and Forecast Review and Approval Process

Similar documents
ARP Forecast Review Critical Aircraft Data Sources

APPENDIX E AVIATION ACTIVITY FORECASTS

Welcome to the Boise Airport Master Plan Update Open House

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Merritt Island Airport

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Forecast and Overview

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Time-series methodologies Market share methodologies Socioeconomic methodologies

3. Aviation Activity Forecasts

Forecast of Aviation Activity

Westover Metropolitan Airport Master Plan Update

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Chapter 1 Introduction and Project Overview

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Creating a Clear Vision with your Airport Layout Plan

Chapter 1 Introduction and Project Overview

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Recommended Performance Measures

Alternatives. Introduction. Range of Alternatives

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION

Forecast Data specific to SDM... 6 Aviation Industry Trends Collection of Other Data... 12

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19

Airport Master Plan 1

Norfolk International Airport

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Austin-Bergstrom International Airport Master Plan Update


Chapter 2 FINDINGS & CONCLUSIONS

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.

Finance and Implementation

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

PUBLIC SCOPING MEETING APRIL 2018

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

AirportInfo. Airport Improvement Program

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Airport Planning at the. Local and National Levels. Presented to: ICAO Airport Planning Workshop for the SAM Region

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES

System Wide Modeling for the JPDO. Shahab Hasan, LMI Presented on behalf of Dr. Sherry Borener, JPDO EAD Director Nov. 16, 2006

Florida Department of Transportation Aviation Office GUIDEBOOK FOR AIRPORT MASTER PLANNING

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

TABLE OF CONTENTS CHAPTERS. INTRODUCTION... i CHAPTER ONE: FORECAST OF AVIATION DEMAND

Aviation Activity Forecasts

MONTROSE REGIONAL AIRPORT APRIL 12, 2016

Master Plan Update Community Advisory Committee Kick-off Meeting

Nantucket Memorial Airport Master Plan Update

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

THIRTEENTH AIR NAVIGATION CONFERENCE

Economic Impact of Aviation in Arizona

What is the ABIA 2040 Master Plan?

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. Ultimate Operations 5th Working Group Briefing 9/25/18

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY. Technical Committee Meeting #2 August 23, 2017

Master Planning AirTAP Fall Forum. Mike Louis, Dan Millenacker

MassDOT Aeronautics Division Capital Improvements Presentation

TXDOT AVIATION DIVISION

SECTION 5.0 FORECASTS OF AVIATION DEMAND

MEETING SUMMARY Page 1 of 4

AirportInfo. Aeronautical Revenue

Update on FAA Standard Operating Procedures (SOP)

SECTION 3 AVIATION ACTIVITY FORECASTS

agis a brief overview

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

APPENDIX E: MINORITY REPORT

Aviation Operating Administration/Executive

Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

CHAPTER 1 EXECUTIVE SUMMARY

Preface. Guidebook Overview

CONTENTS Preface Guidebook Overview Part 1 - Master Plans: Setting the Stage Airport Master Plans

Chapter 3: Aviation Forecasts

Collier County Airport Authority. Joint Automated Capital Improvement Program

1. Background and Proposed Action

CHAPTER 2 AVIATION ACTIVITY FORECAST

Lake Tahoe Airport Master Plan

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport

Yakima Air Terminal McAllister Field. Aviation Demand Forecast Workshop October 13, 2011

1.0 AIRPORT HISTORY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

TRB and ACRP Research Updates: Practical Application

Planning and Designing Airport Infrastructure to Support GPS and PBN Approach Development

SAN JOSE CAPITAL OF SILICON VALLEY

Quarterly Performance Measurement Report

CHAPTER 1: INTRODUCTION

Yakima Air Terminal/McAllister Field Airport Master Plan Update

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Transcription:

LONG BEACH, CALIFORNIA FAA Terminal Area Forecast (TAF) Overview and Forecast Review and Approval Process Paul Devoti Airport Planner Federal Aviation Administration paul.devoti@faa.gov 1

