OUTLINE RESPONSE FROM WELWYN PLANNING & AMENITYGROUP (WPAG) TO CONSULTATION OVER PROPOSED EXPANSION OF LUTON AIRPORT

Similar documents
Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation

Response to the London Heathrow Airport Expansion Public Consultation

Strategic Transport Forum 21 st September 2018

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.

Heathrow Consultation January March 2018

Consultation by Luton BC on Planning Application for expansion of London Luton Airport (our ref: CB/13/00088/OAC)

SUSTAINABLE DEVELOPMENT PLAN 2015

6/28/11 TELEPHONE (n=400, RDD) AND ON-LINE (n=6,294) SURVEY RESULTS

The Mayor s draft The London Plan Consultation. Response from the Richmond Heathrow Campaign 2 March 2018

Lower Thames Crossing consultation response

Whangarei Airport. Prepared by Carine Andries 10/20173

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL

Questions inviting views and conclusions in respect of the three short-listed options

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

TfL Planning. 1. Question 1

Reducing traffic: a new plan for public transport

Major Scheme Business Case Summary Report for Programme Entry

Member-led Review of Cycling Infrastructure

Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report

EXHIBIT LIST. No Exhibit Name Page. 1 R391 HS2 Residents Charter.pdf (R391) R392 Response to Select Committee

Strategic Transport Forum

2018 General Aviation and Part 135 Activity Survey Large Fleet Form

Noise Action Plan Summary

Ground Transportation Strategy. Victoria Airport Authority

TERMINAL DEVELOPMENT PLAN

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

FUTURE AIRSPACE CHANGE

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

About ABTA. Executive summary

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018

CONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS A REVIEW OF SURFACE ACCESS. Response by Newcastle International Airport Ltd

Train Stations are not just arrival and departure locations

The Point Roundabout Improvement Scheme

WELCOME LONDON STANSTED AIRPORT. stanstedairport.com BUILDING FOR THE FUTURE

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

M621. Junctions 1 to 7 Improvement scheme. Share your views

Living on the edge: The impact of travel costs on low paid workers living in outer London executive summary. living on the edge 1

Classification: Public AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019)

CAA stakeholder engagement Draft airspace modernisation strategy

GATWICK AND WANDSWORTH

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

ECONOMY & SURFACE ACCESS SUMMARY LAND USE LAND USE SUSTAINABLE DEVELOPMENT PLAN 2016 DHL. manchesterairport.co.uk

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

UNLOCKING THE BRIGHTON MAINLINE

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

Liverpool John Lennon Airport Master Plan to Interim Consultation Summary October 2017

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

Istanbul Technical University Air Transportation Management, M.Sc. Program Aviation Economics and Financial Analysis Module 2 18 November 2013

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

TOWN TRUST. Bury St Edmunds Railway Station

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

THAMES GATEWAY BRIDGE INQUIRY ENDS

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED

The resignalling scheme

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Tandridge District Council s response to the Department for Transport s questions in its consultation on the Draft Aviation Policy Framework

South of England north-south connectivity

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

The decision on whether to take enforcement action falls outside the scope of delegated powers.

Queensland Tourism Aviation Blueprint to 2016

Edinburgh Airport Corporate Responsibility Report 2008

Plugging the greater Midlands region into global wealth

EAST SUSSEX AND GATWICK. THRIVING TOGETHER.

CAA consultation on its Environmental Programme

Airport Planning and Terminal Design

CAGNE Communities Against Gatwick Noise and Emissions

The Government s Aviation Strategy Transport for the North (TfN) response

Airport Master Plans

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

ECONOMIC REGULATION OF THE NEW RUNWAY AND CAPACITY EXPANSION AT HEATHROW AIRPORT: CONSULTATION ON CAA PRIORITIES AND TIMETABLE CAP 1510

Campaign Office Surrey RH6 OEP 31 January RESPONSE TO The Night Flight Restrictions Consultation 2017

Kent AND GATWICK. THRIVING TOGETHER.

