Project Purpose: Project History and Status:

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Hurricane Manuel California

Puerto Logistico Aeropuerto Los Cabos

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

COPA NORTEAMERICA

Schedules of Customs Offices Via Cargo Area. CUSTOMS AGUA PRIETA Importation. From Monday to Friday 9:00 to 18:00 hrs. Saturday 9:00 to 11:00 hrs.

Itinerary for 3 day fly in gray whale trip Dates beginning Christmas week 2014 through April, 2015.

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Committed to Service Since 1986

Mexico's Baja Peninsula: What To Know Before You Go (Publishing Chapbooks Book 6) [Kindle Edition] By Mikel Miller

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Circuit Reliability Review

Circuit Reliability Review

Electric System Serving Pierce County Current system and future investments

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

SEA LEVEL MEASUREMENTS IN MEXICO Report to the XI GLOSS group of experts May 2009

THE TOP DESTINATION OF THE AUTOMOTIVE INDUSTRY IN CENTRAL MEXICO

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Tohoku Pacific Ocean Earthquake: Current Status and Restoration Plan

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Holistic Area-wide Approach for Successfully Managing Citrus Greening (Huanglongbing) in Mexico

COMPETITIVE ADVANTAGES

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Service and Professionalism

Lifelines. Mexico Earthquake Reconnaissance Briefing. Erica C. Fischer, Ph.D., P.E. Oregon State University. Erica Fischer, Oregon State University

Circuit Reliability Review

Planning Resilient Transmission Networks in Chile

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Contributing to Mexico s development for more than 50 years. Morelia Michoacán. Corporate Office Ciudad de México

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Large Disturbances During 2014 in Power System of Serbia

Circuit Reliability Review

As per NHC advisory positions, this was very close to the cyclone s track less than 3 n mi E of NEWTON s center (at its point of closest approach).

Terramar Security Report February 2011

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Applying Geospatial Tools to Produce Data for SDG Indicators in Mexico

HISTORICAL CHANGES OF GRAY WHALES ABUNDANCE IN SAN IGNACIO AND OJO DE LIEBRE BREEDING LAGOONS, MEXICO.

PROSPECCIÓN ARQUEOLÓGICA A TRAVÉS DE LIDAR Y ORTOFOTOGRAMETRIA EN EL TAJÍN, VERACRUZ

Circuit Reliability Review

Circuit Reliability Review

1. Universidad Nacional Autónoma de México 2. Centro de Investigación Científica y de Educación Superior de Ensenada

Circuit Reliability Review

Circuit Reliability Review

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via

Projected Supply and Demand for Natural Gas over the next 10 years and Plans for Major LNG Receiving Terminals March 11, 2003 Houston, Texas

Meredith Castillo, Engineer Jorge Socías, Engineer Gabriel Gómez, Architect. Francis Calcagno, Industrial Engineer

This is an official document, if any discrepancies found in the content please contact Gran Vision Design team. T A Carretera

FROM MEXICO TO THE WORLD BUSINESS CENTER PRODUCTS EXHIBITION. Conferences. Cultural Events. Workshops FREE ENTRANCE

Circuit Reliability Review

4A District 32. Offensive MVP Name Jersey School Class Isaias Martinez 9 Edcouch-Elsa 12 Co-MVP Santos Villarreal 1 Veterans 10 Co-MVP

Seawater Desalination Plant Cabo San Lucas, B.C.S., Mexico

Transcription:

Hurricane Odile La Paz - Los Cabos, BCS ENG. CLAUDIO AIBAR SÁNCHEZ claudio.aibar@cfe.gob.mx ENG. MIGUEL NAVARRO VALLE miguel.navarro01@cfe.gob.mx ENG. JULIO PRECIADO LÓPEZ julio.preciado@cfe.gob.mx 2015 PLS-CADD Advanced Trainning and user group meeting Monona Terrace Convention Center, Madison, WI June 2-4, 2015

Índex 1.- BACKGROUND 2.- STRUCTURES LOCATION 3.- THE IMPORTANCE OF PLS-CADD 4.- ACTIVITY REPORTS 5.- PHOTOGRAPHIC REPORT. 6.- ACTUALMENTE Coordination of Transmission and Transformation Projects 2

1.- Background Coordination of Transmission and Transformation Projects 3

1.- Background Incidence of hurricanes in the Pacific Ocean in the period 1949 2004 Fuente: www.cna.gob.mx Coordination of Transmission and Transformation Projects 4

1.- Background Hurricanes that hit Baja California Sur in the last 20 years 1995 1997 1996 1998 Fuente: www.cna.gob.mx Coordination of Transmission and Transformation Projects 5

