What is an Airport Master Plan?

Similar documents
AIRPORT MASTER PLAN UPDATE

BNA Master Plan Update Community Advisory Committee Meeting No. 5

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

BNA Master Plan Update Public Meeting No. 2

Addendum - Airport Development Alternatives (Chapter 6)

Chapter 4 Airport Facility Requirements

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

Fort Wayne International Airport Master Plan Study. Executive Summary

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Chapter 5 Airport Development Alternatives

Master Plan Update Technical Advisory Committee Meeting

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Lake Tahoe Airport Master Plan

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Birmingham Airport 2033

Master Plan Update Community Advisory Committee Kick-off Meeting

CHAPTER 1: INTRODUCTION

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Alternatives Analysis EXECUTIVE SUMMARY

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Punta Gorda Airport Master Plan Update

CHAPTER 1 EXECUTIVE SUMMARY

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

FORECASTING FUTURE ACTIVITY

Tampa International Airport Master Plan Update. December 12, 2012

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

STUDY WORK GROUP MEETING No. 3. November 29, 2016

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

Westover Metropolitan Airport Master Plan Update

Chapter 8.0 Implementation Plan

Public Information Meeting. September 2015

DRAFT MASTER PLAN UPDATE

Table of Contents. Overview Objectives Key Issues Process...1-3


Fort Lauderdale Hollywood International Airport

MASTER PLAN CONCEPT 1 DRAFT

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

CHAPTER 3 ALTERNATIVES CONSIDERED

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Study Committee Meeting. September 2015

Welcome to the Boise Airport Master Plan Update Open House

COMMERCIAL AND GENERAL AVIATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

8.0 AIRPORT LAYOUT PLANS

ENVISIONING AUSTIN s Airport of the Future

MONTROSE REGIONAL AIRPORT

Merritt Island Airport

Norfolk International Airport

Current and Forecast Demand

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

SouthwestFloridaInternational Airport

Collier County Airport Authority. Joint Automated Capital Improvement Program

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan

Grants Pass Airport Master Plan & Airport Layout Plan Update

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

General Aviation Master Plan Update

CHAPTER 4: ALTERNATIVES

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

Introduction DRAFT March 9, 2017

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

2012 AIRPORT MASTER PLAN 2016 ADDENDUM VOLUME 1 SUBMITTED ON: SEPTEMBER 22, 2017

The CLE Master Plan Includes:

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

Savannah / Hilton Head International Airport Master Plan Update

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

CHAPTER 5 - FACILITY REQUIREMENTS

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

Westshore Development Forum Presented by: Alice J. Price, AICP, Senior Project Director

Sunshine Coast Airport Master Plan September 2007

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19

AVIATION. MichiganReportCard.com 5

Blue Grass Airport (LEX) serves the needs of a multi-county area that

Yakima Air Terminal/McAllister Field Airport Master Plan Update

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Transcription:

What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential environmental and socioeconomic impacts. -FAA Advisory Circular 150/500-6B Airport Master Plans

Master Plan Process Investigative Solutions Implementation Inventory Forecasts Facility Requirements Development Alternatives Program Implementation Plan Master Plan Report Airport Layout Plan

Master Plan Goals PUBLIC IPUT GOAL Share findings and solicit input from stakeholders and general public during the Master Plan process STRATEGIC LAD MAAGEMET GOAL Promote highest and best land use SAFETY GOAL Conform to industry regulations and guidelines EVIROMETAL AWAREESS GOAL Further environmental awareness OPERATIOAL EFFICIECY GOAL Accommodate short-term (2020), intermediate-term (2025), and long-term (205) demand ECOOMIC GROWTH GOAL Facilitate regional economic growth through airport development and operation FISCAL SUSTAIABILITY GOAL Maintain fiscal sustainability

Tons Forecast of Aviation Activity Operations Enplanements 140,000 1,400,000 0,000 1,200,000 100,000 1,000,000 0,000 00,000 60,000 600,000 40,000 400,000 20,000 200,000 0 2015 2016 2020 2025 20 205 0 2015 2016 2020 2025 20 205 Total Commercial General aviation Military Total Operations Air Carrier Commuter Total Enplanements Cargo Volume Based Aircraft 10,000 160 9,000 140 0,000 100,000 6,000 0 60 40 5,000 4,000 2015 2016 2020 2025 20 205 20 0 2015 2016 2020 2025 20 205 Single Engine Multi Engine Jet Helicopter Total Based Aircraft

Airside Facility Requirements Taxiway Paved Shoulders Required All in W, E, SE Quadrants (exception Twy B and B) Additional precision instrument runway required Pavement Widths, OFAs, and Strength insufficient for ADG-III Required Runway Length =,00ft