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION

HEATHROW AIRSPACE AND FUTURE OPERATIONS CONSULTATION

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Liverpool John Lennon Airport Master Plan to Consultation Report February 2018

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

Cover story PROJECT RUNWAY

Section A: Scheme Summary

Performance monitoring report for first half of 2016

Airline Network Structures Dr. Peter Belobaba

2016 Regional Transportation Alternatives Program (TAP) Grant Application

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

Submission to NSW Koala Strategy Consultation Process. March 2017

The way we run our business The marketplace

Councillor Briefing on Elvetham Chase

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project.

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

Silvia Giulietti ETIS Conference Brussels An EEA reporting mechanism on tourism and environment and ETIS

Transcription:

OUTLINE RESPONSE FROM WELWYN PLANNING & AMENITYGROUP (WPAG) TO CONSULTATION OVER PROPOSED EPANSION OF LUTON AIRPORT This draft follows the format of the supplied response booklet. The contents have been discussed and agreed by the WPAG Committee and at our AGM of th July 208. Responses have been constrained to fit the free-test boxes in the booklet and some questions have been left unaddressed as they were not considered directly relevant to residents of Welwyn. The numbers in RED refer to the relevant paragraph in the Consultation Document. Qa Are you responding.? (Please tick one box) As an individual On behalf of an organisation or group Qb If you are responding on behalf of an organisation of a group? Which organisation do you represent Welwyn Planning & Amenity Group, established circa 962, Regd. Charity 272277 In what capacity are you responding Vice Chairman and Editor of the WPAG website www.wpag.org.uk Q2a Please tell us if you... (Please tick all that apply Work at London Luton Airport Have used London Luton Airport in the last 2 years Q2b Please tell us if you are currently affected by the operations of London Luton Airport? Most of the parish of Welwyn is located under LLA flightpaths and the community is subjected to excessive noise and pollution from over-flying aircraft, which is worsened at peak holiday travel times. The parish is located to the east of the airport, some -3 miles away (road distance) and 8-0 miles (straight line distance) and comprises the settlements of Welwyn Village, Digswell, Oaklands and Mardley Heath. Welwyn has inadequate access to LLA via the B656 minor road network and the frequently heavily congested A(M) Motorway, and on arrival passengers constantly experience chaotic LLA drop-off and Terminal transfer facilities. Sections of the B656 at Welwyn, Codicote and Langley, have extensive housing and industrial development plans which will exacerbate the access problems regardless of LLA expansion proposals.

Q3a To allow us to understand your priorities with regard to the potential benefits of the expansion proposals, how are the following to you? Please rank the following in order from to 7, where is the and 7 is the to you: (please tick one box per row and one box per column) Ability to attract new jobs and economic growth into the area Ability to support key local services through Luton Council Ability to support charitable and voluntary organisation services through LLA: Community Fund in areas impacted by airport operations Locally-convenient air travel to a greater range of destinations Ability to support growth of the UK economy Ability to contribute to meeting the increasing national demand for air travel Ability to maintain competitive charges for airlines and customers 2 3 4 5 6 7 Q3b Are there any other benefits you think we should be prioritising from the expansion of London Luton Airport? Expansion of LLA should be driven by National Air Travel demands and strategies, and NOT driven by perceived benefits to the local economy. There are no (local) economic benefits likely to accrue to Welwyn. Welwyn is unlikely to supply goods or services to the airport. There are no clear employment benefits for Welwyn as it is considered unlikely that many Welwyn residents will commute to work at LLA, and recruitment is more likely to be targeted at the Luton/Dunstable/Bedford conurbations. Welwyn will receive NO direct benefit from the Expansion Project at LLA. but on the contrary we will be exposed to more noise and pollution due to an increasing number of aircraft movements and extended times of take-off/landing; worsening local travel congestion with no improvements to passenger access; and no resultant local economic advantage. Q4a Do you agree that our expansion strategy to make the best use of the existing runway is more appropriate than pursuing an extended, realigned or second runway? (Please tick one box). Agree Disagree Don t know Please tell us more about the reasons for your answer to Q4a