1.- Background Hurricanes that hit Baja California Sur in the last 20 years 1999 2003 2001 2004 Fuente: www.cna.gob.mx Coordination of Transmission and Transformation Projects 6

1.- Background Hurricanes that hit Baja California Sur in the last 20 years 2006 2009 2007 2010 Fuente: www.cna.gob.mx Coordination of Transmission and Transformation Projects 7

1.- Background On September 7th 2014, was detected through the System of Early Response to Impacts of Hurricanes (SIRETIH), the formation of an atmospheric disturbance with potential to become the fifteenth tropical cyclone in eastern Pacific waters about 785 km south of Acapulco in Guerrero state, on September 10th was formed as a tropical depression "Odile" 415 km south of Port of Lazaro Cardenas, Michoacan with a parallel shift to the west coast of Mexico, becoming a Category 1 hurricane off the coast of Manzanillo, Colima on 13th September. During the September 14th he maintained its direction towards the Baja California Peninsula, registering a maximum intensity of 4 hurricane with winds up to 222 km / hr. Coordination of Transmission and Transformation Projects 8

1.- Background On Sunday September 14, 2014, at approximately 21:45 pm local time, the hurricane "Odile" hit the Baja California peninsula near Cabo San Lucas with Category 3 intensity on the Saffir-Simpson scale, with sustained winds 205 km / hr. The radius of hurricane-force winds extended up to 85 km from the center and tropical storm force winds reached 295 km. Coordination of Transmission and Transformation Projects 9

1.- Background Coordination of Transmission and Transformation Projects 10

1.- Background Date Ubicación de Odile Gráfico 14-Sept Huracán de categoría III en la escala de Saffir- Simpson, se localizó a 145 km al sureste de Cabo San Lucas, Baja California Sur, tiene movimiento hacia el nor-noroeste a 26 km/hr, vientos máximos sostenidos de 205 km/hr y rachas de hasta 250 km/hr. 15-Sept Huracán de categoría II se ubicó en tierra, a las 07:00 horas, tiempo del centro del país, a 40 km al estenoreste de Santa Fe, Baja California Sur, y a 60 km al oeste de La Paz, Baja California Sur; registra vientos máximos sostenidos de 175 km/hr, rachas de hasta 195 km/hr y desplazamiento a 26 km/hr hacia el nornoroeste. Coordination of Transmission and Transformation Projects 11

2.- Structures Location Coordination of Transmission and Transformation Projects 12

2.- Structures Location The amount of damaged structures from steel towers, poles and structures formed by pole woods, amounted to 534 of which 481 suffered total damage and 53 other structures were possible to repair. With this stay the entire grid of power transmission at high voltage (115 kv circuits 27 and two 230 kv circuits) out of service from the Las Pilas switching substation, located approximately 120 km north of the city La Paz to the substation Los Cabos near Cabo San Lucas, knocking out the power supply to the municipalities of La Paz and Los Cabos. Zona Las Pilas Zona La Paz Zona La Paz Zona Los Cabos Zona Los Cabos Coordination of Transmission and Transformation Projects 13

2.- Structures Location Zona Las Pilas Coordination of Transmission and Transformation Projects 14

2.- Structures Location Zona La Paz Coordination of Transmission and Transformation Projects 15

2.- Structures Location Zona Los cabos Coordination of Transmission and Transformation Projects 16

2.- Structures Location Cantidades de estructuras de reconstrucción definitiva Coordination of Transmission and Transformation Projects 17

3.- The Importance of PLS-CADD Coordination of Transmission and Transformation Projects 18

ENGINEERING COORDINADORES - Miguel Navarro Valle - Claudio Aibar Sánchez PROYECTISTAS Recursos Humanos - David Delgadillo Rodríguez - Rodolfo Huitrón Hernández - Daniel Juárez Razo - Juan Pablo Gómez Olivera - Ezequiel Vara Arres - José Agustín Alcántara Hernández - Luis A. Villegas Montenegro - Edgar HUMAN RESOURCES TOPOGRAPHY GRUPO TOPOGRAFÍA 1 Recursos Humanos - Almanza - Manuel León Equipo - 2 Estaciones Totales - 1 GPS GRUPO TOPOGRAFÍA 2 Recursos Humanos - Manuel Falcón Alarcón Equipo - 1 Estación Total - 1 GPS GRUPO TOPOGRAFÍA 3 (RRC OCC) Recursos Humanos - Sergio Isaías Medellín - Félix Castillo Ochoa Equipo - 1 Estación Total - 1 GPS GRUPO TOPOGRAFÍA 4 Recursos Humanos - César Alquisira Luna Equipo - 1 Estación Total - 1 GPS GRUPO TOPOGRAFÍA 5 Recursos Humanos - Miguel A. Castro Favela Equipo - 1 Estación Total Subdirección de Proyectos y Construcción Coordinación de Proyectos de Transmisión y Transformación Coordination of Transmission and Transformation Projects