Terminal Facility Requirements

Landside Requirements

GA, Cargo, and Support Requirements

Recommended Development Alternative Project List Airside 1 Runway 1-5 Extension GRAPHICAL SCALE 1400 00 0 1400 Feet 2 Taxiway D Upgrade to ADG-III ew Parallel Taxiway 4 Extension of Taxiway D 5 Relocated RTR 6 Relocated ASR ew MALSR ew Airside Perimeter Road 9 ew Jet A Fuel Farm TT-6 PULL 2WS 2 TT-6 PULL 2WS BCH BCH 1900C 1900C BCH 1900C BCH 1900C A0-600F 0F A0-60 0F A0-60 A0-600F A0-60 0F A0-600F A0-60 0F A0-600F TT-6 PULL 2WS TT-6 PULL 2WS 26 10 ew Remain-Over-ight (RO) Apron 1 Terminal Terminal Building Expansion 10 14 1 Landside 1 Curbside Reconfiguration 16 14 Expansion of Parking Garage 15 Expansion of Economy 1 and Cell Lot 16 Modification of Surface Lot 1 Relocation of Employee Lot 15 2 19 2 General Aviation 1 GA CBP FIS Facility 20 4 19 ew Apron 20 Realignment of Maygarden Road 21 ew GA Fuel Farm 22 Self-Serve AvGas Fueling Station 2 T-Hangar Expansion 24 Relocation of Helicopter Hardstand 25 ew Conventional Hangars 26 ew Access Road and Vehicle Parking Area 5 24 6 5 25c 19a 21 9 1 25b 19b 26b 26c 5 2 1 21 Legend Existing Property Line Future Property Line ASR Critical Area Runway Visibility Zone (RVZ) MALSR ew Airfield Pavement Expanded Airfield Pavement ew Facility Development ew Access Roads ew Vehicle Parking Area ew Airside Perimeter Road Runway Protection Zone (RPZ) Source: Pensacola International Airport, 200; RS&H, 201 Aeronautical Development ew Access Taxiway (ADG IV) 2 Potential Facility Site Potential Apron Site Potential Vehicle Parking Site on-aeronautical 1 Demolish Abandoned TRACO Building

Recommended Terminal Alternative LOWER LEVEL Legend Ticketing Public Circulation Baggage Handling Restrooms Baggage Claim Lobby Rental Car Lobby Rental Car Offices Support 0 50 100 Feet Source: Pensacola International Airport, 200; RS&H, 201

Recommended Terminal Alternative UPPER LEVEL Legend Holdroom Public Circulation Restrooms Concessions Office/Administration 0 50 100 Feet Source: Pensacola International Airport, 200; RS&H, 201

Terminal Recommended Development Alternative Project List Airside 10 ew Remain-Over-ight (RO) Apron GRAPHICAL SCALE 0' 1 150' 0 0' Feet 10 16 15 Terminal Terminal Building Expansion Landside 1 Curbside Reconfiguration 14 Expansion of Parking Garage 15 Expansion of Economy 1 and Cell Lot 16 Modification of Surface Lot 1 Relocation of Employee Lot on-aeronautical 1 Demolish Abandoned TRACO Building 1 14 Legend Existing Property Line Future Property Line ASR Critical Area Runway Visibility Zone (RVZ) MALSR ew Airfield Pavement Expanded Airfield Pavement ew Facility Development ew Access Roads ew Vehicle Parking Area ew Airside Perimeter Road Runway Protection Zone (RPZ) Source: Pensacola International Airport, 200; RS&H, 201

GA Recommended Development Alternative Project List Airside 1 Runway 1-5 Extension 2 GRAPHICAL SCALE 19 500' 250' 0 500' Feet 2 Taxiway D Upgrade to ADG-III ew Parallel Taxiway 5 Relocated RTR 6 Relocated ASR ew Airside Perimeter Road 2 General Aviation 1 GA CBP FIS Facility 20 19 ew Apron 20 Realignment of Maygarden Road 22 Self-Serve AvGas Fueling Station 2 T-Hangar Expansion 24 Relocation of Helicopter Hardstand 25 ew Conventional Hangars 26 ew Access Road and Vehicle Parking Area 6 5 H5 H Aeronautical Development ew Access Taxiway (ADG IV) H 24 H 19a H H 25c 2 Potential Facility Site Potential Apron Site Potential Vehicle Parking Site H 21 1 19b 25b 26b 26c 5 2 1 Legend Existing Property Line Future Property Line ASR Critical Area Runway Visibility Zone (RVZ) MALSR ew Airfield Pavement Expanded Airfield Pavement ew Facility Development ew Access Roads ew Vehicle Parking Area ew Airside Perimeter Road Runway Protection Zone (RPZ) Source: Pensacola International Airport, 200; RS&H, 201