Increasing and gaining better use of the existing facility will be cheaper and more ecologically friendly than taking even more space to expand, provided the intra-airport travelling is properly addressed. Q4b We think that development to the north side of the runway is the appropriate solution for making best use of the existing runway. Our proposal is therefore to focus on options to the north and to discontinue the southern option at this stage. Do you agree? Agree Disagree Don t know Please tell us more about the reasons for your answer to Q4b Minimises greenbelt footprint Q4c If development is taken forward to the north side we think a two terminal solution is appropriate. Do you agree? Agree Disagree Don t know Please tell us more about the reasons for your answer to Q4c Pedestrian movement within the current terminal is congested and awkward with multiple changes of level and poor walkways (i.e. no travellators for less able/elderly). There is inadequate seating in the single waiting area (fundamentally none, other than that provided for the restaurant/snack bar outlets) and when flights are delayed (which is common) passengers sit on the floor, including in the walkways to the gates, which is dangerous as well as uncomfortable. The current ventilation/air conditioning is appalling in of the waiting areas but especially near the gates, where one may have to wait for over 30 minutes. There are also inadequate toilet facilities near the gates. We do not want a second terminal which will exacerbate travelling between two terminals, with the inevitable gate changes. The priority should be to get the current terminal working properly with a serious redesign and without the changes in level, which makes manhandling carry-on cases difficult. Q5a We have identified the following key impacts which we consider particularly is the expansion. pp 52-74 Please rank the following in order from to 0, where is the and 0 is the to you: (please tick one box per row and one box per column) Earthworks and replacement public open space Noise Flightpaths 2 3 4 5 6 7 8 9 0

Surface access Air quality Landscape and visual Heritage Biodiversity Climate change Land ownership and acquisition Q5b Please tell us if there are any other key impacts you think we need to consider? Welwyn residents have no rail access to LLA and inevitably have to use taxi or own car drop-off or use airport parking. Currently, access to LLA from Welwyn on the B656 Welwyn/Hitchin corridor makes use of single-lane country roads which are increasingly over-loaded, narrow and winding. This presents dangers for all road users trying to access LLA, and the communities they pass through. Similarly, the B653 to/from Welwyn Garden City and the south east of the airport is equally inadequate with the added problem of periodic night-time fogs rising from the River Lea. The lack of an adequate access road network through Welwyn and neighbouring villages, is worsening as there are many scheduled housing developments along the B656 corridor for whom alternative access via the A(M) would not be a practical proposition. Also, congestion at the A(M) (Exit 6 North) Motorway regularly forces traffic to use Welwyn/Hitchin B656 corridor. The access roads close to the airport are congested with a three-way mix of local to Luton traffic, M commuter traffic for Luton itself, and LLA passenger traffic. There is a need for a comprehensive review and introduction of a traffic management plan as part of the LLA Expansion Project. Q5c We propose to take earth from the site to avoid the significant extra traffic burden on the local area. Do you have any comments on this proposal? Surely transporting earth will increase local traffic in the sort-term? Q5d When designing and constructing a replacement public open space, how would you prioritise the following? Please rank the following in order from to 8, where is the and 8 is the to you: (please tick one box per row and one box per column) Park Facilities Park outlook Natural habitats Sports and recreational facilities Quality of children s play areas Accessibility from the surrounding community Surfaced and/or accessible paths 9inc for disabled users Connections to other rights of way 2 3 4 5 6 7 8

