservations + Contracts + Deliveries (as of 30.06.2018) (3) This Project will be delivered over the period of two years, w/ total of 100 units: 60 in 2019 and 40 in 2020 8 8

2020 Expected Deliveries Total housing units 2,008 Under construction 11% Sold 2 26% License granted 16% License requested 80% License to be requested 4% Project 1 Regional Office Municipality # Units Construction License Status Sold 2 Armstrong Cisneo (F1&F2) Andalucía Sevilla 120 Requested Marketing 35 Cook Cataluña Hospitalet de Llobregat 62 Requested Marketing 39 Estronci 93 Cataluña Hospitalet de Llobregat 71 Requested Marketing 21 Hevia F1 East & Mallorca Valencia 73 Requested Marketing 42 Hevia F2 East & Mallorca Valencia 73 Requested Marketing 0 Jardines H. Rosario F3 Andalucía Sevilla 79 Requested Marketing Pending 0 Marina Real II East & Mallorca Denia 80 Requested Marketing 5 Morillas Costa del Sol Málaga 82 Requested Marketing Pending 0 Middel Views Costa del Sol Fuengirola 84 Requested Marketing 41 Azara East & Mallorca Alicante 85 Requested Marketing Pending 0 J.Castellarnau (F1,F2&F3) Cataluña Sabadell 138 Requested Marketing 51 Lángara Centre Torrejón de Ardoz 100 Requested Marketing 9 Escalonia II Centre Las Rozas 150 Requested Marketing 41 Vanian 9 F1 Costa del Sol Estepona 29 Pending request Design 0 Bagaria Cataluña Cornella 51 Pending request Design 0 Total 2,008 518 Varied since last disclosure (1) Projects may be moved backwards or forwards in terms of expected delivery dates for scheduling purposes (2) Sales = Reservations + Contracts + Deliveries (as of 30.06.2018) 9 9

Closing Remarks 01 Competitive advantage in land sourcing Proven outstanding sourcing capabilities: 1. 182% of 2018 investment target overachieved 2. 16 bilateral deals sealed up to 1,905 housing units in H1 2018 3. C.100Mn invested since IPO (october 2017) +4 years visibility in the business plan allows us to focus on Fully Permitted plots with an opportunistic approach Deep in-house local knowledge and +8 years of micromarkets monitoring allow us to repeat the first mover advantage 02 Confirmation of target deliveries 100% 2018/2019 deliveries already launched and under construction 76% 2020 deliveries already launched and 11% under construction 10 10

Appendix 1: H1 2018 land acquisitions

Land acquisitions track record 100% Fully Permitted Land 1 // Where 90% Ready to Build 2 Land Acquisitions 3 Timeline (# of potential units) # Units 15.699 1.180 4.497 4.945 3.172 1.905 2014 2015 2016 2017 H1 2018 Accumulated 1. Land suitable for development where, at a minimum, the most specific land use planning has already been approved 2. Fully permitted land with all of the utilities and services required for urban land uses and Real Estate development in place. Residential building purchases would be subjected only to obtaining the relevant construction permits 3. Third party appraisal approach to estimate number of units may vary from company approach. Estimated number of units may vary in time due to differences between maximum land buildability and final product definition. Buildable surface remains constant 12 12

Land acquisitions 1 breakdown in H1 2018 H1 2018 Acquisitions Detail Regional Office Municipality Potential Housing Units (#) Acquisition Cost ( Mn) Acquisition Cost per unit ( /unit) Expected Capex to reach Ready to Build Status ( Mn) Total Land Investment per unit ( /unit) Acquisition Cost per Buildable Sqm ( /sqm) Total Land Investment per Buildable sqm ( /sqm) Centre Madrid 80 5.9 73,304 0 83,602 604 697 Centre Alcorcón 382 9.0 23,542 7.9 44,241 216 406 Centre Centre Villanueva del Pardillo Villanueva del Pardillo 193 10.7 55,198 1.9 65,042 512 603 54 4.0 73,781 0.5 83,602 615 697 Centre Valladolid 179 9.9 55,480 0 55,480 448 448 Andalucía Mairena del Aljarafe 267 9.5 35,405 0 35,405 275 275 Andalucía Bormujos 49 1.0 20,871 0.7 35,799 150 258 Andalucía Bormujos 32 0.9 27,329 0.5 41,618 201 307 Andalucía Bormujos 24 0.5 20,527 0.3 34,531 153 257 Andalucía Granada 276 11.7 42,386 2.5 51,487 320 389 Andalucía Granada 160 7.2 45,101 0.7 49,756 412 455 Andalucía Granada 83 3.8 46,407 0.4 50,901 440 482 East & Mallorca Valencia 126 7.0 55,907 0 55,907 458 458 1,905 81.1 42,561 15.5 50,694 356 424 1. # of projects do not represent same # of deals due to the existence of of multiple sellers 13 13

Appendix 2: Business Plan 2017-2023: Confirming Guidance

Business Plan 2017-2023: Confirming Guidance Sustainable Housing Development Plan (IPO Business Plan) # Units Target Launches Target Deliveries Launch Run Rate Delivery Run Rate 3.000 3.000 3.000 3.063 3.000 3.326 1,773 Units launched in 2017 2.580 2.438 1.748 2.042 1.986 1.055 0 231 2017 2018 2019 2020 2021 2022 2023 12 Units Delivered in 2017 15 15

16 FY 2017 RESULTS Villas Arco Norte. Dos Hermanas.