TAF Overview FAA Terminal Area Forecast Online database of airport specific forecasts Official FAA forecast by individual airport Published annually in late December by APO-100 (Forecasts and Performance Analysis Division) Unconstrained TAF Uses Air Traffic Controller Staffing Levels and Budgeting Airport and Capacity Planning NAS Development (Capital Investment Analysis, etc..) NextGen modeling and planning http://aspm.faa.gov/main/taf.asp

TAF Development Preparation of TAF is a year-long process APO-100 uses several different methodologies to prepare the airport forecasts in the Terminal Area Forecast. The airports are grouped into the following categories: OEP (35 OEP airports) Second Tier (roughly the remaining top 100 airports in terms of enplanements) Other FAA and Contract Towers Non FAA facilities

Historic Activity Enplanements, Operations, Based Aircraft Socioeconomic Data Income, Population, Employment Cost of Flying Yield, Fare Operational Factors TAF Development Forecast Inputs Seats per aircraft, Load Factors, Operations/Based Aircraft 4

Aviation Forecasts Airport sponsors generate aviation activity forecasts for use in defining scope and timing of airport development FAA is concerned with sponsor forecasts when used in FAA decision making, including: Key environmental issues (determination of Purpose and Need, noise, air quality, and land use analyses in an EA or EIS) Initial financial decisions including issuance of an LOI (Letter of Intent) and calculation of a BCA (Benefit Cost Analysis) Noise compatibility planning (Part 150) Approval of development on an airport layout plan (ALP)

FAA Review of Sponsor Forecasts Forecast approval always rests with FAA Airport District Office (ADO) / Regional Office. FAA Headquarters may, however, review and provide recommendations. Items that FAA looks for during review Forecast based on latest available data Realistic assumptions Appropriate methodologies Forecasts provide justification for planning and development recommendations Forecasts are consistent the FAA Terminal Area Forecast 6

Comparison with TAF For all classes of airports, forecasts for total enplanements, based aircraft, and total operations are considered consistent with the TAF when the meet the following criterion: Forecasts differ by less than 10 percent in the five-year forecast period Forecasts differ by less than 15 percent in the ten-year forecast period If the forecast is not consistent with the TAF, differences must be resolved if the forecast is to be used in FAA decision making Latest Guidance: Review and Approval of Aviation Forecasts, June 2008

FAA HQ Review Forecasts that require FAA Headquarters review are: Those inconsistent with the TAF, OR Forecasts for projects that are expected to require an EIS and/or BCA, even if the forecasts are consistent with the TAF. Exception- FAA Headquarters review is not required for forecasts at non-towered general aviation and reliever airports where: Five and ten-year forecasts do not exceed 200 based aircraft or 200,000 total annual operations, AND The related development is not expected to require an EIS and/or BCA

FAA HQ Review HQ Review May take up to 45 days and require coordination with APO-100, if necessary. Common Issues: Fiscal Year vs. Calendar Year Non revenue passengers and military charter passengers excluded from TAF New service unknown to APO-100 Letters of support/other documentation Goal: thorough sponsor forecast consistent with TAF (10%/15%)

Resources and Guidance FAA Terminal Area Forecast (TAF) http://aspm.faa.gov/main/taf.asp Review and Approval of Aviation Forecasts (FAA Airports Guidance) FAA Forecast Review Checklist (for HQ review) Forecasting Aviation Activity by Airport (APO Guidance) FAA Advisory Circular 150/5370-6B, Airport Master Plans (Ch. 7) http://www.faa.gov/airports/planning_capacity/media/approval _local_forecasts_2008.pdf http://www.faa.gov/airports/planning_capacity/media/request_ approval_local_forecasts_2008.pdf l l http://www.faa.gov/data_research/aviation_data_statistics/for ecasting/media/af1.doc http://www.faa.gov/airports/resources/advisory_circulars/medi a/150-5070-6b/150_5070_6b_chg1.pdf ACRP Synthesis Report 2 Airport http://onlinepubs.trb.org/onlinepubs/acrp/acrp_syn_002.pdf Aviation Activity Forecasting FAA Aerospace Forecasts http://www.faa.gov/data_research/aviation/aerospace_foreca sts/2010-2030/