Q5e Do you have any other priorities that a replacement public open space should provide, or any other comments relating to our approach to providing replacement public open space? Since Welwyn is some 0 miles away from the airport, any local space issues immediate to the airport are not applicable. Q5f We recognise that expansion could bring associated noise impacts. How often are you currently affected by the following sources of airport-related noise? (Please tick one box per row) Noise from arriving and departing aircraft Noise from aircraft on the ground Noise from increased road traffic Temporary noise during construction Frequently Occasionally Not at all Don t know Q5g We are considering a range of measures to mitigate noise impacts from future expansion. pp 56-59 Please rank the following in order from to 8, where would bring the benefit and 7 the benefit to you. (Please tick one box per row and one box per column) Restricting aircraft movements at night from 2330 to 0559 to the existing permitted limit Providing incentives for airlines to adopt quieter aircraft Optimising flight paths to mitigate the impact of noise from arriving and departing aircraft Reviewing the Noise Insulation Scheme which provided compensation for homeowners and businesses Improving use of space, reducing taxi time and queueing to reduce ground noise Using acoustic barriers to reduce ground and surface access noise Managing noise and vibration impacts during construction benefit 2 3 4 5 6 7 benefit Q5h Do you have any comments or suggestions about the above measures that we are proposing to take to address noise impacts? Welwyn s primary concern is noise and pollution from lower-flying aircraft immediately after take-off and on approach to land. Plans to increase volumes and frequency of flights adds to our concerns, along with the likely introduction of larger aircraft with lower climb rates, and associated increasing noise and pollution.

Q5i Do you agree with the key objectives of the surface access strategy, to.? pp 60-62 (Please tick one box for each objective) Promote greater use of public and sustainable modes of transport than currently achieved Identify possible improvements to the existing highway network before assessing if any new roads might be needed? Agree Disagree Don t know Q5j We will be assessing how we can provide access to an expanded airport by all modes of transport, with a focus on rail, bus, walking and cycling. Are there any particular initiatives you would like to see implemented to support improved access to the airport by public/sustainable transport? Consider the whole (i.e. expanded) airport when siting car parks. Current medium term is good and the drop-off/shuttle bus scheme is excellent. The pick-up/drop off near the terminal building involve a convoluted route and is expensive. Residents from our area will not use rail as there is no station near that line, are unlikely to walk or cycle due to distance and the need to carry luggage. Taxi or private car will be the primary methods, as now, but with all the associated access problems detailed in our response to Q5b above. Q5k We are assessing a number of locations on the highway network that may require improvement works to support expansion. Are there any particular locations you want to make sure we have considered? B653 along its whole length from Stanborough (Welwyn Garden City) to near Parkway station, but especially from Batford to East Hyde. The Route from the B653 from near Parkway station to the airport is congested with local traffic and traffic from the M to and from Luton. The B656 Welwyn/Hitchin corridor has many scheduled housing developments for whom alternative access via the A(M) would not be a practical proposition. Congestion at the A(M) (Exit 6 North) Motorway regularly forces traffic to use the Welwyn/Hitchin B656 corridor, and pressure should be brought to bear to improve traffic flows on the A(M). from Exit 6 (North) to Exit 8 Luton turn off. The access roads close to the airport are congested with a three-way mix of local to Luton traffic, M commuter traffic for Luton itself, and LLA passenger traffic. There is a need for a comprehensive review and introduction of a traffic management plan as part of the LLA Expansion Project.

Q5l Do you have any comments on the measures proposed to manage effects of expansion on air quality or other measures? pp 63-64 Q5l Do you have any comments on the measures proposed to manage landscape and visual effects of expansion or other measures? pp 65-66 Q5n Do you have any comments on the emerging strategy to preserve, understand and enhance public engagement with the historic environment? pp 67-70 Q5o Do you have any comments on how the impact on biodiversity should be minimised and where enhancement to the ecological environment should be sought? pp 7-72 Q6 Do you have any further comments about the proposals for expansion or about this consultation? pp7/72 In order to make meaningful comments, we believe that the next round of consultation (promised in 209) must include specimen proposals for flight volumes, flight take-off and landing patterns for larger aircraft, operating times, road traffic improvement and parking expansion.