3.- The importance of PLS-CADD Given the magnitude of the damage caused by Hurricane Odile, the participation of engineering group CFE was fundamental to restore fast as we could. [1] 100% of the structures installed in the final draft were analyzed with PLS, PLS Pole and Tower. [2] The electromechanical project was conceived with criteria considering civil and electromechanical engineering to increase the reliability of the national power grid in the area of Baja California Sur PLS-CADD tool. 23 projects were carried out for a month with ten combo licenses of PLS-CADD. [3] In a period of three months 448 structures and their foundations were installed. [4] The importance of the use and management software allowed an immediate response to develop projects efficiently and reliable. Coordination of Transmission and Transformation Projects 20

3.- The importance of PLS-CADD Engineering criteria applied in the final restoration [1] Project considered in the electromechanical wind pressures up to 180 km/hr [2] Install dead end structures in tangent each 2.0 km [3] Not very tall structures [4] Anti hurricane devices stubs to restore the structures using the existing foundations. [5] In structures in cross rivers and streams foundations were constructed based batteries girders league. Coordination of Transmission and Transformation Projects 21

4.- Activity Report Coordination of Transmission and Transformation Projects 22

4.- Activity Report Given the magnitude of the damage caused by Hurricane Odile, the participation of all CFE area was required to temporarily restore the electricity service to the people of Baja California Sur. Generating plants emergency were installed by the production area was coordinated with the area of energy supply fuel for them, the range was concentrated on repairing the medium voltage network and reconnection of services and the area transmission (supported construction) focused on the assembly of temporary structures for reconnection of the high voltage network. Coordination of Transmission and Transformation Projects, was in charge of the process of final reconstruction of the infrastructure of high voltage transmission affected by Hurricane Odile in Baja California. Coordination of Transmission and Transformation Projects 23

4.- Activity Report For the final reconstruction installation of 508 structures were designed, this represents rehabilitate access roads to the 508 structures, dismantling 4442 tons of collapsed buildings, digging 5790 m3 by 1880 foundations, placing 690 tons of reinforcing steel for foundations, strain 5502 m3 concrete for foundations, build and assemble 3813 tons of structural steel and build about 700 km of cable conductor, 190 km of guard cable and 300 km of optical fiber. To the above, we had the support of 12 contractors and 3 service providers with a human resource of 1167 workers and 382 units of machinery and equipment, while the part of CFE a team deployed to site 174 co of the 6 regional residences and national offices as well as 62 vehicles and 32 specialized equipment. Coordination of Transmission and Transformation Projects 24

5.- Photografic Report Coordination of Transmission and Transformation Projects 25

5.- Photografic Report Equipment Coordination of Transmission and Transformation Projects 26

5.- Photografic Report Damage Verification Coordination of Transmission and Transformation Projects 27

5.- Photografic Report Removing structures Coordination of Transmission and Transformation Projects 28

5.- Photografic Report Provisional structures Coordination of Transmission and Transformation Projects 29

5.- Photografic Report Road acces Coordination of Transmission and Transformation Projects 30

5.- Photografic Report Projects Engineer Coordination of Transmission and Transformation Projects 31

5.- Photografic Report Meetings Coordination of Transmission and Transformation Projects 32

5.- Photografic Report Locating structures Coordination of Transmission and Transformation Projects 33

5.- Photografic Report Digging foundations Coordination of Transmission and Transformation Projects 34

5.- Photografic Report Foundations Coordination of Transmission and Transformation Projects 35

5.- Photografic Report concrete for foundations Coordination of Transmission and Transformation Projects 36

5.- Photografic Report Assembling structures Coordination of Transmission and Transformation Projects 37

5.- Photografic Report Assembling structures Coordination of Transmission and Transformation Projects 38

5.- Photografic Report Insulators and conductors Coordination of Transmission and Transformation Projects 39

5.- Photografic Report Conductor instalation Coordination of Transmission and Transformation Projects 40

5.- Photografic Report Removing provisional structures Coordination of Transmission and Transformation Projects 41

5.- Photografic Report Transmission Line rebuilt Coordination of Transmission and Transformation Projects 42

6.- Currently Coordination of Transmission and Transformation Projects 43

6.- Actualmente Huracán Blanca, categoría IV Impact at 7th june Coordination of Transmission and Transformation Projects 44