Future Land Use Plan Legend Airport Surveilance Radar ASR Critical Area H E Runway Protection Zone SPA IS 9T AV Building Restriction Line H TR L LAG LEY AVE ew Taxiway ADG V TDG 6 ew Airfield Pavements Airport Property Boundary RTR Site RAC Service Facility ew MALSR Fuel Farm Airport Support MALSR I SCE Stormwater and Wetlands Airfield Pavement Removal C HW Passenger Terminal Area Y Airfield Aviation Development YO BA Maygarden Road Realignment Reserved Airport & th Development Taxiway D Extension ADG III TDG Commercial Fuel Farm TH AV E D LV UB Mixed-Use Development RTR Relocation Commercial Development ASR Critical Area ew Taxiway ADG V TDG 6 1000' Runway Extension TH GA Fuel Farm AVE Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CES/Airbus DS, USDA, USGS, AeroGRID, IG, and the GIS User Community Source: Esri Imagery, 201; RS&H, 201 0 1,000 Feet 2,000 º

Recommended Development Alternative Phasing 0-5 Years Future 1 Runway 1-5 Extension 2 0 ew Parallel Taxiway 19c ew Apron 5 Relocated RTR 2c T-Hangar Expansion ew MALSR 25c ew Airside Perimeter Road 26c 1400 TT-6 PULL 2WS BCH 1900C 1900C Expansion of Economy 1 and Cell Lot ew Jet A Fuel Farm 10 ew Remain-Over-ight (RO) Apron 2 Potential Facility Site Potential Apron Site 1 Curbside Reconfiguration Potential Vehicle Parking Site 1 Relocation of Employee Lot 1 Demolish Abandoned TRACO Building 1 GA CBP FIS Facility 9 BCH 15 ew Conventional Hangars ew Access Road and Vehicle Parking Area ew Access Taxiway (ADG IV) a TT-6 PULL 2WS BCH 1900C 1900C BCH A0-600F 0F Relocated ASR Taxiway D Upgrade to ADG-III Feet 00 6 2 GRAPHICAL SCALE 1400-20 Years Future A0-60 A0-60 0F A0-600F A0-60 0F A0-600F A0-60 0F A0-600F TT-6 PULL 2WS TT-6 PULL 2WS 2 1 10 14 19a 21 ew GA Fuel Farm 22 Self-Serve AvGas Fueling Station 2a 16 24 1 15 ew Apron b 1 T-Hangar Expansion Relocation of Helicopter Hardstand 2 19c 6-10 Years Future 4 Extension of Taxiway D 2a 2b 4 5 24 9 6 5 25c 19a a 22 1 25b 19b 26b 26c 2 5 1 21 b ew Airside Perimeter Road 14 Expansion of Parking Garage 16 Modification of Surface Lot 20 2c Legend Existing Property Line Future Property Line ASR Critical Area Runway Visibility Zone (RVZ) MALSR ew Airfield Pavement Expanded Airfield Pavement ew Facility Development ew Access Roads ew Vehicle Parking Area ew Airside Perimeter Road Runway Protection Zone (RPZ) # Airside Projects # Terminal Projects # Landside Projects # General Aviation Projects # Aeronautical Projects # on-aeronautical Projects Source: Pensacola International Airport, 200; RS&H, 201 19b 20 ew Apron Realignment of Maygarden Road 2b T-Hangar Expansion 25b ew Conventional Hangars ew Access Road and Vehicle Parking Area 26b

1 2 Terminal Alternative Phasing LOWER LEVEL 0-5 Years Future 1 2 Bag Claim Lobby Expansion Inbound Bag Room Relocation 10 1 6-10 Years Future Make-up Area Expansion - 20 Years Future 4 5 6 9 10 ew Holdrooms Expand and Relocate SSCP Existing Holdroom Expansion Post-Security Concessions Reconfigured Ticket Lobby orth Lobby Mezzanine Support Spaces Baggage Service Office Relocation 1 14 Public Circulation Rental Car Lobby Expansion Restroom Relocation ew Restroom UPPER LEVEL 9 4 Legend Holdroom Public Circulation Restrooms 6 Concessions Office/Administration 4 Ticketing 4 5 Baggage Handling Baggage Claim Lobby 14 Rental Car Lobby Rental Car Offices Support 0 5 150 Feet Source: Pensacola International Airport, 200; RS&H, 201